Case Study: Carbon Capture Project
Koch Modular engineering team helped the
client design a modular pilot plant system as a
significant part of the first ever operating
carbon capture and storage facility. The
system was installed at a pulverized coal-
fueled power plant where the captured CO2
was injected underground for permanent
storage. The process boasts high CO2 removal
rates, low solvent slip (release) and high CO2
purity.
 CLIENT:
A Major Construction and
Technology Company.
 INDUSTRY:
Power Plant Construction
M O D U L A R P R O C E S S S Y S T E M S | D I S T I L L A T I O N | L I Q U I D E X T R A C T I O N | E N G I N E E R I N G | P I L O T T E S T I N G
Telephone: (201) 267-8670
www.modularprocess.com
3
Key Engineering Features
 KMPS was selected as the supplier because of its successful experience
in carbon dioxide removal and the capability of designing modular units.
 As a test unit, the system was designed to accommodate a broad range
of operating conditions.
 Modular design allowed for the customer to concentrate on the balance
of the greenfield project’s engineering, infrastructure and on-site
construction activities, with minimal interruption.
 KMPS’s modular system was the earliest to be completed at the site and
required minimum site labor.
M O D U L A R P R O C E S S S Y S T E M S | D I S T I L L A T I O N | L I Q U I D E X T R A C T I O N | E N G I N E E R I N G | P I L O T T E S T I N G
Telephone: (201) 267-8670
www.modularprocess.com
4
Core Challenges
 The solvent had a tendency to form solids at low temperatures and in
stagnant spots. Proper temperature control and piping design to avoid
pockets are essential.
 Materials of construction – certain high temperature areas required the
use of higher alloys than regular stainless steel.
 Installation – most of the column packing and internals were installed
in the KMPS shop but the random packing and internals had to be
installed on site. A KMPS engineer was on-site to ensure proper
installation.
 Schedule – the project was schedule-driven. The use of KMPS modules
substantially reduced the site labor requirement and shortened project
schedule.
M O D U L A R P R O C E S S S Y S T E M S | D I S T I L L A T I O N | L I Q U I D E X T R A C T I O N | E N G I N E E R I N G | P I L O T T E S T I N G
Telephone: (201) 267-8670
www.modularprocess.com
5
The Solution
 Multi-module flue gas carbon capture system including solvent
regeneration and recovery.
 Based on the client’s “Chilled Ammonia Process”.
 The process first absorbs the CO2 using an ammonium carbonate
solvent. The CO2 was then stripped out from the solvent in a
regenerator, converting the ammonium bicarbonate back into
ammonium carbonate. The latter is returned to the CO2 absorber,
thus completing the solvent cycle.
M O D U L A R P R O C E S S S Y S T E M S | D I S T I L L A T I O N | L I Q U I D E X T R A C T I O N | E N G I N E E R I N G | P I L O T T E S T I N G
Telephone: (201) 267-8670
www.modularprocess.com
6
Flue Gas Return
-90% CO2
Flue Gas Feed
With CO2
Wash Water
CO2
CO2Removal&
SolventRegeneration
CO2Absorber
Solvent Cooling
Heat
Recovery
Lean Solvent
Rich Solvent
CO2 Removal Basic Process Flow Diagram
M O D U L A R P R O C E S S S Y S T E M S | D I S T I L L A T I O N | L I Q U I D E X T R A C T I O N | E N G I N E E R I N G | P I L O T T E S T I N G
Telephone: (201) 267-8670
www.modularprocess.com
7
Installed Modular Process System
M O D U L A R P R O C E S S S Y S T E M S | D I S T I L L A T I O N | L I Q U I D E X T R A C T I O N | E N G I N E E R I N G | P I L O T T E S T I N G
Telephone: (201) 267-8670
www.modularprocess.com
8
Impact
1. Because of KMPS’ previous experience with similar projects, Koch Modular was
able to capture the special design features to ensure smooth operation of the
unit.
2. When the same customer needed a partner to build a larger carbon capture unit
in a West Virginia power plant, Koch Modular was the logical choice.
3. Despite the complexity of the equipment, the Koch Modular unit was the most
trouble-free section of the plant.
4. The pilot unit was run by the power utility for two years to test the concept – up
to 300 tons a day of CO2 was compressed, injected and sequestered between
layers of rock deep underground. The project was deemed a complete success.
M O D U L A R P R O C E S S S Y S T E M S | D I S T I L L A T I O N | L I Q U I D E X T R A C T I O N | E N G I N E E R I N G | P I L O T T E S T I N G
Telephone: (201) 267-8670
www.modularprocess.com
9
Why Modular from KMPS?
For this project, KMPS leveraged its extensive CO2 removal experience, proprietary
distributor design technology and experience designing modular process systems which
resulted in a complete multi-module flue gas carbon capture system including solvent
regeneration and recovery that was supplied with a Process Performance Guarantee. Our
modular fabrication approach to process systems has many advantages, the main points of
which are highlighted below. To learn specifically how modular fabrication achieves these
benefits, please visit our website: www.modularprocess.com
 Shorter schedule / faster time to market
 Lower cost / lump sum bid / single source
 Minimal plant site interruption / improved safety
M O D U L A R P R O C E S S S Y S T E M S | D I S T I L L A T I O N | L I Q U I D E X T R A C T I O N | E N G I N E E R I N G | P I L O T T E S T I N G
Telephone: (201) 267-8670
www.modularprocess.com
10
Koch Modular Products & Services
Customer Inquiry Data
Startup Assistance and
Training
Process Development
(In Collaboration with Client’s
Engineers and Scientists)
Material Balance, PFD’s, Unit Operation
Selection, Process Simulation
Process Design
Equipment Design, P&ID’s, Equipment
General Arrangement
Detailed Engineering
Equipment, Piping, Structural,
Electrical, Instrumentation & Controls
Construction
Modular System
Specialists in Process Design and Construction of Modular Mass Transfer Systems for the
Chemical Processing Industry.
Pilot Plant Testing
(If Required)
4
11
Case Study: Carbon Capture from
Power Plant Flue Gas
Stan Lam, P.E. | Process Engineering Manager
www.linkedin.com/in/stan-lam
Stan Lam is an expert in the design and troubleshooting of distillation
columns. Stan has been designing, inspecting and installing distillation
column trays, packing and internals for over 35 years. Stan is a graduate
of The University of Birmingham and a certified Professional Engineer.

Weitere ähnliche Inhalte

Mehr von Koch Modular Process Systems, LLC.

Koch Modular's CURT (Construction Users Round Table) Presentation
Koch Modular's CURT (Construction Users Round Table) PresentationKoch Modular's CURT (Construction Users Round Table) Presentation
Koch Modular's CURT (Construction Users Round Table) PresentationKoch Modular Process Systems, LLC.
 
Case Study: Modular Distillation System to Recover Spent Solvents
Case Study: Modular Distillation System to Recover Spent SolventsCase Study: Modular Distillation System to Recover Spent Solvents
Case Study: Modular Distillation System to Recover Spent SolventsKoch Modular Process Systems, LLC.
 
Case Study: Acetic Acid Recovery from Aqueous Fermentation Broth
Case Study: Acetic Acid Recovery from Aqueous Fermentation BrothCase Study: Acetic Acid Recovery from Aqueous Fermentation Broth
Case Study: Acetic Acid Recovery from Aqueous Fermentation BrothKoch Modular Process Systems, LLC.
 
Case Study: Modular Distillation System to Recover Spent Solvents
Case Study: Modular Distillation System to Recover Spent SolventsCase Study: Modular Distillation System to Recover Spent Solvents
Case Study: Modular Distillation System to Recover Spent SolventsKoch Modular Process Systems, LLC.
 
Enriching Liquid-Liquid Extraction: CHEMICAL ENGINEERING, November 2004
Enriching Liquid-Liquid Extraction: CHEMICAL ENGINEERING, November 2004Enriching Liquid-Liquid Extraction: CHEMICAL ENGINEERING, November 2004
Enriching Liquid-Liquid Extraction: CHEMICAL ENGINEERING, November 2004Koch Modular Process Systems, LLC.
 
Recovering and Recycling Low-Boiling Alcohols and Ketones: CHEMICAL ENGINEERI...
Recovering and Recycling Low-Boiling Alcohols and Ketones: CHEMICAL ENGINEERI...Recovering and Recycling Low-Boiling Alcohols and Ketones: CHEMICAL ENGINEERI...
Recovering and Recycling Low-Boiling Alcohols and Ketones: CHEMICAL ENGINEERI...Koch Modular Process Systems, LLC.
 
Generating Your Own VLE Data: CHEMICAL ENGINEERING, March 1995
Generating Your Own VLE Data: CHEMICAL ENGINEERING, March 1995Generating Your Own VLE Data: CHEMICAL ENGINEERING, March 1995
Generating Your Own VLE Data: CHEMICAL ENGINEERING, March 1995Koch Modular Process Systems, LLC.
 
A Fresh Look At Liquid-Liquid Extraction: CHEMICAL ENGINEERING, February 1991
A Fresh Look At Liquid-Liquid Extraction: CHEMICAL ENGINEERING, February 1991A Fresh Look At Liquid-Liquid Extraction: CHEMICAL ENGINEERING, February 1991
A Fresh Look At Liquid-Liquid Extraction: CHEMICAL ENGINEERING, February 1991Koch Modular Process Systems, LLC.
 
Solving Separation Problems using Liquid-Liquid Extraction (LLE)
Solving Separation Problems using Liquid-Liquid Extraction (LLE)Solving Separation Problems using Liquid-Liquid Extraction (LLE)
Solving Separation Problems using Liquid-Liquid Extraction (LLE)Koch Modular Process Systems, LLC.
 

Mehr von Koch Modular Process Systems, LLC. (20)

Designing of liquid liquid extraction columns
Designing of liquid liquid extraction columnsDesigning of liquid liquid extraction columns
Designing of liquid liquid extraction columns
 
Koch Modular's CURT (Construction Users Round Table) Presentation
Koch Modular's CURT (Construction Users Round Table) PresentationKoch Modular's CURT (Construction Users Round Table) Presentation
Koch Modular's CURT (Construction Users Round Table) Presentation
 
Case Study: Modular Distillation System to Recover Spent Solvents
Case Study: Modular Distillation System to Recover Spent SolventsCase Study: Modular Distillation System to Recover Spent Solvents
Case Study: Modular Distillation System to Recover Spent Solvents
 
Effectively Break Azeotropes
Effectively Break AzeotropesEffectively Break Azeotropes
Effectively Break Azeotropes
 
Liquid-Liquid Extraction: Generating Equilibrium Data
Liquid-Liquid Extraction: Generating Equilibrium DataLiquid-Liquid Extraction: Generating Equilibrium Data
Liquid-Liquid Extraction: Generating Equilibrium Data
 
A Modular C2 Splitter - Hydrocarbon Engineering April 2017
A Modular C2 Splitter - Hydrocarbon Engineering April 2017A Modular C2 Splitter - Hydrocarbon Engineering April 2017
A Modular C2 Splitter - Hydrocarbon Engineering April 2017
 
Case Study: Acetic Acid Recovery from Aqueous Fermentation Broth
Case Study: Acetic Acid Recovery from Aqueous Fermentation BrothCase Study: Acetic Acid Recovery from Aqueous Fermentation Broth
Case Study: Acetic Acid Recovery from Aqueous Fermentation Broth
 
FAT Module Assembly
FAT Module AssemblyFAT Module Assembly
FAT Module Assembly
 
Project report card
Project report cardProject report card
Project report card
 
KMPS Project Documentation
KMPS Project DocumentationKMPS Project Documentation
KMPS Project Documentation
 
KMPS Extraction Column Installation
KMPS Extraction Column InstallationKMPS Extraction Column Installation
KMPS Extraction Column Installation
 
Case Study: Modular Distillation System to Recover Spent Solvents
Case Study: Modular Distillation System to Recover Spent SolventsCase Study: Modular Distillation System to Recover Spent Solvents
Case Study: Modular Distillation System to Recover Spent Solvents
 
Moving To Modular: CHEMICAL ENGINEERING, January 2015
Moving To Modular: CHEMICAL ENGINEERING, January 2015Moving To Modular: CHEMICAL ENGINEERING, January 2015
Moving To Modular: CHEMICAL ENGINEERING, January 2015
 
Enriching Liquid-Liquid Extraction: CHEMICAL ENGINEERING, November 2004
Enriching Liquid-Liquid Extraction: CHEMICAL ENGINEERING, November 2004Enriching Liquid-Liquid Extraction: CHEMICAL ENGINEERING, November 2004
Enriching Liquid-Liquid Extraction: CHEMICAL ENGINEERING, November 2004
 
Recovering and Recycling Low-Boiling Alcohols and Ketones: CHEMICAL ENGINEERI...
Recovering and Recycling Low-Boiling Alcohols and Ketones: CHEMICAL ENGINEERI...Recovering and Recycling Low-Boiling Alcohols and Ketones: CHEMICAL ENGINEERI...
Recovering and Recycling Low-Boiling Alcohols and Ketones: CHEMICAL ENGINEERI...
 
Generating Your Own VLE Data: CHEMICAL ENGINEERING, March 1995
Generating Your Own VLE Data: CHEMICAL ENGINEERING, March 1995Generating Your Own VLE Data: CHEMICAL ENGINEERING, March 1995
Generating Your Own VLE Data: CHEMICAL ENGINEERING, March 1995
 
A Fresh Look At Liquid-Liquid Extraction: CHEMICAL ENGINEERING, February 1991
A Fresh Look At Liquid-Liquid Extraction: CHEMICAL ENGINEERING, February 1991A Fresh Look At Liquid-Liquid Extraction: CHEMICAL ENGINEERING, February 1991
A Fresh Look At Liquid-Liquid Extraction: CHEMICAL ENGINEERING, February 1991
 
Solving Separation Problems using Liquid-Liquid Extraction (LLE)
Solving Separation Problems using Liquid-Liquid Extraction (LLE)Solving Separation Problems using Liquid-Liquid Extraction (LLE)
Solving Separation Problems using Liquid-Liquid Extraction (LLE)
 
Detailed Engineering Services
Detailed Engineering Services Detailed Engineering Services
Detailed Engineering Services
 
DeltaV Operator Training
DeltaV Operator Training DeltaV Operator Training
DeltaV Operator Training
 

Kürzlich hochgeladen

Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 

Kürzlich hochgeladen (20)

Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 

Case Study: Carbon Capture from Power Plant Flue Gas

  • 1. Telephone: (201) 267-8670 www.modularprocess.com Carbon Capture from Power Plant Flue Gas KMPS Whitepaper Series
  • 2. M O D U L A R P R O C E S S S Y S T E M S | D I S T I L L A T I O N | L I Q U I D E X T R A C T I O N | E N G I N E E R I N G | P I L O T T E S T I N G Telephone: (201) 267-8670 www.modularprocess.com 2 Case Study: Carbon Capture Project Koch Modular engineering team helped the client design a modular pilot plant system as a significant part of the first ever operating carbon capture and storage facility. The system was installed at a pulverized coal- fueled power plant where the captured CO2 was injected underground for permanent storage. The process boasts high CO2 removal rates, low solvent slip (release) and high CO2 purity.  CLIENT: A Major Construction and Technology Company.  INDUSTRY: Power Plant Construction
  • 3. M O D U L A R P R O C E S S S Y S T E M S | D I S T I L L A T I O N | L I Q U I D E X T R A C T I O N | E N G I N E E R I N G | P I L O T T E S T I N G Telephone: (201) 267-8670 www.modularprocess.com 3 Key Engineering Features  KMPS was selected as the supplier because of its successful experience in carbon dioxide removal and the capability of designing modular units.  As a test unit, the system was designed to accommodate a broad range of operating conditions.  Modular design allowed for the customer to concentrate on the balance of the greenfield project’s engineering, infrastructure and on-site construction activities, with minimal interruption.  KMPS’s modular system was the earliest to be completed at the site and required minimum site labor.
  • 4. M O D U L A R P R O C E S S S Y S T E M S | D I S T I L L A T I O N | L I Q U I D E X T R A C T I O N | E N G I N E E R I N G | P I L O T T E S T I N G Telephone: (201) 267-8670 www.modularprocess.com 4 Core Challenges  The solvent had a tendency to form solids at low temperatures and in stagnant spots. Proper temperature control and piping design to avoid pockets are essential.  Materials of construction – certain high temperature areas required the use of higher alloys than regular stainless steel.  Installation – most of the column packing and internals were installed in the KMPS shop but the random packing and internals had to be installed on site. A KMPS engineer was on-site to ensure proper installation.  Schedule – the project was schedule-driven. The use of KMPS modules substantially reduced the site labor requirement and shortened project schedule.
  • 5. M O D U L A R P R O C E S S S Y S T E M S | D I S T I L L A T I O N | L I Q U I D E X T R A C T I O N | E N G I N E E R I N G | P I L O T T E S T I N G Telephone: (201) 267-8670 www.modularprocess.com 5 The Solution  Multi-module flue gas carbon capture system including solvent regeneration and recovery.  Based on the client’s “Chilled Ammonia Process”.  The process first absorbs the CO2 using an ammonium carbonate solvent. The CO2 was then stripped out from the solvent in a regenerator, converting the ammonium bicarbonate back into ammonium carbonate. The latter is returned to the CO2 absorber, thus completing the solvent cycle.
  • 6. M O D U L A R P R O C E S S S Y S T E M S | D I S T I L L A T I O N | L I Q U I D E X T R A C T I O N | E N G I N E E R I N G | P I L O T T E S T I N G Telephone: (201) 267-8670 www.modularprocess.com 6 Flue Gas Return -90% CO2 Flue Gas Feed With CO2 Wash Water CO2 CO2Removal& SolventRegeneration CO2Absorber Solvent Cooling Heat Recovery Lean Solvent Rich Solvent CO2 Removal Basic Process Flow Diagram
  • 7. M O D U L A R P R O C E S S S Y S T E M S | D I S T I L L A T I O N | L I Q U I D E X T R A C T I O N | E N G I N E E R I N G | P I L O T T E S T I N G Telephone: (201) 267-8670 www.modularprocess.com 7 Installed Modular Process System
  • 8. M O D U L A R P R O C E S S S Y S T E M S | D I S T I L L A T I O N | L I Q U I D E X T R A C T I O N | E N G I N E E R I N G | P I L O T T E S T I N G Telephone: (201) 267-8670 www.modularprocess.com 8 Impact 1. Because of KMPS’ previous experience with similar projects, Koch Modular was able to capture the special design features to ensure smooth operation of the unit. 2. When the same customer needed a partner to build a larger carbon capture unit in a West Virginia power plant, Koch Modular was the logical choice. 3. Despite the complexity of the equipment, the Koch Modular unit was the most trouble-free section of the plant. 4. The pilot unit was run by the power utility for two years to test the concept – up to 300 tons a day of CO2 was compressed, injected and sequestered between layers of rock deep underground. The project was deemed a complete success.
  • 9. M O D U L A R P R O C E S S S Y S T E M S | D I S T I L L A T I O N | L I Q U I D E X T R A C T I O N | E N G I N E E R I N G | P I L O T T E S T I N G Telephone: (201) 267-8670 www.modularprocess.com 9 Why Modular from KMPS? For this project, KMPS leveraged its extensive CO2 removal experience, proprietary distributor design technology and experience designing modular process systems which resulted in a complete multi-module flue gas carbon capture system including solvent regeneration and recovery that was supplied with a Process Performance Guarantee. Our modular fabrication approach to process systems has many advantages, the main points of which are highlighted below. To learn specifically how modular fabrication achieves these benefits, please visit our website: www.modularprocess.com  Shorter schedule / faster time to market  Lower cost / lump sum bid / single source  Minimal plant site interruption / improved safety
  • 10. M O D U L A R P R O C E S S S Y S T E M S | D I S T I L L A T I O N | L I Q U I D E X T R A C T I O N | E N G I N E E R I N G | P I L O T T E S T I N G Telephone: (201) 267-8670 www.modularprocess.com 10 Koch Modular Products & Services Customer Inquiry Data Startup Assistance and Training Process Development (In Collaboration with Client’s Engineers and Scientists) Material Balance, PFD’s, Unit Operation Selection, Process Simulation Process Design Equipment Design, P&ID’s, Equipment General Arrangement Detailed Engineering Equipment, Piping, Structural, Electrical, Instrumentation & Controls Construction Modular System Specialists in Process Design and Construction of Modular Mass Transfer Systems for the Chemical Processing Industry. Pilot Plant Testing (If Required) 4
  • 11. 11 Case Study: Carbon Capture from Power Plant Flue Gas Stan Lam, P.E. | Process Engineering Manager www.linkedin.com/in/stan-lam Stan Lam is an expert in the design and troubleshooting of distillation columns. Stan has been designing, inspecting and installing distillation column trays, packing and internals for over 35 years. Stan is a graduate of The University of Birmingham and a certified Professional Engineer.