SlideShare ist ein Scribd-Unternehmen logo
1 von 38
TPM
LOSS -
ANALYSIS
Suni Vatnhamar 2016
1
Total Productive Maintenance
Loss analysis: a method to
improve machine utilization
2
A presentation arranged by Suni Vatnhamar 2016
(MBA – B.SC. Technical Engineering)
CONTENT
Suni Vatnhamar 2016
3
• Active use of the KPI’s – Policy Deployment
• Loss analysis
• OEE in detail
• KPI and loss driven improvement process
CONTENT
Suni Vatnhamar 2016
4
• Active use of the KPI’s – Policy Deployment
• Loss analysis
• OEE in detail
• KPI and loss driven improvement process
THE COCKPIT
Suni Vatnhamar 2016
5
 The vision and strategy is the way ahead
 The KPI’s (Key Performance Indicator) are the
instruments to take the right actions to bring us
towards the vision
Strategy and visionOEE Reject rate
Delivery precition
EVA
OPERATIONAL SHOP FLOOR
TARGETS
Suni Vatnhamar 2016
6
 Targets for all departments and organisational
levels
 ”What you do not measure – you can not improve”
 The closer you are to the problem, the more often you need to
follow up
 Working towards a target is motivating and builds team spirit
SHIFT
DAY
WEEK
 KPI’s for me need to be
 Measureable
 Directly influenced by my
performance
 Directly linked to the site strategy
and KPI’s
KPI DEPLOYMENT
Suni Vatnhamar 2016
7
Vision/
Strategy
Target
Target
TargetOperator/shop floor teams
Shift leader
Production manager
KPI
General Manager
(Plant manager)
• Maximum 3 KPI’s on shop floor level
• KPI’s per level based on “red” KPI’s and loss analysis
POLICY DEPLOYMENT
Action Plan
Action Plan
Suni Vatnhamar 2016
8
3 years
1 year
Month
Week
Day
Shift
Hour
Act – Create standards to
sustain result
Strategy
Budget targets
Operational targets
Plan – ”Red” numbers.
Improvement plan
Check – Did it work?
What was the result?
Do – Analysis of
why and carry
out actions
Action plan
DAILY ACTION PLAN
VISUAL CONTROL
Suni Vatnhamar 2016
9
Red: Below target
”Traffic light”
Yellow: Above last year,
but below target
Green: Above target
Equipment status
• Visualize the status of the operation
Digital, real time process
status visualisation
TEAM BOARD
- ACTIVE USE OF SHOP FLOOR TARGETS -
Suni Vatnhamar 2016
10
Measure Analyse Plan/Do
Team KPI Board
Why ”red” figures?
Team
Team picture
Team name
Team logo
Team roles:
- Leader:….
Target status
M Tu W Th F
Rejects
D
E
N
100 200 50 70 150
Process
problems
(min)
D
E
N
150 20 60 200 100
100 50 50 70 150
40 20 50 70 25
100 20 15
100 200 50 30 150
30 70
Actionlist
CONTENT
Suni Vatnhamar 2016
11
• Active use of the KPI’s – Policy Deployment
• Loss analysis
• OEE in detail
• KPI and loss driven improvement process
Suni Vatnhamar 2016
12
• Machines and equipment do represent the main elements bringing margins
to the unit
• Machines and equipment do also represent a significant part of needed
investments / use of cash
• Investments in machines and equipment will be an ongoing process to:
- Secure needed capacity to cover customer orders
- Secure required capability to meet customer requirements
- Secure needed performance to secure completeness in the
market
Therefore: Implement a best possible process to secure utilization of cash
represented in machinery and equipment by:
- Reducing stoppage time,- loss not creating margins
- Reducing production of non conforming articles,- not creating
margins, only waste
- Continuous improvement of performance by reducing cycle, to
reduce need of machine hours to cover customer orders
- Continuous improvement of performance by reducing cycle,
to improve machine hour contribution: GP / hour
Why high focus on production
performance measurement?
Suni Vatnhamar 2016
13
OEE – What does it tell me?
 OEE = Overall Equipment Effectiveness
 OEE is giving machine output compared to maximum
possible output in the same time periode
Number of approved products produced x Min theoretical cycle time
OEE = ----------------------------------------------------------------------------------------------------
Utilised machine time
Lost production
Machine output
TimeActual output
Maximum
possible output
Suni Vatnhamar 2016
14
A Utilized time
No order,
trials/testing
B Net production time
Stoppage time: Breakdowns
no people, no material, planned
maintenance, start/stop
C Possible theoretical production at optimal cycle Availability (OEEa): B/A
D Actual production
Performance Loss:
Performance (OEEp):D/C
E Actual production Quality (OEEq): F/E
F Approved production
Quality Loss:
Rejects
OEE = B/A x D/C x F/E
set up and change over
Cycle loss, minor
stoppages, adjustments
Rework
OEE - detail
Total yearly time = 365 days x 24 h
Installed capacity = maximum available time within agreed shift solution Weekends, holidays
Stoppage time categories
Category Description
Set up/change over From last article from machine representing ended order to first article from machine representing the new order
approved for packing, including both tool change and color/material change. Waiting for resources included
Machine cause Stoppage time represented by machine failures (machine and integrated robot), waiting for resources included
Tool cause Stoppage time represented by tool failures, waiting for resources included
Equipment cause Stoppage time represented by additional equipment installed in machine cells, waiting for resources included
Process problems Stoppage time represented by process problems giving stoppage time due to non conforming production / high
frequency of non conforming production. Waiting for resources included
Planned maintenance Stoppage time represented by planned maintenance activities. Planned maintenance outside the installed
capacity (in weekends and holidays) and total overhaul of machine is not accounted for
No material Stoppage time represented by shortage of ingoing materials / packaging materials
No operator Stoppage time represented by shortage of operators. If there is no customer need,- machine status should be
reported in category no order
Start up/shut down Stoppage time due to shut down for and start up of machine for weekend, holiday etc (start up after all other
stoppage categories,- lost time categories, are included in “basic” stoppage time reported)
Other Other reasons for stoppage time,- not defined above
Suni Vatnhamar 2016
15
A machine have a minimum possible cycle time for product A of 20
seconds. The following information is given for a production shift.
Measure the OEE for the shift.
Product Start Stop Number good produced
A 07 15 1000
OEE – example 1
How many hours possible production is lost?
Solution:
Maximum output for 8 hour production = 3 / min * 60 min * 8 hours = 1440
OEE = Number produced / maks output = 1000 / 1440 = 69%
8 h
Solution:
Lost time = 8 hours x (100 % - 69 %) = 2,5 hours
5,5h
2,5h
OEE = 69 %
Suni Vatnhamar 2016
16
A machine has for product A en minimum cycle time of 20 seconds and
for product B a minimum cycle time of 30 seconds. The following
information is given for a production shift. Measure the OEE for the shift.
Product Start Stop Number produced
A 07 12 600
B 12 15 180
OEE – example 2
Solution:
Maximum output of product A = 3 / min x 60 min x 5 hours = 900
OEE product A = 600 / 900 = 67 %
Maximum output of product B = 2 / min x 60 min x 3 hours = 360
OEE product B = 180 / 360 = 50 %
OEE total 8 hours = 67 % x 5/8 + 50 % x 3/8 = 60,6 %
Suni Vatnhamar 2016
17
OEE availability (OEEa) = Utilised time – Stoppage time
Utilised time
Stoppage time categories (see next page for further definitions)
• Machine cause, equipment cause, tool cause, process problems
(breakdown)
• Set up/change over
• Planned maintenance
• No material
• No personnel
• Start up/shut down
NB: Planned maintenance outside installed capacity time is not accounted
for (overhaul etc)
NB2: Trials and testing is not affecting OEE availability
NB3: All waiting time is included in the given stoppage time categories
(waiting for resources, waiting to start up after breakdown etc)
Suni Vatnhamar 2016
18
OEE Availability
OEE performance = Actual production in net production time
Possible theoretical production at optimal cycle
Possible theoretical output at optimal cycle
Single unit production
= Standard setting cycle time in MRP for specific item/machine combination
• Standard values in the MRP-system should be the same as expressed in the “process books”
(process data carriers) representing best possible performance at approved capability (Cpk)
- Actual values should be controlled against standard values at every start up, and documented
NB: OEEp should never hit 100%! When OEEp for a specific item/machine combination is >100% for
a certain time period, an adjustment of the standard setting cycle time in MRP should be made.
Performance Loss:
• Cycle time loss = (standard cycle time/actual cycle time) x net production time
• Minor stoppage (machine stops < 5 minutes and non recordable stoppages)
• Adjustments (machine still running, but reduced output)
Suni Vatnhamar 2016
19
OEE Performance
OEE quality = No. of approved products produced in net production time
Total no. of produced units
Quality Loss:
• Rejected products during net production time time
• Including rejected products during minor adjustments (within net production time)
• Products rejected after production (reworked)
Suni Vatnhamar 2016
20
OEE Quality
OEEq (quality) is expressing lost time in net production due to production of non conforming
articles
Note:
- OEEq: Calculation should be based on rejected articles inside net production time
- Internal reject rate: total rejected articles (start up included) -> defined as KPI, see
coming slide
- Internal reject rate should normally be reported on a level > (100 – OEEq)
A machine is producing product A with a minimum possible cycle time
of 30 seconds for a 2 cavity machine. The following information is
reported for one days production:
Day - report
• Utilised time = 24 hours
• Total produced = 4250
• Total rejected = 250
• Actual cycle time = 32 seconds
• 30 min stoppage for no material
• 30 min stoppage for no operator
• 1 hour stoppage for machine cause
• 1,5 hour stoppage for tool cause
• 30 min stoppage for start up of machine
Loss analysis – Example 3
Measure If time:
• OEE availability (%) Total lost time and lost time for
• OEE performance (%) availability, performance and
• OEE quality (%) quality
• OEE (%)
Suni Vatnhamar 2016
21
Example 3 - Solution
Solution:
Total stoppage time = 30 min + 30 min + 1 hour + 1,5 hour + 30 min = 4 hours
OEE a = (Utilised time – Stoppage time)/Utilised time = (24 – 4)/24 = 83,3 %
Net production time = 24 – 4 = 20 hours
Possible theoretical production per hour = 2 * 2 / min * 60 min = 240
OEE p = Actual production in net production time/possible theoretical production at optimal cycle
= 4250/(240x20) = 88,5 %
OEE q = No of approved products produced in net production time / total no of produced units
= 4000/4250 = 94,1 %
OEE = 83,3% x 88,5% x 94,1% = 69,4 %
Lost time:
Total lossed time = 24 * (100 – 69,4) = 7,3 hours
Availability = 4 hours
Quality = 250 units / 4 units per min = 62,5 min
Performance = 7,3 – 4 – 1,04 = 2,3 hours
Suni Vatnhamar 2016
22
CONTENT
Suni Vatnhamar 2016
23
• Active use of the KPI’s – Policy Deployment
• Loss analysis
• OEE in detail
• KPI and loss driven improvement process
Why are the KPI’s red?
 To improve the KPI’s we need to know details about the causes of low
performance
 For production, the causes will be connected to the 4M’s
Man Machine
Methods Materials
AttitudeSkills
Relations
Detoriation
MaintenanceDesign
Standards
Strategy Resources
Projects
Storage
Quality
Specification
Transportation
Suni Vatnhamar 2016
24
Machine performance related
losses
Availability loss
• Machine cause
• Tool cause
• Equipment cause
• Process problems
• Change over/Set up
• Start up/shut down
• No operator
• No material
• Planned maintenance
• Other (cleaning)
Performance loss
• Cycle time loss
• Minor stoppage and adjustments
Quality loss
• Rejects
ReducesOEE • Spoilage
• Giveaway (overweight)
• Maintenance/spare parts
• Consumables
• Energy
Potential cost
Real Cost
Suni Vatnhamar 2016
25
OEEa and loss categories
Suni Vatnhamar 2016
26
0%
1%
1%
2%
2%
3%
3%
4%
4%
% of
utilise
d time
Electrical Pneumatics Hydraulic Control
Machine failure
OEEp and loss categories
Performance Loss categories:
• Cycle time loss = (standard cycle time/actual cycle
time) x net production time
• Minor stoppage (machine stops < 5 minutes and
non recordable stoppages)
• Adjustments (machine still running, but reduced
output)
Suni Vatnhamar 2016
27
OEEq and reject loss categories
Internal rejects = Rejects during net production + rejects during start up after set –
up/change over
Note: Rejected parts repaired is also included into the reject rate
Set – up/change
over
Net production time
Quality defects = 100% - OEEq
Quality defects = Internal rejects
Start up after c/o
Products approved for packing
Suni Vatnhamar 2016
28
A machine is producing product A with a minimum possible cycle time
of 30 seconds for a 2 cavity machine. The following information is
reported for one days production:
Day - report
• Utilised time = 24 hours
• Total produced = 4250
• Total rejected = 250
• Actual cycle time = 32 seconds
• 30 min stoppage for no material
• 30 min stoppage for no operator
• 1 hour stoppage for machine cause
• 1,5 hour stoppage for tool cause
• 30 min stoppage for start up of machine
Loss analysis – Example 3 cont.
Measure
• All losses in % available time
Suni Vatnhamar 2016
29
Example 3 – Loss Analysis
Solution
Availability loss % of available time
Machine cause 4,2 %
Tool cause 6,3 %
No material 2,1 %
No operator 2,1 %
Start up 2,1 %
Quality loss 4,3 % (1,04 h)
Cycle time loss 5,2% (60/32 = 1,7 units/min -> Loss of
2x(2-1,7) = 0,25 units lost per min. Total
units lost = 0,25x60minx20h = 300 units
lost = 75 min = 5,2 %)
Minor stoppage & Adjustments 4,3 % (4800 – 4250 = 550 units lost to
performance -> 550 – 300 = 250 units lost
to minor stoppage and adjustements)
SUM 30,6%
Suni Vatnhamar 2016
30
Pareto analysis
0
1
2
3
4
5
6
7
OEE loss
(% of utilised
time)
ToolcauseC
ycle
tim
e
Q
uality
M
inorstoppage
M
achine
cause
N
o
m
aterial
N
o
operatorStartup
Pareto analysis of Example 3
Suni Vatnhamar 2016
31
AGENDA
Suni Vatnhamar 2016
32
• Active use of the KPI’s – Policy Deployment
• Loss analysis
• OEE in detail
• KPI and loss driven improvement process
Suni Vatnhamar 2016
33
Corporate Strategy: Losses
approach
OEE
Internal
Rejects
KPI’s
Plan Do
CheckAct
 5S, SMED, VSM, TWI, etc.
 Lean Management
 Layout changes
 Effective maintenance program
 Focused Improvement projects
 …..
- Management Audits
- Visualisation
- Standards
SOP
….
Maint. schedule
• Line Management daily follow up
Corporate Vision
and Strategy
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Target 51.6 51.6 51.6 51.6 53.2 55.1 56.6 58.6 59.7 60.8 61.8 62.8
Actual 52.3 51.58 52.41 53.66
Target 51.6 51.6 51.6 51.6 53.2 55.1 56.6 58.6 59.7 60.8 61.8 62.8
Actual 52.1 52.1 52.1 52.1
Target 14.6 16 16.9 16.5 17 17.3 17 17.2 17.4 17.2 17.4 18
Actual 16.2 16.8 16 15.6
Target 25.6 25.4 25.1 24.9 24.7 24.5 24.2 24 23.8 23.6 23.3 23.1
Actual 26.4 25.3 26.8 23.7
Target 98.5 98.5 98.5 98.5 98.5 98.5 98.5 98.5 98.5 98.5 98.5 98.5
Actual 97.65 90.6 95.4 87.7
SHE Measures
OTIF
OPE Plant (13 week average)
Cost vs Budget
FACTORY KPI SCORECARD
Key Performance Indicators
OEE Plant (13 week average)
MONTHS
OEE%
0
10
20
30
40
50
60
70
1 4 7 10 13
Week No
OPE%
0
0.5
1
1.5
2
2.5
1 4 7 10 13
Week No
Cost v Budget
0
2
4
6
8
10
12
14
16
18
20
1 4 7 10 13
Week No
SHE
0
5
10
15
20
25
30
1 3 5 7 9 11 13 15
Week No
OTIF
0
20
40
60
80
100
120
1 4 7 10 13
Week No
KPI’s Losses
Site Year Plan
Local site Vision and
Strategy
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Target 51.6 51.6 51.6 51.6 53.2 55.1 56.6 58.6 59.7 60.8 61.8 62.8
Actual 52.3 51.58 52.41 53.66
Target 51.6 51.6 51.6 51.6 53.2 55.1 56.6 58.6 59.7 60.8 61.8 62.8
Actual 52.1 52.1 52.1 52.1
Target 14.6 16 16.9 16.5 17 17.3 17 17.2 17.4 17.2 17.4 18
Actual 16.2 16.8 16 15.6
Target 25.6 25.4 25.1 24.9 24.7 24.5 24.2 24 23.8 23.6 23.3 23.1
Actual 26.4 25.3 26.8 23.7
Target 98.5 98.5 98.5 98.5 98.5 98.5 98.5 98.5 98.5 98.5 98.5 98.5
Actual 97.65 90.6 95.4 87.7
SHE Measures
OTIF
OPE Plant (13 week average)
Cost vs Budget
FACTORY KPI SCORECARD
Key Performance Indicators
OEE Plant (13 week average)
MONTHS
OEE%
0
10
20
30
40
50
60
70
1 4 7 10 13
Week No
OPE%
0
0.5
1
1.5
2
2.5
1 4 7 10 13
Week No
Cost v Budget
0
2
4
6
8
10
12
14
16
18
20
1 4 7 10 13
Week No
SHE
0
5
10
15
20
25
30
1 3 5 7 9 11 13 15
Week No
OTIF
0
20
40
60
80
100
120
1 4 7 10 13
Week No
KPI’s
0
1
2
3
4
5
6
7
OEE loss
(% of utilised
time)
ToolcauseC
ycle
tim
e
Q
uality
M
inorstoppage
M
achine
causeN
o
m
aterial
N
o
operator
Startup
Suni Vatnhamar 2016
34
KPI and Loss driven process
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
Target 51.6 51.6 51.6 51.6 53.2 55.1 56.6 58.6 59.7 60.8 61.8 62.8
Actual 52.3 51.58 52.41 53.66
Target 51.6 51.6 51.6 51.6 53.2 55.1 56.6 58.6 59.7 60.8 61.8 62.8
Actual 52.1 52.1 52.1 52.1
Target 14.6 16 16.9 16.5 17 17.3 17 17.2 17.4 17.2 17.4 18
Actual 16.2 16.8 16 15.6
Target 25.6 25.4 25.1 24.9 24.7 24.5 24.2 24 23.8 23.6 23.3 23.1
Actual 26.4 25.3 26.8 23.7
Target 98.5 98.5 98.5 98.5 98.5 98.5 98.5 98.5 98.5 98.5 98.5 98.5
Actual 97.65 90.6 95.4 87.7
SHE Measures
OTIF
OPE Plant (13 week average)
Cost vs Budget
FACTORY KPI SCORECARD
Key Performance Indicators
OEE Plant (13 week average)
MONTHS
OEE%
0
10
20
30
40
50
60
70
1 4 7 10 13
Week No
OPE%
0
0.5
1
1.5
2
2.5
1 4 7 10 13
Week No
Cost v Budget
0
2
4
6
8
10
12
14
16
18
20
1 4 7 10 13
Week No
SHE
0
5
10
15
20
25
30
1 3 5 7 9 11 13 15
Week No
OTIF
0
20
40
60
80
100
120
1 4 7 10 13
Week No
KPI’s Losses
Site Year Plan
Focus on “red” KPI’s
Prioritisation
Suni Vatnhamar 2016
35
Prioritisation matrix
1.priority 2.priority
3.priority 4.priority
Difficulty
(resource need and complexity)
HighLittle
LittleHigh
Expectedeffect
Suni Vatnhamar 2016
36
Loss driven KPI deployment
OEE
Increase of 7%
Breakdowns
Down 3 OEE%
Change over
Down 2 OEE%
No material
Down 2 OEE%
Maintenance Tool setters Logistics
Use the losses to set KPI’s at all levels in the organisation,
including support functions
Suni Vatnhamar 2016
37
PBS tools from Loss analysis
Loss
Effective maint.
Autonomous maint
Focused Impr.
 When you know the losses and understand the problems
behind, you can use good leadership and the right tools to
remove the losses
 Which tool to use is dependent on the actual loss
Waste
5S
SMED
Pull
Zero defects
One Piece Flow
Standardised work
Standardisation
THANKS !
Suni Vatnhamar 2016
38

Weitere ähnliche Inhalte

Was ist angesagt?

SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)Chris Cummins
 
Total productive maintenance(TPM)
Total productive maintenance(TPM)Total productive maintenance(TPM)
Total productive maintenance(TPM)Md.Muzahid Khan
 
Jishu hozen
Jishu  hozenJishu  hozen
Jishu hozenQC Labs
 
Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)Brian Thomas
 
Autonomous Maintenance (AM)
Autonomous Maintenance (AM)Autonomous Maintenance (AM)
Autonomous Maintenance (AM)Pramod A
 
TPM for lean manufacturing chp4 step of “jlshu hozen “activities
TPM for lean manufacturing  chp4 step of “jlshu hozen “activitiesTPM for lean manufacturing  chp4 step of “jlshu hozen “activities
TPM for lean manufacturing chp4 step of “jlshu hozen “activities博行 門眞
 
TPM the effective maintenance with Autonomous Maintenance
TPM the effective maintenance with Autonomous MaintenanceTPM the effective maintenance with Autonomous Maintenance
TPM the effective maintenance with Autonomous MaintenanceTimothy Wooi
 
Lean manufacturing overview
Lean manufacturing overviewLean manufacturing overview
Lean manufacturing overviewPruek Pinyo
 
Jishu Hozen or Autonomous Maintenance
Jishu Hozen or Autonomous Maintenance Jishu Hozen or Autonomous Maintenance
Jishu Hozen or Autonomous Maintenance DEEPAK SAHOO
 
tpm (total productive maintenance)
tpm (total productive maintenance)tpm (total productive maintenance)
tpm (total productive maintenance)Shreya Chaudhary
 

Was ist angesagt? (20)

Smed smpl 1
Smed smpl 1Smed smpl 1
Smed smpl 1
 
16 major losses tng
16 major losses tng16 major losses tng
16 major losses tng
 
SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)SBS - SMED Training (Set Up Reduction)
SBS - SMED Training (Set Up Reduction)
 
Total productive maintenance(TPM)
Total productive maintenance(TPM)Total productive maintenance(TPM)
Total productive maintenance(TPM)
 
OEE
OEEOEE
OEE
 
TPM: Autonomous Maintenance (Jishu Hozen) Framework Poster
TPM: Autonomous Maintenance (Jishu Hozen) Framework PosterTPM: Autonomous Maintenance (Jishu Hozen) Framework Poster
TPM: Autonomous Maintenance (Jishu Hozen) Framework Poster
 
Jishu hozen
Jishu  hozenJishu  hozen
Jishu hozen
 
Lean manufacturing ppt
Lean manufacturing pptLean manufacturing ppt
Lean manufacturing ppt
 
Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)
 
[Partial Preview:] Overall Equipment Effectiveness (OEE)
[Partial Preview:] Overall Equipment Effectiveness (OEE)[Partial Preview:] Overall Equipment Effectiveness (OEE)
[Partial Preview:] Overall Equipment Effectiveness (OEE)
 
Autonomous Maintenance (AM)
Autonomous Maintenance (AM)Autonomous Maintenance (AM)
Autonomous Maintenance (AM)
 
TPM for lean manufacturing chp4 step of “jlshu hozen “activities
TPM for lean manufacturing  chp4 step of “jlshu hozen “activitiesTPM for lean manufacturing  chp4 step of “jlshu hozen “activities
TPM for lean manufacturing chp4 step of “jlshu hozen “activities
 
TPM the effective maintenance with Autonomous Maintenance
TPM the effective maintenance with Autonomous MaintenanceTPM the effective maintenance with Autonomous Maintenance
TPM the effective maintenance with Autonomous Maintenance
 
Tpm training
Tpm trainingTpm training
Tpm training
 
TPM & OEE
TPM & OEETPM & OEE
TPM & OEE
 
Lean manufacturing overview
Lean manufacturing overviewLean manufacturing overview
Lean manufacturing overview
 
Lean Manufacturing Training
Lean Manufacturing TrainingLean Manufacturing Training
Lean Manufacturing Training
 
Jishu Hozen or Autonomous Maintenance
Jishu Hozen or Autonomous Maintenance Jishu Hozen or Autonomous Maintenance
Jishu Hozen or Autonomous Maintenance
 
SMED Kaizen Event
SMED Kaizen EventSMED Kaizen Event
SMED Kaizen Event
 
tpm (total productive maintenance)
tpm (total productive maintenance)tpm (total productive maintenance)
tpm (total productive maintenance)
 

Andere mochten auch

M shop pres_updated_2_2012
M shop pres_updated_2_2012M shop pres_updated_2_2012
M shop pres_updated_2_2012stacey_goulding
 
Insuring Lean Operations - How JPF Learned to be Lean
Insuring Lean Operations - How JPF Learned to be LeanInsuring Lean Operations - How JPF Learned to be Lean
Insuring Lean Operations - How JPF Learned to be LeanLean Enterprise Academy
 
TPM For lean manufacturing chp 2 | concept of production efficiency | lea...
TPM For lean manufacturing   chp 2 |  concept of production efficiency |  lea...TPM For lean manufacturing   chp 2 |  concept of production efficiency |  lea...
TPM For lean manufacturing chp 2 | concept of production efficiency | lea...博行 門眞
 
Wali's Will-Skill Matrix
Wali's Will-Skill MatrixWali's Will-Skill Matrix
Wali's Will-Skill MatrixWali Zahid
 
7 ways of reducing tpm cost
7 ways of reducing tpm cost 7 ways of reducing tpm cost
7 ways of reducing tpm cost TradeInsight
 
460 operations - 4.20
460   operations - 4.20460   operations - 4.20
460 operations - 4.20Kyle Bakken
 
TPM For lean manufacturing chp3 | kobetsu kaizen for production efficiency...
TPM For lean manufacturing  chp3 |   kobetsu kaizen for production efficiency...TPM For lean manufacturing  chp3 |   kobetsu kaizen for production efficiency...
TPM For lean manufacturing chp3 | kobetsu kaizen for production efficiency...博行 門眞
 
Conference presentation-farinas-maintenance-2011
Conference presentation-farinas-maintenance-2011Conference presentation-farinas-maintenance-2011
Conference presentation-farinas-maintenance-2011Sushil Anand
 
Value stream mapping - Future State
Value stream mapping - Future StateValue stream mapping - Future State
Value stream mapping - Future Statekrishnaheda
 
Value Stream Mapping Example
Value  Stream  Mapping  ExampleValue  Stream  Mapping  Example
Value Stream Mapping ExampleDan Junkins
 
Business Requirements Gathering - Current & Future State
Business Requirements Gathering - Current & Future StateBusiness Requirements Gathering - Current & Future State
Business Requirements Gathering - Current & Future StateJason Bargent
 

Andere mochten auch (20)

Tpm intro
Tpm introTpm intro
Tpm intro
 
M shop pres_updated_2_2012
M shop pres_updated_2_2012M shop pres_updated_2_2012
M shop pres_updated_2_2012
 
Training with ROI
Training with ROITraining with ROI
Training with ROI
 
Case Study of Herrestad Clinic, Sweden
Case Study of Herrestad Clinic, SwedenCase Study of Herrestad Clinic, Sweden
Case Study of Herrestad Clinic, Sweden
 
Insuring Lean Operations - How JPF Learned to be Lean
Insuring Lean Operations - How JPF Learned to be LeanInsuring Lean Operations - How JPF Learned to be Lean
Insuring Lean Operations - How JPF Learned to be Lean
 
Tpm+basics
Tpm+basicsTpm+basics
Tpm+basics
 
TPM For lean manufacturing chp 2 | concept of production efficiency | lea...
TPM For lean manufacturing   chp 2 |  concept of production efficiency |  lea...TPM For lean manufacturing   chp 2 |  concept of production efficiency |  lea...
TPM For lean manufacturing chp 2 | concept of production efficiency | lea...
 
Wali's Will-Skill Matrix
Wali's Will-Skill MatrixWali's Will-Skill Matrix
Wali's Will-Skill Matrix
 
Skill will matrix
Skill will matrixSkill will matrix
Skill will matrix
 
Housing Repairs
Housing RepairsHousing Repairs
Housing Repairs
 
7 ways of reducing tpm cost
7 ways of reducing tpm cost 7 ways of reducing tpm cost
7 ways of reducing tpm cost
 
Tpm 02
Tpm 02Tpm 02
Tpm 02
 
460 operations - 4.20
460   operations - 4.20460   operations - 4.20
460 operations - 4.20
 
TPM For lean manufacturing chp3 | kobetsu kaizen for production efficiency...
TPM For lean manufacturing  chp3 |   kobetsu kaizen for production efficiency...TPM For lean manufacturing  chp3 |   kobetsu kaizen for production efficiency...
TPM For lean manufacturing chp3 | kobetsu kaizen for production efficiency...
 
Skill matrix for Garments Industry
Skill matrix for Garments IndustrySkill matrix for Garments Industry
Skill matrix for Garments Industry
 
Conference presentation-farinas-maintenance-2011
Conference presentation-farinas-maintenance-2011Conference presentation-farinas-maintenance-2011
Conference presentation-farinas-maintenance-2011
 
skills matrix
skills matrixskills matrix
skills matrix
 
Value stream mapping - Future State
Value stream mapping - Future StateValue stream mapping - Future State
Value stream mapping - Future State
 
Value Stream Mapping Example
Value  Stream  Mapping  ExampleValue  Stream  Mapping  Example
Value Stream Mapping Example
 
Business Requirements Gathering - Current & Future State
Business Requirements Gathering - Current & Future StateBusiness Requirements Gathering - Current & Future State
Business Requirements Gathering - Current & Future State
 

Ähnlich wie TPM Loss Analysis

Equipment reliability l2
Equipment reliability l2Equipment reliability l2
Equipment reliability l2Matthew Clemens
 
Industrial Engineering Tools & Activities of a RMG !!!
Industrial Engineering Tools & Activities of a RMG !!!Industrial Engineering Tools & Activities of a RMG !!!
Industrial Engineering Tools & Activities of a RMG !!!Mahibur Rahman
 
2.IE Presentation.pptx
2.IE Presentation.pptx2.IE Presentation.pptx
2.IE Presentation.pptxVarun Mehrotra
 
Generic Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S DesrocherGeneric Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S DesrocherAlan Desrocher
 
VSM (Lean Manufacturing) Project PPT
VSM (Lean Manufacturing) Project PPTVSM (Lean Manufacturing) Project PPT
VSM (Lean Manufacturing) Project PPTFASI93
 
Make green go green by going lean
Make green go green by going leanMake green go green by going lean
Make green go green by going leanbwu.nl
 
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET Journal
 
Equipment reliability l1
Equipment reliability l1Equipment reliability l1
Equipment reliability l1Matthew Clemens
 
Plant Productivity Measurement, Analysis & Improvement: Business Case
Plant Productivity Measurement, Analysis & Improvement: Business CasePlant Productivity Measurement, Analysis & Improvement: Business Case
Plant Productivity Measurement, Analysis & Improvement: Business CaseMohammed Hamed Ahmed Soliman
 
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...Karina Islam
 
Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)MohammedLahssaini1
 
Oee (overall equipment effectifness)
Oee (overall equipment effectifness)Oee (overall equipment effectifness)
Oee (overall equipment effectifness)Anang Tristianto
 

Ähnlich wie TPM Loss Analysis (20)

Tools of lean mfg
Tools of lean mfgTools of lean mfg
Tools of lean mfg
 
Tools of lean mfg
Tools of lean mfgTools of lean mfg
Tools of lean mfg
 
Equipment reliability l2
Equipment reliability l2Equipment reliability l2
Equipment reliability l2
 
The Six Big Losses of OEE
The Six Big Losses of OEEThe Six Big Losses of OEE
The Six Big Losses of OEE
 
om
omom
om
 
Industrial Engineering Tools & Activities of a RMG !!!
Industrial Engineering Tools & Activities of a RMG !!!Industrial Engineering Tools & Activities of a RMG !!!
Industrial Engineering Tools & Activities of a RMG !!!
 
2.IE Presentation.pptx
2.IE Presentation.pptx2.IE Presentation.pptx
2.IE Presentation.pptx
 
Generic Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S DesrocherGeneric Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S Desrocher
 
VSM (Lean Manufacturing) Project PPT
VSM (Lean Manufacturing) Project PPTVSM (Lean Manufacturing) Project PPT
VSM (Lean Manufacturing) Project PPT
 
K012556370
K012556370K012556370
K012556370
 
K012556370
K012556370K012556370
K012556370
 
Make green go green by going lean
Make green go green by going leanMake green go green by going lean
Make green go green by going lean
 
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
 
Ofs whitepaper
Ofs whitepaperOfs whitepaper
Ofs whitepaper
 
Equipment reliability l1
Equipment reliability l1Equipment reliability l1
Equipment reliability l1
 
Plant Productivity Measurement, Analysis & Improvement: Business Case
Plant Productivity Measurement, Analysis & Improvement: Business CasePlant Productivity Measurement, Analysis & Improvement: Business Case
Plant Productivity Measurement, Analysis & Improvement: Business Case
 
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
 
Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)
 
tpm presentation
tpm presentationtpm presentation
tpm presentation
 
Oee (overall equipment effectifness)
Oee (overall equipment effectifness)Oee (overall equipment effectifness)
Oee (overall equipment effectifness)
 

Kürzlich hochgeladen

GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607dollysharma2066
 
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, MumbaiPooja Nehwal
 
internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic managementharfimakarim
 
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceanilsa9823
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Kondapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Kondapur high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Kondapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Kondapur high-profile Call Girladitipandeya
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girladitipandeya
 
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Nehwal
 
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Pooja Nehwal
 
CEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biographyCEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biographyHafizMuhammadAbdulla5
 
operational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementoperational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementTulsiDhidhi1
 

Kürzlich hochgeladen (20)

GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
 
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
{ 9892124323 }} Call Girls & Escorts in Hotel JW Marriott juhu, Mumbai
 
internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic management
 
Empowering Local Government Frontline Services - Mo Baines.pdf
Empowering Local Government Frontline Services - Mo Baines.pdfEmpowering Local Government Frontline Services - Mo Baines.pdf
Empowering Local Government Frontline Services - Mo Baines.pdf
 
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual serviceCALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
CALL ON ➥8923113531 🔝Call Girls Charbagh Lucknow best sexual service
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Kondapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Kondapur high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Kondapur high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Kondapur high-profile Call Girl
 
Disrupt or be Disrupted - Kirk Vallis.pdf
Disrupt or be Disrupted - Kirk Vallis.pdfDisrupt or be Disrupted - Kirk Vallis.pdf
Disrupt or be Disrupted - Kirk Vallis.pdf
 
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call GirlVIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
VIP 7001035870 Find & Meet Hyderabad Call Girls Ameerpet high-profile Call Girl
 
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote SpeakerLeadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
Leadership in Crisis - Helio Vogas, Risk & Leadership Keynote Speaker
 
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
Pooja Mehta 9167673311, Trusted Call Girls In NAVI MUMBAI Cash On Payment , V...
 
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
 
CEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biographyCEO of Google, Sunder Pichai's biography
CEO of Google, Sunder Pichai's biography
 
Peak Performance & Resilience - Dr Dorian Dugmore
Peak Performance & Resilience - Dr Dorian DugmorePeak Performance & Resilience - Dr Dorian Dugmore
Peak Performance & Resilience - Dr Dorian Dugmore
 
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdfImagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
Imagine - HR; are handling the 'bad banter' - Stella Chandler.pdf
 
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No AdvanceRohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
Rohini Sector 16 Call Girls Delhi 9999965857 @Sabina Saikh No Advance
 
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICECall Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SERVICE
Call Girls Service Tilak Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SERVICE
 
LoveLocalGov - Chris Twigg, Inner Circle
LoveLocalGov - Chris Twigg, Inner CircleLoveLocalGov - Chris Twigg, Inner Circle
LoveLocalGov - Chris Twigg, Inner Circle
 
operational plan ppt.pptx nursing management
operational plan ppt.pptx nursing managementoperational plan ppt.pptx nursing management
operational plan ppt.pptx nursing management
 
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdfImagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
Imagine - Creating Healthy Workplaces - Anthony Montgomery.pdf
 
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg PartnershipUnlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
Unlocking the Future - Dr Max Blumberg, Founder of Blumberg Partnership
 

TPM Loss Analysis

  • 2. Total Productive Maintenance Loss analysis: a method to improve machine utilization 2 A presentation arranged by Suni Vatnhamar 2016 (MBA – B.SC. Technical Engineering)
  • 3. CONTENT Suni Vatnhamar 2016 3 • Active use of the KPI’s – Policy Deployment • Loss analysis • OEE in detail • KPI and loss driven improvement process
  • 4. CONTENT Suni Vatnhamar 2016 4 • Active use of the KPI’s – Policy Deployment • Loss analysis • OEE in detail • KPI and loss driven improvement process
  • 5. THE COCKPIT Suni Vatnhamar 2016 5  The vision and strategy is the way ahead  The KPI’s (Key Performance Indicator) are the instruments to take the right actions to bring us towards the vision Strategy and visionOEE Reject rate Delivery precition EVA
  • 6. OPERATIONAL SHOP FLOOR TARGETS Suni Vatnhamar 2016 6  Targets for all departments and organisational levels  ”What you do not measure – you can not improve”  The closer you are to the problem, the more often you need to follow up  Working towards a target is motivating and builds team spirit SHIFT DAY WEEK  KPI’s for me need to be  Measureable  Directly influenced by my performance  Directly linked to the site strategy and KPI’s
  • 7. KPI DEPLOYMENT Suni Vatnhamar 2016 7 Vision/ Strategy Target Target TargetOperator/shop floor teams Shift leader Production manager KPI General Manager (Plant manager) • Maximum 3 KPI’s on shop floor level • KPI’s per level based on “red” KPI’s and loss analysis
  • 8. POLICY DEPLOYMENT Action Plan Action Plan Suni Vatnhamar 2016 8 3 years 1 year Month Week Day Shift Hour Act – Create standards to sustain result Strategy Budget targets Operational targets Plan – ”Red” numbers. Improvement plan Check – Did it work? What was the result? Do – Analysis of why and carry out actions Action plan DAILY ACTION PLAN
  • 9. VISUAL CONTROL Suni Vatnhamar 2016 9 Red: Below target ”Traffic light” Yellow: Above last year, but below target Green: Above target Equipment status • Visualize the status of the operation Digital, real time process status visualisation
  • 10. TEAM BOARD - ACTIVE USE OF SHOP FLOOR TARGETS - Suni Vatnhamar 2016 10 Measure Analyse Plan/Do Team KPI Board Why ”red” figures? Team Team picture Team name Team logo Team roles: - Leader:…. Target status M Tu W Th F Rejects D E N 100 200 50 70 150 Process problems (min) D E N 150 20 60 200 100 100 50 50 70 150 40 20 50 70 25 100 20 15 100 200 50 30 150 30 70 Actionlist
  • 11. CONTENT Suni Vatnhamar 2016 11 • Active use of the KPI’s – Policy Deployment • Loss analysis • OEE in detail • KPI and loss driven improvement process
  • 12. Suni Vatnhamar 2016 12 • Machines and equipment do represent the main elements bringing margins to the unit • Machines and equipment do also represent a significant part of needed investments / use of cash • Investments in machines and equipment will be an ongoing process to: - Secure needed capacity to cover customer orders - Secure required capability to meet customer requirements - Secure needed performance to secure completeness in the market Therefore: Implement a best possible process to secure utilization of cash represented in machinery and equipment by: - Reducing stoppage time,- loss not creating margins - Reducing production of non conforming articles,- not creating margins, only waste - Continuous improvement of performance by reducing cycle, to reduce need of machine hours to cover customer orders - Continuous improvement of performance by reducing cycle, to improve machine hour contribution: GP / hour Why high focus on production performance measurement?
  • 13. Suni Vatnhamar 2016 13 OEE – What does it tell me?  OEE = Overall Equipment Effectiveness  OEE is giving machine output compared to maximum possible output in the same time periode Number of approved products produced x Min theoretical cycle time OEE = ---------------------------------------------------------------------------------------------------- Utilised machine time Lost production Machine output TimeActual output Maximum possible output
  • 14. Suni Vatnhamar 2016 14 A Utilized time No order, trials/testing B Net production time Stoppage time: Breakdowns no people, no material, planned maintenance, start/stop C Possible theoretical production at optimal cycle Availability (OEEa): B/A D Actual production Performance Loss: Performance (OEEp):D/C E Actual production Quality (OEEq): F/E F Approved production Quality Loss: Rejects OEE = B/A x D/C x F/E set up and change over Cycle loss, minor stoppages, adjustments Rework OEE - detail Total yearly time = 365 days x 24 h Installed capacity = maximum available time within agreed shift solution Weekends, holidays
  • 15. Stoppage time categories Category Description Set up/change over From last article from machine representing ended order to first article from machine representing the new order approved for packing, including both tool change and color/material change. Waiting for resources included Machine cause Stoppage time represented by machine failures (machine and integrated robot), waiting for resources included Tool cause Stoppage time represented by tool failures, waiting for resources included Equipment cause Stoppage time represented by additional equipment installed in machine cells, waiting for resources included Process problems Stoppage time represented by process problems giving stoppage time due to non conforming production / high frequency of non conforming production. Waiting for resources included Planned maintenance Stoppage time represented by planned maintenance activities. Planned maintenance outside the installed capacity (in weekends and holidays) and total overhaul of machine is not accounted for No material Stoppage time represented by shortage of ingoing materials / packaging materials No operator Stoppage time represented by shortage of operators. If there is no customer need,- machine status should be reported in category no order Start up/shut down Stoppage time due to shut down for and start up of machine for weekend, holiday etc (start up after all other stoppage categories,- lost time categories, are included in “basic” stoppage time reported) Other Other reasons for stoppage time,- not defined above Suni Vatnhamar 2016 15
  • 16. A machine have a minimum possible cycle time for product A of 20 seconds. The following information is given for a production shift. Measure the OEE for the shift. Product Start Stop Number good produced A 07 15 1000 OEE – example 1 How many hours possible production is lost? Solution: Maximum output for 8 hour production = 3 / min * 60 min * 8 hours = 1440 OEE = Number produced / maks output = 1000 / 1440 = 69% 8 h Solution: Lost time = 8 hours x (100 % - 69 %) = 2,5 hours 5,5h 2,5h OEE = 69 % Suni Vatnhamar 2016 16
  • 17. A machine has for product A en minimum cycle time of 20 seconds and for product B a minimum cycle time of 30 seconds. The following information is given for a production shift. Measure the OEE for the shift. Product Start Stop Number produced A 07 12 600 B 12 15 180 OEE – example 2 Solution: Maximum output of product A = 3 / min x 60 min x 5 hours = 900 OEE product A = 600 / 900 = 67 % Maximum output of product B = 2 / min x 60 min x 3 hours = 360 OEE product B = 180 / 360 = 50 % OEE total 8 hours = 67 % x 5/8 + 50 % x 3/8 = 60,6 % Suni Vatnhamar 2016 17
  • 18. OEE availability (OEEa) = Utilised time – Stoppage time Utilised time Stoppage time categories (see next page for further definitions) • Machine cause, equipment cause, tool cause, process problems (breakdown) • Set up/change over • Planned maintenance • No material • No personnel • Start up/shut down NB: Planned maintenance outside installed capacity time is not accounted for (overhaul etc) NB2: Trials and testing is not affecting OEE availability NB3: All waiting time is included in the given stoppage time categories (waiting for resources, waiting to start up after breakdown etc) Suni Vatnhamar 2016 18 OEE Availability
  • 19. OEE performance = Actual production in net production time Possible theoretical production at optimal cycle Possible theoretical output at optimal cycle Single unit production = Standard setting cycle time in MRP for specific item/machine combination • Standard values in the MRP-system should be the same as expressed in the “process books” (process data carriers) representing best possible performance at approved capability (Cpk) - Actual values should be controlled against standard values at every start up, and documented NB: OEEp should never hit 100%! When OEEp for a specific item/machine combination is >100% for a certain time period, an adjustment of the standard setting cycle time in MRP should be made. Performance Loss: • Cycle time loss = (standard cycle time/actual cycle time) x net production time • Minor stoppage (machine stops < 5 minutes and non recordable stoppages) • Adjustments (machine still running, but reduced output) Suni Vatnhamar 2016 19 OEE Performance
  • 20. OEE quality = No. of approved products produced in net production time Total no. of produced units Quality Loss: • Rejected products during net production time time • Including rejected products during minor adjustments (within net production time) • Products rejected after production (reworked) Suni Vatnhamar 2016 20 OEE Quality OEEq (quality) is expressing lost time in net production due to production of non conforming articles Note: - OEEq: Calculation should be based on rejected articles inside net production time - Internal reject rate: total rejected articles (start up included) -> defined as KPI, see coming slide - Internal reject rate should normally be reported on a level > (100 – OEEq)
  • 21. A machine is producing product A with a minimum possible cycle time of 30 seconds for a 2 cavity machine. The following information is reported for one days production: Day - report • Utilised time = 24 hours • Total produced = 4250 • Total rejected = 250 • Actual cycle time = 32 seconds • 30 min stoppage for no material • 30 min stoppage for no operator • 1 hour stoppage for machine cause • 1,5 hour stoppage for tool cause • 30 min stoppage for start up of machine Loss analysis – Example 3 Measure If time: • OEE availability (%) Total lost time and lost time for • OEE performance (%) availability, performance and • OEE quality (%) quality • OEE (%) Suni Vatnhamar 2016 21
  • 22. Example 3 - Solution Solution: Total stoppage time = 30 min + 30 min + 1 hour + 1,5 hour + 30 min = 4 hours OEE a = (Utilised time – Stoppage time)/Utilised time = (24 – 4)/24 = 83,3 % Net production time = 24 – 4 = 20 hours Possible theoretical production per hour = 2 * 2 / min * 60 min = 240 OEE p = Actual production in net production time/possible theoretical production at optimal cycle = 4250/(240x20) = 88,5 % OEE q = No of approved products produced in net production time / total no of produced units = 4000/4250 = 94,1 % OEE = 83,3% x 88,5% x 94,1% = 69,4 % Lost time: Total lossed time = 24 * (100 – 69,4) = 7,3 hours Availability = 4 hours Quality = 250 units / 4 units per min = 62,5 min Performance = 7,3 – 4 – 1,04 = 2,3 hours Suni Vatnhamar 2016 22
  • 23. CONTENT Suni Vatnhamar 2016 23 • Active use of the KPI’s – Policy Deployment • Loss analysis • OEE in detail • KPI and loss driven improvement process
  • 24. Why are the KPI’s red?  To improve the KPI’s we need to know details about the causes of low performance  For production, the causes will be connected to the 4M’s Man Machine Methods Materials AttitudeSkills Relations Detoriation MaintenanceDesign Standards Strategy Resources Projects Storage Quality Specification Transportation Suni Vatnhamar 2016 24
  • 25. Machine performance related losses Availability loss • Machine cause • Tool cause • Equipment cause • Process problems • Change over/Set up • Start up/shut down • No operator • No material • Planned maintenance • Other (cleaning) Performance loss • Cycle time loss • Minor stoppage and adjustments Quality loss • Rejects ReducesOEE • Spoilage • Giveaway (overweight) • Maintenance/spare parts • Consumables • Energy Potential cost Real Cost Suni Vatnhamar 2016 25
  • 26. OEEa and loss categories Suni Vatnhamar 2016 26 0% 1% 1% 2% 2% 3% 3% 4% 4% % of utilise d time Electrical Pneumatics Hydraulic Control Machine failure
  • 27. OEEp and loss categories Performance Loss categories: • Cycle time loss = (standard cycle time/actual cycle time) x net production time • Minor stoppage (machine stops < 5 minutes and non recordable stoppages) • Adjustments (machine still running, but reduced output) Suni Vatnhamar 2016 27
  • 28. OEEq and reject loss categories Internal rejects = Rejects during net production + rejects during start up after set – up/change over Note: Rejected parts repaired is also included into the reject rate Set – up/change over Net production time Quality defects = 100% - OEEq Quality defects = Internal rejects Start up after c/o Products approved for packing Suni Vatnhamar 2016 28
  • 29. A machine is producing product A with a minimum possible cycle time of 30 seconds for a 2 cavity machine. The following information is reported for one days production: Day - report • Utilised time = 24 hours • Total produced = 4250 • Total rejected = 250 • Actual cycle time = 32 seconds • 30 min stoppage for no material • 30 min stoppage for no operator • 1 hour stoppage for machine cause • 1,5 hour stoppage for tool cause • 30 min stoppage for start up of machine Loss analysis – Example 3 cont. Measure • All losses in % available time Suni Vatnhamar 2016 29
  • 30. Example 3 – Loss Analysis Solution Availability loss % of available time Machine cause 4,2 % Tool cause 6,3 % No material 2,1 % No operator 2,1 % Start up 2,1 % Quality loss 4,3 % (1,04 h) Cycle time loss 5,2% (60/32 = 1,7 units/min -> Loss of 2x(2-1,7) = 0,25 units lost per min. Total units lost = 0,25x60minx20h = 300 units lost = 75 min = 5,2 %) Minor stoppage & Adjustments 4,3 % (4800 – 4250 = 550 units lost to performance -> 550 – 300 = 250 units lost to minor stoppage and adjustements) SUM 30,6% Suni Vatnhamar 2016 30
  • 31. Pareto analysis 0 1 2 3 4 5 6 7 OEE loss (% of utilised time) ToolcauseC ycle tim e Q uality M inorstoppage M achine cause N o m aterial N o operatorStartup Pareto analysis of Example 3 Suni Vatnhamar 2016 31
  • 32. AGENDA Suni Vatnhamar 2016 32 • Active use of the KPI’s – Policy Deployment • Loss analysis • OEE in detail • KPI and loss driven improvement process
  • 33. Suni Vatnhamar 2016 33 Corporate Strategy: Losses approach OEE Internal Rejects KPI’s Plan Do CheckAct  5S, SMED, VSM, TWI, etc.  Lean Management  Layout changes  Effective maintenance program  Focused Improvement projects  ….. - Management Audits - Visualisation - Standards SOP …. Maint. schedule • Line Management daily follow up Corporate Vision and Strategy JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Target 51.6 51.6 51.6 51.6 53.2 55.1 56.6 58.6 59.7 60.8 61.8 62.8 Actual 52.3 51.58 52.41 53.66 Target 51.6 51.6 51.6 51.6 53.2 55.1 56.6 58.6 59.7 60.8 61.8 62.8 Actual 52.1 52.1 52.1 52.1 Target 14.6 16 16.9 16.5 17 17.3 17 17.2 17.4 17.2 17.4 18 Actual 16.2 16.8 16 15.6 Target 25.6 25.4 25.1 24.9 24.7 24.5 24.2 24 23.8 23.6 23.3 23.1 Actual 26.4 25.3 26.8 23.7 Target 98.5 98.5 98.5 98.5 98.5 98.5 98.5 98.5 98.5 98.5 98.5 98.5 Actual 97.65 90.6 95.4 87.7 SHE Measures OTIF OPE Plant (13 week average) Cost vs Budget FACTORY KPI SCORECARD Key Performance Indicators OEE Plant (13 week average) MONTHS OEE% 0 10 20 30 40 50 60 70 1 4 7 10 13 Week No OPE% 0 0.5 1 1.5 2 2.5 1 4 7 10 13 Week No Cost v Budget 0 2 4 6 8 10 12 14 16 18 20 1 4 7 10 13 Week No SHE 0 5 10 15 20 25 30 1 3 5 7 9 11 13 15 Week No OTIF 0 20 40 60 80 100 120 1 4 7 10 13 Week No KPI’s Losses Site Year Plan Local site Vision and Strategy JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Target 51.6 51.6 51.6 51.6 53.2 55.1 56.6 58.6 59.7 60.8 61.8 62.8 Actual 52.3 51.58 52.41 53.66 Target 51.6 51.6 51.6 51.6 53.2 55.1 56.6 58.6 59.7 60.8 61.8 62.8 Actual 52.1 52.1 52.1 52.1 Target 14.6 16 16.9 16.5 17 17.3 17 17.2 17.4 17.2 17.4 18 Actual 16.2 16.8 16 15.6 Target 25.6 25.4 25.1 24.9 24.7 24.5 24.2 24 23.8 23.6 23.3 23.1 Actual 26.4 25.3 26.8 23.7 Target 98.5 98.5 98.5 98.5 98.5 98.5 98.5 98.5 98.5 98.5 98.5 98.5 Actual 97.65 90.6 95.4 87.7 SHE Measures OTIF OPE Plant (13 week average) Cost vs Budget FACTORY KPI SCORECARD Key Performance Indicators OEE Plant (13 week average) MONTHS OEE% 0 10 20 30 40 50 60 70 1 4 7 10 13 Week No OPE% 0 0.5 1 1.5 2 2.5 1 4 7 10 13 Week No Cost v Budget 0 2 4 6 8 10 12 14 16 18 20 1 4 7 10 13 Week No SHE 0 5 10 15 20 25 30 1 3 5 7 9 11 13 15 Week No OTIF 0 20 40 60 80 100 120 1 4 7 10 13 Week No KPI’s
  • 34. 0 1 2 3 4 5 6 7 OEE loss (% of utilised time) ToolcauseC ycle tim e Q uality M inorstoppage M achine causeN o m aterial N o operator Startup Suni Vatnhamar 2016 34 KPI and Loss driven process JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC Target 51.6 51.6 51.6 51.6 53.2 55.1 56.6 58.6 59.7 60.8 61.8 62.8 Actual 52.3 51.58 52.41 53.66 Target 51.6 51.6 51.6 51.6 53.2 55.1 56.6 58.6 59.7 60.8 61.8 62.8 Actual 52.1 52.1 52.1 52.1 Target 14.6 16 16.9 16.5 17 17.3 17 17.2 17.4 17.2 17.4 18 Actual 16.2 16.8 16 15.6 Target 25.6 25.4 25.1 24.9 24.7 24.5 24.2 24 23.8 23.6 23.3 23.1 Actual 26.4 25.3 26.8 23.7 Target 98.5 98.5 98.5 98.5 98.5 98.5 98.5 98.5 98.5 98.5 98.5 98.5 Actual 97.65 90.6 95.4 87.7 SHE Measures OTIF OPE Plant (13 week average) Cost vs Budget FACTORY KPI SCORECARD Key Performance Indicators OEE Plant (13 week average) MONTHS OEE% 0 10 20 30 40 50 60 70 1 4 7 10 13 Week No OPE% 0 0.5 1 1.5 2 2.5 1 4 7 10 13 Week No Cost v Budget 0 2 4 6 8 10 12 14 16 18 20 1 4 7 10 13 Week No SHE 0 5 10 15 20 25 30 1 3 5 7 9 11 13 15 Week No OTIF 0 20 40 60 80 100 120 1 4 7 10 13 Week No KPI’s Losses Site Year Plan Focus on “red” KPI’s Prioritisation
  • 35. Suni Vatnhamar 2016 35 Prioritisation matrix 1.priority 2.priority 3.priority 4.priority Difficulty (resource need and complexity) HighLittle LittleHigh Expectedeffect
  • 36. Suni Vatnhamar 2016 36 Loss driven KPI deployment OEE Increase of 7% Breakdowns Down 3 OEE% Change over Down 2 OEE% No material Down 2 OEE% Maintenance Tool setters Logistics Use the losses to set KPI’s at all levels in the organisation, including support functions
  • 37. Suni Vatnhamar 2016 37 PBS tools from Loss analysis Loss Effective maint. Autonomous maint Focused Impr.  When you know the losses and understand the problems behind, you can use good leadership and the right tools to remove the losses  Which tool to use is dependent on the actual loss Waste 5S SMED Pull Zero defects One Piece Flow Standardised work Standardisation