Exploring the Future Potential of AI-Enabled Smartphone Processors
1954 Wg Architectural Control Committee Compliance
1. ARCHITECTURAL CONTROL COMMITTEE
COMPLIANCE FORM
Project Description: ___________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
________________________________________________________________________
Date Project Completed ________________________________________________
Project Inspected by: __________________________________________________
(ACC Committee Members)
The project described above has met the guidelines and requirements of the Waterford
Green Architectural Control Committee. The committee has reviewed this project and
finds it to be in compliance with neighborhood design standards.
___________________________________________