BACKGROUND:
Clotz Consulting Engineers CC was established in March 2007 (Reg. number:-
1993/024106/23) to provide Design, Estimating, and Project Management services to
companies within the Electricity Distribution and Transmission Industry.
CCE specialises in line design, development and design of new towers/structures,
inspection of lines, verification of as built structures/towers, verification of conductor
clearances, project management and general consultancy for overhead and underground
transmission and distribution lines in South Africa.
The CCE team are based in East London. The owner, Karsten Clotz, has over 25 years'
experience in providing the electricity supply industry with specialist design and other
related services.
Clients include Eskom Holdings Pty Ltd ECOU, wind / solar farms, mining companies,
construction contractors and other engineering consultants.
The company has developed into a highly technical specialist in overhead lines.
Our strengths lie in our ability to provide excellent technical services based on experience
and the ability to produce detail designs using the latest technology, equipment and
software, in the shortest possible time.
The company has enjoyed consistent growth over the past 7 years and now has a solid
portfolio of current and completed projects.
CCE are preparing to enter the international market soon.
GOALS:
The firm's goal has always been to provide a high-quality, expert engineering design
service.
Our major strength is that we understand the details required to complete each project from
the overall concept down to the smallest hardware fitting.
Each project we do carries our hallmark qualities of integrity, quality, respect for the client,
and cost-effectiveness.
SERVICES:
Engineering:-
 Transmission Line Design
 Distribution Line Design
 Development of new tower / structures
 Customize existing towers / structures
 Steelwork / Manufacturing drawings
Verification and inspections:-
 As Built verification of structures / towers
 As Built verification of conductor clearances
 As Built verification of line hardware installed
 Line inspections
Other:-
 Quality control
 Method statement
 Foundation Soil type allocation calculations and monitoring
 Project management
 Clerk of works
 Seminars / Training
PROJECTS
Current and completed projects:
The list of current and completed projects are provided as evidence of our capabilities.
2014:- Prime Electrical/Eskom Holdings Pty Ltd:- Cahora Bassa 533kV HVDC overhead
line.
The work entails assisting the construction contractor, Prime Electrical, to manage and
implement the tendered work for the supply, delivery to site, installation and commissioning
of 5 X 533kV Transmission Line sections on the existing Apollo / Songo HVDC line across
the Limpopo-, Nuanetse- and Save Rivers respectively. The work will have to be done
during the Christmas (2014) holiday season. Eskom has subcontracted the repair work and
new lines to subcontractors, due to the short time constraints and large quantity of work
required.
2014:- Zenith Installations:- Eskom 33kV and below structures.
The work entailed the development and design of a new series of hybrid wood and steel
intermediate and strain structures.
2014:- Aecom/VDM Surveys:- Juno Aries 132kV Lines.
This is a Presidential Priority project, which involved the design of several short lines from
Eskom MTS substations to Transnet TFS substations, in order to increase the electrical
capacity of the Saldanah rail system. A new series of structures was designed using PLS
Pole (TNET type A, C, D, and E). The conductors are twin Tern. The shield wire is
Chickadee and the OPGW is 48 core 16kA. Customized terminal structures and bifurcation
structures had to be designed to cater for phase transformation from 3-phase dual circuit to
6 x 1-phase at the traction substations.
2014:- Eskom Holdings Pty Ltd ECOU:- Dreunberg Sable 132kV line upgrade.
The work entailed the upgrade of an existing 132kV line from Wolf conductor to Tern
conductor, for the section of line, between Dreunberg substation and the new Sable
substation. The existing structures were inspected and data was captured in the field, using
the ikeGPS laser device. The data was imported into PLS Cadd. Problems / defects /
tensioning issues, were identified. A new Tee off structure was designed, as well as a
custom suspension / strain bracket, to achieve the necessary ground and phase clearance.
Earthing of existing structures and installation of a new OPGW conductor was designed to
cater for an increased fault level due to solar generation.
2014:- Eskom Holdings Pty Ltd ECOU:- Vuyani Qunu Zimbane ADSS / OPGW Bypasses.
The work entailed the design, and planning for the installation of temporary ADSS bypasses
to be constructed under live conditions. Customized structure modifications were
implemented to ensure that work could be safely executed by live line teams.
2011:- Eskom Holdings Pty Ltd ECOU:- Elliot Ugie 132kV line (53km).
The work entailed the design of a new 132kV Sub-transmission line, as part of the Greater
East London Strengthening Project. The line has double circuit and single circuit sections.
New dual circuit pinned guyed Intermediate structures, dual circuit Strain 0-90 deg
structures and dual circuit H-Pole 0-5 deg steel structures, were designed using PLS Pole.
The approach to Ugie Substation was challenging as the new line had to cross over two
existing MV lines, and under an existing 132kV line.
2011:- Eskom Holdings Pty Ltd ECOU:- Sappi Elliot 132kV line (80km).
The work entailed the design of a new 132kV Sub-transmission line, as part of the Greater
East London Strengthening Project. The line has double circuit and single circuit sections.
The newly developed twin pole guyed intermediate, dual circuit Strain 0-90 deg Steel
Structures, and dual circuit H-Pole 0-5 deg Steel Structures, were used in the design. Two
custom tripple pole structures (30m) were designed to cater for very large span length
requirements.
2014:- Prime Electrical:- Compile method statements for the construction of 400kV lines for
Prime Electrical (construction company).
The method statements formed part of the Technical Returnable Documents for Invitation to
pre-qualify for the Eskom Transmission Line Contractors' Panel for the construction of
132kV, 275kV, 400kV and 765kV power lines.
2014:- Aurecon/VDM Surveys:- Melkhout Kouga 132kV line (40km).
The work entailed the design required to replace the OPGW with Pine conductor as a short /
medium term solution. The prelim investigation identified problems / issues, i.e. conductor
swing angle and uplift violations as a result of original design criteria faults. A detailed report
was submitted indicating OPGW options, structure modifications required in order to string
the line to the correct criteria. Profile sheets with conductor tensions, were provided to the
client to assist with the stringing of Pine conductor as an alternative to OPGW.
2014:- Zenith Installations:- Three Sisters 132kV line.
The work entailed the design of steel monopoles and the provision of steelwork
manufacture drawings the Three Sisters line.
2014:- Zenith Installations:- Zimbani Vuyani 132kV Line.
The work entailed the design of steel monopoles and the provision of steelwork
manufacture drawings the Zimbani Vuyani line.
2014:- Zenith Installations/Optipower:- Kafue Muzuma Victoria Falls 220kV bypass line.
This entailed the design of various Method 4 structures using PLS Pole, and provision of
bypass options for Kafue Muzuma Victoria Falls 220kV bypass line project, Zambia.
2014:- Zenith Installations:- Mafinizo Taweni 132kV Line.
The work entailed the design of dual circuit structures and the provision of steelwork
manufacture drawings the Mafinizo Taweni 132kV line.
2014:- Zenith Installations:- Various high masts.
The work entailed the design of various high mast lighting and antenna masts structures
using PLS Pole, and provision of steelwork / manufacturing drawings.
2014:- Siyavuya Power Projects/VDM Surveys:- 245 Series Lattice Towers (Queenspark).
The work entailed the calculation of data required for the setting out of foundations for 245
Series Lattice structures, and provision of profile sheets and foundation setting out
drawings, reflecting K-points and sub ground points taking into account terrain side slope.
2014:- Aurecon :- Melkhout Kouga 132kV line (4.831km).
The work entailed the modelling of Method 4, 273 series, structures using PLS Pole.
Provision of profile sheets and survey data for setting out of foundations and stays. Re-route
of a section of the line (lattice towers), provide profile sheets and structure & stay
coordinates for the re-route.
2013:- Eskom Holdings Pty Ltd ECOU:- Zimbani Mafini 132kV line (Opgw).
The work entailed the design, planning and optimization of OPGW on a section of the line.
The existing line was inspected and structure measurements captured, using the ikeGPS
laser device. The data was imported into PLS Cadd and the existing structures were
modelled in PLS Pole, using the latest Eskom criteria. Structure modifications and
reinforcements were designed in order to replace the existing shield wire with OPGW
48Core 10kA. Detailed structure drawings were provided to include approved changes to
exist structures.
2013:- Norconsult:- Kemba Embekweni 66kV line (15.28km).
The proposed line will be between Kemba substation and Embekweni substation, and are
required by an IPP for connection to a new solar project. The work entailed the design of
proposed route options for a new single circuit Kemba Embekweni 66kV line. A new series
of structures were modelled, using PLS Pole, to carry twin Chickadee conductor. A prelim
line routing and costing report were submitted.
2013:- Basil Reed Matomo:- Van Stadens Wind farm 22kV lines (8km).
The project was unique in the sense that twin Upas conductors were used. The work
entailed the provision of services for quality management, Clerk of Works, Technical
problem solving (Engineering) during the construction phase, as well as "As Built" line
inspections (hardware, etc.) and "As Built" verification for Structures, conductor clearances,
etc.).
2013:- VDM Surveys:- Dorper Wind farm 132kV lines.
The work required two new tee off lines for an IPP. The work entailed structure verification
(structure measurements) and conductor verification (span height measurements), using the
ikeGPS laser device. The data was imported into PLS Cadd, and the new lines were
designed using steel monopoles.
2013:- Norconsult:- Emergency Cable Structures for 22kV lines.
The work entailed the development and design of an emergency structure to be used with
the emergency cable, under live conditions, in order to isolate a section of line or substation.
The work included the design of the pole sections, cable cleat and cable clamp cross arm,
with surge arrestors and fused cut-out assemblies, as well as the provision of steelwork
manufacturing drawings and a Bill of Quantities.
2012:- Eskom Holdings Pty Ltd ECOU:- Riebeeck Sterkspruit 66kV line (43km).
The work entailed a comprehensive field investigation and line inspection to identify the
current status of the existing single circuit 66kV line. A Line Inspection and Report, including
recommendations, was provided to the client. Provide PRF Presentation to assist the client
(Plant department) to request finance for the replacement of the existing line.
2012:- Eskom Holdings Pty Ltd ECOU:- Qumbu Mount Frere 132kV line Emergency work
(Section of line where the structures failed due to a natural disaster).
The work entailed the inspection / evaluation and proposal for the emergency repair work.
This also included the sourcing of line hardware from the local TSC and project
management of the emergency repair work. Compile an Emergency Five Pole Replacement
plan to assist the client with future emergency repair work.
2012:- Eskom Holdings Pty Ltd ECOU:- Qolweni Cala & Cala Elliot OPGW (66.34km).
The work entailed the design for the complete replacement of the OPGW. A custom bracket
was designed, and structures had to be modified to increase phase to shield clearance.
2012:- Eskom Holdings Pty Ltd ECOU:- Paretto Feeders.
This was a pilot project which entailed the investigation and solutions for “clashing
conductors” on the Sappi Cicira 22kV system. The work entailed the detailed inspection and
data collection of structures, as well as investigation into “clashing conductors”. A detailed
report and bill of materials was compiled in order to correct problems, defects and BIL
issues.
2012:- Eskom Holdings Pty Ltd ECOU:- Data Software Development.
This entailed the development of a data dictionary package to be used for the MV line
inspections and data collection for the Paretto Feeders project.
2011:- Eskom Holdings Pty Ltd ECOU:- Qolweni Hlobo 132kV line (44km).
The work entailed the design of a new single circuit 132kV line as part of the Greater East
London Strengthening Project. A new steel tripple pole structure and a new bifurcation
intermediate structure were designed using PLS Pole. A foundation reconciliation worksheet
was developed and introduced, to ensure the accurate recording of soil types for pole & stay
foundations and provide ongoing monitoring of the soil types.
2011:- Eskom Holdings Pty Ltd ECOU:- Vuyani Hlobo 132kV line (77km).
The work entailed the design of a new single circuit 132kV line. Drilled rock anchor
foundations were used, and training were provided to the contractor's construction team. A
“staggered” OPGW sizing arrangement was implemented to cater for the increased fault
level at Vuyani substation.
2011:- Eskom Holdings Pty Ltd ECOU:- Albany Kariega 132kV line (40km).
The work entailed the design for the rebuild of the existing 40km line with 132kV steel
monopoles, Chickadee conductor, earth wire, silicon type insulators and bird guards /
diverters where required. A new “cigar type” series of intermediate structures were designed
and modelled using PLS Pole. The new “cigar type” structure was required to mitigate
against the vortex shedding phenomena, encountered with Eskom’s 7621 series structures.
2011:- Eskom Holdings Pty Ltd ECOU, MEW and Roshcon:- Development of drilled and
grouted rock anchor system for M20 and M24 stays.
On-site training for MEW and Roshcon’s construction teams were provided.
2008:- Eskom Holdings Pty Ltd ECOU:- Emergency Structures for 132kV and 66kV lines.
The work entailed the development / design of standard “universal” series of emergency
structures to be utilized for various configurations, for use on 132kV lines, based on “direct
replacement” criteria. This included an emergency replacement strategy (i.e. response plan
and emergency repair work plan). This would assist the client to minimize quantities
required for maintenance spares and speed up emergency repairs.
2008:- Eskom Holdings Pty Ltd ECOU:- Komani Tsolwana 66kV line (73km).
The work entailed the design of a new single circuit 66kV line, as well as a temporary
bypass at the Freemantle substation. A new steel H-pole, with a lattice cross arm, was
designed to cater for a road crossing near the Komani Substation.
2008:- Eskom Holdings Pty Ltd ECOU:- Tsolwana 22kV link lines (27km).
The work entailed the design of a new network of 22kV link lines to incorporate the new
Tsolwana Substation near Tarkastad, as well as a bypass at the Tsolwana substation.
2008:- Eskom Holdings Pty Ltd ECOU:- Kariega Whitney 66kV line (15km).
The project was required in order to provide a fibre link between Albany Substation near
Port Alfred, and Kariega Substation near Bathurst. The work entailed the design of structure
modifications, in order for the ADSS to be installed above the phase conductors. The work
was required to be carried out under live conditions. Stringing was done by helicopter.
2008:- Eskom Holdings Pty Ltd ECOU:- Butterworth Godidi 66kV line (34km).
The work entailed the design of a new single circuit 66kV line, from Butterworth substation
to the new Godidi substation on the coast. The line was required to be strung, using a very
light conductor (Mink). This created many challenges with regards to conductor swing out
and uplift during high wind conditions.
2008:- Eskom Holdings Pty Ltd ECOU:- Godidi Substation 22kV link lines (3km).
The work entailed the design of new 22kV link lines and MV grid modifications, as well as a
bypass at Godidi substation.
2007:- Eskom Holdings Pty Ltd ECOU:- Posseidon Zebra 66kV line.
The work required the design of new structures, and modifications to existing structures in
order to re-route the existing 66kV line, under live conditions at Posseidon Substation. The
work was required, to cater for new 765kV feeder for Eskom Transmission.
2007:- Eskom Holdings Pty Ltd ECOU:- Freemantle Indwe 66kV line (35km).
The work entailed the design of a new 35 km single circuit 66kV line, as well as two
temporary bypass structures at the Freemantle substation. A new series of hybrid wood
/steel structures were developed using PLS Pole. The new hybrid wood / steel structure
series was used in line design. The project required significant helicopter work in
challenging terrain.
2007 to 2013:- Eskom Holdings Pty Ltd ECOU:- Helicopter work for inspection of various
132kV and 66kV lines.
Development / Design of a high speed GPS geotagging system for the photographic
inspections of power lines. A post processing system of the inspection photos were
developed to produce user friendly reports for the client.
2006:- Eskom Holdings Pty Ltd ECOU:- Komani Indwe 66kV Line (35km) and Qolweni Cala
66kV line (36km).
This entailed the design of a new series of hybrid wood / steel guyed intermediate structures
and guyed steel monopole strain structures. The lines had to be constructed in close
proximity to existing lines.
2005:- Eskom Holdings Pty Ltd ECOU:- Dumasi Zimbani 132kV line (87km).
This is an extremely mountainous area. This required the design of light weight structures
(pinned, guyed monopole strain structures), for ease of installation in mountainous terrain.
Spans in excess of 900m were required.
2004:- Eskom Holdings Pty Ltd ECOU:- Grassridge Melkhout Single Circuit 132kV line
(92km).
The work entailed the design of the new line from Grassridge Substation to Melkhout
substation in Humansdorp. Eskom 76XX steel guyed structures were developed and
modelled, using PLS Pole.
2005:- Eskom Holdings Pty Ltd ECOU:- Qumbu Ugie 132kV line (70km).
This entailed the design and development of a new series of H-pole strain structures, using
PLS Pole. Pinned guyed foundations were used and a batching plant was set up on site to
manufacture pre-cast concrete foundations. Significant helicopter work was required in
order to erect structures in inaccessible terrain.
2005:- Eskom Holdings Pty Ltd ECOU:- Ugie 22kV link lines and associated infrastructure.
The work entailed the design of new 22kV link lines and MV grid modifications, as well as a
bypass at the Ugie substation, in order provide a temporary construction supply point for the
new PG Bison wood processing factory.
2007 to 2014:- Various Clients:- Development of various clamps and brackets, steel cross
arms, steel structures
 Design Various Steel Clamps Brackets
 Design Various Steel Cross Arms
 Design Various Steel Structures
The works entailed the development and design of various clamps / brackets, steel cross
arms, steel structures and provide detailed manufacturing steelwork drawings to clients.
This was challenging due to time constraints, as it was required to design and provide
manufacturing drawings in a very short period of time.
2007 to 2014:- Eskom Holdings Pty Ltd ECOU:- Steelwork Inspections
The work entailed the inspection of steelwork at the manufacturers’ premises, to ensure that
the manufactured products are as per the steelwork drawings.
Licenses
QTY
PLS Cadd (Version 13.01) used for profiling lines. 1
PLS Pole (Version 13.01) used to design wood, steel and concrete structures; 1
PLS Tower (Version 13.01) used to design lattice steel towers; 1
Turbo Cad Pro Platinum (Version 21.1) 2
Smartdraw CI Business Edition (Verson 21.2.4.5) 2
MRP (Verson 4.2.29) - material reporting program (Software used to compile an
accurate Bill of materials, for any 132kV, 66kV, 22kV projects, in a short period of
time);
2
Microsoft Access 2010 (Software used to filter data, exported from the material
reporting program, and compile a BOM in a .xlsx or .xls format);
2
Global Mapper (Version 12) (Software for GIS applications and ensures that photos
are accurately tagged with latitude and longitude coordinates);
1
Quantum GIS (1.8.0) software for GIS applications; 1
Google Earth Pro & Google Earth (Software used to view a .kmz / .kml file to
assist the tenderers to price more accurately and to assist the surveyor and
construction contractor to visualise the terrain before the start of the construction
phase);
1
GPS Pathfinder Office, TerraSync and Data Transfer to process data collected with
a Trimble device;
1
Geojot (Software used to assist in the process to collect data with a Mobile device,
i.e. iPad)
1
Datadroid Forms (Software used to assist in the process to collect data with a
Mobile device, i.e. iPad)
1
Photo link program (PLP) Software used to compile detailed reports after analyses
of the geo-tagged photos of manual line inspections;
1
ikeGPS™; CCE is now the first official reseller in Southern Africa for ikeGPS™ products,
hardware and software. The system provides LIDAR true size imaging and data
processing for line inspections, vegetation management and survey applications.
(Web:- www.ikeGPS.com);
2
GSM Commander:- CCE are approved vendors and installers for the GSM Commander
Telemetry systems, in the Eastern Cape.GSM Commander™ is the ultimate remote
control/monitoring, that works via cellular networks. (Web:-
www.gsmcommander.com);
1
Specialized Computer Software & Licenses:
DEVELOPMENT:
CCE are fully committed to:
• Job creation;
• Training of staff;
• Uplift & develop previously disadvantaged people of South Africa:
Bursaries to previously disadvantaged students;
Provide financial assistance / training to the disabled;
Providing accommodation to staff;
ORGANOGRAM:
CCE is continuously refining and extending its resources, with specific emphasis on the
development of its human resources. CCE promote the development of human resources, as
this is the most valuable investment, any business can make.
CONTACT DETAILS:
Clotz Consulting Engineers CC
Business Address:-
62 Bonza Bay Road,
Beacon Bay,
5241
South Africa
Postal Address:
Postnet Suite 275,
Private Bag X3,
Beacon Bay,
5205
South Africa
Registered Office:
Graaff Reinet Road 17
Uitenhage
6229
South Africa
Phone: (043) 7485 465
Fax: (086) 6480 117 or (086) 5171 686
Mobile: 082 5220 600 or 072 7430 659
Email: karstenc@mweb.co.za or renek@polka.co.za
Website:- http://cce.za.com/

Weitere ähnliche Inhalte

Andere mochten auch

Cómo registrar tu marca en España paso a paso
Cómo registrar tu marca en España paso a pasoCómo registrar tu marca en España paso a paso
Cómo registrar tu marca en España paso a paso
econred
 
Turismo Fluvial en Alemania - 2012
Turismo Fluvial en Alemania - 2012Turismo Fluvial en Alemania - 2012
Turismo Fluvial en Alemania - 2012
Keltia Viatges
 
Sps Conferenc Essen 2009 Stenum Fresner
Sps Conferenc Essen 2009 Stenum FresnerSps Conferenc Essen 2009 Stenum Fresner
Sps Conferenc Essen 2009 Stenum Fresner
CSCP
 
MCCCD Experts
MCCCD ExpertsMCCCD Experts
MCCCD Experts
mcccd
 

Andere mochten auch (12)

Planificación TEOYE 1°APM 2014
Planificación TEOYE 1°APM 2014Planificación TEOYE 1°APM 2014
Planificación TEOYE 1°APM 2014
 
Cómo registrar tu marca en España paso a paso
Cómo registrar tu marca en España paso a pasoCómo registrar tu marca en España paso a paso
Cómo registrar tu marca en España paso a paso
 
Insan ve bilgisayar etkileşimi / Human Computer interaction
Insan ve bilgisayar etkileşimi / Human Computer interactionInsan ve bilgisayar etkileşimi / Human Computer interaction
Insan ve bilgisayar etkileşimi / Human Computer interaction
 
June2016TradeComplianceOps
June2016TradeComplianceOpsJune2016TradeComplianceOps
June2016TradeComplianceOps
 
Historia del Planeta Alfa, "el manantial sagrado".
Historia del Planeta Alfa, "el manantial sagrado". Historia del Planeta Alfa, "el manantial sagrado".
Historia del Planeta Alfa, "el manantial sagrado".
 
Turismo Fluvial en Alemania - 2012
Turismo Fluvial en Alemania - 2012Turismo Fluvial en Alemania - 2012
Turismo Fluvial en Alemania - 2012
 
Conceptos para avanzar juntos en la educación actual
Conceptos para avanzar juntos en la educación actualConceptos para avanzar juntos en la educación actual
Conceptos para avanzar juntos en la educación actual
 
ISLE Professionalization Fair 2. Soledad Gómez González: "Sustainable Practi...
ISLE Professionalization Fair 2. Soledad Gómez González: "Sustainable  Practi...ISLE Professionalization Fair 2. Soledad Gómez González: "Sustainable  Practi...
ISLE Professionalization Fair 2. Soledad Gómez González: "Sustainable Practi...
 
Sps Conferenc Essen 2009 Stenum Fresner
Sps Conferenc Essen 2009 Stenum FresnerSps Conferenc Essen 2009 Stenum Fresner
Sps Conferenc Essen 2009 Stenum Fresner
 
Wellness & Spa Hotel Lindenhof in South Tyrol
Wellness & Spa Hotel Lindenhof in South TyrolWellness & Spa Hotel Lindenhof in South Tyrol
Wellness & Spa Hotel Lindenhof in South Tyrol
 
MCCCD Experts
MCCCD ExpertsMCCCD Experts
MCCCD Experts
 
From Past to Present: Sustainable Transportation Practices in Graz
From Past to Present: Sustainable Transportation Practices in GrazFrom Past to Present: Sustainable Transportation Practices in Graz
From Past to Present: Sustainable Transportation Practices in Graz
 

32 CCE Company profile Feb 2015

  • 1. BACKGROUND: Clotz Consulting Engineers CC was established in March 2007 (Reg. number:- 1993/024106/23) to provide Design, Estimating, and Project Management services to companies within the Electricity Distribution and Transmission Industry. CCE specialises in line design, development and design of new towers/structures, inspection of lines, verification of as built structures/towers, verification of conductor clearances, project management and general consultancy for overhead and underground transmission and distribution lines in South Africa. The CCE team are based in East London. The owner, Karsten Clotz, has over 25 years' experience in providing the electricity supply industry with specialist design and other related services. Clients include Eskom Holdings Pty Ltd ECOU, wind / solar farms, mining companies, construction contractors and other engineering consultants. The company has developed into a highly technical specialist in overhead lines. Our strengths lie in our ability to provide excellent technical services based on experience and the ability to produce detail designs using the latest technology, equipment and software, in the shortest possible time. The company has enjoyed consistent growth over the past 7 years and now has a solid portfolio of current and completed projects. CCE are preparing to enter the international market soon. GOALS: The firm's goal has always been to provide a high-quality, expert engineering design service. Our major strength is that we understand the details required to complete each project from the overall concept down to the smallest hardware fitting. Each project we do carries our hallmark qualities of integrity, quality, respect for the client, and cost-effectiveness.
  • 2. SERVICES: Engineering:-  Transmission Line Design  Distribution Line Design  Development of new tower / structures  Customize existing towers / structures  Steelwork / Manufacturing drawings Verification and inspections:-  As Built verification of structures / towers  As Built verification of conductor clearances  As Built verification of line hardware installed  Line inspections Other:-  Quality control  Method statement  Foundation Soil type allocation calculations and monitoring  Project management  Clerk of works  Seminars / Training PROJECTS Current and completed projects: The list of current and completed projects are provided as evidence of our capabilities. 2014:- Prime Electrical/Eskom Holdings Pty Ltd:- Cahora Bassa 533kV HVDC overhead line. The work entails assisting the construction contractor, Prime Electrical, to manage and implement the tendered work for the supply, delivery to site, installation and commissioning of 5 X 533kV Transmission Line sections on the existing Apollo / Songo HVDC line across the Limpopo-, Nuanetse- and Save Rivers respectively. The work will have to be done during the Christmas (2014) holiday season. Eskom has subcontracted the repair work and new lines to subcontractors, due to the short time constraints and large quantity of work required. 2014:- Zenith Installations:- Eskom 33kV and below structures. The work entailed the development and design of a new series of hybrid wood and steel intermediate and strain structures.
  • 3. 2014:- Aecom/VDM Surveys:- Juno Aries 132kV Lines. This is a Presidential Priority project, which involved the design of several short lines from Eskom MTS substations to Transnet TFS substations, in order to increase the electrical capacity of the Saldanah rail system. A new series of structures was designed using PLS Pole (TNET type A, C, D, and E). The conductors are twin Tern. The shield wire is Chickadee and the OPGW is 48 core 16kA. Customized terminal structures and bifurcation structures had to be designed to cater for phase transformation from 3-phase dual circuit to 6 x 1-phase at the traction substations. 2014:- Eskom Holdings Pty Ltd ECOU:- Dreunberg Sable 132kV line upgrade. The work entailed the upgrade of an existing 132kV line from Wolf conductor to Tern conductor, for the section of line, between Dreunberg substation and the new Sable substation. The existing structures were inspected and data was captured in the field, using the ikeGPS laser device. The data was imported into PLS Cadd. Problems / defects / tensioning issues, were identified. A new Tee off structure was designed, as well as a custom suspension / strain bracket, to achieve the necessary ground and phase clearance. Earthing of existing structures and installation of a new OPGW conductor was designed to cater for an increased fault level due to solar generation. 2014:- Eskom Holdings Pty Ltd ECOU:- Vuyani Qunu Zimbane ADSS / OPGW Bypasses. The work entailed the design, and planning for the installation of temporary ADSS bypasses to be constructed under live conditions. Customized structure modifications were implemented to ensure that work could be safely executed by live line teams. 2011:- Eskom Holdings Pty Ltd ECOU:- Elliot Ugie 132kV line (53km). The work entailed the design of a new 132kV Sub-transmission line, as part of the Greater East London Strengthening Project. The line has double circuit and single circuit sections. New dual circuit pinned guyed Intermediate structures, dual circuit Strain 0-90 deg structures and dual circuit H-Pole 0-5 deg steel structures, were designed using PLS Pole. The approach to Ugie Substation was challenging as the new line had to cross over two existing MV lines, and under an existing 132kV line. 2011:- Eskom Holdings Pty Ltd ECOU:- Sappi Elliot 132kV line (80km). The work entailed the design of a new 132kV Sub-transmission line, as part of the Greater East London Strengthening Project. The line has double circuit and single circuit sections. The newly developed twin pole guyed intermediate, dual circuit Strain 0-90 deg Steel Structures, and dual circuit H-Pole 0-5 deg Steel Structures, were used in the design. Two custom tripple pole structures (30m) were designed to cater for very large span length requirements.
  • 4. 2014:- Prime Electrical:- Compile method statements for the construction of 400kV lines for Prime Electrical (construction company). The method statements formed part of the Technical Returnable Documents for Invitation to pre-qualify for the Eskom Transmission Line Contractors' Panel for the construction of 132kV, 275kV, 400kV and 765kV power lines. 2014:- Aurecon/VDM Surveys:- Melkhout Kouga 132kV line (40km). The work entailed the design required to replace the OPGW with Pine conductor as a short / medium term solution. The prelim investigation identified problems / issues, i.e. conductor swing angle and uplift violations as a result of original design criteria faults. A detailed report was submitted indicating OPGW options, structure modifications required in order to string the line to the correct criteria. Profile sheets with conductor tensions, were provided to the client to assist with the stringing of Pine conductor as an alternative to OPGW. 2014:- Zenith Installations:- Three Sisters 132kV line. The work entailed the design of steel monopoles and the provision of steelwork manufacture drawings the Three Sisters line. 2014:- Zenith Installations:- Zimbani Vuyani 132kV Line. The work entailed the design of steel monopoles and the provision of steelwork manufacture drawings the Zimbani Vuyani line. 2014:- Zenith Installations/Optipower:- Kafue Muzuma Victoria Falls 220kV bypass line. This entailed the design of various Method 4 structures using PLS Pole, and provision of bypass options for Kafue Muzuma Victoria Falls 220kV bypass line project, Zambia. 2014:- Zenith Installations:- Mafinizo Taweni 132kV Line. The work entailed the design of dual circuit structures and the provision of steelwork manufacture drawings the Mafinizo Taweni 132kV line. 2014:- Zenith Installations:- Various high masts. The work entailed the design of various high mast lighting and antenna masts structures using PLS Pole, and provision of steelwork / manufacturing drawings. 2014:- Siyavuya Power Projects/VDM Surveys:- 245 Series Lattice Towers (Queenspark). The work entailed the calculation of data required for the setting out of foundations for 245 Series Lattice structures, and provision of profile sheets and foundation setting out drawings, reflecting K-points and sub ground points taking into account terrain side slope.
  • 5. 2014:- Aurecon :- Melkhout Kouga 132kV line (4.831km). The work entailed the modelling of Method 4, 273 series, structures using PLS Pole. Provision of profile sheets and survey data for setting out of foundations and stays. Re-route of a section of the line (lattice towers), provide profile sheets and structure & stay coordinates for the re-route. 2013:- Eskom Holdings Pty Ltd ECOU:- Zimbani Mafini 132kV line (Opgw). The work entailed the design, planning and optimization of OPGW on a section of the line. The existing line was inspected and structure measurements captured, using the ikeGPS laser device. The data was imported into PLS Cadd and the existing structures were modelled in PLS Pole, using the latest Eskom criteria. Structure modifications and reinforcements were designed in order to replace the existing shield wire with OPGW 48Core 10kA. Detailed structure drawings were provided to include approved changes to exist structures. 2013:- Norconsult:- Kemba Embekweni 66kV line (15.28km). The proposed line will be between Kemba substation and Embekweni substation, and are required by an IPP for connection to a new solar project. The work entailed the design of proposed route options for a new single circuit Kemba Embekweni 66kV line. A new series of structures were modelled, using PLS Pole, to carry twin Chickadee conductor. A prelim line routing and costing report were submitted. 2013:- Basil Reed Matomo:- Van Stadens Wind farm 22kV lines (8km). The project was unique in the sense that twin Upas conductors were used. The work entailed the provision of services for quality management, Clerk of Works, Technical problem solving (Engineering) during the construction phase, as well as "As Built" line inspections (hardware, etc.) and "As Built" verification for Structures, conductor clearances, etc.). 2013:- VDM Surveys:- Dorper Wind farm 132kV lines. The work required two new tee off lines for an IPP. The work entailed structure verification (structure measurements) and conductor verification (span height measurements), using the ikeGPS laser device. The data was imported into PLS Cadd, and the new lines were designed using steel monopoles. 2013:- Norconsult:- Emergency Cable Structures for 22kV lines. The work entailed the development and design of an emergency structure to be used with the emergency cable, under live conditions, in order to isolate a section of line or substation. The work included the design of the pole sections, cable cleat and cable clamp cross arm, with surge arrestors and fused cut-out assemblies, as well as the provision of steelwork manufacturing drawings and a Bill of Quantities.
  • 6. 2012:- Eskom Holdings Pty Ltd ECOU:- Riebeeck Sterkspruit 66kV line (43km). The work entailed a comprehensive field investigation and line inspection to identify the current status of the existing single circuit 66kV line. A Line Inspection and Report, including recommendations, was provided to the client. Provide PRF Presentation to assist the client (Plant department) to request finance for the replacement of the existing line. 2012:- Eskom Holdings Pty Ltd ECOU:- Qumbu Mount Frere 132kV line Emergency work (Section of line where the structures failed due to a natural disaster). The work entailed the inspection / evaluation and proposal for the emergency repair work. This also included the sourcing of line hardware from the local TSC and project management of the emergency repair work. Compile an Emergency Five Pole Replacement plan to assist the client with future emergency repair work. 2012:- Eskom Holdings Pty Ltd ECOU:- Qolweni Cala & Cala Elliot OPGW (66.34km). The work entailed the design for the complete replacement of the OPGW. A custom bracket was designed, and structures had to be modified to increase phase to shield clearance. 2012:- Eskom Holdings Pty Ltd ECOU:- Paretto Feeders. This was a pilot project which entailed the investigation and solutions for “clashing conductors” on the Sappi Cicira 22kV system. The work entailed the detailed inspection and data collection of structures, as well as investigation into “clashing conductors”. A detailed report and bill of materials was compiled in order to correct problems, defects and BIL issues. 2012:- Eskom Holdings Pty Ltd ECOU:- Data Software Development. This entailed the development of a data dictionary package to be used for the MV line inspections and data collection for the Paretto Feeders project. 2011:- Eskom Holdings Pty Ltd ECOU:- Qolweni Hlobo 132kV line (44km). The work entailed the design of a new single circuit 132kV line as part of the Greater East London Strengthening Project. A new steel tripple pole structure and a new bifurcation intermediate structure were designed using PLS Pole. A foundation reconciliation worksheet was developed and introduced, to ensure the accurate recording of soil types for pole & stay foundations and provide ongoing monitoring of the soil types. 2011:- Eskom Holdings Pty Ltd ECOU:- Vuyani Hlobo 132kV line (77km). The work entailed the design of a new single circuit 132kV line. Drilled rock anchor foundations were used, and training were provided to the contractor's construction team. A “staggered” OPGW sizing arrangement was implemented to cater for the increased fault level at Vuyani substation.
  • 7. 2011:- Eskom Holdings Pty Ltd ECOU:- Albany Kariega 132kV line (40km). The work entailed the design for the rebuild of the existing 40km line with 132kV steel monopoles, Chickadee conductor, earth wire, silicon type insulators and bird guards / diverters where required. A new “cigar type” series of intermediate structures were designed and modelled using PLS Pole. The new “cigar type” structure was required to mitigate against the vortex shedding phenomena, encountered with Eskom’s 7621 series structures. 2011:- Eskom Holdings Pty Ltd ECOU, MEW and Roshcon:- Development of drilled and grouted rock anchor system for M20 and M24 stays. On-site training for MEW and Roshcon’s construction teams were provided. 2008:- Eskom Holdings Pty Ltd ECOU:- Emergency Structures for 132kV and 66kV lines. The work entailed the development / design of standard “universal” series of emergency structures to be utilized for various configurations, for use on 132kV lines, based on “direct replacement” criteria. This included an emergency replacement strategy (i.e. response plan and emergency repair work plan). This would assist the client to minimize quantities required for maintenance spares and speed up emergency repairs. 2008:- Eskom Holdings Pty Ltd ECOU:- Komani Tsolwana 66kV line (73km). The work entailed the design of a new single circuit 66kV line, as well as a temporary bypass at the Freemantle substation. A new steel H-pole, with a lattice cross arm, was designed to cater for a road crossing near the Komani Substation. 2008:- Eskom Holdings Pty Ltd ECOU:- Tsolwana 22kV link lines (27km). The work entailed the design of a new network of 22kV link lines to incorporate the new Tsolwana Substation near Tarkastad, as well as a bypass at the Tsolwana substation. 2008:- Eskom Holdings Pty Ltd ECOU:- Kariega Whitney 66kV line (15km). The project was required in order to provide a fibre link between Albany Substation near Port Alfred, and Kariega Substation near Bathurst. The work entailed the design of structure modifications, in order for the ADSS to be installed above the phase conductors. The work was required to be carried out under live conditions. Stringing was done by helicopter. 2008:- Eskom Holdings Pty Ltd ECOU:- Butterworth Godidi 66kV line (34km). The work entailed the design of a new single circuit 66kV line, from Butterworth substation to the new Godidi substation on the coast. The line was required to be strung, using a very light conductor (Mink). This created many challenges with regards to conductor swing out and uplift during high wind conditions.
  • 8. 2008:- Eskom Holdings Pty Ltd ECOU:- Godidi Substation 22kV link lines (3km). The work entailed the design of new 22kV link lines and MV grid modifications, as well as a bypass at Godidi substation. 2007:- Eskom Holdings Pty Ltd ECOU:- Posseidon Zebra 66kV line. The work required the design of new structures, and modifications to existing structures in order to re-route the existing 66kV line, under live conditions at Posseidon Substation. The work was required, to cater for new 765kV feeder for Eskom Transmission. 2007:- Eskom Holdings Pty Ltd ECOU:- Freemantle Indwe 66kV line (35km). The work entailed the design of a new 35 km single circuit 66kV line, as well as two temporary bypass structures at the Freemantle substation. A new series of hybrid wood /steel structures were developed using PLS Pole. The new hybrid wood / steel structure series was used in line design. The project required significant helicopter work in challenging terrain. 2007 to 2013:- Eskom Holdings Pty Ltd ECOU:- Helicopter work for inspection of various 132kV and 66kV lines. Development / Design of a high speed GPS geotagging system for the photographic inspections of power lines. A post processing system of the inspection photos were developed to produce user friendly reports for the client. 2006:- Eskom Holdings Pty Ltd ECOU:- Komani Indwe 66kV Line (35km) and Qolweni Cala 66kV line (36km). This entailed the design of a new series of hybrid wood / steel guyed intermediate structures and guyed steel monopole strain structures. The lines had to be constructed in close proximity to existing lines. 2005:- Eskom Holdings Pty Ltd ECOU:- Dumasi Zimbani 132kV line (87km). This is an extremely mountainous area. This required the design of light weight structures (pinned, guyed monopole strain structures), for ease of installation in mountainous terrain. Spans in excess of 900m were required. 2004:- Eskom Holdings Pty Ltd ECOU:- Grassridge Melkhout Single Circuit 132kV line (92km). The work entailed the design of the new line from Grassridge Substation to Melkhout substation in Humansdorp. Eskom 76XX steel guyed structures were developed and modelled, using PLS Pole.
  • 9. 2005:- Eskom Holdings Pty Ltd ECOU:- Qumbu Ugie 132kV line (70km). This entailed the design and development of a new series of H-pole strain structures, using PLS Pole. Pinned guyed foundations were used and a batching plant was set up on site to manufacture pre-cast concrete foundations. Significant helicopter work was required in order to erect structures in inaccessible terrain. 2005:- Eskom Holdings Pty Ltd ECOU:- Ugie 22kV link lines and associated infrastructure. The work entailed the design of new 22kV link lines and MV grid modifications, as well as a bypass at the Ugie substation, in order provide a temporary construction supply point for the new PG Bison wood processing factory. 2007 to 2014:- Various Clients:- Development of various clamps and brackets, steel cross arms, steel structures  Design Various Steel Clamps Brackets  Design Various Steel Cross Arms  Design Various Steel Structures The works entailed the development and design of various clamps / brackets, steel cross arms, steel structures and provide detailed manufacturing steelwork drawings to clients. This was challenging due to time constraints, as it was required to design and provide manufacturing drawings in a very short period of time. 2007 to 2014:- Eskom Holdings Pty Ltd ECOU:- Steelwork Inspections The work entailed the inspection of steelwork at the manufacturers’ premises, to ensure that the manufactured products are as per the steelwork drawings.
  • 10. Licenses QTY PLS Cadd (Version 13.01) used for profiling lines. 1 PLS Pole (Version 13.01) used to design wood, steel and concrete structures; 1 PLS Tower (Version 13.01) used to design lattice steel towers; 1 Turbo Cad Pro Platinum (Version 21.1) 2 Smartdraw CI Business Edition (Verson 21.2.4.5) 2 MRP (Verson 4.2.29) - material reporting program (Software used to compile an accurate Bill of materials, for any 132kV, 66kV, 22kV projects, in a short period of time); 2 Microsoft Access 2010 (Software used to filter data, exported from the material reporting program, and compile a BOM in a .xlsx or .xls format); 2 Global Mapper (Version 12) (Software for GIS applications and ensures that photos are accurately tagged with latitude and longitude coordinates); 1 Quantum GIS (1.8.0) software for GIS applications; 1 Google Earth Pro & Google Earth (Software used to view a .kmz / .kml file to assist the tenderers to price more accurately and to assist the surveyor and construction contractor to visualise the terrain before the start of the construction phase); 1 GPS Pathfinder Office, TerraSync and Data Transfer to process data collected with a Trimble device; 1 Geojot (Software used to assist in the process to collect data with a Mobile device, i.e. iPad) 1 Datadroid Forms (Software used to assist in the process to collect data with a Mobile device, i.e. iPad) 1 Photo link program (PLP) Software used to compile detailed reports after analyses of the geo-tagged photos of manual line inspections; 1 ikeGPS™; CCE is now the first official reseller in Southern Africa for ikeGPS™ products, hardware and software. The system provides LIDAR true size imaging and data processing for line inspections, vegetation management and survey applications. (Web:- www.ikeGPS.com); 2 GSM Commander:- CCE are approved vendors and installers for the GSM Commander Telemetry systems, in the Eastern Cape.GSM Commander™ is the ultimate remote control/monitoring, that works via cellular networks. (Web:- www.gsmcommander.com); 1 Specialized Computer Software & Licenses:
  • 11. DEVELOPMENT: CCE are fully committed to: • Job creation; • Training of staff; • Uplift & develop previously disadvantaged people of South Africa: Bursaries to previously disadvantaged students; Provide financial assistance / training to the disabled; Providing accommodation to staff; ORGANOGRAM: CCE is continuously refining and extending its resources, with specific emphasis on the development of its human resources. CCE promote the development of human resources, as this is the most valuable investment, any business can make.
  • 12. CONTACT DETAILS: Clotz Consulting Engineers CC Business Address:- 62 Bonza Bay Road, Beacon Bay, 5241 South Africa Postal Address: Postnet Suite 275, Private Bag X3, Beacon Bay, 5205 South Africa Registered Office: Graaff Reinet Road 17 Uitenhage 6229 South Africa Phone: (043) 7485 465 Fax: (086) 6480 117 or (086) 5171 686 Mobile: 082 5220 600 or 072 7430 659 Email: karstenc@mweb.co.za or renek@polka.co.za Website:- http://cce.za.com/