1. Johnny K. Gilbreath
310 Bay Ave
Surfside Beach Tx. 77541
903-806-5958
jokegil@yahoo.com
Summary of Experience
Over 29 years experience in maintenance and construction projects covering a broad range of
responsibilities from New Contruction to Overhauls. All phases of erection and installation gas
and steam driven turbines, generators ,high pressure boilers, blowers, fans, pumps and
conveyor systems multi-stage compressors. Highly proficient in convection, reverse and laser
alignment.
Experience
Performance contractors
Brian Lowery
Millwright Superintendent
Current
Tellepsen Ind.
Jake Jacob
Millwright superintendent
Kararay Poly plant
12/13-7/15
Performance Contractors
2012/2013
Supervisor -Brian Lowery
Millwright Superintendent
2. Lyonndell
Revamp on a Meoth. Plant
HMIS
10/2010 - 2011
Supervisor- Terry Collumns
Millwright G.F
Thysengruph Steel Mill
JVIC
Fort Stockton, TX
03/2009 to 06/2010
Supervisor - Bill Thorpe
Millwright Superintendent - Installation of 24 Dresser - Rand Compressors-and all misc.
equipment.
JVIC
Victoria, TX
05/2007 to 03/2009
Supervisor - George Higgins
Millwright Superintendent - Installation of Mitsubishi combustion turbines and generators with
balance of plant auxiliary equipment.
MCS
Gentry, AR
01/2007 to 05/2007
Supervisor - Dick Greg
Project Superintendent - Turbine overhaul and F.D. Fan rebuild.
MCS
3. Jonesboro, AR
10/2006 to 04/2007
Millwright Superintendent - Installation of G.E. LM6000.
FMG
Sherman, TX
10/2005 to 10/2006
Supervisor - Greg Vice
Millwright Superintendent - Installation of food processing plant with all conveyor systems,
motors and grinders.
H & M
Sylacauga, AL
06/2004 to 09/2005
Supervisor - Mile Nolan
Journeyman - Installation of two G.E LM6000’s, boiler feed water pumps, chillers and all
auxiliary
equipment.
H B Zackary
Kiowa, OK
01/2002 to 11/2003
Supervisor - Jack White
Forman - Installation of two G.E combustion turbines and generators and all auxiliary
equipment.
H & M
Wrightsville, AR
04/2001 to 01/2002
Supervisor - Johnny Gilbreath
General Forman - Installation of two G. E. steam turbines and generators.
Texas Instruments
4. Richardson, TX
09/1997 to 04/2001
Supervisor - Rodger Prince
Millwright - Industrial maintenance Supervisor.
Fluor Daniels
Lake Ray Hubbard, TX
03/1997 to 06/1997
Supervisor - Billy Burke
Millwright - Overhaul of a 550 mega-watt G.E. steam turbine and generator.
Fluor Daniels
Fairfield, TX
04/1996 to 01/1997
Supervisor - Kyle Wilfong
Foreman - High and low pressure steam turbine overhauls. Complete overhaul on G.E.
generator and lube oil system.
Rust
Mansfield, LA
07/1995 to 03/1996
Supervisor - Terry Collums
General Foreman - Installed G.E. frame 7EA gas turbine and generator.
Rust
Spartanburg, SC
04/1993 to 05/1995
Supervisor - Bo Hastings
Foreman - Overhaul of plastic plant and all equipment.
Ultrasystems
Point Comfort, TX
5. 10/1992 to 03/1993
Supervisor - Bo Maso
Journeyman - Installation of motors, pumps and 3 demag compressors.
Education
H & M - 40 hrs of OSHA training
Texas Instruments - 80 hrs of Laser Alignment
Zachary - 40 hrs of Supervision training
Hughes Springs TX High School - 1985 Graduate
References on request
Education
Text here
Relevant Experience
Text here
Other Experience
Text here
References Available Upon Request
6. 10/1992 to 03/1993
Supervisor - Bo Maso
Journeyman - Installation of motors, pumps and 3 demag compressors.
Education
H & M - 40 hrs of OSHA training
Texas Instruments - 80 hrs of Laser Alignment
Zachary - 40 hrs of Supervision training
Hughes Springs TX High School - 1985 Graduate
References on request
Education
Text here
Relevant Experience
Text here
Other Experience
Text here
References Available Upon Request