FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
gesa_sol.ppt
1. W h y G E
A Complete System Solution
Supplier
Global Focus With
Engineering And Field
Support
Experience Over A Broad
Range Of Industries
A corporate commitment to
six sigma quality
Financial Strength
Dedicated to bringing the best
Automation solutions to our
customers
INTEGRATION SERVICES
STARTUP AND COMISSIONING
ASSET MAINTENANCE
REMOTE DIAGNOSTICS
PROJECT FINANCING
PROJECT MANAGEMENT
APPLICATION DESIGN
POWER SYSTEM CONSULTING
Substation Automation System Solutions
2. GESA - A System Solution that Delivers Productivity
PLANNING
ENGINEERING
PROTECTION
MAINTENANCE
Real-time Analysis that Avoids
Interruptions
Precise and Confident Operator
Decisions in Restoring Service
Reduction in the Need for Costly
Field Visits
More Effective Long Term Planning
& Loading Decisions
Translating data into information
at the users fingertips
3. The Challenge: Putting Information to Work
“On-Line Information”:
Your key competitive advantage
• Fine-tune planning
• Streamline settlements
• Budget accurately
• Asses cost of service
• Allocate capacity
• Faster service response
• Remote status & control
• Analyze power quality
• Identify events, SOE
• Receive fault records
• Target maintenance
• Monitor loading trends
Enterprise Operations
4. The Foundation of the Solution: Mission critical monitoring and
control
OPERATING INFORMATION: TAP
CHANGERS, CAPACITOR BANKS
RELAY OPERATIONS, RECLOSE
STATISTICS, CAPACITOR FUSE STATUS
RELAY & BREAKER SELF-
TEST/DIAGNOSTICS
POWER QUALITY INFORMATION: PF,
HARMONICS
LOAD INFORMATION, DEMAND
PATTERNS
ELECTRICAL PARAMETERS
GE-SA An Integrated Solution
5. GE Substation Automation - The most competitive solution
Sub-second response for Ethernet
connected devices
Dual master redundancy with
automatic system control transfer
Automatic interleaving of events
and metering values
Ethernet substation UCA 2.0 LAN
Peer to peer communications
Remote view nodes and web
browser compatible HMI Interface
Automatic oscillography upload
Object oriented system tools for
reliable, low cost reconfiguration
Real-time system status and
control execution
Maximize your Competitive
Edge
6. GE Substation Automation System
Three powerful dimensions to a complete
Substation Automation Solution:
• Proven, “off the shelf”
components that integrate
today’s IEDs
• Ethernet for data transport in the
substation and to remote sites
• Pre-engineered software,
application tools and device
interfaces
7. Built Upon a New Generation Substation Architecture
HTML
Wizards
HMI
Screens
Trends Oscillography
Viewer
Event
Viewer
Facility
Diagnostics
Remote
Monitor
System
Configurator
HTML
Graphics
OPC/ DDE/ CORBA
Interface to
Corporate
WAN/ LAN
Configuration
Tools
Power
Analysis
Tools
Event
Logger
Operational
Efficiency/
Reliability
UCA - MMS
Server
Legacy
Server
SCADA
Protocols
Redundant Substation Ethernet LAN
Level
1
-
IEDs
Training/
Testing
WEB Server - HMI View Nodes
Monitoring Protection &
Control
Interoperability
Redundant Substation Ethernet LAN
Control
Interoperability
Level
2
-
Integration
Host
User
Open System Solution -- Relays,
Software, Communications, Networking
8. How many ways can I receive event information?
In Equipment Monitor
HMI (1) Annunciator Panel
HMI (2) One-Line Diagram
HMI (3) Beeper / Email
Event log
View Node PC - Intranet or
Internet
Level 3 System
UR Itself
GE guarantees that your critical information
is always available when you need it
9. Standard:
RS-485
Modbus
PLCs
Series 90 &
3rd Party
Meter &
Protection
Devices
Communication
Interfaces
Standard: DDE / Net DDE / OPC
GE Relays & Other
239 565 750 DFP100 MDP
269 735 760 DFP200 MMII
489 745 ALPS LPS SM3
Oscillography
Retriever
Legacy/ 3rd
Party Apps
Other
Protocols
Windows
Applications
SEL 20/20
3rd Party
SEL 251
SEL 351
SEL 321
SEL 587
Modbus
Monitor
Event
Retrieval
Port
Server
Dial Up
Access
Ethernet
Gateway
Windows NT Server/ Workstation
IPC &
Operating
System Layer
MMS Server
Data
Analyzer
Reporting
Tool
Ethernet Modbus / UCA-MMS
Legacy/
3rd Party
Media
Modem
Application
Layer
Remote
Monitoring &
Diagnostic Layer
Third Party Server
Ethernet Server
Modbus Server
Oscillography
Viewer & Analyzer
Event Viewer
SOE Analysis
HTML
Wizards
System
Configuration
HMI
Screens
Remote
Monitoring
Intranet / Internet
GE Universal
Relays
ActiveX
Controls
UCA/MMS
Devices
METERS
E3710 PQM
E3720 E7700
E7300
GESA System Architecture
10. Software
Smart Screen “Wizards”
• One Line Diagrams
• Event Logger
• IED Faceplate
• IED Tabular Values
• Annunciator Panel
• Alarm List with Sorting Feature
• Trending
Integration Productivity and Reliability
11. Creative tools to help you solve your automation
challenges
Wizard Technology
Standard Wizard Technology
Ease of use- 1000s of HMI points defined
with 3 - 4 user inputs
Canned Development - Guaranteed high
quality
UR Wizard Technology
Design Flexibility - 1 wizard for entire UR
Family
User Configuration - Screens chosen by
user
Integration Flexibility - New UR types and
screens can be added without rebuilding
12. PMCS Sequence of Event Log
• Time stamped to nearest milli-second
• Synchronizable to GPS via IRIG-B
• Automatic retrieval from IED to Host
• Storage on host disk
• Automatically forward to operations
PC
• Data sort capability included
– Standard filters
•Time
•Device Type
•Alarm Condition
Monitors and records all system event characteristics
13. • Configurable Alarm Conditions
– Any present value can drive an alarm
– Set range of operation
• Failure Alarms
– Equipment generated
– System generated
– Grouped per IED
Remote
Communication
of Critical Alarms
Alarm Annunciator Panel
15. Integrated Solutions to help you succeed
MODULARITY OF HARDWARE MODULES
AND COMPONENTS
DYNAMIC RECONFIGURATION
REAL-TIME STATE ANALYSIS AND
OPERATION
RELIABILITY OF SOFTWARE OBJECTS
AND MODULES
PEER TO PEER COMMUNICATIONS
INTEROPERABILITY
16. ….Towards Web based Arch for service
Strength:
• Design geared towards services, remote monitoring
• Entire system is configurable/ upgradable over the web
• Remote monitoring & diagnostics over Internet/Intranets
• HMI neutral - HTML wizards
• Designed to Support HTML graphics in next generation de
• Designed for corporate data ware housing
• N Level redundancy
• Interoperability among GE systems.
Thrust:
• Web based, standardized architecture for all systems
• Open system, Scalability & Performance
• Ethernet - Wireless/fiber
• HTML graphics to be embedded into IED’s
• Easy integration of third party systems - acquisitions
Web based Architecture - Easy Integration
of new systems and improved support
17. WEB SERVER
Comm
Interfaces
DDE / OPC
Oscillography
Viewer
Waveform
Server
PMCS DDE Server
Event
Viewer
Event
Server
CIMPLICITY
Ethernet Server’ PML ION Server
Dial Up
Access
Mutliple
Serial Port
Windows NT Serve r/ Workstation 5.0 - 4.0 / Windows XP/7...
DDE/OPC
&
Operating
System Layer
Ethernet
UR series
ActiveX
Controls
Application
Layer
Remote
Monitoring,
Config,&
Diag Layer
CAM
Viewer
Cost Allocation
Logger
View
Nodes
PMCS MMS Server Lon DB
IP Server
MMS - Modbus
Monitor
Replacement
LON
Works
OPC / DDE
HTML
Wizards
System
Config
Intouch
ActiveX Web
Browser
JAVA/HTML Support
HMI
screens
Web Browser
MMS EGD
GE Control
Tool Box
Trender
Future GESA System Architecture
18. GE’s Commitment to Automation Systems
• 50 person development, project management
and marketing team
• 4 year $12MM investment in new software and
networking hardware
• 200+ industrial & utility system installations
• 250+ system orders in backlog
• Coupled with a Multi-million $$ investment in
the UR platform
• $80 MM in acquisitions to build system
integrator capabilities
19. W o r l d w i d e Experience
North America
ConEd
PSE&G
PECO
Salt River
Europe &
Africa
ERZ
South America
Electroperu
Inepar
Electronorte
EDENOR
Rio Light
Furnas
Electrosul
CHESF
COPEL
Asia Pacific
Aliu Zhou
Zhe Zhang
Guang Xi
SUBSTATION
AUTOMATION
INSTALATIONS AROUND
THE WORLD
20. What our Customers Require -- That GE is Committed to
Deliver
Critical to Quality Metrics
Access to system application experts -- before,
during and after a sale
Open architecture solutions, built on industry
standards - future upgrade path
Thorough specification of the system to be
delivered - fully understood by the user
Deliver and commission on schedule; within
budget - supplier and customer
Effective operator training - establishing basic
user competency
Return on investment - work together to obtain
the expected benefits
C u s t o m e r F o c u s e d