SlideShare ist ein Scribd-Unternehmen logo
1 von 1
Downloaden Sie, um offline zu lesen
C3 E5 G7 H8
1
2
3
4
5
9
D4
8
OPEN TO
ENTERANCE
LOBBEY BELLOW
7
6
F6A1
HA 150mm DIAMIETER
CIRCULAR STEEL COLUMN
RESTING ON THE SUPORTING
STRUCTION OF THE FIRST
FLOOR AND EXTENDING UP TO
THE INTERSECTIONS OF W250
X 40 STEEL BEAMS ON THE
FIRST AND SECOND FLOOR
ABOVE
B2 J9
10107901810790
1010
254
190
47904797
3400 120050001590 1010 1010990 1010 1790
9335
3000 4190
31911010119010101190199010103905590
5200 3684 1906 881 2137 5782 3400 1200
19826 4835
W3
2010
910
50
WA
910 50
50
71267
92150
50
1810
822 822
67
501076
67
55750
3000
1417 1417
67
50
1076
67
55750
1800
1800
1010
EXTERIOR - SINGLE PUNCH
FIRST FLOOR
- REFER TO NOTES
- ALUMINUM STOREFRONT WINDOW
- KAWNEER 5500 PUNCH
STOREFRONT CURRENT WALL
CONSTUCTION
-ISOWEB™ GLASS REINFORCED
WITH NYLON THERMAL BREAK
PROVIDES LOW THERMAL
TRANSMITTANCE, HIGH
CONDENSATION RESISTANCE AND
ELIMINATES DRY SHRINKAGE
EXTERIOR - DOUBLE PUNCH
SECOND FLOOR
DOUBLE WIDE PUNCH FIRST FLOOR
WD WE
1800
WJ NORTH SOUTH PARALLEL
VESTIBULE CURTAIN WALL
WK
EAST SOUTH PARALLEL
VESTIBULE CURTAIN WALL
2610
2810
1510
3024
3123
6146
6146
3600
5200
2499
1745
1610
1260
400
STAIR B
201
1400
SOUTH MAIN ENTERANCE LOBBY
2 STORIE CURTAIN WALL
WK
WEST ENTERANCE LOBBY 2
STORIE CURTAIN WALL
LOW ROOF
BELOW
P1
P-3
P-3
W3
P-2
W-2
W-2
W-2
P1
P1
P1
P-2
D1
D1
D1
D1D23
41
P1
P-2
W3
WL
WO
5000
WH
WF
510 2810 790 2810 790 5690
5233
WE WE
3210
WG
380mm DRAIN
STRAINER WITH
200mm ROOF
DRAIN
WH
WI
WB
WD
WB
WB
WBWB WC
1340055905590
5590
MECH.SHAFT
411
19051140
P-3
4083
A-7
3
D22
D22
P-2
W3W3
P-2
W3
W3
P-2
P1
P1
9186 460364 4962 172 4133 118 2143
118
- REFER TO NOTES
- ALUMINUM STOREFRONT WINDOW
- KAWNEER 5500 PUNCH
STOREFRONT CURRENT WALL
CONSTUCTION
-ISOWEB™ GLASS REINFORCED
WITH NYLON THERMAL BREAK
PROVIDES LOW THERMAL
TRANSMITTANCE, HIGH
CONDENSATION RESISTANCE AND
ELIMINATES DRY SHRINKAGE
- REFER TO NOTES
- ALUMINUM STOREFRONT WINDOW
- KAWNEER 5500 PUNCH STOREFRONT
CURRENT WALL CONSTUCTION
-ISOWEB™ GLASS REINFORCED WITH
NYLON THERMAL BREAK PROVIDES
LOW THERMAL TRANSMITTANCE, HIGH
CONDENSATION RESISTANCE AND
ELIMINATES DRY SHRINKAGE
- REFER TO NOTES
- ALUMINUM STOREFRONT WINDOW
- KAWNEER1600 LR Wall™ CURTAIN
WALL SYSTEM
- STRUCTRAL SILICONE GLAZED
VERTICALS AND CAPTURED
HORIZONTALS
- EXTRUDED JOINT PLUGS REQUIRED
WITH WEEPED INTERMEDIATE
HORIZONTALS
-PERMANODIC™ ANODIZED FINISH
- REFER TO NOTES
- ALUMINUM STOREFRONT WINDOW
- KAWNEER1600 LR Wall™ CURTAIN
WALL SYSTEM
- STRUCTRAL SILICONE GLAZED
VERTICALS AND CAPTURED
HORIZONTALS
- EXTRUDED JOINT PLUGS REQUIRED
WITH WEEPED INTERMEDIATE
HORIZONTALS
-PERMANODIC™ ANODIZED FINISH
- REFER TO NOTES
- ALUMINUM STOREFRONT WINDOW
- KAWNEER1600 LR Wall™ CURTAIN
WALL SYSTEM
- STRUCTRAL SILICONE GLAZED
VERTICALS AND CAPTURED
HORIZONTALS
- EXTRUDED JOINT PLUGS REQUIRED
WITH WEEPED INTERMEDIATE
HORIZONTALS
-PERMANODIC™ ANODIZED FINISH
- REFER TO NOTES
- ALUMINUM STOREFRONT WINDOW
- KAWNEER1600 LR Wall™ CURTAIN
WALL SYSTEM
- STRUCTRAL SILICONE GLAZED
VERTICALS AND CAPTURED
HORIZONTALS
- EXTRUDED JOINT PLUGS REQUIRED
WITH WEEPED INTERMEDIATE
HORIZONTALS
-PERMANODIC™ ANODIZED FINISH
ELEVATOR ROOM
ST-104
VAULT
Room
ST-112
MENS
WASHROOM
ST-110
1600
PEACH
ALABASTER
WATERABLE
SILL
Room
ST-111
118 118
1903194
WF
400
400
50
Room
109Room
110
100 1071
64
1113
64
1113
51
900
51
547
64
64
500
64
1219
64
1300
64
1300
64
700
64
400
5137
5400
290
2572
146
1088
64
1024
64
123
64
64
337
64
700
64
130064
2590
64 693
64
900
64
1062
146
641100
64
130064
2991
2590
1428 1428 64146 1428
4495
- REFER TO NOTES
- ALUMINUM STOREFRONT WINDOW
- KAWNEER1600 LR Wall™ CURTAIN
WALL SYSTEM
- STRUCTRAL SILICONE GLAZED
VERTICALS AND CAPTURED
HORIZONTALS
- EXTRUDED JOINT PLUGS REQUIRED
WITH WEEPED INTERMEDIATE
HORIZONTALS
-PERMANODIC™ ANODIZED FINISH
INTERIOR - SECOND FLOOR
SOUTH FACEING CURTAIN WALL
WL
64
1679
64
1530
64
3400
TOP OF FINISHED GROUND FLOOR=
TOP OF FINSIHED SECOND FLOOR=
64 1326
64
1353
64
1353
64
1311
400
5700
64700
64
1300
64
1300
64
1219
64
50064
5400
290
WO - REFER TO NOTES
- ALUMINUM STOREFRONT WINDOW
- KAWNEER1600 LR Wall™ CURTAIN
WALL SYSTEM
- STRUCTRAL SILICONE GLAZED
VERTICALS AND CAPTURED
HORIZONTALS
- EXTRUDED JOINT PLUGS REQUIRED
WITH WEEPED INTERMEDIATE
HORIZONTALS
-PERMANODIC™ ANODIZED FINISH
64
1187
64
1187
64
1187
64
1187
146
5147
64
1600
64
1609
64
3400
INTERIOR - SECOND FLOOR WEST
FACEING CURTAIN WALL
Scale
Date
Drawn by
FUTURE ARCHITECTURE
AND CONSTRUCTION
ENGINEERING
TECHNOLOGIST
Sheet No.
KIERAN
TRIMBEE
DESIGN CO.
1 : 100
11/6/201411:30:30PM
A-2
ARCHITECTUAL PLANS
AND SCHEDULES
ARCH1030 MAJOR
PROJECT
10/24/2014
Author
GO FOR BROKE DESIGN
GROUP
1 : 100
A-2
SECOND FLOOR PLAN1
NORTH
1 : 100
A-2
WINDOW SCHEDULE2
WINDOW NOTES
1. PROVIDE NEW WINDOWS OF THE HIGHEST POSSIBLE QUALITY AND WITH A MINIMUN 10 YEAR WARRANTY ON
ALL PARTS INCLUDING GLAZING.
2. ALL NEW FRAMES SHALL BE THERMALLY BROKEN ANODIZED ALUMINUM, COMPLETE WITH ANODIZED
EXTRUDED ALUMINUM SILL. ACCEPTABLE MANUFACTURERS, KAWNEER, OR EQ.
3. SLIDERS SHALL BE LOCATED AT THE INNER AND OUTER SIDES OF THE WINDOWS. SLIDER COMPONENTS
SHALL CONTAIN NEOPRENE ROLLERS WITH WEATHERSTRIPPING FOR A WEATHER TIGHT SEAL. PROVIDE A
HEAVY DUTY SCREEN ON THE ON EXTERIOR PROVIDE LIMIT STOPS TO PREVENT WINDOWS FROM OPENING
GREATER THAN 4".
4. GLAZING MUST BE THERMALLY BROKEN WITH SEALED UNITS FROM AN IGMAC CERTIFIED MANUFACTURER
AND CARRY A MINIMUM 10 YEAR WARRANTY.
5. WINDOWS TO CONFORM TO THE CURRENT CAN/CSA A440 WINDOW STANDARD WITH DOCUMENTED RATINGS
OF A3,B3 AND C3. PROVIDE DOCUMENTATION SUPPORTING TESTING IF REQUIRED BY CONSLTANTS.
6. PROVIDE THE OWNER WITH CUT SAMPLES INDICATING ALL REQUIRED OPTIONS AND GIVE AMPLE TIME FOR
OWNER TO MAKE APPROPRIATE SECTIONS THAT WILL NOT DELAY THE CONSTRUCTION OF THE BIULDING
7. WHERE NEW WINDOWS FIT INTO EXISTING OPENINGS THAT ARE NOT ALTERED, VERIFY ALL DIMENSTIONS
PRIOR TO ORDERING WINDOWS.
8. WHERE ALL NEW WINDOW OPENINGS ARE TO BE INSTALLED, CREATE NEW OPENINGS FIRST THEN VERIFY
OPENING DIMENSIONS PRIOR TO ORDERING WINDOWS.
9. ENSURE WINDOWS ARE ORDERED AND AVAILABLE ON SITE IN A TIMELY BASIS.
10. FOLLOW INSALLATION RECOMMENDATIONS BY WINDOW MANUFACTURER.
11. INSTALL LOW EXPANSION FAOM INSULATION AROUND ALL WINDOW PERIMETERS.
12. FOR ALL WINDOWS, BOTH NEW AND EXISTING, PROVIDE NEW WOOD LAMINATE STOOL WITH WOOD TRIM.
13. SEALANTS
A. PROVIDE CLOSED CELL FOAM BACKER ROD AND CAULKING AROUND ALL WINDOW AND DOOR
PERIMETERS AND WHERE SIDING BUTTS AGAINST MASONRY.
B. ENSURE PROPER CAULKING JOINT WIDTH TO DEPTH RATIO OF 2:1 IS MAINTAINED.
C. FOLLOW MANUFACTURERS RECOMMENDED METHODS FOR INSTALLATION OF CAULKING SEALANTS
D. USE ONLY HIGH QUALITY MATERIALS AS MANUFACTURED BY TREMCO OR EQUIVALENT. DO NOT USE
MONO OR DAP.

Weitere ähnliche Inhalte

Was ist angesagt?

Centre for the Creative Arts and Media (CCAM) | GMIT General Arrangment Drawings
Centre for the Creative Arts and Media (CCAM) | GMIT General Arrangment DrawingsCentre for the Creative Arts and Media (CCAM) | GMIT General Arrangment Drawings
Centre for the Creative Arts and Media (CCAM) | GMIT General Arrangment DrawingsJonathan Flanagan
 
Construction pdf major project
Construction pdf major projectConstruction pdf major project
Construction pdf major projectYolanda Sewpersad
 
Final year Revit project
Final year Revit projectFinal year Revit project
Final year Revit projectMark Thornton
 
Pearce Avenue Project
Pearce Avenue ProjectPearce Avenue Project
Pearce Avenue Projectcharliewynn_3
 
Rocom general catalog
Rocom general catalogRocom general catalog
Rocom general catalogElectromate
 
Chobe River College School Hall + Master Site Plan
Chobe River College School Hall + Master Site PlanChobe River College School Hall + Master Site Plan
Chobe River College School Hall + Master Site PlanGrant Hepburn
 
orion installation illuminated
orion installation illuminatedorion installation illuminated
orion installation illuminatedPeter Hoban
 
India’s !st & only Hollywood benchmarked studio facility
India’s !st & only Hollywood benchmarked studio facilityIndia’s !st & only Hollywood benchmarked studio facility
India’s !st & only Hollywood benchmarked studio facilityarchana jhangiani
 
Municipal Hays-SECTION-ELEVATIONS-A3 (2)
Municipal Hays-SECTION-ELEVATIONS-A3 (2)Municipal Hays-SECTION-ELEVATIONS-A3 (2)
Municipal Hays-SECTION-ELEVATIONS-A3 (2)David Dinsdale
 
Mark Thornton Portfolio
Mark Thornton PortfolioMark Thornton Portfolio
Mark Thornton PortfolioMark Thornton
 
Plano Caja Acustica 18s kit18
Plano Caja Acustica 18s kit18Plano Caja Acustica 18s kit18
Plano Caja Acustica 18s kit18Alexander Segnini
 
Eldon Electrical Enclosures - Floor Standing Stainless Steel Enclosures
Eldon Electrical Enclosures - Floor Standing Stainless Steel Enclosures Eldon Electrical Enclosures - Floor Standing Stainless Steel Enclosures
Eldon Electrical Enclosures - Floor Standing Stainless Steel Enclosures Thorne & Derrick International
 

Was ist angesagt? (20)

Centre for the Creative Arts and Media (CCAM) | GMIT General Arrangment Drawings
Centre for the Creative Arts and Media (CCAM) | GMIT General Arrangment DrawingsCentre for the Creative Arts and Media (CCAM) | GMIT General Arrangment Drawings
Centre for the Creative Arts and Media (CCAM) | GMIT General Arrangment Drawings
 
Construction pdf major project
Construction pdf major projectConstruction pdf major project
Construction pdf major project
 
Studiowork submission
Studiowork submission Studiowork submission
Studiowork submission
 
Final year Revit project
Final year Revit projectFinal year Revit project
Final year Revit project
 
Pearce avenue
Pearce avenuePearce avenue
Pearce avenue
 
Pearce Avenue Project
Pearce Avenue ProjectPearce Avenue Project
Pearce Avenue Project
 
15-106 3
15-106 315-106 3
15-106 3
 
Rocom general catalog
Rocom general catalogRocom general catalog
Rocom general catalog
 
Chobe River College School Hall + Master Site Plan
Chobe River College School Hall + Master Site PlanChobe River College School Hall + Master Site Plan
Chobe River College School Hall + Master Site Plan
 
ERDENEBAT 374-3
ERDENEBAT 374-3ERDENEBAT 374-3
ERDENEBAT 374-3
 
LD-MP-01 @ issue C
LD-MP-01 @ issue CLD-MP-01 @ issue C
LD-MP-01 @ issue C
 
orion installation illuminated
orion installation illuminatedorion installation illuminated
orion installation illuminated
 
India’s !st & only Hollywood benchmarked studio facility
India’s !st & only Hollywood benchmarked studio facilityIndia’s !st & only Hollywood benchmarked studio facility
India’s !st & only Hollywood benchmarked studio facility
 
Municipal Hays-SECTION-ELEVATIONS-A3 (2)
Municipal Hays-SECTION-ELEVATIONS-A3 (2)Municipal Hays-SECTION-ELEVATIONS-A3 (2)
Municipal Hays-SECTION-ELEVATIONS-A3 (2)
 
Working drawings
Working drawingsWorking drawings
Working drawings
 
Mark Thornton Portfolio
Mark Thornton PortfolioMark Thornton Portfolio
Mark Thornton Portfolio
 
M25 Wire
M25 WireM25 Wire
M25 Wire
 
Khupe River Lodge
Khupe River LodgeKhupe River Lodge
Khupe River Lodge
 
Plano Caja Acustica 18s kit18
Plano Caja Acustica 18s kit18Plano Caja Acustica 18s kit18
Plano Caja Acustica 18s kit18
 
Eldon Electrical Enclosures - Floor Standing Stainless Steel Enclosures
Eldon Electrical Enclosures - Floor Standing Stainless Steel Enclosures Eldon Electrical Enclosures - Floor Standing Stainless Steel Enclosures
Eldon Electrical Enclosures - Floor Standing Stainless Steel Enclosures
 

Andere mochten auch

Andere mochten auch (14)

Uttar Pradesh Flood Situation Report (July 18 2011)
Uttar Pradesh Flood Situation Report  (July 18 2011)Uttar Pradesh Flood Situation Report  (July 18 2011)
Uttar Pradesh Flood Situation Report (July 18 2011)
 
up presentation
up presentationup presentation
up presentation
 
Naga
NagaNaga
Naga
 
Nagaland
NagalandNagaland
Nagaland
 
Thermal performance of rural architecture in jharkhand case study of typical ...
Thermal performance of rural architecture in jharkhand case study of typical ...Thermal performance of rural architecture in jharkhand case study of typical ...
Thermal performance of rural architecture in jharkhand case study of typical ...
 
Himachal & nagaland
Himachal & nagalandHimachal & nagaland
Himachal & nagaland
 
North india architecture
North india architectureNorth india architecture
North india architecture
 
Nagaland (The land of Culture)
Nagaland (The land of Culture)Nagaland (The land of Culture)
Nagaland (The land of Culture)
 
Uttar pradesh
Uttar pradeshUttar pradesh
Uttar pradesh
 
Intoduction of UP
Intoduction of UPIntoduction of UP
Intoduction of UP
 
Uttar pradesh
Uttar pradeshUttar pradesh
Uttar pradesh
 
Rural housing in india
Rural housing in indiaRural housing in india
Rural housing in india
 
VERNACULAR ARCHITECTURE
VERNACULAR ARCHITECTUREVERNACULAR ARCHITECTURE
VERNACULAR ARCHITECTURE
 
Thesis on earth architecture
Thesis on earth architectureThesis on earth architecture
Thesis on earth architecture
 

Ähnlich wie Go For Broke Arch A-2

Ähnlich wie Go For Broke Arch A-2 (20)

House Carol Submission
House Carol SubmissionHouse Carol Submission
House Carol Submission
 
Katie Johnson Portfolio
Katie Johnson PortfolioKatie Johnson Portfolio
Katie Johnson Portfolio
 
RSD Sample
RSD SampleRSD Sample
RSD Sample
 
Proposed Builder's Work Plan for Pub/Restaurant
Proposed Builder's Work Plan for Pub/RestaurantProposed Builder's Work Plan for Pub/Restaurant
Proposed Builder's Work Plan for Pub/Restaurant
 
House Odendahl (SITE PLAN)-A1
House Odendahl (SITE PLAN)-A1House Odendahl (SITE PLAN)-A1
House Odendahl (SITE PLAN)-A1
 
Marine-Engg-Fans
Marine-Engg-FansMarine-Engg-Fans
Marine-Engg-Fans
 
Bonner House - Set.pdf
Bonner House - Set.pdfBonner House - Set.pdf
Bonner House - Set.pdf
 
Ktrimbee A-4
Ktrimbee A-4Ktrimbee A-4
Ktrimbee A-4
 
House Plan For Robert Ledwaba
House Plan For Robert LedwabaHouse Plan For Robert Ledwaba
House Plan For Robert Ledwaba
 
61677859-Nooter-Eriksen-Presentation-2.pdf
61677859-Nooter-Eriksen-Presentation-2.pdf61677859-Nooter-Eriksen-Presentation-2.pdf
61677859-Nooter-Eriksen-Presentation-2.pdf
 
ATECO GENERAL CATALOGUE JP
ATECO GENERAL CATALOGUE JPATECO GENERAL CATALOGUE JP
ATECO GENERAL CATALOGUE JP
 
Industrial visit(ved kumar -1216540115)
Industrial visit(ved kumar -1216540115)Industrial visit(ved kumar -1216540115)
Industrial visit(ved kumar -1216540115)
 
Tlalanyane Residence Proposal
Tlalanyane Residence ProposalTlalanyane Residence Proposal
Tlalanyane Residence Proposal
 
FBP_1200 Series details-1213
FBP_1200 Series details-1213FBP_1200 Series details-1213
FBP_1200 Series details-1213
 
NEWCON Knife Gate Valve for Slurry Application
NEWCON Knife Gate Valve for Slurry ApplicationNEWCON Knife Gate Valve for Slurry Application
NEWCON Knife Gate Valve for Slurry Application
 
24 Finch St Working Drawings
24 Finch St Working Drawings24 Finch St Working Drawings
24 Finch St Working Drawings
 
Knife Edge Gate Valve
Knife Edge Gate ValveKnife Edge Gate Valve
Knife Edge Gate Valve
 
House Harripersad Submission
House Harripersad SubmissionHouse Harripersad Submission
House Harripersad Submission
 
Atrium Details
Atrium DetailsAtrium Details
Atrium Details
 
BE catalogue v0 7
BE catalogue v0 7BE catalogue v0 7
BE catalogue v0 7
 

Go For Broke Arch A-2

  • 1. C3 E5 G7 H8 1 2 3 4 5 9 D4 8 OPEN TO ENTERANCE LOBBEY BELLOW 7 6 F6A1 HA 150mm DIAMIETER CIRCULAR STEEL COLUMN RESTING ON THE SUPORTING STRUCTION OF THE FIRST FLOOR AND EXTENDING UP TO THE INTERSECTIONS OF W250 X 40 STEEL BEAMS ON THE FIRST AND SECOND FLOOR ABOVE B2 J9 10107901810790 1010 254 190 47904797 3400 120050001590 1010 1010990 1010 1790 9335 3000 4190 31911010119010101190199010103905590 5200 3684 1906 881 2137 5782 3400 1200 19826 4835 W3 2010 910 50 WA 910 50 50 71267 92150 50 1810 822 822 67 501076 67 55750 3000 1417 1417 67 50 1076 67 55750 1800 1800 1010 EXTERIOR - SINGLE PUNCH FIRST FLOOR - REFER TO NOTES - ALUMINUM STOREFRONT WINDOW - KAWNEER 5500 PUNCH STOREFRONT CURRENT WALL CONSTUCTION -ISOWEB™ GLASS REINFORCED WITH NYLON THERMAL BREAK PROVIDES LOW THERMAL TRANSMITTANCE, HIGH CONDENSATION RESISTANCE AND ELIMINATES DRY SHRINKAGE EXTERIOR - DOUBLE PUNCH SECOND FLOOR DOUBLE WIDE PUNCH FIRST FLOOR WD WE 1800 WJ NORTH SOUTH PARALLEL VESTIBULE CURTAIN WALL WK EAST SOUTH PARALLEL VESTIBULE CURTAIN WALL 2610 2810 1510 3024 3123 6146 6146 3600 5200 2499 1745 1610 1260 400 STAIR B 201 1400 SOUTH MAIN ENTERANCE LOBBY 2 STORIE CURTAIN WALL WK WEST ENTERANCE LOBBY 2 STORIE CURTAIN WALL LOW ROOF BELOW P1 P-3 P-3 W3 P-2 W-2 W-2 W-2 P1 P1 P1 P-2 D1 D1 D1 D1D23 41 P1 P-2 W3 WL WO 5000 WH WF 510 2810 790 2810 790 5690 5233 WE WE 3210 WG 380mm DRAIN STRAINER WITH 200mm ROOF DRAIN WH WI WB WD WB WB WBWB WC 1340055905590 5590 MECH.SHAFT 411 19051140 P-3 4083 A-7 3 D22 D22 P-2 W3W3 P-2 W3 W3 P-2 P1 P1 9186 460364 4962 172 4133 118 2143 118 - REFER TO NOTES - ALUMINUM STOREFRONT WINDOW - KAWNEER 5500 PUNCH STOREFRONT CURRENT WALL CONSTUCTION -ISOWEB™ GLASS REINFORCED WITH NYLON THERMAL BREAK PROVIDES LOW THERMAL TRANSMITTANCE, HIGH CONDENSATION RESISTANCE AND ELIMINATES DRY SHRINKAGE - REFER TO NOTES - ALUMINUM STOREFRONT WINDOW - KAWNEER 5500 PUNCH STOREFRONT CURRENT WALL CONSTUCTION -ISOWEB™ GLASS REINFORCED WITH NYLON THERMAL BREAK PROVIDES LOW THERMAL TRANSMITTANCE, HIGH CONDENSATION RESISTANCE AND ELIMINATES DRY SHRINKAGE - REFER TO NOTES - ALUMINUM STOREFRONT WINDOW - KAWNEER1600 LR Wall™ CURTAIN WALL SYSTEM - STRUCTRAL SILICONE GLAZED VERTICALS AND CAPTURED HORIZONTALS - EXTRUDED JOINT PLUGS REQUIRED WITH WEEPED INTERMEDIATE HORIZONTALS -PERMANODIC™ ANODIZED FINISH - REFER TO NOTES - ALUMINUM STOREFRONT WINDOW - KAWNEER1600 LR Wall™ CURTAIN WALL SYSTEM - STRUCTRAL SILICONE GLAZED VERTICALS AND CAPTURED HORIZONTALS - EXTRUDED JOINT PLUGS REQUIRED WITH WEEPED INTERMEDIATE HORIZONTALS -PERMANODIC™ ANODIZED FINISH - REFER TO NOTES - ALUMINUM STOREFRONT WINDOW - KAWNEER1600 LR Wall™ CURTAIN WALL SYSTEM - STRUCTRAL SILICONE GLAZED VERTICALS AND CAPTURED HORIZONTALS - EXTRUDED JOINT PLUGS REQUIRED WITH WEEPED INTERMEDIATE HORIZONTALS -PERMANODIC™ ANODIZED FINISH - REFER TO NOTES - ALUMINUM STOREFRONT WINDOW - KAWNEER1600 LR Wall™ CURTAIN WALL SYSTEM - STRUCTRAL SILICONE GLAZED VERTICALS AND CAPTURED HORIZONTALS - EXTRUDED JOINT PLUGS REQUIRED WITH WEEPED INTERMEDIATE HORIZONTALS -PERMANODIC™ ANODIZED FINISH ELEVATOR ROOM ST-104 VAULT Room ST-112 MENS WASHROOM ST-110 1600 PEACH ALABASTER WATERABLE SILL Room ST-111 118 118 1903194 WF 400 400 50 Room 109Room 110 100 1071 64 1113 64 1113 51 900 51 547 64 64 500 64 1219 64 1300 64 1300 64 700 64 400 5137 5400 290 2572 146 1088 64 1024 64 123 64 64 337 64 700 64 130064 2590 64 693 64 900 64 1062 146 641100 64 130064 2991 2590 1428 1428 64146 1428 4495 - REFER TO NOTES - ALUMINUM STOREFRONT WINDOW - KAWNEER1600 LR Wall™ CURTAIN WALL SYSTEM - STRUCTRAL SILICONE GLAZED VERTICALS AND CAPTURED HORIZONTALS - EXTRUDED JOINT PLUGS REQUIRED WITH WEEPED INTERMEDIATE HORIZONTALS -PERMANODIC™ ANODIZED FINISH INTERIOR - SECOND FLOOR SOUTH FACEING CURTAIN WALL WL 64 1679 64 1530 64 3400 TOP OF FINISHED GROUND FLOOR= TOP OF FINSIHED SECOND FLOOR= 64 1326 64 1353 64 1353 64 1311 400 5700 64700 64 1300 64 1300 64 1219 64 50064 5400 290 WO - REFER TO NOTES - ALUMINUM STOREFRONT WINDOW - KAWNEER1600 LR Wall™ CURTAIN WALL SYSTEM - STRUCTRAL SILICONE GLAZED VERTICALS AND CAPTURED HORIZONTALS - EXTRUDED JOINT PLUGS REQUIRED WITH WEEPED INTERMEDIATE HORIZONTALS -PERMANODIC™ ANODIZED FINISH 64 1187 64 1187 64 1187 64 1187 146 5147 64 1600 64 1609 64 3400 INTERIOR - SECOND FLOOR WEST FACEING CURTAIN WALL Scale Date Drawn by FUTURE ARCHITECTURE AND CONSTRUCTION ENGINEERING TECHNOLOGIST Sheet No. KIERAN TRIMBEE DESIGN CO. 1 : 100 11/6/201411:30:30PM A-2 ARCHITECTUAL PLANS AND SCHEDULES ARCH1030 MAJOR PROJECT 10/24/2014 Author GO FOR BROKE DESIGN GROUP 1 : 100 A-2 SECOND FLOOR PLAN1 NORTH 1 : 100 A-2 WINDOW SCHEDULE2 WINDOW NOTES 1. PROVIDE NEW WINDOWS OF THE HIGHEST POSSIBLE QUALITY AND WITH A MINIMUN 10 YEAR WARRANTY ON ALL PARTS INCLUDING GLAZING. 2. ALL NEW FRAMES SHALL BE THERMALLY BROKEN ANODIZED ALUMINUM, COMPLETE WITH ANODIZED EXTRUDED ALUMINUM SILL. ACCEPTABLE MANUFACTURERS, KAWNEER, OR EQ. 3. SLIDERS SHALL BE LOCATED AT THE INNER AND OUTER SIDES OF THE WINDOWS. SLIDER COMPONENTS SHALL CONTAIN NEOPRENE ROLLERS WITH WEATHERSTRIPPING FOR A WEATHER TIGHT SEAL. PROVIDE A HEAVY DUTY SCREEN ON THE ON EXTERIOR PROVIDE LIMIT STOPS TO PREVENT WINDOWS FROM OPENING GREATER THAN 4". 4. GLAZING MUST BE THERMALLY BROKEN WITH SEALED UNITS FROM AN IGMAC CERTIFIED MANUFACTURER AND CARRY A MINIMUM 10 YEAR WARRANTY. 5. WINDOWS TO CONFORM TO THE CURRENT CAN/CSA A440 WINDOW STANDARD WITH DOCUMENTED RATINGS OF A3,B3 AND C3. PROVIDE DOCUMENTATION SUPPORTING TESTING IF REQUIRED BY CONSLTANTS. 6. PROVIDE THE OWNER WITH CUT SAMPLES INDICATING ALL REQUIRED OPTIONS AND GIVE AMPLE TIME FOR OWNER TO MAKE APPROPRIATE SECTIONS THAT WILL NOT DELAY THE CONSTRUCTION OF THE BIULDING 7. WHERE NEW WINDOWS FIT INTO EXISTING OPENINGS THAT ARE NOT ALTERED, VERIFY ALL DIMENSTIONS PRIOR TO ORDERING WINDOWS. 8. WHERE ALL NEW WINDOW OPENINGS ARE TO BE INSTALLED, CREATE NEW OPENINGS FIRST THEN VERIFY OPENING DIMENSIONS PRIOR TO ORDERING WINDOWS. 9. ENSURE WINDOWS ARE ORDERED AND AVAILABLE ON SITE IN A TIMELY BASIS. 10. FOLLOW INSALLATION RECOMMENDATIONS BY WINDOW MANUFACTURER. 11. INSTALL LOW EXPANSION FAOM INSULATION AROUND ALL WINDOW PERIMETERS. 12. FOR ALL WINDOWS, BOTH NEW AND EXISTING, PROVIDE NEW WOOD LAMINATE STOOL WITH WOOD TRIM. 13. SEALANTS A. PROVIDE CLOSED CELL FOAM BACKER ROD AND CAULKING AROUND ALL WINDOW AND DOOR PERIMETERS AND WHERE SIDING BUTTS AGAINST MASONRY. B. ENSURE PROPER CAULKING JOINT WIDTH TO DEPTH RATIO OF 2:1 IS MAINTAINED. C. FOLLOW MANUFACTURERS RECOMMENDED METHODS FOR INSTALLATION OF CAULKING SEALANTS D. USE ONLY HIGH QUALITY MATERIALS AS MANUFACTURED BY TREMCO OR EQUIVALENT. DO NOT USE MONO OR DAP.