517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP
“Learning through Innovative management
concepts to ensure transfer of Knowledge of
Elderly people” – LIKE
3rd Project Meeting
Santander, 26th-27th November 2012
Dimitris Raftopoulos - Project Coordinator
517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP
Meeting Agenda
• Overall Status Update
• WP.1: Project Management
• WP.3: Developing Business Concepts for Age Management &
Investment in the HR Sector
• WP.5: Quality Assurance
• WP.6: Awareness raising activities
• WP.7: Dissemination of results
• Next Steps
517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP
517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP
Projects’ Action Plan
• Implementation Methodology – PMI Project Life Cycle
• WP1 - Project Management | Lead: 3LRI
• WP2 - Defining Ageing and Employment Trends in EU | Lead: University
of Social Sciences
• WP3 - Developing Business Concepts for Age Management & Investment
in the HR sector | Lead: UoS
• WP4 - Pilot Projects | Lead: FU-Uppsala
• WP5 - Quality Assurance | Lead: 3LRI
• WP6 - Awareness raising activities | Lead: Documenta
• WP7 - Dissemination of Results | Lead: 3LRI
• WP8 - Mainstreaming and results exploitation | Lead: 3LRI
517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP
WP.1 Project
Management
1.2 Web-based system
1.4 Progress reports & List of
Indicators
517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP
WP.3: Developing Business
Concepts for Age Management
& Investment in the HR Sector
University of Strathclyde
517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP
WP.3: Developing Business Concepts for Age
Management & Investment in the HR Sector
• 3.1 Designing model for
enterprises on age management:
Uni. of Strathclyde
• 3.2 Guide for management
optimisation performance: Uni. Of
Social Sciences
• 3.3 Development of measurable
performance indicators: FU-
Uppsala
• 3.4 Analysis of older workforce
work traits: Documenta
517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP
WP.3-Act.3.1-3.2
Activity 3.1: Designing model for enterprises on age management
• Focus on the development of innovative business concepts related to age management processes. To this end, a study
will be conducted to design a model for enterprises on introducing age management concepts, flexible working
arrangements and succession management, using the finding of the report already elaborated in WP2.
• Duration: M15, 1 month
• Budget: 13.627,00€
• The 40 pages report will be firstly available in English and in electronic version and then translated in Greek,
Spanish, Polish and Swedish
Activity 3.2: Guide for management optimisation performance
• The above guide will cross examine the management systems currently deployed in the companies of the EU with
those suggested in the first action of WP3 and will lead to the development of a methodological guide which will
point what actions need to be taken in order to optimize the performance of management systems used in the EU
market.
• Duration: M17, 1 month
• Budget: 2.674,00€
• The 40 pages report will be available in English
517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP
WP.3-Act.3.3-3.4
Activity 3.3: Development of measurable performance indicators
• In order to examine the effectiveness of the proposed systems, a guide will be elaborated stating the measurable
performance indicators that are needed in order to estimate the effectiveness of the management concepts. This will
offer the opportunity for perfective maintenance actions as well as identification of further needed actions that need
to be taken.
• Duration: M19, 1 month
• Budget: 7.797,00€
• The 40 pages report will be available in English
Activity 3.4: Analysis of older workforce work traits
• An analysis of the work traits of the aged workforce (strengths and weaknesses) will be conducted in order to
identify the EU labour market employment opportunities for the aged workforce. The SWOT analysis will be
conducted under the perspective of the “new skills for new jobs report”, thus the findings of it will point the set of
questions needed to be asked so to start transforming older workers to become more productive again for their
companies/ organizations.
• Duration: Μ20, 1 month
• Budget: 7.785,00€
• The 40 pages report will be available in English and then translated in Greek, Spanish, Polish and Swedish
517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP
WP.3-Act.3.5
Activity 3.5: Employment opportunities for older workers
• Employment opportunities will be the results of the previous report and will be
examined in relation to the EQF system along with the national qualifications systems.
The aim of the report is to examine how to adapt the approach of potential
employment opportunities for aged personnel to the local labour market. The report
will examine how the different levels of the professional framework systems can become
the starting point for changing the perception towards aged personnel and their skills.
It will also demonstrate the required actions in terms of training issues for older
workers.
• Duration: Μ22, 1 month
• Budget: 6.944,00€
• The 40 pages report will be available in English
517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP
517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP
WP.5: Quality
Assurance
3L Research Institute
517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP
5.2: Methodological Guide for WP
“Developing Business Concepts for Age
Management & Investment in the HR
sector”: Univ. of Strathclyde
5.5: Evaluation of the results of
the project: Uni. Of Social
Sciences & 3L Research Institute
517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP
WP.5-Act.5.2
• 5.2: Methodological Guide for WP “Developing Business Concepts for Age
Management & Investment in the HR sector”
• Status Update by University of Strathclyde
• Responsible PP: UoS
• 5.5: Evaluation of the results of the project
• Status Update by 3L Research Institute
• Responsible PP: 3L Research Institute
517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP
Act. 5.5: External
Evaluation of the results
of the project
University of Social Sciences
517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP
• Role of the evaluator
• Stages of the project evaluation
• Types of evaluation
• Project evaluation + quality next steps
• Available tools for evaluation for the project
Contents
517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP
The evaluator must:
• Set the context for open discussion on project performance
• Identify strengths & weaknesses, obstacles to progress
• Make recommendations to continue, modify, and/or delete
• Assures and improves the quality of the project and project outcomes and of other actors
• pursues a culture of quality assurance
• Helps quantifying results
• Predicts how the project activities will develop
• Reduces the work of the Final Report
Role of the evaluator
517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP
• Start after the project approval
• Make a logical schedule
• Choose evaluation tools carefully structured and make
indicators clear
Stages of the project evaluation
517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP
• Use the evidence to implement changes
• Analyse results -if possible at a project meeting
1. What does this mean for the project?
2. What should we do next?
3. How will we manage changes to the project’s workplan?
• Draw attention to the positives as well as challenges
• Adapt: workplan, activities, communication platforms, management,
budgets
• Inform everyone involved -try not to impose!
• Record all reasons for the changes
Stages of the project evaluation
517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP
• Internal Evaluation: performed by staff of partnership
members, preferably directly involved in the project work
• External Evaluation: performed by an expert not attached to
any of the partnership members, who has no other task in
the project
Types of the evaluation 1/2
517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP
Planning
Evaluation
Inception Report &
a Quality A2 Plan
Formative
Evaluation
Progress Reports &
Quality Assurance Recommendations
Summative
Evaluation
Impact Reports &
Quality Assessment
Types of Evaluation 2/2
517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP
Planningevaluation
• Send a questionnaire to
all the participants before
the event to assess their
expectations
Formativeevaluation
• Enable the participants
to reflect on the progress
of the event (e.g.
training, meeting,
seminar) while it is
taking place (e.g. through
reflective diaries,
individual interviews,
post-it notes stuck on a
wall, etc.)
Summativeevaluation
• Gather final evaluative
information at the end of
the event, discuss it, use
to improve the next
event
Examples types of evaluation
517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP
• What can we say about the object in our hands?
1. who will be responsible for evaluation across the partnership
2. agree on the priorities for evaluation
1. What are we going to evaluate?
2. The processes of the project?
3. The outputs of the project?
4. The outcomes of the project?
3. What tools we are going to use for all 3 types of evaluation
Evaluation Quality next steps
517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP
Evaluation Plan & Quality Indicators
517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP
Evaluation Plan & Quality Indicators
517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP
WP.6: Awareness
Raising Activities
Documenta
517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP
WP.6: Awareness Raising Activities
• 6.1 Workshops for the age
management concept
benefits
• 6.2 Sensitizing
entrepreneurs
• 6.3 Seminars addressing HR
managers
• 6.4 Sensitizing the aged
workforce
Employers Employees
Entrepreneurs Managers
Local Society Stakeholders
517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP
WP.6-Act.6.1
Activity 6.1: Awareness raising activities
• The five workshops (one per country) will involve local public and private actors, enterprises
employees, customers, suppliers, employers and the community and will discuss as well as
examine the benefits enterprises could have from the proposed strategies. It will reveal the
strengths of aged work force and at the same time will demonstrate how enterprises can be
prepared to face the “demographic bomb issue”. Invited speakers, expert on their fields, will
elaborate on Age management concepts.
• The target groups will be targeted by the partners through the general promotion of the
project and directly by communicating with national and local stakeholders, through
meetings, emails and phone calls in order to catch a minimum of 20 participants per
workshop.
• These workshops will last half a day and will be organised by each partner in each
participating country, adapting the content to their language, their specific working
conditions, labour market needs and specificities of the attendants.
• Duration: M10-M12, 3 months
• Budget: 29.706,00€
517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP
Lunch
517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP
WP.6-Act.6.2-6.3
Activity 6.2: Sensitising entrepreneurs
• Project partners will visit each other’s area and will visit businesses that operate with aged work force and have successful
results, for exchanging experience. PPs will discuss with the personnel and owners, gaining valuable experience and know–how
that they could bring back to their organizations as well as countries. Local business people will be part as well of the study
tours.
• These study tours (5 in total, one per country), will last one day and will take place together with the project meetings, in
order to save time and money from travelling.
• Duration: M2, M9, M15, M21, M27, 5 months
• Budget: 2.500,00€ (included in 6.1)
Activity 6.3: Seminars addressing HR managers
• There will be organized 5 seminars, one in each different participating country, addressing to Human Resources Managers for
implementing decisions on staff recruitment, retention and redundancy in view of the formulated Age Management Concepts.
The proposed issues will be deriving from the reports already elaborated in the context of the project.
• Catch a minimum of 20 participants per seminar.
• These seminars will last half a day and will be organised by each partner in each participating country, adapting the content to
their language, their specific labour market needs and conditions and specificities of the attendants.
• Duration: M18-M22, 5 months
• Budget: 1.700,00€ (included in 6.1)
517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP
WP.6-Act.6.4
Activity 6.4: Sensitising the aged workforce
• In parallel with the seminars organized focusing in HR managers, another 5 will be organized,
addressing to aged workforce and Unemployed aged 50+, with special focus on sensitive social
groups. It will explain the strengths they have as well as the skills that they need to gain, in
order to remain competitive in the labour market they operate and even in the EU market.
• Catch a minimum of 20 participants per seminar
• These seminars will last half a day and will be organised by each partner in each participating
country, adapting the content to their language, their specific labour market needs and
conditions and specificities of the attendants.
• Duration: M18-M22, 5 months
• Budget: 1.700,00 € (included in 6.1)
517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP
WP.7: Dissemination of
results
3L Research Institute
517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP
517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP
WP.7: Dissemination of results
Publicity campaign
• Dissemination of events
• Press campaign
• Logo
• Posters
Publicity campaign
• Information and
Sensitisation brochures
• Electronic Newsletters
517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP
WP.7-Act.7.2
Activity 7.2: Publicity campaign – Information and Sensitisation
brochures
Four brochures of 4pages will be produced, in the following languages: EN, ES, EL, SE, PL
• one presenting the project
• one sensitising the aged workforce
• one sensitizing enterprises and
• one presenting the project results
• The Lead Partner of the Work Package will create a common layout (with the approbation of all partners),
including a project logo, to be used in all brochures and overall material, and a common text, but each
partner will adapt the text to local conditions, needs and specificities
• Each brochure (A5) will be printed in 1000 items per country
• Duration: M3, M7, M33, 3 months
• Budget: 11.300,00€
517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP
WP.7-Act.7.3
Activity 7.3: Publicity campaign – Dissemination of events
• For each event organised (workshops, seminars, conference), each partner will produce and
diffuse flyers and posters to disseminate the event in order to ensure the largest possible
participation.
• This means that 6 different flyers and 6 different posters will be produced in each language.
Each flyer (A5) will be printed in 200 items, each poster (A3) in 20 items.
• The Lead Partner of the Work Package will create a common layout (with the approbation of
all partners), to be used in for flyers and posters, and a common text, but each partner will
adapt the text to local conditions, needs and specificities.
• This dissemination will be done in an electronic way as well.
• Duration: M9, M17, M26, M28-29, 5 months
• Budget: 1.900,00€ (included in 7.1)
517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP
WP.7-Act.7.4
Activity 7.4: Publicity campaign – Electronic Newsletters
• 6 newsletters on the employability of the aged workforce and presenting the project
evolution and outputs during the project lifetime will be sent electronically, which will
be used to promote the main Project initiatives, to inform the operators of interested
sectors on the project implementation, the activity phases still in progress, the
possibilities and modalities of participation, to sensitize the population towards the
thematic at the focus of the debate, to spread the results obtained by the Project.
• The Lead Partner will have the overall coordination of the activity, but all partners will
participate in the drafting of the newsletter and in its dissemination to all relevant EU,
national, regional and local actors, not only within the 5 participating countries but
also in other European countries, to ensure the largest possible dissemination.
• Duration: M3, M9, M15, M21, M27, M33, 6 months
• Budget: (included in 7.1)
517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP
WP.7-Act.7.5
Activity 7.5: Press campaign
• The project will be presented to local actors and local press by each partner during a press-conference
presenting the project and addressing specific issues relevant to the project theme and the local conditions.
Each partner will decide on when organising the press-conference, in order to choose the most appropriate
moment for a more effective and positive event (e.g. before an important event).
• During the press-conferences, folders will be distributed to the journalists with information about the
project, the programme, the transnational actions and the local actions and added value of the project.
• Regional press-releases will inform target groups about the project and the organised events and will be
issued after the press-conference and more often if possible.
• Project partners will launch a press and radio campaign trying to sensitise as many actors and target groups
as possible.
• Duration: M1-M36, 36 months
• Budget: 250,00 € (included in 7.1)
517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP
Next Steps
• 4th meeting - Poland: May
XX-XX/05/2013
• 5th meeting - UK: December
XX-XX/12/2013
• Closing meeting - Brussels:
September
XX-XX/09/2014
Study Tour
517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP
Time Table

Weitere ähnliche Inhalte

Was ist angesagt?

PMP Chapter 6 of 6 closing process group (1- Process) (Based on PMBOK 6th ed...
PMP Chapter 6 of 6  closing process group (1- Process) (Based on PMBOK 6th ed...PMP Chapter 6 of 6  closing process group (1- Process) (Based on PMBOK 6th ed...
PMP Chapter 6 of 6 closing process group (1- Process) (Based on PMBOK 6th ed...Shamil Habet
 
Project Management Plan
Project Management Plan Project Management Plan
Project Management Plan Pracas Infosys
 
PMP as per PMBOK 6
PMP as per PMBOK 6PMP as per PMBOK 6
PMP as per PMBOK 6Amit Gupta
 
PMBOK 5th Edition Project Management Processes and Knowledge Areas
PMBOK 5th Edition Project Management Processes and Knowledge AreasPMBOK 5th Edition Project Management Processes and Knowledge Areas
PMBOK 5th Edition Project Management Processes and Knowledge AreasMr.Sohail Amin
 
Undestand PMBok 5th, Section 4
Undestand PMBok 5th, Section 4Undestand PMBok 5th, Section 4
Undestand PMBok 5th, Section 4Amr Miqdadi
 
Insights into the Project Management Body of Knowledge (PMBOK® Guide) - Sixth...
Insights into the Project Management Body of Knowledge (PMBOK® Guide) - Sixth...Insights into the Project Management Body of Knowledge (PMBOK® Guide) - Sixth...
Insights into the Project Management Body of Knowledge (PMBOK® Guide) - Sixth...Tareq Al-Behairi,PMP,PMI-ACP
 
Undestand PMBok 5th, Section 3
Undestand PMBok 5th, Section 3Undestand PMBok 5th, Section 3
Undestand PMBok 5th, Section 3Amr Miqdadi
 
Introduction to PMP Brief Presentation
Introduction to PMP Brief PresentationIntroduction to PMP Brief Presentation
Introduction to PMP Brief Presentationjamilireifij
 
Is your project not going well this will help you get it back on track
Is your project not going well this will help you get it back on trackIs your project not going well this will help you get it back on track
Is your project not going well this will help you get it back on trackProject Management Solutions
 
PMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management ProcessesPMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management ProcessesMohamed Loey
 
Undestand PMBok 5th, Section 1&2
Undestand PMBok 5th, Section 1&2Undestand PMBok 5th, Section 1&2
Undestand PMBok 5th, Section 1&2Amr Miqdadi
 
ProjectManagementforNGOs
ProjectManagementforNGOsProjectManagementforNGOs
ProjectManagementforNGOswebuploader
 
PMBoK ed.5 brief overview
PMBoK ed.5 brief overviewPMBoK ed.5 brief overview
PMBoK ed.5 brief overviewOleksiy Rudenko
 

Was ist angesagt? (20)

PMP Chapter 6 of 6 closing process group (1- Process) (Based on PMBOK 6th ed...
PMP Chapter 6 of 6  closing process group (1- Process) (Based on PMBOK 6th ed...PMP Chapter 6 of 6  closing process group (1- Process) (Based on PMBOK 6th ed...
PMP Chapter 6 of 6 closing process group (1- Process) (Based on PMBOK 6th ed...
 
Project Management Plan
Project Management Plan Project Management Plan
Project Management Plan
 
PMP as per PMBOK 6
PMP as per PMBOK 6PMP as per PMBOK 6
PMP as per PMBOK 6
 
PMP PMBOK5 Ch4 integration management
PMP PMBOK5 Ch4 integration managementPMP PMBOK5 Ch4 integration management
PMP PMBOK5 Ch4 integration management
 
PMBOK 5th Edition Project Management Processes and Knowledge Areas
PMBOK 5th Edition Project Management Processes and Knowledge AreasPMBOK 5th Edition Project Management Processes and Knowledge Areas
PMBOK 5th Edition Project Management Processes and Knowledge Areas
 
Section 1: introduction
Section 1: introductionSection 1: introduction
Section 1: introduction
 
Undestand PMBok 5th, Section 4
Undestand PMBok 5th, Section 4Undestand PMBok 5th, Section 4
Undestand PMBok 5th, Section 4
 
Insights into the Project Management Body of Knowledge (PMBOK® Guide) - Sixth...
Insights into the Project Management Body of Knowledge (PMBOK® Guide) - Sixth...Insights into the Project Management Body of Knowledge (PMBOK® Guide) - Sixth...
Insights into the Project Management Body of Knowledge (PMBOK® Guide) - Sixth...
 
Undestand PMBok 5th, Section 3
Undestand PMBok 5th, Section 3Undestand PMBok 5th, Section 3
Undestand PMBok 5th, Section 3
 
Introduction to PMP Brief Presentation
Introduction to PMP Brief PresentationIntroduction to PMP Brief Presentation
Introduction to PMP Brief Presentation
 
Is your project not going well this will help you get it back on track
Is your project not going well this will help you get it back on trackIs your project not going well this will help you get it back on track
Is your project not going well this will help you get it back on track
 
PMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management ProcessesPMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management Processes
 
Pmbok6 changes
Pmbok6 changesPmbok6 changes
Pmbok6 changes
 
Pmp in summary
Pmp in summaryPmp in summary
Pmp in summary
 
The Project Management Plan in 20 steps
The Project Management Plan in 20 stepsThe Project Management Plan in 20 steps
The Project Management Plan in 20 steps
 
Undestand PMBok 5th, Section 1&2
Undestand PMBok 5th, Section 1&2Undestand PMBok 5th, Section 1&2
Undestand PMBok 5th, Section 1&2
 
PMP PMBOK5 project management processes
PMP PMBOK5 project management processesPMP PMBOK5 project management processes
PMP PMBOK5 project management processes
 
ProjectManagementforNGOs
ProjectManagementforNGOsProjectManagementforNGOs
ProjectManagementforNGOs
 
PMBoK ed.5 brief overview
PMBoK ed.5 brief overviewPMBoK ed.5 brief overview
PMBoK ed.5 brief overview
 
PMP / Framework 1 2-3
PMP / Framework 1 2-3PMP / Framework 1 2-3
PMP / Framework 1 2-3
 

Andere mochten auch

Ddd leuven demo mijn bibliotheek administratie 20141006
Ddd leuven demo mijn bibliotheek administratie 20141006Ddd leuven demo mijn bibliotheek administratie 20141006
Ddd leuven demo mijn bibliotheek administratie 20141006Bibnet vzw
 
Open Vlacc en FRBR
Open Vlacc en FRBROpen Vlacc en FRBR
Open Vlacc en FRBRBibnet vzw
 
Ddd brugge demo mijn bibliotheek administratie 20141006
Ddd brugge demo mijn bibliotheek administratie 20141006Ddd brugge demo mijn bibliotheek administratie 20141006
Ddd brugge demo mijn bibliotheek administratie 20141006Bibnet vzw
 
{LIKE} 2nd PM PPT
{LIKE} 2nd PM PPT{LIKE} 2nd PM PPT
{LIKE} 2nd PM PPTLIKE
 
Bibnet regionale ddd_blik_op_cultuur_slideshare
Bibnet regionale ddd_blik_op_cultuur_slideshareBibnet regionale ddd_blik_op_cultuur_slideshare
Bibnet regionale ddd_blik_op_cultuur_slideshareBibnet vzw
 
Facebook in de klas llit
Facebook in de klas llitFacebook in de klas llit
Facebook in de klas llitgbonamie
 
Cabriology Janbraeckman Bibnet EBLIDA LIBER
Cabriology Janbraeckman Bibnet EBLIDA LIBERCabriology Janbraeckman Bibnet EBLIDA LIBER
Cabriology Janbraeckman Bibnet EBLIDA LIBERBibnet vzw
 

Andere mochten auch (8)

Ddd leuven demo mijn bibliotheek administratie 20141006
Ddd leuven demo mijn bibliotheek administratie 20141006Ddd leuven demo mijn bibliotheek administratie 20141006
Ddd leuven demo mijn bibliotheek administratie 20141006
 
Open Vlacc en FRBR
Open Vlacc en FRBROpen Vlacc en FRBR
Open Vlacc en FRBR
 
Ddd brugge demo mijn bibliotheek administratie 20141006
Ddd brugge demo mijn bibliotheek administratie 20141006Ddd brugge demo mijn bibliotheek administratie 20141006
Ddd brugge demo mijn bibliotheek administratie 20141006
 
{LIKE} 2nd PM PPT
{LIKE} 2nd PM PPT{LIKE} 2nd PM PPT
{LIKE} 2nd PM PPT
 
Bibnet regionale ddd_blik_op_cultuur_slideshare
Bibnet regionale ddd_blik_op_cultuur_slideshareBibnet regionale ddd_blik_op_cultuur_slideshare
Bibnet regionale ddd_blik_op_cultuur_slideshare
 
Facebook in de klas llit
Facebook in de klas llitFacebook in de klas llit
Facebook in de klas llit
 
The Bruges Communiqué on enhanced European Cooperation in Vocational Educatio...
The Bruges Communiqué on enhanced European Cooperation in Vocational Educatio...The Bruges Communiqué on enhanced European Cooperation in Vocational Educatio...
The Bruges Communiqué on enhanced European Cooperation in Vocational Educatio...
 
Cabriology Janbraeckman Bibnet EBLIDA LIBER
Cabriology Janbraeckman Bibnet EBLIDA LIBERCabriology Janbraeckman Bibnet EBLIDA LIBER
Cabriology Janbraeckman Bibnet EBLIDA LIBER
 

Ähnlich wie {LIKE} 3rd PM PPT

WP 6. LEBPASS – Quality Plan
WP 6. LEBPASS – Quality PlanWP 6. LEBPASS – Quality Plan
WP 6. LEBPASS – Quality PlanLEBPass Project
 
1PJM6000 Week 1Project Management PracticesProfess.docx
1PJM6000 Week 1Project Management PracticesProfess.docx1PJM6000 Week 1Project Management PracticesProfess.docx
1PJM6000 Week 1Project Management PracticesProfess.docxRAJU852744
 
1PJM6000 Week 1Project Management PracticesProfess.docx
1PJM6000 Week 1Project Management PracticesProfess.docx1PJM6000 Week 1Project Management PracticesProfess.docx
1PJM6000 Week 1Project Management PracticesProfess.docxaulasnilda
 
APWASpring2015 presentation-Final
APWASpring2015 presentation-FinalAPWASpring2015 presentation-Final
APWASpring2015 presentation-FinalZahid Khan, PE, PMP
 
3.project managementprocess
3.project managementprocess3.project managementprocess
3.project managementprocessNiranjana K.R.
 
04 project integration management
04  project integration management04  project integration management
04 project integration managementAla Ibrahim
 
{LIKE} kick off PPT
{LIKE} kick off PPT{LIKE} kick off PPT
{LIKE} kick off PPTLIKE
 
DISE - Introduction to Project Management
DISE - Introduction to Project ManagementDISE - Introduction to Project Management
DISE - Introduction to Project ManagementRasan Samarasinghe
 
M&E of development projects and role of imed dr taibur
M&E of development projects and role of imed dr taiburM&E of development projects and role of imed dr taibur
M&E of development projects and role of imed dr taiburDr. Md. Taibur Rahman
 
Euro spi 2002 paper - how implementing self-assessment powered our spi programme
Euro spi 2002 paper - how implementing self-assessment powered our spi programmeEuro spi 2002 paper - how implementing self-assessment powered our spi programme
Euro spi 2002 paper - how implementing self-assessment powered our spi programmeKurt Greve
 
Sustainable development and project management
Sustainable development and project managementSustainable development and project management
Sustainable development and project managementOmar Latif
 
Lessons learned from an ISO/IEC 15504 SPI Programme in a Company
Lessons learned from an ISO/IEC 15504 SPI Programme in a CompanyLessons learned from an ISO/IEC 15504 SPI Programme in a Company
Lessons learned from an ISO/IEC 15504 SPI Programme in a CompanyBartomeu Fluxà Cabrer
 
Project Management - PMI Approach
Project Management - PMI ApproachProject Management - PMI Approach
Project Management - PMI ApproachZaur Ahmadov, PMP
 
01 introductiontoframework
01 introductiontoframework01 introductiontoframework
01 introductiontoframeworkDhamo daran
 

Ähnlich wie {LIKE} 3rd PM PPT (20)

WP 6. LEBPASS – Quality Plan
WP 6. LEBPASS – Quality PlanWP 6. LEBPASS – Quality Plan
WP 6. LEBPASS – Quality Plan
 
Preparing for pmi ba exam
Preparing for pmi ba examPreparing for pmi ba exam
Preparing for pmi ba exam
 
1PJM6000 Week 1Project Management PracticesProfess.docx
1PJM6000 Week 1Project Management PracticesProfess.docx1PJM6000 Week 1Project Management PracticesProfess.docx
1PJM6000 Week 1Project Management PracticesProfess.docx
 
1PJM6000 Week 1Project Management PracticesProfess.docx
1PJM6000 Week 1Project Management PracticesProfess.docx1PJM6000 Week 1Project Management PracticesProfess.docx
1PJM6000 Week 1Project Management PracticesProfess.docx
 
APWASpring2015 presentation-Final
APWASpring2015 presentation-FinalAPWASpring2015 presentation-Final
APWASpring2015 presentation-Final
 
3.project managementprocess
3.project managementprocess3.project managementprocess
3.project managementprocess
 
04 project integration management
04  project integration management04  project integration management
04 project integration management
 
{LIKE} kick off PPT
{LIKE} kick off PPT{LIKE} kick off PPT
{LIKE} kick off PPT
 
PROJECT PLANNING.pptx
PROJECT PLANNING.pptxPROJECT PLANNING.pptx
PROJECT PLANNING.pptx
 
PROJECT PLANNING.pptx
PROJECT PLANNING.pptxPROJECT PLANNING.pptx
PROJECT PLANNING.pptx
 
DISE - Introduction to Project Management
DISE - Introduction to Project ManagementDISE - Introduction to Project Management
DISE - Introduction to Project Management
 
M&E of development projects and role of imed dr taibur
M&E of development projects and role of imed dr taiburM&E of development projects and role of imed dr taibur
M&E of development projects and role of imed dr taibur
 
Euro spi 2002 paper - how implementing self-assessment powered our spi programme
Euro spi 2002 paper - how implementing self-assessment powered our spi programmeEuro spi 2002 paper - how implementing self-assessment powered our spi programme
Euro spi 2002 paper - how implementing self-assessment powered our spi programme
 
PMO Daily Operations using Scrum Methodology
PMO Daily Operations using Scrum MethodologyPMO Daily Operations using Scrum Methodology
PMO Daily Operations using Scrum Methodology
 
Sustainable development and project management
Sustainable development and project managementSustainable development and project management
Sustainable development and project management
 
Lessons learned from an ISO/IEC 15504 SPI Programme in a Company
Lessons learned from an ISO/IEC 15504 SPI Programme in a CompanyLessons learned from an ISO/IEC 15504 SPI Programme in a Company
Lessons learned from an ISO/IEC 15504 SPI Programme in a Company
 
Project Management - PMI Approach
Project Management - PMI ApproachProject Management - PMI Approach
Project Management - PMI Approach
 
PROJECT PORTFOLIO MANAGEMENT at IT Services Hungary Ltd
PROJECT PORTFOLIO MANAGEMENT at IT Services Hungary LtdPROJECT PORTFOLIO MANAGEMENT at IT Services Hungary Ltd
PROJECT PORTFOLIO MANAGEMENT at IT Services Hungary Ltd
 
PM LnL
PM LnLPM LnL
PM LnL
 
01 introductiontoframework
01 introductiontoframework01 introductiontoframework
01 introductiontoframework
 

Kürzlich hochgeladen

CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxJiesonDelaCerna
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfMahmoud M. Sallam
 
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerunnathinaik
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxsocialsciencegdgrohi
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfUjwalaBharambe
 
Biting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfBiting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfadityarao40181
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaVirag Sontakke
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 

Kürzlich hochgeladen (20)

CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptx
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Pharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdfPharmacognosy Flower 3. Compositae 2023.pdf
Pharmacognosy Flower 3. Compositae 2023.pdf
 
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developer
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
 
Biting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfBiting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdf
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of India
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 

{LIKE} 3rd PM PPT

  • 1. 517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP “Learning through Innovative management concepts to ensure transfer of Knowledge of Elderly people” – LIKE 3rd Project Meeting Santander, 26th-27th November 2012 Dimitris Raftopoulos - Project Coordinator
  • 2. 517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP Meeting Agenda • Overall Status Update • WP.1: Project Management • WP.3: Developing Business Concepts for Age Management & Investment in the HR Sector • WP.5: Quality Assurance • WP.6: Awareness raising activities • WP.7: Dissemination of results • Next Steps
  • 4. 517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP Projects’ Action Plan • Implementation Methodology – PMI Project Life Cycle • WP1 - Project Management | Lead: 3LRI • WP2 - Defining Ageing and Employment Trends in EU | Lead: University of Social Sciences • WP3 - Developing Business Concepts for Age Management & Investment in the HR sector | Lead: UoS • WP4 - Pilot Projects | Lead: FU-Uppsala • WP5 - Quality Assurance | Lead: 3LRI • WP6 - Awareness raising activities | Lead: Documenta • WP7 - Dissemination of Results | Lead: 3LRI • WP8 - Mainstreaming and results exploitation | Lead: 3LRI
  • 5. 517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP WP.1 Project Management 1.2 Web-based system 1.4 Progress reports & List of Indicators
  • 6. 517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP WP.3: Developing Business Concepts for Age Management & Investment in the HR Sector University of Strathclyde
  • 7. 517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP WP.3: Developing Business Concepts for Age Management & Investment in the HR Sector • 3.1 Designing model for enterprises on age management: Uni. of Strathclyde • 3.2 Guide for management optimisation performance: Uni. Of Social Sciences • 3.3 Development of measurable performance indicators: FU- Uppsala • 3.4 Analysis of older workforce work traits: Documenta
  • 8. 517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP WP.3-Act.3.1-3.2 Activity 3.1: Designing model for enterprises on age management • Focus on the development of innovative business concepts related to age management processes. To this end, a study will be conducted to design a model for enterprises on introducing age management concepts, flexible working arrangements and succession management, using the finding of the report already elaborated in WP2. • Duration: M15, 1 month • Budget: 13.627,00€ • The 40 pages report will be firstly available in English and in electronic version and then translated in Greek, Spanish, Polish and Swedish Activity 3.2: Guide for management optimisation performance • The above guide will cross examine the management systems currently deployed in the companies of the EU with those suggested in the first action of WP3 and will lead to the development of a methodological guide which will point what actions need to be taken in order to optimize the performance of management systems used in the EU market. • Duration: M17, 1 month • Budget: 2.674,00€ • The 40 pages report will be available in English
  • 9. 517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP WP.3-Act.3.3-3.4 Activity 3.3: Development of measurable performance indicators • In order to examine the effectiveness of the proposed systems, a guide will be elaborated stating the measurable performance indicators that are needed in order to estimate the effectiveness of the management concepts. This will offer the opportunity for perfective maintenance actions as well as identification of further needed actions that need to be taken. • Duration: M19, 1 month • Budget: 7.797,00€ • The 40 pages report will be available in English Activity 3.4: Analysis of older workforce work traits • An analysis of the work traits of the aged workforce (strengths and weaknesses) will be conducted in order to identify the EU labour market employment opportunities for the aged workforce. The SWOT analysis will be conducted under the perspective of the “new skills for new jobs report”, thus the findings of it will point the set of questions needed to be asked so to start transforming older workers to become more productive again for their companies/ organizations. • Duration: Μ20, 1 month • Budget: 7.785,00€ • The 40 pages report will be available in English and then translated in Greek, Spanish, Polish and Swedish
  • 10. 517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP WP.3-Act.3.5 Activity 3.5: Employment opportunities for older workers • Employment opportunities will be the results of the previous report and will be examined in relation to the EQF system along with the national qualifications systems. The aim of the report is to examine how to adapt the approach of potential employment opportunities for aged personnel to the local labour market. The report will examine how the different levels of the professional framework systems can become the starting point for changing the perception towards aged personnel and their skills. It will also demonstrate the required actions in terms of training issues for older workers. • Duration: Μ22, 1 month • Budget: 6.944,00€ • The 40 pages report will be available in English
  • 13. 517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP 5.2: Methodological Guide for WP “Developing Business Concepts for Age Management & Investment in the HR sector”: Univ. of Strathclyde 5.5: Evaluation of the results of the project: Uni. Of Social Sciences & 3L Research Institute
  • 14. 517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP WP.5-Act.5.2 • 5.2: Methodological Guide for WP “Developing Business Concepts for Age Management & Investment in the HR sector” • Status Update by University of Strathclyde • Responsible PP: UoS • 5.5: Evaluation of the results of the project • Status Update by 3L Research Institute • Responsible PP: 3L Research Institute
  • 15. 517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP Act. 5.5: External Evaluation of the results of the project University of Social Sciences
  • 16. 517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP • Role of the evaluator • Stages of the project evaluation • Types of evaluation • Project evaluation + quality next steps • Available tools for evaluation for the project Contents
  • 17. 517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP The evaluator must: • Set the context for open discussion on project performance • Identify strengths & weaknesses, obstacles to progress • Make recommendations to continue, modify, and/or delete • Assures and improves the quality of the project and project outcomes and of other actors • pursues a culture of quality assurance • Helps quantifying results • Predicts how the project activities will develop • Reduces the work of the Final Report Role of the evaluator
  • 18. 517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP • Start after the project approval • Make a logical schedule • Choose evaluation tools carefully structured and make indicators clear Stages of the project evaluation
  • 19. 517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP • Use the evidence to implement changes • Analyse results -if possible at a project meeting 1. What does this mean for the project? 2. What should we do next? 3. How will we manage changes to the project’s workplan? • Draw attention to the positives as well as challenges • Adapt: workplan, activities, communication platforms, management, budgets • Inform everyone involved -try not to impose! • Record all reasons for the changes Stages of the project evaluation
  • 20. 517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP • Internal Evaluation: performed by staff of partnership members, preferably directly involved in the project work • External Evaluation: performed by an expert not attached to any of the partnership members, who has no other task in the project Types of the evaluation 1/2
  • 21. 517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP Planning Evaluation Inception Report & a Quality A2 Plan Formative Evaluation Progress Reports & Quality Assurance Recommendations Summative Evaluation Impact Reports & Quality Assessment Types of Evaluation 2/2
  • 22. 517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP Planningevaluation • Send a questionnaire to all the participants before the event to assess their expectations Formativeevaluation • Enable the participants to reflect on the progress of the event (e.g. training, meeting, seminar) while it is taking place (e.g. through reflective diaries, individual interviews, post-it notes stuck on a wall, etc.) Summativeevaluation • Gather final evaluative information at the end of the event, discuss it, use to improve the next event Examples types of evaluation
  • 23. 517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP • What can we say about the object in our hands? 1. who will be responsible for evaluation across the partnership 2. agree on the priorities for evaluation 1. What are we going to evaluate? 2. The processes of the project? 3. The outputs of the project? 4. The outcomes of the project? 3. What tools we are going to use for all 3 types of evaluation Evaluation Quality next steps
  • 27. 517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP WP.6: Awareness Raising Activities • 6.1 Workshops for the age management concept benefits • 6.2 Sensitizing entrepreneurs • 6.3 Seminars addressing HR managers • 6.4 Sensitizing the aged workforce Employers Employees Entrepreneurs Managers Local Society Stakeholders
  • 28. 517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP WP.6-Act.6.1 Activity 6.1: Awareness raising activities • The five workshops (one per country) will involve local public and private actors, enterprises employees, customers, suppliers, employers and the community and will discuss as well as examine the benefits enterprises could have from the proposed strategies. It will reveal the strengths of aged work force and at the same time will demonstrate how enterprises can be prepared to face the “demographic bomb issue”. Invited speakers, expert on their fields, will elaborate on Age management concepts. • The target groups will be targeted by the partners through the general promotion of the project and directly by communicating with national and local stakeholders, through meetings, emails and phone calls in order to catch a minimum of 20 participants per workshop. • These workshops will last half a day and will be organised by each partner in each participating country, adapting the content to their language, their specific working conditions, labour market needs and specificities of the attendants. • Duration: M10-M12, 3 months • Budget: 29.706,00€
  • 30. 517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP WP.6-Act.6.2-6.3 Activity 6.2: Sensitising entrepreneurs • Project partners will visit each other’s area and will visit businesses that operate with aged work force and have successful results, for exchanging experience. PPs will discuss with the personnel and owners, gaining valuable experience and know–how that they could bring back to their organizations as well as countries. Local business people will be part as well of the study tours. • These study tours (5 in total, one per country), will last one day and will take place together with the project meetings, in order to save time and money from travelling. • Duration: M2, M9, M15, M21, M27, 5 months • Budget: 2.500,00€ (included in 6.1) Activity 6.3: Seminars addressing HR managers • There will be organized 5 seminars, one in each different participating country, addressing to Human Resources Managers for implementing decisions on staff recruitment, retention and redundancy in view of the formulated Age Management Concepts. The proposed issues will be deriving from the reports already elaborated in the context of the project. • Catch a minimum of 20 participants per seminar. • These seminars will last half a day and will be organised by each partner in each participating country, adapting the content to their language, their specific labour market needs and conditions and specificities of the attendants. • Duration: M18-M22, 5 months • Budget: 1.700,00€ (included in 6.1)
  • 31. 517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP WP.6-Act.6.4 Activity 6.4: Sensitising the aged workforce • In parallel with the seminars organized focusing in HR managers, another 5 will be organized, addressing to aged workforce and Unemployed aged 50+, with special focus on sensitive social groups. It will explain the strengths they have as well as the skills that they need to gain, in order to remain competitive in the labour market they operate and even in the EU market. • Catch a minimum of 20 participants per seminar • These seminars will last half a day and will be organised by each partner in each participating country, adapting the content to their language, their specific labour market needs and conditions and specificities of the attendants. • Duration: M18-M22, 5 months • Budget: 1.700,00 € (included in 6.1)
  • 34. 517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP WP.7: Dissemination of results Publicity campaign • Dissemination of events • Press campaign • Logo • Posters Publicity campaign • Information and Sensitisation brochures • Electronic Newsletters
  • 35. 517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP WP.7-Act.7.2 Activity 7.2: Publicity campaign – Information and Sensitisation brochures Four brochures of 4pages will be produced, in the following languages: EN, ES, EL, SE, PL • one presenting the project • one sensitising the aged workforce • one sensitizing enterprises and • one presenting the project results • The Lead Partner of the Work Package will create a common layout (with the approbation of all partners), including a project logo, to be used in all brochures and overall material, and a common text, but each partner will adapt the text to local conditions, needs and specificities • Each brochure (A5) will be printed in 1000 items per country • Duration: M3, M7, M33, 3 months • Budget: 11.300,00€
  • 36. 517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP WP.7-Act.7.3 Activity 7.3: Publicity campaign – Dissemination of events • For each event organised (workshops, seminars, conference), each partner will produce and diffuse flyers and posters to disseminate the event in order to ensure the largest possible participation. • This means that 6 different flyers and 6 different posters will be produced in each language. Each flyer (A5) will be printed in 200 items, each poster (A3) in 20 items. • The Lead Partner of the Work Package will create a common layout (with the approbation of all partners), to be used in for flyers and posters, and a common text, but each partner will adapt the text to local conditions, needs and specificities. • This dissemination will be done in an electronic way as well. • Duration: M9, M17, M26, M28-29, 5 months • Budget: 1.900,00€ (included in 7.1)
  • 37. 517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP WP.7-Act.7.4 Activity 7.4: Publicity campaign – Electronic Newsletters • 6 newsletters on the employability of the aged workforce and presenting the project evolution and outputs during the project lifetime will be sent electronically, which will be used to promote the main Project initiatives, to inform the operators of interested sectors on the project implementation, the activity phases still in progress, the possibilities and modalities of participation, to sensitize the population towards the thematic at the focus of the debate, to spread the results obtained by the Project. • The Lead Partner will have the overall coordination of the activity, but all partners will participate in the drafting of the newsletter and in its dissemination to all relevant EU, national, regional and local actors, not only within the 5 participating countries but also in other European countries, to ensure the largest possible dissemination. • Duration: M3, M9, M15, M21, M27, M33, 6 months • Budget: (included in 7.1)
  • 38. 517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP WP.7-Act.7.5 Activity 7.5: Press campaign • The project will be presented to local actors and local press by each partner during a press-conference presenting the project and addressing specific issues relevant to the project theme and the local conditions. Each partner will decide on when organising the press-conference, in order to choose the most appropriate moment for a more effective and positive event (e.g. before an important event). • During the press-conferences, folders will be distributed to the journalists with information about the project, the programme, the transnational actions and the local actions and added value of the project. • Regional press-releases will inform target groups about the project and the organised events and will be issued after the press-conference and more often if possible. • Project partners will launch a press and radio campaign trying to sensitise as many actors and target groups as possible. • Duration: M1-M36, 36 months • Budget: 250,00 € (included in 7.1)
  • 39. 517619-LLP-1-2011-1-GR-GRUNDTVIG-GMP Next Steps • 4th meeting - Poland: May XX-XX/05/2013 • 5th meeting - UK: December XX-XX/12/2013 • Closing meeting - Brussels: September XX-XX/09/2014 Study Tour