SlideShare ist ein Scribd-Unternehmen logo
1 von 11
Downloaden Sie, um offline zu lesen
KATIE JOHNSON
PORTFOLIO
COFFEE BOX
FINAL YEAR PROJECT
ISOMETRIC FLOOR PLANS
EXTENSION DETAIL
Final Project - This project investigates and
devises a means to reinstate the canal’s original use as a
transport mechanism supporting the import trade in
London. Imported coffee will travel up the
canal from Limehouse Docks to the site and then
transferred via crane into the top floor of
building where the roasting process will take place.
Visitors are able to view and experience how the
coffee is created, from milling through to packaging.
The second part of the building extends the
experience and houses intimate private cinema screens
where visitors can enjoy a cinematic experience and also
buy the fresh made coffee from the coffee shop and take
it through to the cinema with them. Likewise, drinks
may be purchased from the new extension added on top of
the building which consists of a Bar with city views.
The current users of the canal are commuters, runners,
cyclists and students. Everyone can experience what
this building offers, a new and useful communal space.
ELEVATION
SECTION
CONCEPT COLLAGE
EXTERIOR VISUAL
INTERIOR VISUAL
SITE MODEL
Made from Plywood
DRAWINGS
FLOOR PLAN DRAWINGS
Drawn on Trace
John Lewis Project
&
Arcadia group
SITE MAP
ARCADIA GROUP
Work Placement Projects
FIXTURE DESIGN
VISUAL CINEMA 4D
1817161514131211100908070605
04
03
02
01
Boiler
Gas
Up
Up
Up
STOCK ROOM
67 SQFT
Up
BoardedBoarded
TOILET
BoardedBoarded
UTILITY ROOM
Fire Exit
Alarmed Door
Pipe
Up
Up
PO
Meter
PLANT ROOM
BOILER ROOM
Electric
Board
Electric
Board
Electric
Switch
STAFF ROOM
DDA
hoist
1
2
3
DISABLED REFUGE
HOOKS
FLOOR
BOX
FLOOR
BOX
C CW W
X3FLOORTOCEILING
FEATUREBAY
X5 FLOOR TO CEILING
FEATURE BAY
MIRROR
BAR
HOOK
1
HOOK
MIRROR
BAR
HOOK
2
RETURN
RUNNER RAIL
LEANING MIRROR
GRAPHICFRAMES
X3 FOOTWEAR BAYS
X4FLOORTOCEILINGBAYSONTILED
WALL
X7 RECESSED TRACK
X4RECESSEDTRACK
ONTIMBER
X7 RECESSED TRACK
ON TIMBER
X5 RECESSED TRACK ON
DECORATED WALL
LARDER
FRIDGE
FREEZER
U/C DISHWASHER
CASHOFFICE
FLUSH LIGHTBOX
3
DDA
BAR
A
B
C
D
PLAN KEY
1:100 @ A0
CAD Ref No.
Scale Date
Drawing No.
Project
Drawn By
Title
INIT DATE
GENERAL NOTES
NOTE:
This drawing is to be read in conjunction
with standard details and specifications.
All dimensions are to be verified on site.
All works are to comply with current
building regulations.
This drawing is the property of Arcadia Group Limited.
Copyright is reserved. This drawing is issued on the
condition that it is not copied, reproduced, retained
or disclosed to any unauthorised person, either wholly
or in part.
Frame Size
Rev. Status
Prop ID.
JC
-
ISSUE REVISION
STORE DEVELOPMENT
COLGRAVE HOUSE, 70 BERNERS ST, LONDON W1T 3NL
TELEPHONE 0207 636 8040 FAX 0207 291 2940
1:5O 20.02.2014
DP BR READING
97-98 BROAD STREET
READING
RG1 2AX
BASEMENT
PROPOSED INTERNAL ELEVATIONS
200.09 A
A0
1. FLOOR TO CEILING SYSTEM:
NEW 1200 BAYS TO BE FIXED TO FLOOR AND CEILING ( TIED BACK TO WALL IF NECESSARY. MC TO ENSURE ADEQUATE GROUNDS ARE
PROVIDED TO FIX INTO. FOR SYSTEM & ASSOCIATED KIT REFER TO DRAWING: 400-01 FLOOR TO WALL SYSTEM
G.A SIGNED OFF BY I.G: 14.02.14
NON ILLUMINATED
GRAPHIC
PANEL
SHOES
DENIM
ELEVATION C
1:25 @ A0
15
400
FOOTWEAR SYSTEM REFER TO DETAIL: 300-13 FOOTWEAR BAYSRECCESSED TRACKON DECORATED WALL REFER TO DETAIL: 300-16 CASHDESK CLADDING & REAR WALL DETAIL REF DWGS: 300-14 CASHDESK CLADDING
DETAIL / 300-15 FLUSH GRAPHIC DETAIL
RECESSED TRACK ON VERTICAL TIMBER WALL REF DETAIL: 300-16
600 600 600400
600 600 600 600 600 600 400 MIN 1200 EQ 1200 EQ 1200 2400
1200180
CENTRECENTRE
1100
100
100680220100
100
600 600 600 1000MIN
14142 16 17 18 19 6 18
DOWNSTAIRS
DOWNSTAIRS TO
MIRROR
MIRROR
1700400200
30012001200 EQEQ1200EQ1200EQ1200
ALLOW FOR
RETURN
FLOOR TO CEILING PERIMETER SYSTEM WITH BRICK & DECORATED MDF BEHIND. REFER TO DETAILS: 300-17 BRICK CLADDING DETAIL / 400-01 FLOOR TO WALL SYSTEM RECESSED TRACK ON DECORATED WALL REFER TO: 300-16 RECESSED TRACK DETAIL
CLIP FRAME BY BRAND
FRET CUT BRANDING
300 CENTRE CENTRE
240
1102601500
900
300 600 600 600 600
1 2 3 4
4001700
5
6 7
8
9
10
11 12
ELEVATION A
1:25 @ A0
xxxxx
xxxxxxxx xxxxxxx xxxx
xxxxx
xxxx
1000
RECESSED TRACK ON VERTICAL TIMBER WALL REF DETAIL: 300-16
1
ELEVATION B
1:25 @ A0 21314
600
BRANDVINYLZONE.
15
600 600 600
2300
4001700
FLOOR TO CEILING PERIMETER SYSTEM WITH BRICK & DECORATED MDF BEHIND. REFER TO DETAILS: 300-17 BRICK
CLADDING DETAIL / 400-01 FLOOR TO WALL SYSTEM
MIN 100 EQ1200 1200 EQ 1200
2100
2600
find your styleFITTING
ROOMS
ELEVATION D
1:25 @ A0
RECCESSED TRACKON DECORATED WALL REFER TO DETAIL: 300-16
1200
10
9
8
7
20 13118
1100
1200 1200 1200100 EQEQEQ
2. BRICK CLADDING DETAIL:
PLASTER BRICK TO BE APPLIED TO TOP AND BOTTOM OF WALL AS SHOWN TO ELEVATION. CENTRAL BAND TO BE MDF DECORATED. MDF
AND PLASTER BRICK TO LIE FLUSH TO CENTRAL PANEL. 5MM ROUTE DETAIL TO TOP AND BOTTOM OF PANEL FOR SHADOW GAP AND EDGE
TO FIINSH BRICK TO. REFER TO FINISHES PLAN & BRICK CLADDING DETAIL 300-17
3. RECESSED TRACK DETAIL
STD 32MM PITCH ALUMINIUMN SECTION SUPPLIED FREE ISSUE BY ARCADIA. TO SET 400MM FROM FLOOR LEVEL AND EXTEND TO 2100MM (
BASED ON 2300MM CEILING HEIGHT). TRACK TO BE RECCESED BY MC INTO EITHER TIMBER, DECORATED PLASTEBORAD WALL, OF MDF
DECORATED PANEL. REFER TO DETAIL DRAWING 300-16. MINIMUM ACCEPTABLE TRACK HEIGHT IS 2100MM
4. SKIRTING DETAIL
TIMBER, TILE & BRICK FINISHES TO GO DOWN TO FLOOR LEVEL - NO SKIRTING REQUIRED, CLEAR FLEXIBLE MASTIC BETWEEN FINISH & VINYL
FLOOR. 100MM PLANT ON SKIRTING REQUIRED TO ANY PLASTERBOARD WALLS OF WALLS WITH EXPOSED FINISHES. REF FINISHES PLAN. &
SKIRTING DETAIL 300-18
5. BRAND GRAPHIC - CLIP FRAME
BRAND TO PROVIDE CLIP FRAME AND GRAPHIC IMAGE - SZIED AS PER ( OR STANDARD SIZE CLOSEST TO DESIGN SPECIFIED DIMS. FRAME
TO BE FIXED TO WALL BY MC. REFER TO GRAPHICS SCHEDULE
6. BRANDING - FRET CUT LETTERING
FRET CUT ACRYLIC LETTERS. DESIGNER TO SPECIFY COLOUR & FINISH. REFER TO SIGNAGE SCHEDULE FOR SIZE AND FINISH SPEC. TO BE
INSTALLED BY SIGGNAGE CONTRACTOR. HEIGHTS & SIZES TO BE RECONFIRMED PRIOR TO IMANUFACTURE/ NSTALLATION
7. STAIRCASE:
NEW STAIRCASE TO BE OF STEEL TRAY CONSTRUCTION WITH CAST CONCRETE TREAD & RISER INSERTS, TO INCLUDE NON SLIP COPPER
INSERTS. BALUSTRADE TO BE CLAMPED BEWTEEN STAIR EDGE AND STEPPED STINGER PLATE. HANDRAIL FIXED THROUGH BALUSTRADE
GLAZING. RECESSED HIGH INSTNESITY LED STRIP DETAIL TO ILLUMINATE STAIR WALL. REFER TO STAIR DESIGN INTENT DETAIL DWG 300-01
8. STAIRWALL ELEVATION:
STAIRWALL TO BE PLASTERBOARD WALL WITH TIMBER ''V' GROOVE DETAIL AND DECORATED. DETAIL TO EXTEND TO STARIWELL OPENING
AND WALL SETBACK UNDER STAIRCASE. REFER TO STAIRWALL ELEVATION & DETAIL DWG 300-02
9. PENDANTS
CLUSTER OF X 5 ANGLEPOISE PENDANTS WITH BLACK BRAIDED CABLE TO BE SUSPENDED FROM STAIRWELL SOFFIT. LAMPS TO BE LED TO
REDUCE MAINTAINENCE. SEE RCP 200-05
10. DOWN TO SIGNAGE
FOLDED ALUMINIUM BOX WITH PLANT ON 'BURTONS' ILLUMINATED LETTERING AND ARROWS TO BOTH SIDES. FRET CUT LETTERS TO
BOTH SIDES. TO BE SUSPENDED FROM CEILING. REFER TO SIGNAGE PACK
11. FITTING ROOMS
FITTING ROOM DOORS INCLUDING DDA TO BE BLACK GLOSS LAMINATE AS PER STANDARD DETAIL. MC TO ENSUDRE DDA DOOR FURNITURE
IS PROVIDED. REFER TO FITTING ROOM /DDA CUBICLE DETAILS 300-12/ 300-13
12. LEANING MIRROR
BACKED MIRROR TO RECEIVE TIMBER MOULDING & SPRAYED. PAINT COLOUR TBC. AND BRACED BACK TO WALL BY MC
13. LEANING GRAPHIC
STRETCH GRAPHIC FRAME TO BE FIXED TO MDF BACK BOARD & EDGES FINISHED WITH WHITE TRIM. TO BE ANGLED AND BRACED BACK TO
WALL BY SIGNAGE CONTRACTOR. BRAND TO PROVIDE ARTWORK. TO BE ANGLED ON SITE. CONTRACOTR TO ENSURE GRAPHIC DOESN'T
CLASH WITH PRODUCT ON PERIMETER SYSTEM. REFER TO GRAPHIC SCHEDULE
14. TIMBER CLADDING ENGINEERED
TIMBER PLANKS TO BE FIXED VERTICALLY MC TO ADJUST T&G GROOVE ON PLANKS TO SUIT. PLANKS TO BE ROUTED TO ALLOW FOR
RECCESS TRACK. SEE DETAIL 300-16
15. NON FIXED PLINTHS
NON FIXED PLINTHS 100MM HIGH TO SIT BETWEEN 1200 CENTRE UPRIGHTS. BRAND TO SPECIFY NUMBER FOR PLINTHS REQUIRED
16. FOOTWEAR BAYS
INDIVIDUAL FOOTWEAR BAYS SUPPLIED BY FIXTURE SUPPLIER. TO BE BRACED BACK TO THE WALL BY MC, MC TO ENSURE ADEQUATE
GROUNDS ARE PROVIDED TO WALL BEHIND. X1 DOUBLE SOCKET & X1 SINGLE REQUIRED TO EACH FOOTWEAR BAY TO PLUG IN
ILLUMINATED PLINTH & VM DISPLAY. ELECTRICIAN TO ALLOW FOR POWER
17. ILLUMINATED INTERNAL SIGNAGE
FIXED INTERNAL ILLUMINATED SIGNAGE TO SHOES/ FITTING ROOMS. ELECTRICIAN TO PROVIDE POWER. REFER TO SIGNAGE SCHEDULE FOR
DETAILS.
NON FIXED SHELF SIGNS: DENIM / SUITS - SMALL POWER TO BE AVAILABLE TO PLUG IN SHELF SIGNS REFER TO SIGNAGE SCHEDULE &
SMALL POWER DRAWING REF: 200-06. COST OPTION FOR NON ILLUMINATED BUILT UP ACRYLIC SHELF MOUNTED SIGNS
18. FLUSH MOUNTED LIGHTBOX
STANDARD GRAPHIC SIZE STRETCH CANVAS LIGHTBOX. 2400 X 1200MM. ELECTRICIAN TO PROVIDE POWER. STRETCH CANVAS ANGLE TO
BE FIXED BACK TO PLY TO LINE TROUGH FLUSH WITH FINISHED FACE OF CASHDESK WALL. MC TO PROVIDE OPENING. SIGNAGE
CONTRACTOR TO SUPPLY & FIX GRAPHIC. BRAND TO PROIVDE ARTWORK. REFER TO DETAIL 300-14
19. CASHDESK
CASHDESK TO BE CLAD TO THE FRONT FACE AND RETURNS WITH BACK PAINTED GLASS. PAINT REFERENCE TBC. REFER TO FINISHES
SCHEDULE. WORKTOP TO BE LAMINATE. REFER TO DETAIL 300-14
20. TILED WALL
WALL TO BE TILED BY MC WITH CRACKLE GLAZE METRO TILE IN BERMONDSEY OLIVE. TILE SIZE 75 X 150MM SEE FINISHES SCHEDULE.
GROUT TO BE MAPEI 112. TILING TO EXTEND WALL TO FLOOR ANY EXPOSED EDGES TO BE FINISHES WITH 3MM ALUMNIUM ANGLE SPRAYED
TO MATCH TILE COLOUR
A ADJUSTMENT TO BASEMENT WALL JC 11.04.14
DOROTHY PERKINS STORE REFURBISHIMENT
BURTON ELEVATION

Weitere ähnliche Inhalte

Was ist angesagt?

Premier terraces
Premier terracesPremier terraces
Premier terracesRohit Yadav
 
Collins House Melbourne eBrochures - Call +65 9189 8321 for Booking
Collins House Melbourne eBrochures - Call +65 9189 8321 for BookingCollins House Melbourne eBrochures - Call +65 9189 8321 for Booking
Collins House Melbourne eBrochures - Call +65 9189 8321 for BookingJayson Ang
 
131002-60319-Jackson Airport-LA-COMBINE
131002-60319-Jackson Airport-LA-COMBINE131002-60319-Jackson Airport-LA-COMBINE
131002-60319-Jackson Airport-LA-COMBINELee Yung Anchor
 
2012.10.26_Blanco Residence - full permit set
2012.10.26_Blanco Residence - full permit set2012.10.26_Blanco Residence - full permit set
2012.10.26_Blanco Residence - full permit setSadaf Mohammadi
 
PG15036_A01-A17 ALLURE MARIBYRNONG PROPOSED SHOWROOM
PG15036_A01-A17 ALLURE MARIBYRNONG PROPOSED SHOWROOMPG15036_A01-A17 ALLURE MARIBYRNONG PROPOSED SHOWROOM
PG15036_A01-A17 ALLURE MARIBYRNONG PROPOSED SHOWROOMLuciano D'Amico Rebord
 
Bagsvaerd Church - Revit Model 1
Bagsvaerd Church - Revit Model 1Bagsvaerd Church - Revit Model 1
Bagsvaerd Church - Revit Model 1David Ge
 
5 Churchill Place
5 Churchill Place5 Churchill Place
5 Churchill PlaceCVydra
 
STANDARD ROAD DETAILS City of Richardson, Texas City USA
STANDARD ROAD DETAILS City of Richardson, Texas City USASTANDARD ROAD DETAILS City of Richardson, Texas City USA
STANDARD ROAD DETAILS City of Richardson, Texas City USAYegor Shulyk
 
John O'Connor's Portfolio
John O'Connor's PortfolioJohn O'Connor's Portfolio
John O'Connor's PortfolioJohn O Connor
 
2000 Del Mar Heights Elementary Modernization
2000 Del Mar Heights Elementary Modernization2000 Del Mar Heights Elementary Modernization
2000 Del Mar Heights Elementary ModernizationJohnGartman1
 
Architectural Technology Project
Architectural Technology ProjectArchitectural Technology Project
Architectural Technology ProjectTomcully18
 
Buy flats in kochi yasoram abode
Buy flats in kochi   yasoram abodeBuy flats in kochi   yasoram abode
Buy flats in kochi yasoram abodeyasoram-builders
 

Was ist angesagt? (16)

Premier terraces
Premier terracesPremier terraces
Premier terraces
 
Collins House Melbourne eBrochures - Call +65 9189 8321 for Booking
Collins House Melbourne eBrochures - Call +65 9189 8321 for BookingCollins House Melbourne eBrochures - Call +65 9189 8321 for Booking
Collins House Melbourne eBrochures - Call +65 9189 8321 for Booking
 
Bryant Residence
Bryant ResidenceBryant Residence
Bryant Residence
 
20150811-Allied Telecom
20150811-Allied Telecom20150811-Allied Telecom
20150811-Allied Telecom
 
131002-60319-Jackson Airport-LA-COMBINE
131002-60319-Jackson Airport-LA-COMBINE131002-60319-Jackson Airport-LA-COMBINE
131002-60319-Jackson Airport-LA-COMBINE
 
2012.10.26_Blanco Residence - full permit set
2012.10.26_Blanco Residence - full permit set2012.10.26_Blanco Residence - full permit set
2012.10.26_Blanco Residence - full permit set
 
PG15036_A01-A17 ALLURE MARIBYRNONG PROPOSED SHOWROOM
PG15036_A01-A17 ALLURE MARIBYRNONG PROPOSED SHOWROOMPG15036_A01-A17 ALLURE MARIBYRNONG PROPOSED SHOWROOM
PG15036_A01-A17 ALLURE MARIBYRNONG PROPOSED SHOWROOM
 
Bagsvaerd Church - Revit Model 1
Bagsvaerd Church - Revit Model 1Bagsvaerd Church - Revit Model 1
Bagsvaerd Church - Revit Model 1
 
5 Churchill Place
5 Churchill Place5 Churchill Place
5 Churchill Place
 
20150330_R4D_Permit Set
20150330_R4D_Permit Set20150330_R4D_Permit Set
20150330_R4D_Permit Set
 
STANDARD ROAD DETAILS City of Richardson, Texas City USA
STANDARD ROAD DETAILS City of Richardson, Texas City USASTANDARD ROAD DETAILS City of Richardson, Texas City USA
STANDARD ROAD DETAILS City of Richardson, Texas City USA
 
John O'Connor's Portfolio
John O'Connor's PortfolioJohn O'Connor's Portfolio
John O'Connor's Portfolio
 
2000 Del Mar Heights Elementary Modernization
2000 Del Mar Heights Elementary Modernization2000 Del Mar Heights Elementary Modernization
2000 Del Mar Heights Elementary Modernization
 
Architectural Technology Project
Architectural Technology ProjectArchitectural Technology Project
Architectural Technology Project
 
Buy flats in kochi yasoram abode
Buy flats in kochi   yasoram abodeBuy flats in kochi   yasoram abode
Buy flats in kochi yasoram abode
 
Mapsko Casa Bella, Sector 82, Gurgaon
Mapsko Casa Bella, Sector 82, GurgaonMapsko Casa Bella, Sector 82, Gurgaon
Mapsko Casa Bella, Sector 82, Gurgaon
 

Andere mochten auch

LUCENSE - Workshop trasporto merci a breve raggio con veicoli elettrici
LUCENSE - Workshop trasporto merci a breve raggio con veicoli elettriciLUCENSE - Workshop trasporto merci a breve raggio con veicoli elettrici
LUCENSE - Workshop trasporto merci a breve raggio con veicoli elettriciLUCENSE
 
Particle + Node (Hackster CascadiaJS workshop)
Particle + Node (Hackster CascadiaJS workshop)Particle + Node (Hackster CascadiaJS workshop)
Particle + Node (Hackster CascadiaJS workshop)Monica Houston
 
ERISA Compliance FAQs: Enforcement
ERISA Compliance FAQs: EnforcementERISA Compliance FAQs: Enforcement
ERISA Compliance FAQs: Enforcementntoscano50
 
Word 2 tha mutha.pt.6.doc
Word 2 tha mutha.pt.6.docWord 2 tha mutha.pt.6.doc
Word 2 tha mutha.pt.6.docMurad Wysinger
 
Central Silk Board Recruitment 2015-2016 Application Form Format
Central Silk Board Recruitment 2015-2016 Application Form FormatCentral Silk Board Recruitment 2015-2016 Application Form Format
Central Silk Board Recruitment 2015-2016 Application Form FormatPriya Jain
 
Sound Screen Box.pt.2.doc
Sound Screen Box.pt.2.docSound Screen Box.pt.2.doc
Sound Screen Box.pt.2.docMurad Wysinger
 
II. ‘‘fotocatalisi: un processo ecosostenibile per la depurazione dell'aria e...
II. ‘‘fotocatalisi: un processo ecosostenibile per la depurazione dell'aria e...II. ‘‘fotocatalisi: un processo ecosostenibile per la depurazione dell'aria e...
II. ‘‘fotocatalisi: un processo ecosostenibile per la depurazione dell'aria e...Albatros - Associazione culturale
 
Расчет оптимального штата
Расчет оптимального штатаРасчет оптимального штата
Расчет оптимального штатаDanil Krasnov
 
So we don't homo out doc
So we don't homo out docSo we don't homo out doc
So we don't homo out docMurad Wysinger
 
mattbeachcapstonepaper
mattbeachcapstonepapermattbeachcapstonepaper
mattbeachcapstonepaperMatt Beach
 

Andere mochten auch (14)

LUCENSE - Workshop trasporto merci a breve raggio con veicoli elettrici
LUCENSE - Workshop trasporto merci a breve raggio con veicoli elettriciLUCENSE - Workshop trasporto merci a breve raggio con veicoli elettrici
LUCENSE - Workshop trasporto merci a breve raggio con veicoli elettrici
 
Particle + Node (Hackster CascadiaJS workshop)
Particle + Node (Hackster CascadiaJS workshop)Particle + Node (Hackster CascadiaJS workshop)
Particle + Node (Hackster CascadiaJS workshop)
 
ERISA Compliance FAQs: Enforcement
ERISA Compliance FAQs: EnforcementERISA Compliance FAQs: Enforcement
ERISA Compliance FAQs: Enforcement
 
Word 2 tha mutha.pt.6.doc
Word 2 tha mutha.pt.6.docWord 2 tha mutha.pt.6.doc
Word 2 tha mutha.pt.6.doc
 
Greenray pt.3.doc
Greenray pt.3.docGreenray pt.3.doc
Greenray pt.3.doc
 
Central Silk Board Recruitment 2015-2016 Application Form Format
Central Silk Board Recruitment 2015-2016 Application Form FormatCentral Silk Board Recruitment 2015-2016 Application Form Format
Central Silk Board Recruitment 2015-2016 Application Form Format
 
059 eng
059 eng059 eng
059 eng
 
Sound Screen Box.pt.2.doc
Sound Screen Box.pt.2.docSound Screen Box.pt.2.doc
Sound Screen Box.pt.2.doc
 
II. ‘‘fotocatalisi: un processo ecosostenibile per la depurazione dell'aria e...
II. ‘‘fotocatalisi: un processo ecosostenibile per la depurazione dell'aria e...II. ‘‘fotocatalisi: un processo ecosostenibile per la depurazione dell'aria e...
II. ‘‘fotocatalisi: un processo ecosostenibile per la depurazione dell'aria e...
 
Расчет оптимального штата
Расчет оптимального штатаРасчет оптимального штата
Расчет оптимального штата
 
078 eng
078 eng078 eng
078 eng
 
So we don't homo out doc
So we don't homo out docSo we don't homo out doc
So we don't homo out doc
 
mattbeachcapstonepaper
mattbeachcapstonepapermattbeachcapstonepaper
mattbeachcapstonepaper
 
Packback Books
Packback BooksPackback Books
Packback Books
 

Ähnlich wie Katie Johnson Portfolio

Ähnlich wie Katie Johnson Portfolio (20)

Architecture Portfolio
Architecture PortfolioArchitecture Portfolio
Architecture Portfolio
 
Construction pdf major project
Construction pdf major projectConstruction pdf major project
Construction pdf major project
 
GITAU JOHN PORTFOLIO
GITAU JOHN PORTFOLIOGITAU JOHN PORTFOLIO
GITAU JOHN PORTFOLIO
 
House Carol Submission
House Carol SubmissionHouse Carol Submission
House Carol Submission
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODSSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
 
Working drawings
Working drawingsWorking drawings
Working drawings
 
Studiowork submission
Studiowork submission Studiowork submission
Studiowork submission
 
House Harripersad Submission
House Harripersad SubmissionHouse Harripersad Submission
House Harripersad Submission
 
DRT Portfolio Works
DRT Portfolio WorksDRT Portfolio Works
DRT Portfolio Works
 
Build Something That Lasts
Build Something That LastsBuild Something That Lasts
Build Something That Lasts
 
Dick Smith
Dick SmithDick Smith
Dick Smith
 
House Plan For Robert Ledwaba
House Plan For Robert LedwabaHouse Plan For Robert Ledwaba
House Plan For Robert Ledwaba
 
Logic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson HouseLogic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson House
 
Red Reedbuck Bush Lodge
Red Reedbuck Bush LodgeRed Reedbuck Bush Lodge
Red Reedbuck Bush Lodge
 
Icf Board
Icf BoardIcf Board
Icf Board
 
House Odendahl (SITE PLAN)-A1
House Odendahl (SITE PLAN)-A1House Odendahl (SITE PLAN)-A1
House Odendahl (SITE PLAN)-A1
 
Pearce avenue
Pearce avenuePearce avenue
Pearce avenue
 
Pearce Avenue Project
Pearce Avenue ProjectPearce Avenue Project
Pearce Avenue Project
 
Aldi Inala
Aldi InalaAldi Inala
Aldi Inala
 
GA-01.pdf
GA-01.pdfGA-01.pdf
GA-01.pdf
 

Katie Johnson Portfolio

  • 2. COFFEE BOX FINAL YEAR PROJECT ISOMETRIC FLOOR PLANS
  • 3. EXTENSION DETAIL Final Project - This project investigates and devises a means to reinstate the canal’s original use as a transport mechanism supporting the import trade in London. Imported coffee will travel up the canal from Limehouse Docks to the site and then transferred via crane into the top floor of building where the roasting process will take place. Visitors are able to view and experience how the coffee is created, from milling through to packaging. The second part of the building extends the experience and houses intimate private cinema screens where visitors can enjoy a cinematic experience and also buy the fresh made coffee from the coffee shop and take it through to the cinema with them. Likewise, drinks may be purchased from the new extension added on top of the building which consists of a Bar with city views. The current users of the canal are commuters, runners, cyclists and students. Everyone can experience what this building offers, a new and useful communal space.
  • 6. SITE MODEL Made from Plywood DRAWINGS FLOOR PLAN DRAWINGS Drawn on Trace
  • 8.
  • 10. ARCADIA GROUP Work Placement Projects FIXTURE DESIGN VISUAL CINEMA 4D
  • 11. 1817161514131211100908070605 04 03 02 01 Boiler Gas Up Up Up STOCK ROOM 67 SQFT Up BoardedBoarded TOILET BoardedBoarded UTILITY ROOM Fire Exit Alarmed Door Pipe Up Up PO Meter PLANT ROOM BOILER ROOM Electric Board Electric Board Electric Switch STAFF ROOM DDA hoist 1 2 3 DISABLED REFUGE HOOKS FLOOR BOX FLOOR BOX C CW W X3FLOORTOCEILING FEATUREBAY X5 FLOOR TO CEILING FEATURE BAY MIRROR BAR HOOK 1 HOOK MIRROR BAR HOOK 2 RETURN RUNNER RAIL LEANING MIRROR GRAPHICFRAMES X3 FOOTWEAR BAYS X4FLOORTOCEILINGBAYSONTILED WALL X7 RECESSED TRACK X4RECESSEDTRACK ONTIMBER X7 RECESSED TRACK ON TIMBER X5 RECESSED TRACK ON DECORATED WALL LARDER FRIDGE FREEZER U/C DISHWASHER CASHOFFICE FLUSH LIGHTBOX 3 DDA BAR A B C D PLAN KEY 1:100 @ A0 CAD Ref No. Scale Date Drawing No. Project Drawn By Title INIT DATE GENERAL NOTES NOTE: This drawing is to be read in conjunction with standard details and specifications. All dimensions are to be verified on site. All works are to comply with current building regulations. This drawing is the property of Arcadia Group Limited. Copyright is reserved. This drawing is issued on the condition that it is not copied, reproduced, retained or disclosed to any unauthorised person, either wholly or in part. Frame Size Rev. Status Prop ID. JC - ISSUE REVISION STORE DEVELOPMENT COLGRAVE HOUSE, 70 BERNERS ST, LONDON W1T 3NL TELEPHONE 0207 636 8040 FAX 0207 291 2940 1:5O 20.02.2014 DP BR READING 97-98 BROAD STREET READING RG1 2AX BASEMENT PROPOSED INTERNAL ELEVATIONS 200.09 A A0 1. FLOOR TO CEILING SYSTEM: NEW 1200 BAYS TO BE FIXED TO FLOOR AND CEILING ( TIED BACK TO WALL IF NECESSARY. MC TO ENSURE ADEQUATE GROUNDS ARE PROVIDED TO FIX INTO. FOR SYSTEM & ASSOCIATED KIT REFER TO DRAWING: 400-01 FLOOR TO WALL SYSTEM G.A SIGNED OFF BY I.G: 14.02.14 NON ILLUMINATED GRAPHIC PANEL SHOES DENIM ELEVATION C 1:25 @ A0 15 400 FOOTWEAR SYSTEM REFER TO DETAIL: 300-13 FOOTWEAR BAYSRECCESSED TRACKON DECORATED WALL REFER TO DETAIL: 300-16 CASHDESK CLADDING & REAR WALL DETAIL REF DWGS: 300-14 CASHDESK CLADDING DETAIL / 300-15 FLUSH GRAPHIC DETAIL RECESSED TRACK ON VERTICAL TIMBER WALL REF DETAIL: 300-16 600 600 600400 600 600 600 600 600 600 400 MIN 1200 EQ 1200 EQ 1200 2400 1200180 CENTRECENTRE 1100 100 100680220100 100 600 600 600 1000MIN 14142 16 17 18 19 6 18 DOWNSTAIRS DOWNSTAIRS TO MIRROR MIRROR 1700400200 30012001200 EQEQ1200EQ1200EQ1200 ALLOW FOR RETURN FLOOR TO CEILING PERIMETER SYSTEM WITH BRICK & DECORATED MDF BEHIND. REFER TO DETAILS: 300-17 BRICK CLADDING DETAIL / 400-01 FLOOR TO WALL SYSTEM RECESSED TRACK ON DECORATED WALL REFER TO: 300-16 RECESSED TRACK DETAIL CLIP FRAME BY BRAND FRET CUT BRANDING 300 CENTRE CENTRE 240 1102601500 900 300 600 600 600 600 1 2 3 4 4001700 5 6 7 8 9 10 11 12 ELEVATION A 1:25 @ A0 xxxxx xxxxxxxx xxxxxxx xxxx xxxxx xxxx 1000 RECESSED TRACK ON VERTICAL TIMBER WALL REF DETAIL: 300-16 1 ELEVATION B 1:25 @ A0 21314 600 BRANDVINYLZONE. 15 600 600 600 2300 4001700 FLOOR TO CEILING PERIMETER SYSTEM WITH BRICK & DECORATED MDF BEHIND. REFER TO DETAILS: 300-17 BRICK CLADDING DETAIL / 400-01 FLOOR TO WALL SYSTEM MIN 100 EQ1200 1200 EQ 1200 2100 2600 find your styleFITTING ROOMS ELEVATION D 1:25 @ A0 RECCESSED TRACKON DECORATED WALL REFER TO DETAIL: 300-16 1200 10 9 8 7 20 13118 1100 1200 1200 1200100 EQEQEQ 2. BRICK CLADDING DETAIL: PLASTER BRICK TO BE APPLIED TO TOP AND BOTTOM OF WALL AS SHOWN TO ELEVATION. CENTRAL BAND TO BE MDF DECORATED. MDF AND PLASTER BRICK TO LIE FLUSH TO CENTRAL PANEL. 5MM ROUTE DETAIL TO TOP AND BOTTOM OF PANEL FOR SHADOW GAP AND EDGE TO FIINSH BRICK TO. REFER TO FINISHES PLAN & BRICK CLADDING DETAIL 300-17 3. RECESSED TRACK DETAIL STD 32MM PITCH ALUMINIUMN SECTION SUPPLIED FREE ISSUE BY ARCADIA. TO SET 400MM FROM FLOOR LEVEL AND EXTEND TO 2100MM ( BASED ON 2300MM CEILING HEIGHT). TRACK TO BE RECCESED BY MC INTO EITHER TIMBER, DECORATED PLASTEBORAD WALL, OF MDF DECORATED PANEL. REFER TO DETAIL DRAWING 300-16. MINIMUM ACCEPTABLE TRACK HEIGHT IS 2100MM 4. SKIRTING DETAIL TIMBER, TILE & BRICK FINISHES TO GO DOWN TO FLOOR LEVEL - NO SKIRTING REQUIRED, CLEAR FLEXIBLE MASTIC BETWEEN FINISH & VINYL FLOOR. 100MM PLANT ON SKIRTING REQUIRED TO ANY PLASTERBOARD WALLS OF WALLS WITH EXPOSED FINISHES. REF FINISHES PLAN. & SKIRTING DETAIL 300-18 5. BRAND GRAPHIC - CLIP FRAME BRAND TO PROVIDE CLIP FRAME AND GRAPHIC IMAGE - SZIED AS PER ( OR STANDARD SIZE CLOSEST TO DESIGN SPECIFIED DIMS. FRAME TO BE FIXED TO WALL BY MC. REFER TO GRAPHICS SCHEDULE 6. BRANDING - FRET CUT LETTERING FRET CUT ACRYLIC LETTERS. DESIGNER TO SPECIFY COLOUR & FINISH. REFER TO SIGNAGE SCHEDULE FOR SIZE AND FINISH SPEC. TO BE INSTALLED BY SIGGNAGE CONTRACTOR. HEIGHTS & SIZES TO BE RECONFIRMED PRIOR TO IMANUFACTURE/ NSTALLATION 7. STAIRCASE: NEW STAIRCASE TO BE OF STEEL TRAY CONSTRUCTION WITH CAST CONCRETE TREAD & RISER INSERTS, TO INCLUDE NON SLIP COPPER INSERTS. BALUSTRADE TO BE CLAMPED BEWTEEN STAIR EDGE AND STEPPED STINGER PLATE. HANDRAIL FIXED THROUGH BALUSTRADE GLAZING. RECESSED HIGH INSTNESITY LED STRIP DETAIL TO ILLUMINATE STAIR WALL. REFER TO STAIR DESIGN INTENT DETAIL DWG 300-01 8. STAIRWALL ELEVATION: STAIRWALL TO BE PLASTERBOARD WALL WITH TIMBER ''V' GROOVE DETAIL AND DECORATED. DETAIL TO EXTEND TO STARIWELL OPENING AND WALL SETBACK UNDER STAIRCASE. REFER TO STAIRWALL ELEVATION & DETAIL DWG 300-02 9. PENDANTS CLUSTER OF X 5 ANGLEPOISE PENDANTS WITH BLACK BRAIDED CABLE TO BE SUSPENDED FROM STAIRWELL SOFFIT. LAMPS TO BE LED TO REDUCE MAINTAINENCE. SEE RCP 200-05 10. DOWN TO SIGNAGE FOLDED ALUMINIUM BOX WITH PLANT ON 'BURTONS' ILLUMINATED LETTERING AND ARROWS TO BOTH SIDES. FRET CUT LETTERS TO BOTH SIDES. TO BE SUSPENDED FROM CEILING. REFER TO SIGNAGE PACK 11. FITTING ROOMS FITTING ROOM DOORS INCLUDING DDA TO BE BLACK GLOSS LAMINATE AS PER STANDARD DETAIL. MC TO ENSUDRE DDA DOOR FURNITURE IS PROVIDED. REFER TO FITTING ROOM /DDA CUBICLE DETAILS 300-12/ 300-13 12. LEANING MIRROR BACKED MIRROR TO RECEIVE TIMBER MOULDING & SPRAYED. PAINT COLOUR TBC. AND BRACED BACK TO WALL BY MC 13. LEANING GRAPHIC STRETCH GRAPHIC FRAME TO BE FIXED TO MDF BACK BOARD & EDGES FINISHED WITH WHITE TRIM. TO BE ANGLED AND BRACED BACK TO WALL BY SIGNAGE CONTRACTOR. BRAND TO PROVIDE ARTWORK. TO BE ANGLED ON SITE. CONTRACOTR TO ENSURE GRAPHIC DOESN'T CLASH WITH PRODUCT ON PERIMETER SYSTEM. REFER TO GRAPHIC SCHEDULE 14. TIMBER CLADDING ENGINEERED TIMBER PLANKS TO BE FIXED VERTICALLY MC TO ADJUST T&G GROOVE ON PLANKS TO SUIT. PLANKS TO BE ROUTED TO ALLOW FOR RECCESS TRACK. SEE DETAIL 300-16 15. NON FIXED PLINTHS NON FIXED PLINTHS 100MM HIGH TO SIT BETWEEN 1200 CENTRE UPRIGHTS. BRAND TO SPECIFY NUMBER FOR PLINTHS REQUIRED 16. FOOTWEAR BAYS INDIVIDUAL FOOTWEAR BAYS SUPPLIED BY FIXTURE SUPPLIER. TO BE BRACED BACK TO THE WALL BY MC, MC TO ENSURE ADEQUATE GROUNDS ARE PROVIDED TO WALL BEHIND. X1 DOUBLE SOCKET & X1 SINGLE REQUIRED TO EACH FOOTWEAR BAY TO PLUG IN ILLUMINATED PLINTH & VM DISPLAY. ELECTRICIAN TO ALLOW FOR POWER 17. ILLUMINATED INTERNAL SIGNAGE FIXED INTERNAL ILLUMINATED SIGNAGE TO SHOES/ FITTING ROOMS. ELECTRICIAN TO PROVIDE POWER. REFER TO SIGNAGE SCHEDULE FOR DETAILS. NON FIXED SHELF SIGNS: DENIM / SUITS - SMALL POWER TO BE AVAILABLE TO PLUG IN SHELF SIGNS REFER TO SIGNAGE SCHEDULE & SMALL POWER DRAWING REF: 200-06. COST OPTION FOR NON ILLUMINATED BUILT UP ACRYLIC SHELF MOUNTED SIGNS 18. FLUSH MOUNTED LIGHTBOX STANDARD GRAPHIC SIZE STRETCH CANVAS LIGHTBOX. 2400 X 1200MM. ELECTRICIAN TO PROVIDE POWER. STRETCH CANVAS ANGLE TO BE FIXED BACK TO PLY TO LINE TROUGH FLUSH WITH FINISHED FACE OF CASHDESK WALL. MC TO PROVIDE OPENING. SIGNAGE CONTRACTOR TO SUPPLY & FIX GRAPHIC. BRAND TO PROIVDE ARTWORK. REFER TO DETAIL 300-14 19. CASHDESK CASHDESK TO BE CLAD TO THE FRONT FACE AND RETURNS WITH BACK PAINTED GLASS. PAINT REFERENCE TBC. REFER TO FINISHES SCHEDULE. WORKTOP TO BE LAMINATE. REFER TO DETAIL 300-14 20. TILED WALL WALL TO BE TILED BY MC WITH CRACKLE GLAZE METRO TILE IN BERMONDSEY OLIVE. TILE SIZE 75 X 150MM SEE FINISHES SCHEDULE. GROUT TO BE MAPEI 112. TILING TO EXTEND WALL TO FLOOR ANY EXPOSED EDGES TO BE FINISHES WITH 3MM ALUMNIUM ANGLE SPRAYED TO MATCH TILE COLOUR A ADJUSTMENT TO BASEMENT WALL JC 11.04.14 DOROTHY PERKINS STORE REFURBISHIMENT BURTON ELEVATION