SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN
Bachelor of Quantity Surveying (Honours)
INTEGRATED ASSIGNMENT:
MEASUREMENT I (QSB60104)
CONSTRUCTION TECHNOLOGY I (BLD 60104)
BUILDING MATERIALS (BLD 62003)
SITE VISIT REPORT
STUDENT NAME : PANG KAI YUN
STUDENT ID NO. : 0319802
DATE OF SUBMISSION : 27 NOVEMBER 2015
1
Content
No. Title Page Number
1. Introduction 2
2. Objective 3
3. Introduction of the Site 4
4. Technical Observation Made On Site 6
5. Pad Footing 13
6. Conclusion 17
2
Introduction
In this individual assignment, we are required to produce a site report after a site visit to a
construction site. This assignment involves three modules, which are Measurement 1,
Construction Technology and Building Materials. The site visit is attended by all Semester 1
August Intake students and two lecturer, which are Miss Ang and Miss Azrina. Before the site
visit, our lecturer has brief us on what we need to wear during the site visit. We are also required
to bring a safety helmet to ensure our safety at the site. During the site visit, we need to note
down what we had saw and learnt at the site.
3
Objective
 To learn about site organization and the importance of site safety.
 To understand the basics of the construction process.
 To witness the usage of construction equipment on site including mechanical plants.
 To explore and identify various types of building materials and technology on site.
 To able to explain the construction of buildings and the scientific principles that
underpins the design and construction.
 To make us understand the significance of teamwork and communication skills while
working together with the construction team members on site.
4
Introduction of the Site
A site visit to a construction site was held in the morning on 19th November 2015
(Thursday). The site is located at Sekyen 2A, Antara Gapi, Bandar Sungai Chik, Hulu Selangor,
Selangor. The site visit was guided by the project manager, Mr Mohd Sobri Bin Hj. Ab. Majid.
The project is about constructing 96 unit semi-detached houses (40’ x 60’). There are
total four types of houses. Type 1 is a flat house; Type 2A is a split down house; Type 2B is a
split up house while Type 3 is a spilt down house. There are total 38 units of Type 2A house, 12
units of Type 2B house, 36 units of Type 2B house and 10 units of Type 3 house.
This project will take about 3 years to complete. It was started at 8th July 2014 and is
expected to complete on 4th July 2016. This project cost around RM 44 million.
Site plan
5
Type 1 Type 2B
Type 2A Type 3
6
Technical Observations Made On Site
We arrive at the site at 9.30am in the morning. On the way into the site, there is an
information board placed in at the entrance. From the information board, we can know some
information about this project such as the contractor, architect and engineers of this project.
There is also a safety sign at the entrance of the construction site. The safety sign provides
information about safety that we need to pay attention when we are in the construction site such
as what we should do and what we should not do in the construction site.
Information board Safety sign
Besides, the construction site is surrounded by vertical hoarding to define the limit of the
site and to prevent unauthorized persons access to site. When we arrived at the site, we were
gathered at the entrance and the project manager, Mr Mohd Sobri Bin Hj. Ab. Majid briefed us
about the safety precautions. After the brief, we began our visit guided by the project manager.
Vertical hoarding Project manager is briefing about the safety
precautions
7
First, I have seen some machineries park at the construction site. We are quite familiar
with the machineries because we have learned before in class. Some of the machineries are truck,
mobile crane, front shovel, etc.
Truck Lorry
Mobile crane Front shovel
Compactor Back hoe
8
Geared Rollover Skips Concrete Mixer
Besides, I also saw a lot of different material placed on the floor along the site. For
example, reinforcement bars, BRC, bricks and metal roof truss. Moreover, there are also houses
that have finished construct.
High tensile reinforcement bar Bend of the high tensile reinforcement bar
Mild steel reinforcement bar BRC
9
Stirrups Metal roof truss
Metal roof truss inside the house Roof tiles
Clay bricks Concrete bricks
Plywood formwork Houses that have finished construct
10
Moreover, the scaffolding used in the site is independent scaffoldings. Independent
scaffoldings do not rely upon building for support. Pile cap is also found at the site. Pile
foundation is also one of the foundations used to build the house. It is depends on the soil
condition of the site.
Independent scaffoldings Material used to build scaffoldings
Pile cap Pile cap that haven been pile
inside the ground
Furthermore, I saw pad footing at the site. The size of the pad footing is in different size
because the size of the pad footing is depends on the load above it. I also saw a worker taking off
the formwork of the pad footing.
Pad footing A worker is taking out the formwork
11
Next to the pad footing is the column. There are some columns have already done, but
some of the formwork of the column have not taken it off yet. I also saw beam and formwork to
beam.
Column Formwork to column
beam Formwork to beam
Construction joint Staircase and the Formwork to staircase
12
After that, we stop at the site office. The site office is located inside a big cabin. Before
we leave, there was a worker teeing the stirrups with a wire.
Temporary site office, cabin Saw a worker is tie the stirrups
The tie the stirrups together
We finish our site visit around 11.30am and we went back to our campus. We arrive at
campus around 1.00pm.
13
Pad Footing
How a pad footing is constructed?
Step 1 : The size of the pad footing is set up according to the plan dimension.
Step 2 : Excavate the earth to the require depth.
Step 3 : Plywood formwork is built at the perimeter of the pad footing.
14
Step 4 : 50mm thick of lean concrete Grade 30 mixture is then poured inside the formwork to
prepare a clean and firm base for the footing.
Step 5 : Reinforcement bar is bent and tied and placed inside the formwork.
Step 6 : Stump reinforcements are then erected. Length of reinforcement bars should be extended
beyond stump level and act as a starter bars for column above.
Step 7 : Concrete Grade 30 is poured into the formwork.
15
Step 8: After the concrete is set and cured, the formwork can be dismantled.
16
What are the materials involved in constructing a pad footing?
1. Reinforced Concrete Grade 30
Reinforced concrete is concrete in which wire mesh or steel bars are embedded to increase
its tensile strength. Concrete has great compressive strength, but very little tensile strength.
To overcome this weakness, concrete is cast around steel reinforcing bars. These bars have
high tensile strength. As the concrete harden, it grips the steel to form a bond. Concrete
Grade 30 concrete has a 1 : 2 : 3 Ratio (Cement : Sand : Aggregates). The grade means the
concrete compression resistance at 28 days.
2. Lean Concrete Grade 30
Lean concrete is a mix where the amount of cement is lower than the amount of liquid
present in the strata. The main function of the lean concrete is to provide the uniform surface
to the foundation concrete and to prevent the direct contact of foundation concrete from the
soil.
3. High Tensile Reinforcement Bar
The high tensile reinforcement bar used is T12 and T16 in the pad footing. T12 is high
tensile reinforcement bar with 12 mm diameter, while T16 is high tensile reinforcement bar
with 16 mmm diameter.
4. Plywood formwork
Plywood is an artificially manufactured wooden material used for making concrete
formwork. It is strong, durable and light weight. The availability of different thickness
plywood in the market makes it popular for different sizes concreting work. It is possible to
have smooth finish in which case on cost in surface finishing is there.
17
Conclusion
This is the first time I visit a construction site. I have gain a lot of new knowledge
through this site visit. In this site visit, I have chance to look at all the material we have learnt in
class such as reinforcement bars, metal roof truss, BRC, etc. Besides, I also saw different
machineries wat the site such as truck, back hoe, concrete mixer, etc.
Moreover, I get to know how a house is built from the foundation up to the roof. We also
have a chance to ask question about the material and the process of the construction.
Furthermore, I leant that the safety is really important in the construction site. We should always
be alert and be careful all the time. We should always wear safety helmet in the site.
Finally, I want to say thank you to the project manager, Mr Mohd Sobri Bin Hj. Ab.
Majid the land surveyor, Mr. Mohd Hafizi Bin Mohammad. They answer all of our question and
willing to tell us more about it. I really gain a lot of valuable knowledge and I hope to have
another chance to have a site visit at another construction site.

Weitere ähnliche Inhalte

Was ist angesagt? (20)

Site visit report 2017
Site visit report 2017Site visit report 2017
Site visit report 2017
 
SITE VISIT REPORT
SITE VISIT REPORTSITE VISIT REPORT
SITE VISIT REPORT
 
Site visit report
Site visit report Site visit report
Site visit report
 
Report
ReportReport
Report
 
Individual site report brief
Individual site report briefIndividual site report brief
Individual site report brief
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Ez
EzEz
Ez
 
site visit report (final)
site visit report (final)site visit report (final)
site visit report (final)
 
Site report
Site reportSite report
Site report
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Site visit report
Site visit reportSite visit report
Site visit report
 
BQS Site Visit Report
BQS Site Visit ReportBQS Site Visit Report
BQS Site Visit Report
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Construction Site Report
Construction Site ReportConstruction Site Report
Construction Site Report
 
CT site visit report
CT site visit report CT site visit report
CT site visit report
 
Site report for Measurement 1
Site report for Measurement 1Site report for Measurement 1
Site report for Measurement 1
 
Construction Materials site visit report
Construction Materials site visit report Construction Materials site visit report
Construction Materials site visit report
 
Measurement 1-site-visit
Measurement 1-site-visitMeasurement 1-site-visit
Measurement 1-site-visit
 
bqs Site report
bqs Site reportbqs Site report
bqs Site report
 
MCB Final report
MCB Final reportMCB Final report
MCB Final report
 

Ähnlich wie Assignment 1 - Antara Gapi, Hulu Selangor, Selangor

Site-Report (1).docx
Site-Report (1).docxSite-Report (1).docx
Site-Report (1).docx
Shze Hwa Lee
 
Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)
Chin Tze Wei
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit Report
ZIyeeTan
 
Final Report
Final Report Final Report
Final Report
Jack Ng
 

Ähnlich wie Assignment 1 - Antara Gapi, Hulu Selangor, Selangor (18)

Project SlideShare
Project SlideShareProject SlideShare
Project SlideShare
 
Site Visit Report CT BM M1
Site Visit Report CT BM M1Site Visit Report CT BM M1
Site Visit Report CT BM M1
 
Site report
Site reportSite report
Site report
 
Site visit report qs semester 1
Site visit report   qs semester 1Site visit report   qs semester 1
Site visit report qs semester 1
 
Site report
Site reportSite report
Site report
 
CT, BM & MEASUREMENT Report
CT, BM & MEASUREMENT ReportCT, BM & MEASUREMENT Report
CT, BM & MEASUREMENT Report
 
Site-Report (1).docx
Site-Report (1).docxSite-Report (1).docx
Site-Report (1).docx
 
Site report
Site reportSite report
Site report
 
Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)Ctw site report(pg 1 to 8, 14)
Ctw site report(pg 1 to 8, 14)
 
Ct bm measurement report
Ct bm measurement reportCt bm measurement report
Ct bm measurement report
 
Site report
Site reportSite report
Site report
 
Site Visit Report
Site Visit ReportSite Visit Report
Site Visit Report
 
SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)
 
Yong Wen Ting Sharon Gun Shim Wei (SITE VISIT REPORT)
Yong Wen Ting Sharon Gun Shim Wei (SITE VISIT REPORT)Yong Wen Ting Sharon Gun Shim Wei (SITE VISIT REPORT)
Yong Wen Ting Sharon Gun Shim Wei (SITE VISIT REPORT)
 
Final Report
Final Report Final Report
Final Report
 
Integrated site vite report
Integrated site vite reportIntegrated site vite report
Integrated site vite report
 
Site report
Site reportSite report
Site report
 
Site visit report
Site visit reportSite visit report
Site visit report
 

Mehr von Kai Yun Pang

Mehr von Kai Yun Pang (20)

Assignment 2 - Resort Proposal at Pulau Langkawi
Assignment 2 - Resort Proposal at Pulau LangkawiAssignment 2 - Resort Proposal at Pulau Langkawi
Assignment 2 - Resort Proposal at Pulau Langkawi
 
Assignment 2 - Report
Assignment 2 - ReportAssignment 2 - Report
Assignment 2 - Report
 
Assignment 1 - Water Pump Station
Assignment 1 - Water Pump StationAssignment 1 - Water Pump Station
Assignment 1 - Water Pump Station
 
Assignment 1 - Microsoft Project
Assignment 1 - Microsoft ProjectAssignment 1 - Microsoft Project
Assignment 1 - Microsoft Project
 
Assignment - Financial Appraisal
Assignment - Financial AppraisalAssignment - Financial Appraisal
Assignment - Financial Appraisal
 
Assignment - Financial Appraisal
Assignment - Financial Appraisal Assignment - Financial Appraisal
Assignment - Financial Appraisal
 
Assignment - FIDIC Contract
Assignment - FIDIC ContractAssignment - FIDIC Contract
Assignment - FIDIC Contract
 
Assignment - Report
Assignment - ReportAssignment - Report
Assignment - Report
 
Seminar - CIPAA 2012
Seminar - CIPAA 2012Seminar - CIPAA 2012
Seminar - CIPAA 2012
 
Assignment - S Hotel (Presentation Slide)
Assignment - S Hotel (Presentation Slide)Assignment - S Hotel (Presentation Slide)
Assignment - S Hotel (Presentation Slide)
 
Assignment - S Hotel
Assignment - S HotelAssignment - S Hotel
Assignment - S Hotel
 
Assignment - Case Study Report
Assignment - Case Study ReportAssignment - Case Study Report
Assignment - Case Study Report
 
Assignment - Journal
Assignment - JournalAssignment - Journal
Assignment - Journal
 
Assignment - Community Service
Assignment - Community Service Assignment - Community Service
Assignment - Community Service
 
Assignment - Final Account
Assignment - Final AccountAssignment - Final Account
Assignment - Final Account
 
Assignment - Report
Assignment - ReportAssignment - Report
Assignment - Report
 
Seminar - Partial Possession by Employer
Seminar - Partial Possession by EmployerSeminar - Partial Possession by Employer
Seminar - Partial Possession by Employer
 
Seminar - Question
Seminar - QuestionSeminar - Question
Seminar - Question
 
Assignment - MK Land
Assignment - MK LandAssignment - MK Land
Assignment - MK Land
 
Assignment - Financial Analysis
Assignment - Financial AnalysisAssignment - Financial Analysis
Assignment - Financial Analysis
 

Kürzlich hochgeladen

Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
Chris Hunter
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
heathfieldcps1
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
kauryashika82
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
MateoGardella
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
QucHHunhnh
 

Kürzlich hochgeladen (20)

INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writing
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 

Assignment 1 - Antara Gapi, Hulu Selangor, Selangor

  • 1. SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN Bachelor of Quantity Surveying (Honours) INTEGRATED ASSIGNMENT: MEASUREMENT I (QSB60104) CONSTRUCTION TECHNOLOGY I (BLD 60104) BUILDING MATERIALS (BLD 62003) SITE VISIT REPORT STUDENT NAME : PANG KAI YUN STUDENT ID NO. : 0319802 DATE OF SUBMISSION : 27 NOVEMBER 2015
  • 2. 1 Content No. Title Page Number 1. Introduction 2 2. Objective 3 3. Introduction of the Site 4 4. Technical Observation Made On Site 6 5. Pad Footing 13 6. Conclusion 17
  • 3. 2 Introduction In this individual assignment, we are required to produce a site report after a site visit to a construction site. This assignment involves three modules, which are Measurement 1, Construction Technology and Building Materials. The site visit is attended by all Semester 1 August Intake students and two lecturer, which are Miss Ang and Miss Azrina. Before the site visit, our lecturer has brief us on what we need to wear during the site visit. We are also required to bring a safety helmet to ensure our safety at the site. During the site visit, we need to note down what we had saw and learnt at the site.
  • 4. 3 Objective  To learn about site organization and the importance of site safety.  To understand the basics of the construction process.  To witness the usage of construction equipment on site including mechanical plants.  To explore and identify various types of building materials and technology on site.  To able to explain the construction of buildings and the scientific principles that underpins the design and construction.  To make us understand the significance of teamwork and communication skills while working together with the construction team members on site.
  • 5. 4 Introduction of the Site A site visit to a construction site was held in the morning on 19th November 2015 (Thursday). The site is located at Sekyen 2A, Antara Gapi, Bandar Sungai Chik, Hulu Selangor, Selangor. The site visit was guided by the project manager, Mr Mohd Sobri Bin Hj. Ab. Majid. The project is about constructing 96 unit semi-detached houses (40’ x 60’). There are total four types of houses. Type 1 is a flat house; Type 2A is a split down house; Type 2B is a split up house while Type 3 is a spilt down house. There are total 38 units of Type 2A house, 12 units of Type 2B house, 36 units of Type 2B house and 10 units of Type 3 house. This project will take about 3 years to complete. It was started at 8th July 2014 and is expected to complete on 4th July 2016. This project cost around RM 44 million. Site plan
  • 6. 5 Type 1 Type 2B Type 2A Type 3
  • 7. 6 Technical Observations Made On Site We arrive at the site at 9.30am in the morning. On the way into the site, there is an information board placed in at the entrance. From the information board, we can know some information about this project such as the contractor, architect and engineers of this project. There is also a safety sign at the entrance of the construction site. The safety sign provides information about safety that we need to pay attention when we are in the construction site such as what we should do and what we should not do in the construction site. Information board Safety sign Besides, the construction site is surrounded by vertical hoarding to define the limit of the site and to prevent unauthorized persons access to site. When we arrived at the site, we were gathered at the entrance and the project manager, Mr Mohd Sobri Bin Hj. Ab. Majid briefed us about the safety precautions. After the brief, we began our visit guided by the project manager. Vertical hoarding Project manager is briefing about the safety precautions
  • 8. 7 First, I have seen some machineries park at the construction site. We are quite familiar with the machineries because we have learned before in class. Some of the machineries are truck, mobile crane, front shovel, etc. Truck Lorry Mobile crane Front shovel Compactor Back hoe
  • 9. 8 Geared Rollover Skips Concrete Mixer Besides, I also saw a lot of different material placed on the floor along the site. For example, reinforcement bars, BRC, bricks and metal roof truss. Moreover, there are also houses that have finished construct. High tensile reinforcement bar Bend of the high tensile reinforcement bar Mild steel reinforcement bar BRC
  • 10. 9 Stirrups Metal roof truss Metal roof truss inside the house Roof tiles Clay bricks Concrete bricks Plywood formwork Houses that have finished construct
  • 11. 10 Moreover, the scaffolding used in the site is independent scaffoldings. Independent scaffoldings do not rely upon building for support. Pile cap is also found at the site. Pile foundation is also one of the foundations used to build the house. It is depends on the soil condition of the site. Independent scaffoldings Material used to build scaffoldings Pile cap Pile cap that haven been pile inside the ground Furthermore, I saw pad footing at the site. The size of the pad footing is in different size because the size of the pad footing is depends on the load above it. I also saw a worker taking off the formwork of the pad footing. Pad footing A worker is taking out the formwork
  • 12. 11 Next to the pad footing is the column. There are some columns have already done, but some of the formwork of the column have not taken it off yet. I also saw beam and formwork to beam. Column Formwork to column beam Formwork to beam Construction joint Staircase and the Formwork to staircase
  • 13. 12 After that, we stop at the site office. The site office is located inside a big cabin. Before we leave, there was a worker teeing the stirrups with a wire. Temporary site office, cabin Saw a worker is tie the stirrups The tie the stirrups together We finish our site visit around 11.30am and we went back to our campus. We arrive at campus around 1.00pm.
  • 14. 13 Pad Footing How a pad footing is constructed? Step 1 : The size of the pad footing is set up according to the plan dimension. Step 2 : Excavate the earth to the require depth. Step 3 : Plywood formwork is built at the perimeter of the pad footing.
  • 15. 14 Step 4 : 50mm thick of lean concrete Grade 30 mixture is then poured inside the formwork to prepare a clean and firm base for the footing. Step 5 : Reinforcement bar is bent and tied and placed inside the formwork. Step 6 : Stump reinforcements are then erected. Length of reinforcement bars should be extended beyond stump level and act as a starter bars for column above. Step 7 : Concrete Grade 30 is poured into the formwork.
  • 16. 15 Step 8: After the concrete is set and cured, the formwork can be dismantled.
  • 17. 16 What are the materials involved in constructing a pad footing? 1. Reinforced Concrete Grade 30 Reinforced concrete is concrete in which wire mesh or steel bars are embedded to increase its tensile strength. Concrete has great compressive strength, but very little tensile strength. To overcome this weakness, concrete is cast around steel reinforcing bars. These bars have high tensile strength. As the concrete harden, it grips the steel to form a bond. Concrete Grade 30 concrete has a 1 : 2 : 3 Ratio (Cement : Sand : Aggregates). The grade means the concrete compression resistance at 28 days. 2. Lean Concrete Grade 30 Lean concrete is a mix where the amount of cement is lower than the amount of liquid present in the strata. The main function of the lean concrete is to provide the uniform surface to the foundation concrete and to prevent the direct contact of foundation concrete from the soil. 3. High Tensile Reinforcement Bar The high tensile reinforcement bar used is T12 and T16 in the pad footing. T12 is high tensile reinforcement bar with 12 mm diameter, while T16 is high tensile reinforcement bar with 16 mmm diameter. 4. Plywood formwork Plywood is an artificially manufactured wooden material used for making concrete formwork. It is strong, durable and light weight. The availability of different thickness plywood in the market makes it popular for different sizes concreting work. It is possible to have smooth finish in which case on cost in surface finishing is there.
  • 18. 17 Conclusion This is the first time I visit a construction site. I have gain a lot of new knowledge through this site visit. In this site visit, I have chance to look at all the material we have learnt in class such as reinforcement bars, metal roof truss, BRC, etc. Besides, I also saw different machineries wat the site such as truck, back hoe, concrete mixer, etc. Moreover, I get to know how a house is built from the foundation up to the roof. We also have a chance to ask question about the material and the process of the construction. Furthermore, I leant that the safety is really important in the construction site. We should always be alert and be careful all the time. We should always wear safety helmet in the site. Finally, I want to say thank you to the project manager, Mr Mohd Sobri Bin Hj. Ab. Majid the land surveyor, Mr. Mohd Hafizi Bin Mohammad. They answer all of our question and willing to tell us more about it. I really gain a lot of valuable knowledge and I hope to have another chance to have a site visit at another construction site.