Pipeline Abandonment Project
Aussie Enviro was hired to undertake pipeline abandonment activities in a manner that
meets our stakeholder’s expectations.
We managed a large scale pipeline abandonment through the removal of 180km of oil
overflow pipe in south west Queensland. Included in the project was the cutting of the
pipeline into manageable sections using a 25 tonne excavator with grapple attachment
and a 35 tonne excavator with shear attachment. After shearing the pipe it was loaded
by dozer onto a prime mover and removed from site to an approved waste facility.
Additionally, a 14 tonne excavator, dozer, large posi track skid steer loader and body
truck were used for final site clean-up and to return it to its useful state.
For the project Aussie Enviro acquired two specialised attachments: Shears for the
cutting of the pipeline and a grapple for holding the pipe during shearing and loading
into the body truck for relocation.
Aussie Enviro was able to remediate the pipeline sites back to a safe, stable and non-
polluting state and compatible with the intended post-closure land use.
TESTIMONIAL:
“…. thank you for the hard work that you guys have done to keep the project running,
you have helped out amazingly on every request we have had. Your crews haven’t
missed a beat and working with Wayne as the supervisor has made all the paperwork
and day to day organisation as easy as it could possibly be. Hope that we get to work
together again in the future.
Cheers
Joshua Hannam
Jackson – TWC Abandonment Project
B2B: Brodie Lloyd
Ph: 07 4646 8020
Email: joshua.hannam@santos.com
Man hours 4,251.5 (total)
LTIs 0
Near Misses 0
Environmental Incidents 0

Weitere ähnliche Inhalte

Ähnlich wie Pipeline Abandonment Project

Australia - Ichthys GEP Project - Project Manager
Australia - Ichthys GEP Project - Project ManagerAustralia - Ichthys GEP Project - Project Manager
Australia - Ichthys GEP Project - Project ManagerNiels Asjee
 
Advent Portfolio - Presentation - 2022.pptx
Advent Portfolio - Presentation - 2022.pptxAdvent Portfolio - Presentation - 2022.pptx
Advent Portfolio - Presentation - 2022.pptxShyamPrasadThiraviam
 
About Waterman Aspen Powerpoint
About Waterman Aspen PowerpointAbout Waterman Aspen Powerpoint
About Waterman Aspen PowerpointMay Begum
 
931b50e6-4a9d-4b54-8552-683e3282e2a5-150409034912-conversion-gate01
931b50e6-4a9d-4b54-8552-683e3282e2a5-150409034912-conversion-gate01931b50e6-4a9d-4b54-8552-683e3282e2a5-150409034912-conversion-gate01
931b50e6-4a9d-4b54-8552-683e3282e2a5-150409034912-conversion-gate01Pavitter Virdi
 
About Waterman Aspen Powerpoint
About Waterman Aspen PowerpointAbout Waterman Aspen Powerpoint
About Waterman Aspen PowerpointHayley Sharp
 
MCD_Oil & Gas Profile 2017.pdf
MCD_Oil & Gas Profile 2017.pdfMCD_Oil & Gas Profile 2017.pdf
MCD_Oil & Gas Profile 2017.pdfKAWMAW
 
Contour Brochure 2022
Contour Brochure 2022Contour Brochure 2022
Contour Brochure 2022ContourMC
 
wagdy garas CV 1
wagdy garas CV 1wagdy garas CV 1
wagdy garas CV 1Wagdy Garas
 
Fuel terminal decommission
Fuel terminal decommissionFuel terminal decommission
Fuel terminal decommissionJen Patterson
 
Marine_Brochure_For_Web
Marine_Brochure_For_WebMarine_Brochure_For_Web
Marine_Brochure_For_WebMike Bisland
 
Suez Victorian Desalination Project
Suez Victorian Desalination ProjectSuez Victorian Desalination Project
Suez Victorian Desalination ProjectRick Nabett
 
Aricle in Irish Trucker Magazine
Aricle in Irish Trucker MagazineAricle in Irish Trucker Magazine
Aricle in Irish Trucker MagazineTony O Neill
 
Severn_Trent_Wanlip_Sludge_2014
Severn_Trent_Wanlip_Sludge_2014Severn_Trent_Wanlip_Sludge_2014
Severn_Trent_Wanlip_Sludge_2014Iain McGregor
 
SAL Company Brochure
SAL Company BrochureSAL Company Brochure
SAL Company BrochurePaul Heinrich
 
Orea Resources Bin Retrieval Case Study 2011
Orea Resources   Bin Retrieval Case Study 2011Orea Resources   Bin Retrieval Case Study 2011
Orea Resources Bin Retrieval Case Study 2011PaulEMorgan
 
Organisational Capacity
Organisational CapacityOrganisational Capacity
Organisational CapacityDean Singleton
 
Completed Projects Ex Brace Other
Completed Projects Ex Brace OtherCompleted Projects Ex Brace Other
Completed Projects Ex Brace Otherkingcrawford1
 
Elgin Country Estate Project Summary as on 20160606
Elgin Country Estate Project Summary as on 20160606 Elgin Country Estate Project Summary as on 20160606
Elgin Country Estate Project Summary as on 20160606 John M Riggs
 

Ähnlich wie Pipeline Abandonment Project (20)

attcofinal
attcofinalattcofinal
attcofinal
 
Australia - Ichthys GEP Project - Project Manager
Australia - Ichthys GEP Project - Project ManagerAustralia - Ichthys GEP Project - Project Manager
Australia - Ichthys GEP Project - Project Manager
 
Reflex notable projects
Reflex notable projectsReflex notable projects
Reflex notable projects
 
Advent Portfolio - Presentation - 2022.pptx
Advent Portfolio - Presentation - 2022.pptxAdvent Portfolio - Presentation - 2022.pptx
Advent Portfolio - Presentation - 2022.pptx
 
About Waterman Aspen Powerpoint
About Waterman Aspen PowerpointAbout Waterman Aspen Powerpoint
About Waterman Aspen Powerpoint
 
931b50e6-4a9d-4b54-8552-683e3282e2a5-150409034912-conversion-gate01
931b50e6-4a9d-4b54-8552-683e3282e2a5-150409034912-conversion-gate01931b50e6-4a9d-4b54-8552-683e3282e2a5-150409034912-conversion-gate01
931b50e6-4a9d-4b54-8552-683e3282e2a5-150409034912-conversion-gate01
 
About Waterman Aspen Powerpoint
About Waterman Aspen PowerpointAbout Waterman Aspen Powerpoint
About Waterman Aspen Powerpoint
 
MCD_Oil & Gas Profile 2017.pdf
MCD_Oil & Gas Profile 2017.pdfMCD_Oil & Gas Profile 2017.pdf
MCD_Oil & Gas Profile 2017.pdf
 
Contour Brochure 2022
Contour Brochure 2022Contour Brochure 2022
Contour Brochure 2022
 
wagdy garas CV 1
wagdy garas CV 1wagdy garas CV 1
wagdy garas CV 1
 
Fuel terminal decommission
Fuel terminal decommissionFuel terminal decommission
Fuel terminal decommission
 
Marine_Brochure_For_Web
Marine_Brochure_For_WebMarine_Brochure_For_Web
Marine_Brochure_For_Web
 
Suez Victorian Desalination Project
Suez Victorian Desalination ProjectSuez Victorian Desalination Project
Suez Victorian Desalination Project
 
Aricle in Irish Trucker Magazine
Aricle in Irish Trucker MagazineAricle in Irish Trucker Magazine
Aricle in Irish Trucker Magazine
 
Severn_Trent_Wanlip_Sludge_2014
Severn_Trent_Wanlip_Sludge_2014Severn_Trent_Wanlip_Sludge_2014
Severn_Trent_Wanlip_Sludge_2014
 
SAL Company Brochure
SAL Company BrochureSAL Company Brochure
SAL Company Brochure
 
Orea Resources Bin Retrieval Case Study 2011
Orea Resources   Bin Retrieval Case Study 2011Orea Resources   Bin Retrieval Case Study 2011
Orea Resources Bin Retrieval Case Study 2011
 
Organisational Capacity
Organisational CapacityOrganisational Capacity
Organisational Capacity
 
Completed Projects Ex Brace Other
Completed Projects Ex Brace OtherCompleted Projects Ex Brace Other
Completed Projects Ex Brace Other
 
Elgin Country Estate Project Summary as on 20160606
Elgin Country Estate Project Summary as on 20160606 Elgin Country Estate Project Summary as on 20160606
Elgin Country Estate Project Summary as on 20160606
 

Pipeline Abandonment Project

  • 1. Pipeline Abandonment Project Aussie Enviro was hired to undertake pipeline abandonment activities in a manner that meets our stakeholder’s expectations. We managed a large scale pipeline abandonment through the removal of 180km of oil overflow pipe in south west Queensland. Included in the project was the cutting of the pipeline into manageable sections using a 25 tonne excavator with grapple attachment and a 35 tonne excavator with shear attachment. After shearing the pipe it was loaded by dozer onto a prime mover and removed from site to an approved waste facility. Additionally, a 14 tonne excavator, dozer, large posi track skid steer loader and body truck were used for final site clean-up and to return it to its useful state. For the project Aussie Enviro acquired two specialised attachments: Shears for the cutting of the pipeline and a grapple for holding the pipe during shearing and loading into the body truck for relocation. Aussie Enviro was able to remediate the pipeline sites back to a safe, stable and non- polluting state and compatible with the intended post-closure land use. TESTIMONIAL: “…. thank you for the hard work that you guys have done to keep the project running, you have helped out amazingly on every request we have had. Your crews haven’t missed a beat and working with Wayne as the supervisor has made all the paperwork and day to day organisation as easy as it could possibly be. Hope that we get to work together again in the future. Cheers Joshua Hannam Jackson – TWC Abandonment Project B2B: Brodie Lloyd Ph: 07 4646 8020 Email: joshua.hannam@santos.com Man hours 4,251.5 (total) LTIs 0 Near Misses 0 Environmental Incidents 0