General Concepts
(i) Additional capitalization
Additional capitalisation means the capital expenditure
incurred or projected to be incurred, after the date of
commercial operation of the project and admitted by the
Commission.
(ii) Auxiliary energy consumption
The quantum of energy consumed by auxiliary equipment
of the generating station, and transformer losses within
the generating station, expressed as a percentage of the
sum of gross energy generated at the generator terminals
of all the units of the generating station.
8/1/2017
DeptOfPowerEngg&Mgmt,AnnaUniversity,
Chennai
2
General Concepts
Contd.,
(iii) Capital cost
Capital Cost for a Project includes the expenditure
incurred or projected to be incurred, including interest
during construction and financing charges, any gain or
loss on account of foreign exchange risk variation during
construction on the loan.
(iv) Date of Commercial Operation’ or ‘COD’
The date declared by the Generating company after
demonstrating peaking capability corresponding to
Installed capacity of the Generating station through a
successful trial run, after notice to the beneficiaries.
8/1/2017
DeptOfPowerEngg&Mgmt,AnnaUniversity,
Chennai
3
General Concepts
Contd.,
(v) Debt-Equity Ratio
Debt–Equity ratio as on the date of commercial operation
shall be considered as 70:30 for determination of tariff.
However, if the Equity employed is more than 30%, the
amount of Equity for determination of tariff would be
limited to 30%. Also, if the actual equity employed by the
developer is less than 30%, the actual Debt and Equity
would considered for determination of tariff.
(vi) Declared capacity
The capability to deliver ex-bus electricity in MW declared
by such generating station in relation to any time-block of
the day or whole of the day, duly taking into account the
availability of fuel or water, and subject to further
qualification in the relevant regulation.
8/1/2017
DeptOfPowerEngg&Mgmt,AnnaUniversity,
Chennai
4
General Concepts
Contd.,
(vii) Design energy
Design energy means the quantum of energy which can be
generated in a 90% dependable year with 95% installed
capacity of the Hydro generating station.
(viii) Operation and Maintenance expenses
The expenditure incurred on operation and maintenance of
the project, or part thereof, and includes the expenditure on
manpower, repairs, spares, consumables, insurance and
overheads.
(xii) Plant availability factor (PAF)
The average of the daily declared capacities (DCs) for all the
days during that period expressed as a percentage of the
installed capacity in MW reduced by the normative auxiliary
energy consumption.
8/1/2017
DeptOfPowerEngg&Mgmt,AnnaUniversity,
Chennai
5
General Concepts
Contd.,
(viii) Normative Annual Plant Availability Factor (NAPAF)
Normative annual plant availability factor (NAPAF) for Hydro
generating stations is determined by the Commission as per the
following criteria:
(a) Storage and Pondage type plants with head variation between
Full Reservoir Level (FRL) and Minimum Draw Down Level
(MDDL) of up to 8%, and where plant availability is not affected
by silt : 90%
(b) Storage and Pondage type plants with head variation between
FRL and MDDL of more than 8%, where plant availability is not
affected by silt : (Average head / Rated head) + 0.02
(c) Pondage type plants where plant availability is significantly
affected by silt: 85%.
(d) Run-of-river type plants: NAPAF to be determined plant-wise,
based on 10-day design energy data, moderated by past experience
where available/relevant.
8/1/2017
DeptOfPowerEngg&Mgmt,AnnaUniversity,
Chennai
6
General Concepts
Contd.,
(xiii) Capacity Index (CI)
Capacity Index (CI) = {Declared Capacity (MW) /
Maximum Available Capacity (MW)} x 100
Where, Declared Capacity (DC) is the power that is
expected to be generated next day based on availability of
water & machine; and Maximum Available Capacity
(MAC) is the maximum power that a station can generate
with all units running, under the prevailing water levels
and flows over the peaking hours next day.
8/1/2017
DeptOfPowerEngg&Mgmt,AnnaUniversity,
Chennai
7
Components of Fixed Charge
8/1/2017
DeptOfPowerEngg&Mgmt,AnnaUniversity,
Chennai
8
Interest on Working Capital
8/1/2017
DeptOfPowerEngg&Mgmt,AnnaUniversity,
Chennai
9
Capacity Charge
Capacity Charge (Rs) = AFC x 0.5 x NDM / NDY x (PAFM / NAPAF)
• AFC (Rs) = Annual fixed cost as specified by the Commission for the year
• NAPAF = Normative Plant availability factor, in percentage
• NDM = Number of days in the month
• NDY = Number of days in the year
• PAFM = Plant availability factor achieved during the month, in
Percentage
8/1/2017
DeptOfPowerEngg&Mgmt,AnnaUniversity,
Chennai
10
Capacity Charge
Contd.,
PAFM = 10000 X ∑ DCi / {N x IC x (100 – Aux)}%
• AUX = Normative auxiliary energy consumption in
percentage
• DCi = Declared capacity (in ex-bus MW) for the ith day of the
month which the station can deliver for at least three (3)
hours
• IC = Installed capacity (in MW) of the complete generating
station
• N = Number of days in the month
8/1/2017
DeptOfPowerEngg&Mgmt,AnnaUniversity,
Chennai
11
Energy charges
• The Energy charge are payable by each beneficiary for the total energy
scheduled to be supplied to the beneficiary
Total Energy charge payable to the generating company for a month:
(Energy charge rate in Rs./kWh) x {Scheduled energy for the month in
kWh} x (100 – FEHS) / 100
Energy charge rate = AFC x 0.5 x 10 / {DE x (100 – AUX) x (100 –
FEHS)}
Where,
• DE (MWh) = Annual design energy specified for the Hydro generating
station
• FEHS (%) = Free energy for the home State
• CERC has capped the Energy charge rate at Rs 0.80/Unit
8/1/2017
DeptOfPowerEngg&Mgmt,AnnaUniversity,
Chennai
12
Tariff determination for a 500
MW Hydro Power Plant
8/1/2017
DeptOfPowerEngg&Mgmt,AnnaUniversity,
Chennai
13
Calculations
Return on equity
1. Capital cost/MW= Rs. 6 Cr
2. Capital cost for 500 MW = 500 x 6= Rs. 3,000 Cr.
3. Normative Debt/Equity Ratio= 70:30
4. Equity = 30/100 X 3000 = Rs. 900 Cr.
5. Debt =70/100 X 3000 = Rs. 2, 100 Cr.
RoE = 15.5% of Equity
= 15.5/100 x 900 = Rs. 139.50 Cr.
8/1/2017
DeptOfPowerEngg&Mgmt,AnnaUniversity,
Chennai
14
Calculations
(2) Interest on Loan
10% of Debt=10 /100 x 2100 =Rs. 210 Cr.
(3) Interest on Working capital
10% of Working capital (Rs. 300 Cr.)
10/100 x 300 = Rs. 30 Cr.
(4) Depreciation
5.28% of Capital cost= 5.28/100 x 3000= Rs. 158.40 Cr.
• (5) O & M Cost
• Normative O&M Cost: 2% of Project Cost
• 2% x 3000 = Rs. 60 Cr
• Hence, Total Fixed cost = (1) + (2) + (3) + (4) + (5)
• = Rs. (139.50+210+30+158.40+60) = Rs. 597.90 Cr. = Rs. 597.90 x 107
8/1/2017
DeptOfPowerEngg&Mgmt,AnnaUniversity,
Chennai
15
Calculations
Contd.,
Annual Energy generation
Gross Energy generated in the Year
500 MW = 500 x 365 x 24 x 90 x 1000/ 106
= 3942 Million Units (MUs)
= 3942 x 106 Units
Auxiliary consumption: 1%
Net Annual Energy generation:
=Gross energy x (1 – Aux consumption)
= 3942 x 106 x (1 - 1%)
= 3902.58 x 106 Units
8/1/2017
DeptOfPowerEngg&Mgmt,AnnaUniversity,
Chennai
16
Calculations
Contd.,
Fixed cost per unit
Fixed Cost/Unit = (Total Fixed Cost) / (Net Annual
Energy generation)
= (597.90 x 107) / (3902.58 x 106)
= Rs 1.53 / kWh
Nominal Tariff:
Nominal Tariff = (Fixed Cost / Unit) + (Variable cost
/Unit)
= Rs (1.53 + 0)/Unit
= Rs. 1.53/Unit
8/1/2017
DeptOfPowerEngg&Mgmt,AnnaUniversity,
Chennai
17
THANK YOU
8/1/2017
DeptOfPowerEngg&Mgmt,AnnaUniversity,
Chennai
18

Weitere ähnliche Inhalte

Was ist angesagt?

What are Ancillary Services In Power System ?
What are Ancillary Services In Power System ?What are Ancillary Services In Power System ?
What are Ancillary Services In Power System ?
Power System Operation
 

Was ist angesagt? (20)

Hydro power-plant
Hydro power-plantHydro power-plant
Hydro power-plant
 
economics of power generation
economics of power generationeconomics of power generation
economics of power generation
 
Hydro power plant
Hydro power plantHydro power plant
Hydro power plant
 
Hydro Power Plants of Pakistan
Hydro Power Plants of PakistanHydro Power Plants of Pakistan
Hydro Power Plants of Pakistan
 
Indian Regulatory Framework Of Power Sector
Indian Regulatory Framework Of Power SectorIndian Regulatory Framework Of Power Sector
Indian Regulatory Framework Of Power Sector
 
Pumped storage hydro power plant
Pumped storage hydro power plantPumped storage hydro power plant
Pumped storage hydro power plant
 
Grid code
Grid codeGrid code
Grid code
 
What are Ancillary Services In Power System ?
What are Ancillary Services In Power System ?What are Ancillary Services In Power System ?
What are Ancillary Services In Power System ?
 
solar-power-plant-ppt
 solar-power-plant-ppt solar-power-plant-ppt
solar-power-plant-ppt
 
Tariff-based Competitive Bidding in the Power Sector
Tariff-based Competitive Bidding in the Power SectorTariff-based Competitive Bidding in the Power Sector
Tariff-based Competitive Bidding in the Power Sector
 
Procedure for-distribution-open-access, Tata Power
Procedure for-distribution-open-access, Tata PowerProcedure for-distribution-open-access, Tata Power
Procedure for-distribution-open-access, Tata Power
 
Future of Hydro Power Development in India
Future of Hydro Power Development in IndiaFuture of Hydro Power Development in India
Future of Hydro Power Development in India
 
Voltage tolerance
Voltage toleranceVoltage tolerance
Voltage tolerance
 
Bangladesh power data
Bangladesh power dataBangladesh power data
Bangladesh power data
 
Hydroelectric powerplant
Hydroelectric powerplantHydroelectric powerplant
Hydroelectric powerplant
 
Financial analysis of 1 MW Solar PV plant
Financial analysis of 1 MW Solar PV plantFinancial analysis of 1 MW Solar PV plant
Financial analysis of 1 MW Solar PV plant
 
Types of hydro power plant
Types of hydro power plantTypes of hydro power plant
Types of hydro power plant
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plant
 
Hydro Power Plants
Hydro Power PlantsHydro Power Plants
Hydro Power Plants
 
Energy resource: pumped storage system
Energy resource: pumped storage systemEnergy resource: pumped storage system
Energy resource: pumped storage system
 

Ähnlich wie Tariff determination for hydro power plant

Maintenance and Projects 16+ Yrs in Automotive Industry
Maintenance and Projects 16+ Yrs in Automotive IndustryMaintenance and Projects 16+ Yrs in Automotive Industry
Maintenance and Projects 16+ Yrs in Automotive Industry
Nishant Patil
 
Chain Drive Power Generation in Roadways by Using Vehicles
Chain Drive Power Generation in Roadways by Using VehiclesChain Drive Power Generation in Roadways by Using Vehicles
Chain Drive Power Generation in Roadways by Using Vehicles
Association of Scientists, Developers and Faculties
 

Ähnlich wie Tariff determination for hydro power plant (20)

CK2017: SIDBI Initiatives on Clean Energy Adoption
CK2017: SIDBI Initiatives on Clean Energy Adoption CK2017: SIDBI Initiatives on Clean Energy Adoption
CK2017: SIDBI Initiatives on Clean Energy Adoption
 
T Divya CV
T Divya CVT Divya CV
T Divya CV
 
Principles of Power Systems V.K Mehta Complete Book - Chapter 4
Principles of Power Systems V.K Mehta Complete Book - Chapter 4Principles of Power Systems V.K Mehta Complete Book - Chapter 4
Principles of Power Systems V.K Mehta Complete Book - Chapter 4
 
Economics of Power Generation(4) h.pdf
Economics of Power Generation(4)       h.pdfEconomics of Power Generation(4)       h.pdf
Economics of Power Generation(4) h.pdf
 
POWER PLANT ECONOMICS AND ENVIRONMENTAL CONSIDERATIONS - SNIST
POWER  PLANT  ECONOMICS AND ENVIRONMENTAL  CONSIDERATIONS - SNISTPOWER  PLANT  ECONOMICS AND ENVIRONMENTAL  CONSIDERATIONS - SNIST
POWER PLANT ECONOMICS AND ENVIRONMENTAL CONSIDERATIONS - SNIST
 
Activity based costing
Activity based costingActivity based costing
Activity based costing
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
 
Lecture 16_Unit 6. Economic Analysis of Power Plants
Lecture 16_Unit 6. Economic Analysis of Power PlantsLecture 16_Unit 6. Economic Analysis of Power Plants
Lecture 16_Unit 6. Economic Analysis of Power Plants
 
Introduction to Sciemus Wind
Introduction to Sciemus WindIntroduction to Sciemus Wind
Introduction to Sciemus Wind
 
Small Power Generation Plant
Small Power Generation PlantSmall Power Generation Plant
Small Power Generation Plant
 
Performance Analysis of 5 MWP Grid-Connected Solar PV Power Plant Using IE...
Performance Analysis  of  5 MWP Grid-Connected  Solar PV Power Plant Using IE...Performance Analysis  of  5 MWP Grid-Connected  Solar PV Power Plant Using IE...
Performance Analysis of 5 MWP Grid-Connected Solar PV Power Plant Using IE...
 
Maintenance and Projects 16+ Yrs in Automotive Industry
Maintenance and Projects 16+ Yrs in Automotive IndustryMaintenance and Projects 16+ Yrs in Automotive Industry
Maintenance and Projects 16+ Yrs in Automotive Industry
 
Chain Drive Power Generation in Roadways by Using Vehicles
Chain Drive Power Generation in Roadways by Using VehiclesChain Drive Power Generation in Roadways by Using Vehicles
Chain Drive Power Generation in Roadways by Using Vehicles
 
IRJET- Implementing Zero Energy Efficiency in Residential Building
IRJET-  	  Implementing Zero Energy Efficiency in Residential BuildingIRJET-  	  Implementing Zero Energy Efficiency in Residential Building
IRJET- Implementing Zero Energy Efficiency in Residential Building
 
Electric vehicles
Electric vehiclesElectric vehicles
Electric vehicles
 
Energy Benchmarking For cement Industry Final Copy.pdf
Energy Benchmarking For cement Industry Final Copy.pdfEnergy Benchmarking For cement Industry Final Copy.pdf
Energy Benchmarking For cement Industry Final Copy.pdf
 
Meghalaya Wind Energy
Meghalaya Wind Energy Meghalaya Wind Energy
Meghalaya Wind Energy
 
Enhancing the Electric Grid Reliability through Data Analytics
Enhancing the Electric Grid Reliability through Data Analytics Enhancing the Electric Grid Reliability through Data Analytics
Enhancing the Electric Grid Reliability through Data Analytics
 
Cost development of renewable energy technologies
Cost development of renewable energy technologiesCost development of renewable energy technologies
Cost development of renewable energy technologies
 

Kürzlich hochgeladen

Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Dr.Costas Sachpazis
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
Tonystark477637
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Kürzlich hochgeladen (20)

Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 

Tariff determination for hydro power plant

  • 1. Tariff Determination for Hydro Power Plant Krishnakumar R V M.E Power Engineering & Management Anna University, Chennai
  • 2. General Concepts (i) Additional capitalization Additional capitalisation means the capital expenditure incurred or projected to be incurred, after the date of commercial operation of the project and admitted by the Commission. (ii) Auxiliary energy consumption The quantum of energy consumed by auxiliary equipment of the generating station, and transformer losses within the generating station, expressed as a percentage of the sum of gross energy generated at the generator terminals of all the units of the generating station. 8/1/2017 DeptOfPowerEngg&Mgmt,AnnaUniversity, Chennai 2
  • 3. General Concepts Contd., (iii) Capital cost Capital Cost for a Project includes the expenditure incurred or projected to be incurred, including interest during construction and financing charges, any gain or loss on account of foreign exchange risk variation during construction on the loan. (iv) Date of Commercial Operation’ or ‘COD’ The date declared by the Generating company after demonstrating peaking capability corresponding to Installed capacity of the Generating station through a successful trial run, after notice to the beneficiaries. 8/1/2017 DeptOfPowerEngg&Mgmt,AnnaUniversity, Chennai 3
  • 4. General Concepts Contd., (v) Debt-Equity Ratio Debt–Equity ratio as on the date of commercial operation shall be considered as 70:30 for determination of tariff. However, if the Equity employed is more than 30%, the amount of Equity for determination of tariff would be limited to 30%. Also, if the actual equity employed by the developer is less than 30%, the actual Debt and Equity would considered for determination of tariff. (vi) Declared capacity The capability to deliver ex-bus electricity in MW declared by such generating station in relation to any time-block of the day or whole of the day, duly taking into account the availability of fuel or water, and subject to further qualification in the relevant regulation. 8/1/2017 DeptOfPowerEngg&Mgmt,AnnaUniversity, Chennai 4
  • 5. General Concepts Contd., (vii) Design energy Design energy means the quantum of energy which can be generated in a 90% dependable year with 95% installed capacity of the Hydro generating station. (viii) Operation and Maintenance expenses The expenditure incurred on operation and maintenance of the project, or part thereof, and includes the expenditure on manpower, repairs, spares, consumables, insurance and overheads. (xii) Plant availability factor (PAF) The average of the daily declared capacities (DCs) for all the days during that period expressed as a percentage of the installed capacity in MW reduced by the normative auxiliary energy consumption. 8/1/2017 DeptOfPowerEngg&Mgmt,AnnaUniversity, Chennai 5
  • 6. General Concepts Contd., (viii) Normative Annual Plant Availability Factor (NAPAF) Normative annual plant availability factor (NAPAF) for Hydro generating stations is determined by the Commission as per the following criteria: (a) Storage and Pondage type plants with head variation between Full Reservoir Level (FRL) and Minimum Draw Down Level (MDDL) of up to 8%, and where plant availability is not affected by silt : 90% (b) Storage and Pondage type plants with head variation between FRL and MDDL of more than 8%, where plant availability is not affected by silt : (Average head / Rated head) + 0.02 (c) Pondage type plants where plant availability is significantly affected by silt: 85%. (d) Run-of-river type plants: NAPAF to be determined plant-wise, based on 10-day design energy data, moderated by past experience where available/relevant. 8/1/2017 DeptOfPowerEngg&Mgmt,AnnaUniversity, Chennai 6
  • 7. General Concepts Contd., (xiii) Capacity Index (CI) Capacity Index (CI) = {Declared Capacity (MW) / Maximum Available Capacity (MW)} x 100 Where, Declared Capacity (DC) is the power that is expected to be generated next day based on availability of water & machine; and Maximum Available Capacity (MAC) is the maximum power that a station can generate with all units running, under the prevailing water levels and flows over the peaking hours next day. 8/1/2017 DeptOfPowerEngg&Mgmt,AnnaUniversity, Chennai 7
  • 8. Components of Fixed Charge 8/1/2017 DeptOfPowerEngg&Mgmt,AnnaUniversity, Chennai 8
  • 9. Interest on Working Capital 8/1/2017 DeptOfPowerEngg&Mgmt,AnnaUniversity, Chennai 9
  • 10. Capacity Charge Capacity Charge (Rs) = AFC x 0.5 x NDM / NDY x (PAFM / NAPAF) • AFC (Rs) = Annual fixed cost as specified by the Commission for the year • NAPAF = Normative Plant availability factor, in percentage • NDM = Number of days in the month • NDY = Number of days in the year • PAFM = Plant availability factor achieved during the month, in Percentage 8/1/2017 DeptOfPowerEngg&Mgmt,AnnaUniversity, Chennai 10
  • 11. Capacity Charge Contd., PAFM = 10000 X ∑ DCi / {N x IC x (100 – Aux)}% • AUX = Normative auxiliary energy consumption in percentage • DCi = Declared capacity (in ex-bus MW) for the ith day of the month which the station can deliver for at least three (3) hours • IC = Installed capacity (in MW) of the complete generating station • N = Number of days in the month 8/1/2017 DeptOfPowerEngg&Mgmt,AnnaUniversity, Chennai 11
  • 12. Energy charges • The Energy charge are payable by each beneficiary for the total energy scheduled to be supplied to the beneficiary Total Energy charge payable to the generating company for a month: (Energy charge rate in Rs./kWh) x {Scheduled energy for the month in kWh} x (100 – FEHS) / 100 Energy charge rate = AFC x 0.5 x 10 / {DE x (100 – AUX) x (100 – FEHS)} Where, • DE (MWh) = Annual design energy specified for the Hydro generating station • FEHS (%) = Free energy for the home State • CERC has capped the Energy charge rate at Rs 0.80/Unit 8/1/2017 DeptOfPowerEngg&Mgmt,AnnaUniversity, Chennai 12
  • 13. Tariff determination for a 500 MW Hydro Power Plant 8/1/2017 DeptOfPowerEngg&Mgmt,AnnaUniversity, Chennai 13
  • 14. Calculations Return on equity 1. Capital cost/MW= Rs. 6 Cr 2. Capital cost for 500 MW = 500 x 6= Rs. 3,000 Cr. 3. Normative Debt/Equity Ratio= 70:30 4. Equity = 30/100 X 3000 = Rs. 900 Cr. 5. Debt =70/100 X 3000 = Rs. 2, 100 Cr. RoE = 15.5% of Equity = 15.5/100 x 900 = Rs. 139.50 Cr. 8/1/2017 DeptOfPowerEngg&Mgmt,AnnaUniversity, Chennai 14
  • 15. Calculations (2) Interest on Loan 10% of Debt=10 /100 x 2100 =Rs. 210 Cr. (3) Interest on Working capital 10% of Working capital (Rs. 300 Cr.) 10/100 x 300 = Rs. 30 Cr. (4) Depreciation 5.28% of Capital cost= 5.28/100 x 3000= Rs. 158.40 Cr. • (5) O & M Cost • Normative O&M Cost: 2% of Project Cost • 2% x 3000 = Rs. 60 Cr • Hence, Total Fixed cost = (1) + (2) + (3) + (4) + (5) • = Rs. (139.50+210+30+158.40+60) = Rs. 597.90 Cr. = Rs. 597.90 x 107 8/1/2017 DeptOfPowerEngg&Mgmt,AnnaUniversity, Chennai 15
  • 16. Calculations Contd., Annual Energy generation Gross Energy generated in the Year 500 MW = 500 x 365 x 24 x 90 x 1000/ 106 = 3942 Million Units (MUs) = 3942 x 106 Units Auxiliary consumption: 1% Net Annual Energy generation: =Gross energy x (1 – Aux consumption) = 3942 x 106 x (1 - 1%) = 3902.58 x 106 Units 8/1/2017 DeptOfPowerEngg&Mgmt,AnnaUniversity, Chennai 16
  • 17. Calculations Contd., Fixed cost per unit Fixed Cost/Unit = (Total Fixed Cost) / (Net Annual Energy generation) = (597.90 x 107) / (3902.58 x 106) = Rs 1.53 / kWh Nominal Tariff: Nominal Tariff = (Fixed Cost / Unit) + (Variable cost /Unit) = Rs (1.53 + 0)/Unit = Rs. 1.53/Unit 8/1/2017 DeptOfPowerEngg&Mgmt,AnnaUniversity, Chennai 17