From:    Brandon Valdez                  To: David Ficklin - OnGoal
                                                                          Rory O’Connor – OnGoal
                             Office: Kansas City                          Lee Turner – OnGoal
                             Date:    7.14.2010                           Andy Heitmann – Turner
                                                                          Dave Dudzik - Turner
                             Re:      Wizards Stadium Project
                                      Update – Week of
                                      7.12.2010



 Current Activities this Week:

 Mass Excavation:
 Backfilling of on-grade seating is ongoing in Area 2
 and Area 3.

 Site Utilities:
 Storm Sewer Installation (Line 6000) has started again      Concourse Level Area 2 – Underground
 on the east side of France Family Drive.                    plumbing and electrical rough-in for the
                                                             Concourse Buildings is ongoing.
  Foundations:
 Area 3 Field Level – Foundation installation continues on
 the east side of the site.

 Concrete Flatwork:
 Area 1 – South Mezzanine concrete placement is
 ongoing. Subgrade prep is ongoing for the next Field
 Level Slab-on-Grade pour (Column Line 29-25). Prep
 work for next Main Concourse structural slab (Column
 Line 23-19.5) is ongoing.
                                                             Field Level Area 1 – Cast-in-place concrete
                                                             riser installation is ongoing.
 Structural Steel Erection:
 Area 1 – Erection of Structural Steel Sequence 2-1 is
 ongoing. Main Canopy truss erection in Sequence 1-7
 has started.

 Underground MEP:
 Electrical Secondary Distribution is ongoing in Areas 2
 and 3.

                                                             Mezzanine Level Area 1 – Concrete for slab-
                                                             depression at Food Service Cooler is placed
                                                             at South Mezzanine.

Building the Future
MEP Rough-in:
 Area 1 – Shallow electrical and plumbing rough-in is
 ongoing. Ductwork installation on Suite Level has begun.

 Metal Stud Framing:
 Area 1 – Metal stud framing for Suite and Press
 Levels are ongoing.
                                                                Area 2 –Steel erection in Sequence 2-1 is in
 Projected Activities occurring next Week:                      full ongoing. Installation of metal decking
                                                                has started.
 Mass Excavation:
 Backfilling of on-grade seating areas will continue in Area
 3. Grading in Area 3 (east of A-Line) will continue.

 Site Utilities:
 Installation of the Storm Line 6000 on the East Side (France
 Family Drive) of the site will continue.

 Deep Underground MEP:
 Deep Sanitary and Electrical Distribution installation
 in Area 3 will continue.

 Foundations:                                                   Area 1 – Shot of the West Building from the
 Area 3 Field Level – Foundation installation will continue.    south concourse area.

 Concrete Flatwork:
 Area 1 Field Level – Concrete placement for Slab-on-Grade
 Will be completed from Column Lines 29-25.

 Area 1 Field Level – Installation of on-grade seating risers
 will continue.

 Structural Steel Erection:
 Erection of Structural Steel in Sequence 2-1 will
 continue. Erection of Structural Steel Sequence 3-1
 will begin.
                                                               Suite/Press Levels Area 1 – Metal stud
 Erection of the Canopy Trusses will continue in Sequence 1-7. framing for Suites are ongoing.




Building the Future
Underground MEP:
 Electrical Secondary will continue in Area 3.

 MEP Rough-in:
 Plumbing and Electrical rough-in for Area 1 Field Level slab
 on grade will continue. MEP Rough-in at Suite Level will
 continue.

 Metal Stud Framing:
                                                                Area 1 – Shot from Roof Level showing the
 Area 1 – Metal stud framing for Suite and Press Levels will
                                                                installation of the Canopy Roof Trusses.
 continue.




                                                                Field Level Area 3 – F-Line Grade Beam is
                                                                ongoing.




Building the Future
Additional Photos:




Area 1 – Structural Steel erection is
complete at Stadium Suite now that the         Area 1 – Shot of the West Building from the
precast seating tub is installed.              northeast corner of the project site.




Suite Level Area 1 – Metal stud framing and    Press Level Area 1 – Metal Stud Framing
metal duckwork installation is ongoing.        installation is ongoing.




                                               Concourse Level Area 1 – Reinforcing Steel
Area 1 – Prefabricated plumbing carriers are   being installed in preparation for upcoming
being delivered to the project site.           concrete pour (Column Lines 23-19.5).




Building the Future

Weitere ähnliche Inhalte

Empfohlen

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by HubspotMarius Sescu
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTExpeed Software
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsPixeldarts
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthThinkNow
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfmarketingartwork
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024Neil Kimberley
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)contently
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024Albert Qian
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsKurio // The Social Media Age(ncy)
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Search Engine Journal
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summarySpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentLily Ray
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best PracticesVit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project managementMindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...RachelPearson36
 

Empfohlen (20)

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPT
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage Engineerings
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 

Construction Update 07-14-2010

  • 1. From: Brandon Valdez To: David Ficklin - OnGoal Rory O’Connor – OnGoal Office: Kansas City Lee Turner – OnGoal Date: 7.14.2010 Andy Heitmann – Turner Dave Dudzik - Turner Re: Wizards Stadium Project Update – Week of 7.12.2010 Current Activities this Week: Mass Excavation: Backfilling of on-grade seating is ongoing in Area 2 and Area 3. Site Utilities: Storm Sewer Installation (Line 6000) has started again Concourse Level Area 2 – Underground on the east side of France Family Drive. plumbing and electrical rough-in for the Concourse Buildings is ongoing. Foundations: Area 3 Field Level – Foundation installation continues on the east side of the site. Concrete Flatwork: Area 1 – South Mezzanine concrete placement is ongoing. Subgrade prep is ongoing for the next Field Level Slab-on-Grade pour (Column Line 29-25). Prep work for next Main Concourse structural slab (Column Line 23-19.5) is ongoing. Field Level Area 1 – Cast-in-place concrete riser installation is ongoing. Structural Steel Erection: Area 1 – Erection of Structural Steel Sequence 2-1 is ongoing. Main Canopy truss erection in Sequence 1-7 has started. Underground MEP: Electrical Secondary Distribution is ongoing in Areas 2 and 3. Mezzanine Level Area 1 – Concrete for slab- depression at Food Service Cooler is placed at South Mezzanine. Building the Future
  • 2. MEP Rough-in: Area 1 – Shallow electrical and plumbing rough-in is ongoing. Ductwork installation on Suite Level has begun. Metal Stud Framing: Area 1 – Metal stud framing for Suite and Press Levels are ongoing. Area 2 –Steel erection in Sequence 2-1 is in Projected Activities occurring next Week: full ongoing. Installation of metal decking has started. Mass Excavation: Backfilling of on-grade seating areas will continue in Area 3. Grading in Area 3 (east of A-Line) will continue. Site Utilities: Installation of the Storm Line 6000 on the East Side (France Family Drive) of the site will continue. Deep Underground MEP: Deep Sanitary and Electrical Distribution installation in Area 3 will continue. Foundations: Area 1 – Shot of the West Building from the Area 3 Field Level – Foundation installation will continue. south concourse area. Concrete Flatwork: Area 1 Field Level – Concrete placement for Slab-on-Grade Will be completed from Column Lines 29-25. Area 1 Field Level – Installation of on-grade seating risers will continue. Structural Steel Erection: Erection of Structural Steel in Sequence 2-1 will continue. Erection of Structural Steel Sequence 3-1 will begin. Suite/Press Levels Area 1 – Metal stud Erection of the Canopy Trusses will continue in Sequence 1-7. framing for Suites are ongoing. Building the Future
  • 3. Underground MEP: Electrical Secondary will continue in Area 3. MEP Rough-in: Plumbing and Electrical rough-in for Area 1 Field Level slab on grade will continue. MEP Rough-in at Suite Level will continue. Metal Stud Framing: Area 1 – Shot from Roof Level showing the Area 1 – Metal stud framing for Suite and Press Levels will installation of the Canopy Roof Trusses. continue. Field Level Area 3 – F-Line Grade Beam is ongoing. Building the Future
  • 4. Additional Photos: Area 1 – Structural Steel erection is complete at Stadium Suite now that the Area 1 – Shot of the West Building from the precast seating tub is installed. northeast corner of the project site. Suite Level Area 1 – Metal stud framing and Press Level Area 1 – Metal Stud Framing metal duckwork installation is ongoing. installation is ongoing. Concourse Level Area 1 – Reinforcing Steel Area 1 – Prefabricated plumbing carriers are being installed in preparation for upcoming being delivered to the project site. concrete pour (Column Lines 23-19.5). Building the Future