SlideShare ist ein Scribd-Unternehmen logo
1 von 1
Downloaden Sie, um offline zu lesen
FEA AND HAND CALCULATION OF WERT, PLP,
PARKING FRAME AND BANANA PLATE
Strength analysis performed for various units, each with own
purposes
FMC Technologies awarded Rambøll to
perform strength analysis of various units,
such as WERT, Pig Loop Porch, Parking
frame, Banana plate according to relevant
standards.
WERT:
It is used for various configurations with
different lengths and weights. Typical unit
are Pig loop Porch (PLP), Triple Porch and
Hogs configuration units.
Evaluation of lifting for WERT with PLP
structure was conducted for this particular
unit, acc. to DNV 2.22 Lifting appliances.
PLP:
The scope of work for PLP structure was
to analyze when subject to force during
lifting, impact loading, landing during
installation and stability against tipping in
accordance with DNV 2.7-3 operational
class R60 to achieve the requirement
from NORSOK R002, which is the strictest
criterion.
Parking Frame:
Parking frame are used for lifting/handling
and transportation of WERT unit. There
was six analysis considered and
developed to understand the structural
integrity of the unit. They are identified as
follows:
 Evaluation of lifting
 Resistance of impact loading
 Transportation analysis sea fastening
 Forklift analysis of Parking Frame
 Stability against tipping
 Drop test analysis (Explicit Dynamic
Analysis)
Banana Plate:
The Banana Plate has been designed by
FMC Technology. The structure is a lifting
device used for adjustment
adjustment of sling used for the
lifting of WERT and various
configurations as Pig Loop Porch,
Triple Porch and Hogs. The analysis
performed for the banana plate
consider the strength capacity of
when subject connected between
two slings
Services provided
FE Analysis with strength calculation in
Mathcad.
CUSTOMER
FMC technologies AS
LOCATION
Kongsberg, Drammen
PERIOD
January 2014 (2 month)
PROJECT MANAGER
Kaiwan Hasani
RELEVANT STANDARDS
Informative reference:
 DNV 2.7-3 Portable offshore Units
 NORSOK R-002 Lifting Equipment
 DNV – Standard for Certification No.
2.22, Lifting Appliances, June 2013
(DNV 2.22)
Normative reference:
 NS-EN 1993 Euro code 3 Steel
Design rules for connections.
IMAGE
WERT, PLP, Parking Frame and Banana plate
designed by FMC Technologies
WERT Pig Loop Porch Parking Frame
Banana Plate

Weitere ähnliche Inhalte

Was ist angesagt?

2. Benoit Latapie - Foundations for infrastructure projects in MENA
2. Benoit Latapie - Foundations for infrastructure projects in MENA2. Benoit Latapie - Foundations for infrastructure projects in MENA
2. Benoit Latapie - Foundations for infrastructure projects in MENA
Benoit Latapie
 
Project - HPCRT - Kaiwan
Project - HPCRT - KaiwanProject - HPCRT - Kaiwan
Project - HPCRT - Kaiwan
Kaiwan Hasani
 
CURRICULUM VITAE TM of AIVALIOTIS GEORGE
CURRICULUM VITAE TM of AIVALIOTIS GEORGECURRICULUM VITAE TM of AIVALIOTIS GEORGE
CURRICULUM VITAE TM of AIVALIOTIS GEORGE
George Aivaliotis
 
000-GENERAL presentation_rev06
000-GENERAL presentation_rev06000-GENERAL presentation_rev06
000-GENERAL presentation_rev06
Stefan Erents
 

Was ist angesagt? (20)

Offshore pile design according to international practice
Offshore pile design according to international practiceOffshore pile design according to international practice
Offshore pile design according to international practice
 
Immanuel's Resume
Immanuel's ResumeImmanuel's Resume
Immanuel's Resume
 
IRJET- Offshore Triceratops – A Review on Dynamic Analysis
IRJET- Offshore Triceratops – A Review on Dynamic AnalysisIRJET- Offshore Triceratops – A Review on Dynamic Analysis
IRJET- Offshore Triceratops – A Review on Dynamic Analysis
 
2. Benoit Latapie - Foundations for infrastructure projects in MENA
2. Benoit Latapie - Foundations for infrastructure projects in MENA2. Benoit Latapie - Foundations for infrastructure projects in MENA
2. Benoit Latapie - Foundations for infrastructure projects in MENA
 
SOFE Poster 2013
SOFE Poster 2013SOFE Poster 2013
SOFE Poster 2013
 
Expansion Of The Cape Town Container Terminal
Expansion Of The Cape Town Container TerminalExpansion Of The Cape Town Container Terminal
Expansion Of The Cape Town Container Terminal
 
Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems
 
POTW Showcase Webinar - August
POTW Showcase Webinar - AugustPOTW Showcase Webinar - August
POTW Showcase Webinar - August
 
Xaris concept study report- lng costal facility - prdw
Xaris   concept study report- lng costal facility - prdw Xaris   concept study report- lng costal facility - prdw
Xaris concept study report- lng costal facility - prdw
 
Project - HPCRT - Kaiwan
Project - HPCRT - KaiwanProject - HPCRT - Kaiwan
Project - HPCRT - Kaiwan
 
What is Pile Integrity Test ?
What is Pile Integrity Test ?What is Pile Integrity Test ?
What is Pile Integrity Test ?
 
C4 Subsea Production
C4 Subsea ProductionC4 Subsea Production
C4 Subsea Production
 
FPSO Redeployment
FPSO RedeploymentFPSO Redeployment
FPSO Redeployment
 
CURRICULUM VITAE TM of AIVALIOTIS GEORGE
CURRICULUM VITAE TM of AIVALIOTIS GEORGECURRICULUM VITAE TM of AIVALIOTIS GEORGE
CURRICULUM VITAE TM of AIVALIOTIS GEORGE
 
CV Romeo Costescu
CV Romeo CostescuCV Romeo Costescu
CV Romeo Costescu
 
Improving Bucketwheel Reclaimer Performance and Asset Integrity using SCADA Data
Improving Bucketwheel Reclaimer Performance and Asset Integrity using SCADA DataImproving Bucketwheel Reclaimer Performance and Asset Integrity using SCADA Data
Improving Bucketwheel Reclaimer Performance and Asset Integrity using SCADA Data
 
000-GENERAL presentation_rev06
000-GENERAL presentation_rev06000-GENERAL presentation_rev06
000-GENERAL presentation_rev06
 
CV_Stress_TaibA
CV_Stress_TaibACV_Stress_TaibA
CV_Stress_TaibA
 
Engineered Spring Supports V.2
Engineered Spring Supports V.2Engineered Spring Supports V.2
Engineered Spring Supports V.2
 
"The Load Capacity of Driven Cast-In-Situ Piles Derived from Installation Par...
"The Load Capacity of Driven Cast-In-Situ Piles Derived from Installation Par..."The Load Capacity of Driven Cast-In-Situ Piles Derived from Installation Par...
"The Load Capacity of Driven Cast-In-Situ Piles Derived from Installation Par...
 

Ähnlich wie Project - Various Unit - Kaiwan

RBH standard cv June2016
RBH standard cv June2016RBH standard cv June2016
RBH standard cv June2016
Richard Hyatt
 
Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1
robinking277
 
Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012
Richard Turnbull
 
Webinar presentation subsea manifold installation tcm4 602978
Webinar presentation subsea manifold installation tcm4 602978Webinar presentation subsea manifold installation tcm4 602978
Webinar presentation subsea manifold installation tcm4 602978
Dai Hung
 

Ähnlich wie Project - Various Unit - Kaiwan (20)

Rushikesh CV
Rushikesh CVRushikesh CV
Rushikesh CV
 
6 Yrs Exp Offshore Structure Subsea Pipelay Anil Kumar
6 Yrs Exp Offshore Structure Subsea Pipelay Anil Kumar6 Yrs Exp Offshore Structure Subsea Pipelay Anil Kumar
6 Yrs Exp Offshore Structure Subsea Pipelay Anil Kumar
 
WL CV 2016
WL CV 2016WL CV 2016
WL CV 2016
 
Summary of Experience
Summary of ExperienceSummary of Experience
Summary of Experience
 
Drillship Specifications Explained
Drillship Specifications ExplainedDrillship Specifications Explained
Drillship Specifications Explained
 
CV_Rahul_Sharma
CV_Rahul_SharmaCV_Rahul_Sharma
CV_Rahul_Sharma
 
Design of a wake adapted propeller for a containership
Design of a wake adapted propeller for a containershipDesign of a wake adapted propeller for a containership
Design of a wake adapted propeller for a containership
 
RBH standard cv June2016
RBH standard cv June2016RBH standard cv June2016
RBH standard cv June2016
 
Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1Cv supplement-2003-1229274598762649-1
Cv supplement-2003-1229274598762649-1
 
CFD_salesmaterial_261215
CFD_salesmaterial_261215CFD_salesmaterial_261215
CFD_salesmaterial_261215
 
IRJET- Preliminary Design of Floating Dry Dock
IRJET- Preliminary Design of Floating Dry DockIRJET- Preliminary Design of Floating Dry Dock
IRJET- Preliminary Design of Floating Dry Dock
 
Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012
 
Webinar presentation subsea manifold installation tcm4 602978
Webinar presentation subsea manifold installation tcm4 602978Webinar presentation subsea manifold installation tcm4 602978
Webinar presentation subsea manifold installation tcm4 602978
 
Customer projects Dlubal RFEM RSTAB
Customer projects Dlubal RFEM RSTAB Customer projects Dlubal RFEM RSTAB
Customer projects Dlubal RFEM RSTAB
 
IRJET- A Study on Corrugated Bulkheads for Bulk Carriers
IRJET- A Study on Corrugated Bulkheads for Bulk CarriersIRJET- A Study on Corrugated Bulkheads for Bulk Carriers
IRJET- A Study on Corrugated Bulkheads for Bulk Carriers
 
Abraham Sanni CV
Abraham Sanni CVAbraham Sanni CV
Abraham Sanni CV
 
Emmo Safety Engineering As
Emmo Safety Engineering AsEmmo Safety Engineering As
Emmo Safety Engineering As
 
Virtual Durability Simulation for Chassis of Commercial vehicle
Virtual Durability Simulation for Chassis of Commercial vehicleVirtual Durability Simulation for Chassis of Commercial vehicle
Virtual Durability Simulation for Chassis of Commercial vehicle
 
Abhay tank-infantry-combat-vehicle-abhay
Abhay tank-infantry-combat-vehicle-abhayAbhay tank-infantry-combat-vehicle-abhay
Abhay tank-infantry-combat-vehicle-abhay
 
Seminar Remotely Operated Vehicle ( ROV )
Seminar Remotely Operated Vehicle ( ROV ) Seminar Remotely Operated Vehicle ( ROV )
Seminar Remotely Operated Vehicle ( ROV )
 

Project - Various Unit - Kaiwan

  • 1. FEA AND HAND CALCULATION OF WERT, PLP, PARKING FRAME AND BANANA PLATE Strength analysis performed for various units, each with own purposes FMC Technologies awarded Rambøll to perform strength analysis of various units, such as WERT, Pig Loop Porch, Parking frame, Banana plate according to relevant standards. WERT: It is used for various configurations with different lengths and weights. Typical unit are Pig loop Porch (PLP), Triple Porch and Hogs configuration units. Evaluation of lifting for WERT with PLP structure was conducted for this particular unit, acc. to DNV 2.22 Lifting appliances. PLP: The scope of work for PLP structure was to analyze when subject to force during lifting, impact loading, landing during installation and stability against tipping in accordance with DNV 2.7-3 operational class R60 to achieve the requirement from NORSOK R002, which is the strictest criterion. Parking Frame: Parking frame are used for lifting/handling and transportation of WERT unit. There was six analysis considered and developed to understand the structural integrity of the unit. They are identified as follows:  Evaluation of lifting  Resistance of impact loading  Transportation analysis sea fastening  Forklift analysis of Parking Frame  Stability against tipping  Drop test analysis (Explicit Dynamic Analysis) Banana Plate: The Banana Plate has been designed by FMC Technology. The structure is a lifting device used for adjustment adjustment of sling used for the lifting of WERT and various configurations as Pig Loop Porch, Triple Porch and Hogs. The analysis performed for the banana plate consider the strength capacity of when subject connected between two slings Services provided FE Analysis with strength calculation in Mathcad. CUSTOMER FMC technologies AS LOCATION Kongsberg, Drammen PERIOD January 2014 (2 month) PROJECT MANAGER Kaiwan Hasani RELEVANT STANDARDS Informative reference:  DNV 2.7-3 Portable offshore Units  NORSOK R-002 Lifting Equipment  DNV – Standard for Certification No. 2.22, Lifting Appliances, June 2013 (DNV 2.22) Normative reference:  NS-EN 1993 Euro code 3 Steel Design rules for connections. IMAGE WERT, PLP, Parking Frame and Banana plate designed by FMC Technologies WERT Pig Loop Porch Parking Frame Banana Plate