Kneat Gx
Compliance by Design




                       1
What is Kneat Gx

 Kneat Gx creates and maintains sets of product,
  process or equipment lifecycle documents with
  less effort and higher quality
 Kneat can be applied to any process where
  compliance and data integrity is business critical
  and information is shared across a set of
  documents
 For example
  – Large project execution
  – Manufacturing facility validation documentation


                                                       2
Some Large Project Execution Concerns…..

 Right First Time translation of requirements
 Collaboration across multiple stakeholders
 Engineering data management
   – Data flow between different stakeholders
   – Data integrity
   – Management of change
 C&Q process
   – Test plans need to be appropriate and optimised
   – Test documents need to be aligned with latest design
   – Management of deviations and re-work process
 Timely handover of accurate and complete data /
  information to operations
                                                            3
Typical Project Execution Outcomes

 Corrupt, inaccurate, missing data

 Test documents not aligned with design
 C&Q process delayed and over budget

 As-building exercise is a headache
 Handover to operations is problematic

 Non-optimal start up impacts company goals



                                               4
Kneat Gx Paperless Approach

 Document content is dynamically linked to a
  database which provides structure and context
 Automated assessment of the impact of change
  across all documents
 Streamlined execution of changes to documents
 Downstream life cycle documents/ test reports are
  auto-generated
 Online test execution and deviation processing
 Cloning of suites of documents for new projects
  maintaining embedded relationships
 Efficiency, Quality and Compliance built in
                                                      5
Kneat Modeling Concept




                         6
Kneat’s Powerful Leveraging of Work




           RE204 bioreactor cloned documents are at
           development closed status and are waiting for a
           document number to be assigned.




           These are new units created by simply cloning RE201
           including all of its associated documentation,
           embedded relationships and model objects.




                                                                 7
Document Change Execution Process

                                                  Affected
                                                 Documents

   Approved                                                   Auto Generate re-    Re-test
   Document                       Auto Impact                                     Documents
                                                         B1.0 test Documents
                                  Assessment
                     Change
A1.0
                    Initiation                           C1.0



A1.1                                                     D1.0



B1.1                                               Change                         Change Pre-
                    Change                          Post-                          Approval
                   Completed                      Approval
C1.1                                All docs                        Change
                                 automatically                   Execution and
                                   updated                          re-test
D1.1


        Approved
       Documents



                                                                                                8
Kneat Fit in Large Project Execution




 All lifecycle documents are generated, approved and executed within
  Kneat
 Global collaboration
 Automated and streamlined change execution
 Just in Time release of test documents
 Online testing and deviation management
 Auto-generation of test and acceptance reports

                                                                        9
Kneat Fit in Large Project Execution

                     Note: A/E can own the
                     MPD for smaller projects                                           • User/functional requirements
                                                                         Requirements   • Risk assessment
                                                                         Management
                                                                                        • Requirements traceability
                                                                         Process
  A/E Data                                                                              • Design verification




                                             Master Project    Import*
 Automation                                                                Kneat              Document
                                            Database (MPD)
  Integrator                                   Owned by
                                                                          Database            Change                  Operations
     Data                                                                                     Execution
                                            Construction Mgr

                                                                                                    • Auto-impact assessment
                                                                                                    • Auto-retest scripts
                                                                                                    • Auto doc updating

 Equipment                                                                              • FAT/SAT
  Vendor
                                                 Receipt                    C&Q         • IV/FV
   Data
                                                Verification               Process      • Online testing / Deviation Mgt
                                                 Process                                • Acceptance Reports




                                        Construction Mgt                    Kneat Gx application (Owned by Operator)
* Import on demand,
periodically or at milestone



                                                                                                                                   10
Kneat Benefits for Project Execution

 Engineering specifications and verification process
  can be standardised
 Global project execution through collaboration
  and live management oversight
 Design and test documents always aligned
   –   On-line document change execution
   –   Auto impact assessment
   –   Auto updating of affected life cycle documents
   –   Just in Time release of test protocols
 Right first time project deliverables translates to
  reduced Business Risk - Quality, Safety, Financial,
  and Operational
                                                        11
Kneat Opportunity for Operations

 Kneat can continue to provide value to operations
  in a new facility
 Instant access to original requirements, design
  basis and associated risk assessments
 Retention of project knowledge, practices and
  templates for future projects
 Ongoing document change execution related to
  facility modifications and additions
 Documentation relating to new equipment can be
  cloned from similar existing equipment

                                                      12
Kneat Supporting Ongoing Operations

                           Enterprise Document Management System

                                                                  Approved documents
                                                                  published from Kneat



                                                      Kneat Database

Initiation                                 Closeout
                                                                                         Facility
             Design               Verify
                                                                                         Modifications /
                                                                                         Upgrades
                      Construct




                                  Facility Lifecycle (20 – 30 years)                         Retirement


 Change execution based on robust impact assessment
 Lifecycle documentation is always audit ready and
  easily accessed


                                                                                                           13
Kneat Fit in Site Infrastructure
                             Management of all
                              site documents


       Publishing of              EDMS
      approved Kneat
        documents


                           Kneat           CAPA
      Generation/                                      Site Change Control
   Management of the                                          System
   content of lifecycle*
       documents
                               Doc status and
                               change details
* Lifecycle documents describe a regulated process, where info is shared across
documents and compliance and data integrity are business critical. eg Facility
Qualification

                                                                                  14
Kneat Benefits for Operations

 Ability to copy/clone work done on previous
  projects provides significant efficiencies

 Reduced time to market for new product launches

 Optimal plant performance is achieved sooner

 Lifecycle documents are audit-ready and
  maintained in a state of compliance at all times

 Lower risk of citations and warning letters

 Lower cost of compliance

                                                     15
Kneat Gx Infrastructure
 Web application based on Microsoft’s .NET
  platform
 Browser based access to secure optimized
  database
 Controlled login over Secure Sockets Layer (SSL)
 Full enterprise level scalability
 Fully validated to GAMP 5 ISPE guidelines and
  21CFR Part 11 regulations
 System architecture facilitates integration with
  other IT applications

                                                     16
17

Weitere ähnliche Inhalte

Was ist angesagt?

Was ist angesagt? (6)

Presentation PIC/S Guide to GMP PE009-13
Presentation PIC/S Guide to GMP PE009-13 Presentation PIC/S Guide to GMP PE009-13
Presentation PIC/S Guide to GMP PE009-13
 
Raw Materials Management
Raw Materials ManagementRaw Materials Management
Raw Materials Management
 
Regulatory aspect of pharmaceutical change control system
Regulatory aspect of pharmaceutical  change control systemRegulatory aspect of pharmaceutical  change control system
Regulatory aspect of pharmaceutical change control system
 
Concept of URS,DQ,IQ,OQ,PQ
Concept of URS,DQ,IQ,OQ,PQConcept of URS,DQ,IQ,OQ,PQ
Concept of URS,DQ,IQ,OQ,PQ
 
Lean Startup Tools for Agile Product Teams
Lean Startup Tools for Agile Product TeamsLean Startup Tools for Agile Product Teams
Lean Startup Tools for Agile Product Teams
 
GMP- APQR Training
GMP- APQR TrainingGMP- APQR Training
GMP- APQR Training
 

Ähnlich wie Kneat Gx Compliance by Design

Software configuration management
Software configuration managementSoftware configuration management
Software configuration management
Shivani Garg
 
Improving safety, efficiency and regulatory compliance via asset documentatio...
Improving safety, efficiency and regulatory compliance via asset documentatio...Improving safety, efficiency and regulatory compliance via asset documentatio...
Improving safety, efficiency and regulatory compliance via asset documentatio...
IBM Danmark
 
Walley.tina
Walley.tinaWalley.tina
Walley.tina
NASAPMC
 
OOW 09 EBS Application Change Management Pack
OOW 09 EBS Application Change Management PackOOW 09 EBS Application Change Management Pack
OOW 09 EBS Application Change Management Pack
jucaab
 
How to bake in quality in agile scrum projects
How to bake in quality in agile scrum projectsHow to bake in quality in agile scrum projects
How to bake in quality in agile scrum projects
Santanu Bhattacharya
 
Digital transformation presentation
Digital transformation presentationDigital transformation presentation
Digital transformation presentation
Siba Panda
 
Aras Partner Solution by Minerva
Aras Partner Solution by MinervaAras Partner Solution by Minerva
Aras Partner Solution by Minerva
Aras
 
06 operations and feedback dap-kabel
06   operations and feedback dap-kabel06   operations and feedback dap-kabel
06 operations and feedback dap-kabel
David Alvarez Palomo
 

Ähnlich wie Kneat Gx Compliance by Design (20)

Adv prod tools assgn5
Adv prod tools assgn5Adv prod tools assgn5
Adv prod tools assgn5
 
Software configuration management
Software configuration managementSoftware configuration management
Software configuration management
 
Improving safety, efficiency and regulatory compliance via asset documentatio...
Improving safety, efficiency and regulatory compliance via asset documentatio...Improving safety, efficiency and regulatory compliance via asset documentatio...
Improving safety, efficiency and regulatory compliance via asset documentatio...
 
XebiaLabs, CloudBees, Puppet Labs Webinar Slides - IT Automation for the Mode...
XebiaLabs, CloudBees, Puppet Labs Webinar Slides - IT Automation for the Mode...XebiaLabs, CloudBees, Puppet Labs Webinar Slides - IT Automation for the Mode...
XebiaLabs, CloudBees, Puppet Labs Webinar Slides - IT Automation for the Mode...
 
Avea Release Management IBM Innovate 2012
Avea Release Management IBM Innovate 2012Avea Release Management IBM Innovate 2012
Avea Release Management IBM Innovate 2012
 
Skyward Erp Presentation
Skyward Erp PresentationSkyward Erp Presentation
Skyward Erp Presentation
 
ITS-Fidel
ITS-FidelITS-Fidel
ITS-Fidel
 
Walley.tina
Walley.tinaWalley.tina
Walley.tina
 
OOW 09 EBS Application Change Management Pack
OOW 09 EBS Application Change Management PackOOW 09 EBS Application Change Management Pack
OOW 09 EBS Application Change Management Pack
 
2012 URISA Track, How to Conduct Geographic Information Systems (GIS) Work wi...
2012 URISA Track, How to Conduct Geographic Information Systems (GIS) Work wi...2012 URISA Track, How to Conduct Geographic Information Systems (GIS) Work wi...
2012 URISA Track, How to Conduct Geographic Information Systems (GIS) Work wi...
 
How to bake in quality in agile scrum projects
How to bake in quality in agile scrum projectsHow to bake in quality in agile scrum projects
How to bake in quality in agile scrum projects
 
Digital transformation presentation
Digital transformation presentationDigital transformation presentation
Digital transformation presentation
 
V-Empower Technical Competence Workflow
V-Empower Technical Competence WorkflowV-Empower Technical Competence Workflow
V-Empower Technical Competence Workflow
 
Voyager scm
Voyager scmVoyager scm
Voyager scm
 
Voyager scm
Voyager scmVoyager scm
Voyager scm
 
Unosquare SlideShare Presentation
Unosquare SlideShare PresentationUnosquare SlideShare Presentation
Unosquare SlideShare Presentation
 
Aras Partner Solution by Minerva
Aras Partner Solution by MinervaAras Partner Solution by Minerva
Aras Partner Solution by Minerva
 
06 operations and feedback dap-kabel
06   operations and feedback dap-kabel06   operations and feedback dap-kabel
06 operations and feedback dap-kabel
 
Pre-TechEd EMEA 2012 - SCOM 2012 Down in the cloud
Pre-TechEd EMEA 2012 - SCOM 2012 Down in the cloudPre-TechEd EMEA 2012 - SCOM 2012 Down in the cloud
Pre-TechEd EMEA 2012 - SCOM 2012 Down in the cloud
 
Java Batch for Cost Optimized Efficiency
Java Batch for Cost Optimized EfficiencyJava Batch for Cost Optimized Efficiency
Java Batch for Cost Optimized Efficiency
 

Kneat Gx Compliance by Design

  • 2. What is Kneat Gx  Kneat Gx creates and maintains sets of product, process or equipment lifecycle documents with less effort and higher quality  Kneat can be applied to any process where compliance and data integrity is business critical and information is shared across a set of documents  For example – Large project execution – Manufacturing facility validation documentation 2
  • 3. Some Large Project Execution Concerns…..  Right First Time translation of requirements  Collaboration across multiple stakeholders  Engineering data management – Data flow between different stakeholders – Data integrity – Management of change  C&Q process – Test plans need to be appropriate and optimised – Test documents need to be aligned with latest design – Management of deviations and re-work process  Timely handover of accurate and complete data / information to operations 3
  • 4. Typical Project Execution Outcomes  Corrupt, inaccurate, missing data  Test documents not aligned with design  C&Q process delayed and over budget  As-building exercise is a headache  Handover to operations is problematic  Non-optimal start up impacts company goals 4
  • 5. Kneat Gx Paperless Approach  Document content is dynamically linked to a database which provides structure and context  Automated assessment of the impact of change across all documents  Streamlined execution of changes to documents  Downstream life cycle documents/ test reports are auto-generated  Online test execution and deviation processing  Cloning of suites of documents for new projects maintaining embedded relationships  Efficiency, Quality and Compliance built in 5
  • 7. Kneat’s Powerful Leveraging of Work RE204 bioreactor cloned documents are at development closed status and are waiting for a document number to be assigned. These are new units created by simply cloning RE201 including all of its associated documentation, embedded relationships and model objects. 7
  • 8. Document Change Execution Process Affected Documents Approved Auto Generate re- Re-test Document Auto Impact Documents B1.0 test Documents Assessment Change A1.0 Initiation C1.0 A1.1 D1.0 B1.1 Change Change Pre- Change Post- Approval Completed Approval C1.1 All docs Change automatically Execution and updated re-test D1.1 Approved Documents 8
  • 9. Kneat Fit in Large Project Execution  All lifecycle documents are generated, approved and executed within Kneat  Global collaboration  Automated and streamlined change execution  Just in Time release of test documents  Online testing and deviation management  Auto-generation of test and acceptance reports 9
  • 10. Kneat Fit in Large Project Execution Note: A/E can own the MPD for smaller projects • User/functional requirements Requirements • Risk assessment Management • Requirements traceability Process A/E Data • Design verification Master Project Import* Automation Kneat Document Database (MPD) Integrator Owned by Database Change Operations Data Execution Construction Mgr • Auto-impact assessment • Auto-retest scripts • Auto doc updating Equipment • FAT/SAT Vendor Receipt C&Q • IV/FV Data Verification Process • Online testing / Deviation Mgt Process • Acceptance Reports Construction Mgt Kneat Gx application (Owned by Operator) * Import on demand, periodically or at milestone 10
  • 11. Kneat Benefits for Project Execution  Engineering specifications and verification process can be standardised  Global project execution through collaboration and live management oversight  Design and test documents always aligned – On-line document change execution – Auto impact assessment – Auto updating of affected life cycle documents – Just in Time release of test protocols  Right first time project deliverables translates to reduced Business Risk - Quality, Safety, Financial, and Operational 11
  • 12. Kneat Opportunity for Operations  Kneat can continue to provide value to operations in a new facility  Instant access to original requirements, design basis and associated risk assessments  Retention of project knowledge, practices and templates for future projects  Ongoing document change execution related to facility modifications and additions  Documentation relating to new equipment can be cloned from similar existing equipment 12
  • 13. Kneat Supporting Ongoing Operations Enterprise Document Management System Approved documents published from Kneat Kneat Database Initiation Closeout Facility Design Verify Modifications / Upgrades Construct Facility Lifecycle (20 – 30 years) Retirement  Change execution based on robust impact assessment  Lifecycle documentation is always audit ready and easily accessed 13
  • 14. Kneat Fit in Site Infrastructure Management of all site documents Publishing of EDMS approved Kneat documents Kneat CAPA Generation/ Site Change Control Management of the System content of lifecycle* documents Doc status and change details * Lifecycle documents describe a regulated process, where info is shared across documents and compliance and data integrity are business critical. eg Facility Qualification 14
  • 15. Kneat Benefits for Operations  Ability to copy/clone work done on previous projects provides significant efficiencies  Reduced time to market for new product launches  Optimal plant performance is achieved sooner  Lifecycle documents are audit-ready and maintained in a state of compliance at all times  Lower risk of citations and warning letters  Lower cost of compliance 15
  • 16. Kneat Gx Infrastructure  Web application based on Microsoft’s .NET platform  Browser based access to secure optimized database  Controlled login over Secure Sockets Layer (SSL)  Full enterprise level scalability  Fully validated to GAMP 5 ISPE guidelines and 21CFR Part 11 regulations  System architecture facilitates integration with other IT applications 16
  • 17. 17