ROBOT WELDING SETUP TIME REDUCTION
TRAINING
November 14, 2013
By Julian Kalac, P.Eng
2
Problem Statement & Objective
Current setup time= 40min
Standard Time= 15min
Target setup Time < 5min
4
SMED (Single Minute Exchange Die)
• Setup Time
– Starts when last piece of previous job is complete;
ends when first good piece of next job is complete
• Internal set-up: While machine is shut-down
– Strive to minimize this as process is not producing
parts
• External set-up: While machine is working
– Prepare for set-up, get all tools/parts needed ready
and beside the press before starting set-up
5
Seven rules for improving Setup
1. Setup improvement begins & ends with 6S.
2. Change Internal (on line) setup into External (off line)
setup then improve any remaining internal changeover.
3. Find alternatives to bolts (they are too slow to get on & off).
4. If you have to use your hands make sure your feet stay put.
5. Don’t rely on special fine tuning skills.
6. Standardize all changeover operations.
7. Standards are standards / they are not flexible.
6
Internal Vs. External (cont’d)
• Primary goal is to change all internal setups to
external ones
• Reduce length of internal setup if unable to
convert to external
• Reduce length of all external setups as well
7
Simple Suggestions
• Analysis of setup procedures using videotapes
• Use more people where available
• Use offline time as maintenance time
• Practice makes perfect
8
SMED Examples
• Split thread bolts
• Handles
• Toggle clamps
• U-shaped washers
9
Example Tools (cont’d)
u-shaped washers Split thread bolts
10
11
Example of SMED Tools
12
13
14
Quick Connect Toggle Clamps
15
The spring-loaded, one-
handed clamp with quick-
set, magnetic V-Pad.
Quick and easy to use!
Squeeze to open, set in
position and turn to
tighten.
MagSpring Clamps
16
Sliding Channel Clamps
17
Table Mount C-Clamps
Quick Connect Clamps
18
Robot 9 Set-Up Reduction Project Action Items
1-5S work station (label tools, screws, nuts & fixtures)-->Brent Nov 14
2-Fabricate welding fixture for 6/22 parts, --Andrey Nov 14
3-Program needed changes --> Earl To be scheduled
4-Redo Setup video same part after 5S --Brent/Julian--( to be sched)
5-Program all parts to run on both sides—Earl 9/22 parts ?
6-Implement a setup/downtime tracking sheet –Julian Nov 14
7-Implement a suggestion log for operators—Julian Nov 14
8-Etch in GRIDS onto the welding fixture—Brent Nov 14
9-Post “To Do List” at Robot 9 cell—Julian Nov 14
10-Decide if Air Gun or Air Rachet is more feasible—Earl—Nov 20
11- See if Robot cn position for Ream from the front side—Earl—Nov 20
12-Anti Spatter tank Earl –Nov 15
13-Colour Code the fixtures as per the setup sheet –Brent Nov 15
19
ROBOT 9 ZERO SETUP TIME
PROJECT
20
Robot 9 Weld Cell Process Flow
Process/Material Flow
Step 1
Parts From Brake Press
Step 2
Tacking
Step 3
Robot 9
Step 4
Clean Part
Step 5
Out to next operation
Move the welded
parts out ASAP
Screw weld blocks onto fixture 10-15min why?
WELD
FIXTURE
WHATS THE
PROBLEM?
22
Screw length
HERE IS THE PROBLEM
HERE IS THE PROBLEM
Robot 9 SetUp Time Reduction
Current setup time= 40min
Standard Time= 15min
Target setup Time < 5min LAST UPDATED
Item # Action Item Who Due Date Status Comments
1 5S work station (label tools, screws, nuts & fixtures) Brent 14-Nov Completed
2 Fabricate welding fixture for 6/22 parts, Andrey 14-Nov Completed
3 Program needed changes for new fixture Earl 21-Nov Open Critical for next step
4 Redo Setup video for BLUE GROUP (228/229 PARTS) Julian/Wayne/Carl 25-Nov Open Will have to do video with
5 Program all parts to run on both sides 9/22 parts ? Earl 30-Jan-14 Open
6 Implement a setup/downtime tracking sheet –Julian Nov Julian 14-Nov Completed
7 Implement a suggestion log for operators Julian 14-Nov Completed
8 Etch in GRIDS onto the welding fixture Brent 14-Nov OVERDUE
9 Post “To Do List” at Robot 9 cell Julian 14-Nov Completed
10 Decide if Air Gun or Air Rachet is more feasible Earl 20-Nov Open
11 See if Robot cn position for Ream from the front side Earl 20-Nov Open
12 Anti Spatter tank Earl Earl 21-Nov Open New hose ordered
13 Colour Code the fixtures as per the setup sheet Brent 19-Nov Overdue 40% completed
14 Next Job Board Earl 26-Nov Open
15 Complete SMED training Julian 15-Nov Completed
16
Separate External from Internal Set-Up action items (1st
pass)
Brent/Julian 18-Nov Completed
SMED 1st Rev = Internal SetUp 38min
> 18min
17
Develop a DRAFT Set-UP SOP Brent/Julian 26-Nov Open
40% completed. Need to validate new
setup time
18
19
November 22, 2013
25
STANDARDIZE SCREWS
PROBLEM SOLUTION WING NUTS
26
OPTIONS
27
The spring-
loaded, one-
handed
clamp with
quick-set,
magnetic V-
Pad. Quick
MagSpring Clamps
OPTIONS
28
Sliding Channel Clamps
OPTIONS
29
Hook
Clamp
s
OPTIONS
30
Table Mount C-Clamps
OPTIONS
31
Table Mount C-Clamps
www.stronghandtools.com/build
pro
3/8”
OPTIONS
32
33
34
1/12/2016
Department Reference #
Confirmed By Date Chapter Rev. PageIssuer
Production manager
Rivet Cell 7.2- Shadow Boards
111May 11, 2006Scheduler
Cleaning Station
Rags
Shovel
Straw Broom
Cleaner
Push Broom
Colour coded cart used for storing riveting
anvils, blocks for the fixture, and stands
Stands
Blocks
Riveting Anvils
Backing Blocks
35
Ownership and pride
36
STANDARD OPERATING PROCEDURE
Robot 9 SMED SOP=ZERO SETUP TIME
SIDE A CHANGEOVER
step # Operation Est Time (min)
1 PREPARE NEXT WO MATERIAL 4
2 GET NEEDED FIXTURES/TOOLS/CLAMPS 3
3 UNLOAD LAST PARTS FROM SIDE 1 1
4 INSPECT AND TOUCH UP PARTS 2
5 TACK PARTS 2 (EXTERNAL SETUP)
6 TAKE DOWN FIXTURE FROM SIDE 1 4 BEING DONE
7 LOAD PARTS ONTO SIDE 1 1 WHILE ROBOT rUNNING
8 START WELDING SIDE 1 0
TOTAL TIME FOR SETUP= 16
WELD CYCLE STARTED = 8 T SETUP TIME CLOCK STARTS
AFTER 8 MIN
SIDE B CHANGEOVER
EXTERNAL SETUP
7 TAKE DOWN FIXTURE FROM SIDE 2 5 INCLUDED IN
8 LOAD PARTS ONTO SIDE21 1 WELD CYCLE (8MIN)
9 START WELDING SIDE 2 0
TOTAL SETUP TIME SIDE B= 6
TOTAL INTERNAL SETUP TIME= 0
TOTAL EXTERNAL SETUP TIME= 12
OLD SETUP TIME (MIN)= 38
DEC 4 SETUP (MIN) = 0
SETUP TIME IMPROVEMENT (MIN) = -38
WHILE THE ROBOT IS WELDING SIDE B, LOST TIME=0 MIN
GOAL IS TO CHANGE STATION A BEFORE ROBOT FINISHES WELDING SIDE B
DURING WELD CYCLE (8MIN) THE FOLLOWING WAS DONE
SET-UP PROCESS STEPS ORIGINAL SETUP
TIME Min
NEW SETUP
TIME Min
Set-up
FIND TOOLS 7.5 1
- Clamp Adjustment 1 0
- Clamps 2.1 0
- Wrenching 2.3 0
- Finite Reaming (1 time) 2 0
- Spacers 1 0
- Find Jigs 5 1
- Tack 4 pcs. 1.2 1
Material Preperation 7 1
TOTAL SET-UP TIME 29.1 4
ROBOT 9 SMED
25 MIN Reduction
Robot 9 SetUp Time Savings (228/229 parts)
OLD SetUp Time for Robot 9
SetUp Time
(Min)
SetUp Time
(Hrs)
Number
SetUps/Shift
Total SetUp
Time/Shift
Total SetUp
Time/Day
SetUp
Time/Week
SetUp
Time/Year
Machine Rate
Annual Lost
Productivity
38 0.63 2 1.27 2.53 12.67 595.33 $ 100.00 $ 59,533.33
DEC 4TH SetUp Time for Robot 9= ZERO SETUP TIME
SetUp Time
(Min)
SetUp Time
(Hrs)
Number
SetUps/Shift
Total SetUp
Time/Shift
Total SetUp
Time/Day
SetUp
Time/Week
SetUp
Time/Year
Machine Rate
Annual Lost
Productivity
5 0.08 2 0.17 0.33 1.67 78.33 $ 100.00 $ 7,833.33
Hrs Saved 517.00
$ 51,700.00ANNUAL SAVINGS =
LEAN Setup Reduction (SMED) training for welding by JULIAN KALAC

Weitere ähnliche Inhalte

Was ist angesagt?

Was ist angesagt? (20)

SMED Kaizen Event
SMED Kaizen EventSMED Kaizen Event
SMED Kaizen Event
 
SMED or Single Minute Exchange of Dies and Set-up Reduction Process
SMED or Single Minute Exchange of Dies and Set-up Reduction ProcessSMED or Single Minute Exchange of Dies and Set-up Reduction Process
SMED or Single Minute Exchange of Dies and Set-up Reduction Process
 
How to implement Single minute exchange of die
How to implement Single minute exchange of die How to implement Single minute exchange of die
How to implement Single minute exchange of die
 
010 bmw tpm management training
010 bmw tpm management training010 bmw tpm management training
010 bmw tpm management training
 
SMED - Quick Change Over
SMED - Quick Change OverSMED - Quick Change Over
SMED - Quick Change Over
 
Lean Manufacturing Training
Lean Manufacturing TrainingLean Manufacturing Training
Lean Manufacturing Training
 
Conducting Kaizen Events
Conducting Kaizen EventsConducting Kaizen Events
Conducting Kaizen Events
 
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORSLEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
 
TPM Implementation Strategy
TPM Implementation StrategyTPM Implementation Strategy
TPM Implementation Strategy
 
TPM. DR. K. BARANIDHARAN
TPM. DR. K. BARANIDHARANTPM. DR. K. BARANIDHARAN
TPM. DR. K. BARANIDHARAN
 
16 major losses tng
16 major losses tng16 major losses tng
16 major losses tng
 
How to Reduce Changeover Time and Increase Throughput
How to Reduce Changeover Time and Increase ThroughputHow to Reduce Changeover Time and Increase Throughput
How to Reduce Changeover Time and Increase Throughput
 
Single Minute Exchange of Dies
Single Minute Exchange of DiesSingle Minute Exchange of Dies
Single Minute Exchange of Dies
 
Lean manufacturing ppt
Lean manufacturing pptLean manufacturing ppt
Lean manufacturing ppt
 
Introduction to Takt time - January 2017
Introduction to Takt time - January 2017Introduction to Takt time - January 2017
Introduction to Takt time - January 2017
 
Lean manufacturing overview
Lean manufacturing overviewLean manufacturing overview
Lean manufacturing overview
 
Lean Manufacturing
Lean Manufacturing Lean Manufacturing
Lean Manufacturing
 
The mystery of OEE
The mystery of OEEThe mystery of OEE
The mystery of OEE
 
TPM - tech talk
TPM - tech talk TPM - tech talk
TPM - tech talk
 
TPM for lean manufacturing chp4 step of “jlshu hozen “activities
TPM for lean manufacturing  chp4 step of “jlshu hozen “activitiesTPM for lean manufacturing  chp4 step of “jlshu hozen “activities
TPM for lean manufacturing chp4 step of “jlshu hozen “activities
 

Andere mochten auch

Weld and Lift Fixtures
Weld and Lift FixturesWeld and Lift Fixtures
Weld and Lift Fixtures
Rentapen Inc
 
Reduce SMT Changeover Time
Reduce SMT Changeover TimeReduce SMT Changeover Time
Reduce SMT Changeover Time
Damian Denis
 

Andere mochten auch (17)

How to reduce changeover loss
How to reduce changeover lossHow to reduce changeover loss
How to reduce changeover loss
 
Smed Training Model Trainer Instructions[1]
Smed Training Model Trainer Instructions[1]Smed Training Model Trainer Instructions[1]
Smed Training Model Trainer Instructions[1]
 
Do you SMED?
Do you SMED?Do you SMED?
Do you SMED?
 
Lean Manufacturing SMED
Lean Manufacturing SMEDLean Manufacturing SMED
Lean Manufacturing SMED
 
Lean presentation ppt
Lean presentation pptLean presentation ppt
Lean presentation ppt
 
Quick Smed Sample
Quick Smed SampleQuick Smed Sample
Quick Smed Sample
 
SMED Setup & Lead Time Reduction
SMED Setup & Lead Time ReductionSMED Setup & Lead Time Reduction
SMED Setup & Lead Time Reduction
 
SMED Training
SMED Training SMED Training
SMED Training
 
Set up reduction
Set up reductionSet up reduction
Set up reduction
 
Smed
SmedSmed
Smed
 
SMED
SMED SMED
SMED
 
SMED - Single Minute Exchange Died
SMED - Single Minute Exchange DiedSMED - Single Minute Exchange Died
SMED - Single Minute Exchange Died
 
CII Tourism Fest 2013 - An International Fest on Tourism & Hospitality (.ppt ...
CII Tourism Fest 2013 - An International Fest on Tourism & Hospitality (.ppt ...CII Tourism Fest 2013 - An International Fest on Tourism & Hospitality (.ppt ...
CII Tourism Fest 2013 - An International Fest on Tourism & Hospitality (.ppt ...
 
Weld and Lift Fixtures
Weld and Lift FixturesWeld and Lift Fixtures
Weld and Lift Fixtures
 
Reduce SMT Changeover Time
Reduce SMT Changeover TimeReduce SMT Changeover Time
Reduce SMT Changeover Time
 
Error Proofing Manual Automotive Assembly by JULIAN KALAC
Error Proofing Manual Automotive Assembly by JULIAN KALACError Proofing Manual Automotive Assembly by JULIAN KALAC
Error Proofing Manual Automotive Assembly by JULIAN KALAC
 
Innovation training
Innovation trainingInnovation training
Innovation training
 

Ähnlich wie LEAN Setup Reduction (SMED) training for welding by JULIAN KALAC

FINAL VIVA PRESENTATION (2012250023)
FINAL VIVA PRESENTATION (2012250023)FINAL VIVA PRESENTATION (2012250023)
FINAL VIVA PRESENTATION (2012250023)
Vignesh Venugopal
 
REWORK Kaizen (2)
REWORK Kaizen (2)REWORK Kaizen (2)
REWORK Kaizen (2)
Randy Brons
 
Work Process Analysis of 4-170 Pizoelectric accelerometer at CECVP Project W...
Work Process Analysis of  4-170 Pizoelectric accelerometer at CECVP Project W...Work Process Analysis of  4-170 Pizoelectric accelerometer at CECVP Project W...
Work Process Analysis of 4-170 Pizoelectric accelerometer at CECVP Project W...
Joseph Uken
 
Updated cycle time_reduction_on_valve_body_ih_
Updated cycle time_reduction_on_valve_body_ih_Updated cycle time_reduction_on_valve_body_ih_
Updated cycle time_reduction_on_valve_body_ih_
Shalini Rai
 
GSI Internship Portfolio
GSI Internship PortfolioGSI Internship Portfolio
GSI Internship Portfolio
Nicole Ripperda
 

Ähnlich wie LEAN Setup Reduction (SMED) training for welding by JULIAN KALAC (11)

Six sigma - dmr tilt table - matthew hunt
Six sigma  - dmr tilt table - matthew huntSix sigma  - dmr tilt table - matthew hunt
Six sigma - dmr tilt table - matthew hunt
 
FINAL VIVA PRESENTATION (2012250023)
FINAL VIVA PRESENTATION (2012250023)FINAL VIVA PRESENTATION (2012250023)
FINAL VIVA PRESENTATION (2012250023)
 
Embedded Recipes 2017 - Understanding SCHED_DEADLINE - Steven Rostedt
Embedded Recipes 2017 - Understanding SCHED_DEADLINE -  Steven RostedtEmbedded Recipes 2017 - Understanding SCHED_DEADLINE -  Steven Rostedt
Embedded Recipes 2017 - Understanding SCHED_DEADLINE - Steven Rostedt
 
Emma maersk
Emma  maerskEmma  maersk
Emma maersk
 
REWORK Kaizen (2)
REWORK Kaizen (2)REWORK Kaizen (2)
REWORK Kaizen (2)
 
Work Process Analysis of 4-170 Pizoelectric accelerometer at CECVP Project W...
Work Process Analysis of  4-170 Pizoelectric accelerometer at CECVP Project W...Work Process Analysis of  4-170 Pizoelectric accelerometer at CECVP Project W...
Work Process Analysis of 4-170 Pizoelectric accelerometer at CECVP Project W...
 
F119 Analysis Recommendations.Pptx [Autosaved]
F119 Analysis Recommendations.Pptx [Autosaved]F119 Analysis Recommendations.Pptx [Autosaved]
F119 Analysis Recommendations.Pptx [Autosaved]
 
Syed salman abbas green belt nov15
Syed salman abbas green belt nov15Syed salman abbas green belt nov15
Syed salman abbas green belt nov15
 
Updated cycle time_reduction_on_valve_body_ih_
Updated cycle time_reduction_on_valve_body_ih_Updated cycle time_reduction_on_valve_body_ih_
Updated cycle time_reduction_on_valve_body_ih_
 
Gf lac m1600-3600_eng_0412
Gf lac m1600-3600_eng_0412Gf lac m1600-3600_eng_0412
Gf lac m1600-3600_eng_0412
 
GSI Internship Portfolio
GSI Internship PortfolioGSI Internship Portfolio
GSI Internship Portfolio
 

Mehr von Julian Kalac P.Eng

FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCH
FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCHFCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCH
FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCH
Julian Kalac P.Eng
 

Mehr von Julian Kalac P.Eng (20)

SIX SIGMA IMPROVES OEE performance from 20% to 39.1%
SIX SIGMA IMPROVES  OEE performance from 20% to 39.1%SIX SIGMA IMPROVES  OEE performance from 20% to 39.1%
SIX SIGMA IMPROVES OEE performance from 20% to 39.1%
 
VOLVO EATS RACK LEAN TRANSFORMATION by Julian Kalac, P.Eng
VOLVO EATS RACK LEAN TRANSFORMATION  by Julian Kalac, P.EngVOLVO EATS RACK LEAN TRANSFORMATION  by Julian Kalac, P.Eng
VOLVO EATS RACK LEAN TRANSFORMATION by Julian Kalac, P.Eng
 
Batch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous FlowBatch & Queue vs Lean Continuous Flow
Batch & Queue vs Lean Continuous Flow
 
Design for Six Sigma in Automotive
Design for Six Sigma in Automotive Design for Six Sigma in Automotive
Design for Six Sigma in Automotive
 
1000 Ton Transfer Press Risk Assessment
1000 Ton Transfer Press Risk Assessment 1000 Ton Transfer Press Risk Assessment
1000 Ton Transfer Press Risk Assessment
 
Lean logistics
Lean logisticsLean logistics
Lean logistics
 
PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS
PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS
PRE-START HEALTH SAFETY REVIEW REPORT of 1000 TON MECHANICAL TRANSFER PRESS
 
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER
1000 TON TRANSFER PRESS SAFE WORK PROCEDURE ;DIE SETUP/CHANGEOVER
 
Live wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedureLive wire testing lock out tag out safe work procedure
Live wire testing lock out tag out safe work procedure
 
Julian Kalac lean 6 sigma project list--2018
 Julian Kalac lean 6 sigma  project list--2018 Julian Kalac lean 6 sigma  project list--2018
Julian Kalac lean 6 sigma project list--2018
 
Machine Safeguarding with Lock Out Tag Out
Machine Safeguarding with Lock Out Tag OutMachine Safeguarding with Lock Out Tag Out
Machine Safeguarding with Lock Out Tag Out
 
Custom Lean Eyelet machine SOP with 5 min changeover
Custom Lean Eyelet machine SOP with 5 min changeoverCustom Lean Eyelet machine SOP with 5 min changeover
Custom Lean Eyelet machine SOP with 5 min changeover
 
MWV CONTROL VS SPEC
MWV CONTROL VS SPECMWV CONTROL VS SPEC
MWV CONTROL VS SPEC
 
FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCH
FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCHFCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCH
FCI AUTOMOTIVE 2005 FORD MINIVAN ABS-VSC LAUNCH
 
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
DESIGN FMEA TRAINING FOR LITENS AUTOMOTIVE
 
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
DFMEA DUE DILIGENCE TRAINING FOR LITENS AUTOMOTIVE
 
Process Capability shift over time
Process Capability shift over timeProcess Capability shift over time
Process Capability shift over time
 
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
 
Continuous improvement by Julian Kalac
Continuous improvement  by Julian KalacContinuous improvement  by Julian Kalac
Continuous improvement by Julian Kalac
 
The hidden factory by JULIAN KALAC
The hidden factory by JULIAN KALACThe hidden factory by JULIAN KALAC
The hidden factory by JULIAN KALAC
 

Kürzlich hochgeladen

Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
dharasingh5698
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 

Kürzlich hochgeladen (20)

Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Intro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdfIntro To Electric Vehicles PDF Notes.pdf
Intro To Electric Vehicles PDF Notes.pdf
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 

LEAN Setup Reduction (SMED) training for welding by JULIAN KALAC

  • 1. 1 ROBOT WELDING SETUP TIME REDUCTION TRAINING November 14, 2013 By Julian Kalac, P.Eng
  • 2. 2 Problem Statement & Objective Current setup time= 40min Standard Time= 15min Target setup Time < 5min
  • 3. 4 SMED (Single Minute Exchange Die) • Setup Time – Starts when last piece of previous job is complete; ends when first good piece of next job is complete • Internal set-up: While machine is shut-down – Strive to minimize this as process is not producing parts • External set-up: While machine is working – Prepare for set-up, get all tools/parts needed ready and beside the press before starting set-up
  • 4. 5 Seven rules for improving Setup 1. Setup improvement begins & ends with 6S. 2. Change Internal (on line) setup into External (off line) setup then improve any remaining internal changeover. 3. Find alternatives to bolts (they are too slow to get on & off). 4. If you have to use your hands make sure your feet stay put. 5. Don’t rely on special fine tuning skills. 6. Standardize all changeover operations. 7. Standards are standards / they are not flexible.
  • 5. 6 Internal Vs. External (cont’d) • Primary goal is to change all internal setups to external ones • Reduce length of internal setup if unable to convert to external • Reduce length of all external setups as well
  • 6. 7 Simple Suggestions • Analysis of setup procedures using videotapes • Use more people where available • Use offline time as maintenance time • Practice makes perfect
  • 7. 8 SMED Examples • Split thread bolts • Handles • Toggle clamps • U-shaped washers
  • 8. 9 Example Tools (cont’d) u-shaped washers Split thread bolts
  • 9. 10
  • 11. 12
  • 12. 13
  • 14. 15 The spring-loaded, one- handed clamp with quick- set, magnetic V-Pad. Quick and easy to use! Squeeze to open, set in position and turn to tighten. MagSpring Clamps
  • 17. 18 Robot 9 Set-Up Reduction Project Action Items 1-5S work station (label tools, screws, nuts & fixtures)-->Brent Nov 14 2-Fabricate welding fixture for 6/22 parts, --Andrey Nov 14 3-Program needed changes --> Earl To be scheduled 4-Redo Setup video same part after 5S --Brent/Julian--( to be sched) 5-Program all parts to run on both sides—Earl 9/22 parts ? 6-Implement a setup/downtime tracking sheet –Julian Nov 14 7-Implement a suggestion log for operators—Julian Nov 14 8-Etch in GRIDS onto the welding fixture—Brent Nov 14 9-Post “To Do List” at Robot 9 cell—Julian Nov 14 10-Decide if Air Gun or Air Rachet is more feasible—Earl—Nov 20 11- See if Robot cn position for Ream from the front side—Earl—Nov 20 12-Anti Spatter tank Earl –Nov 15 13-Colour Code the fixtures as per the setup sheet –Brent Nov 15
  • 18. 19 ROBOT 9 ZERO SETUP TIME PROJECT
  • 19. 20 Robot 9 Weld Cell Process Flow Process/Material Flow Step 1 Parts From Brake Press Step 2 Tacking Step 3 Robot 9 Step 4 Clean Part Step 5 Out to next operation Move the welded parts out ASAP
  • 20. Screw weld blocks onto fixture 10-15min why? WELD FIXTURE WHATS THE PROBLEM?
  • 21. 22 Screw length HERE IS THE PROBLEM
  • 22. HERE IS THE PROBLEM
  • 23. Robot 9 SetUp Time Reduction Current setup time= 40min Standard Time= 15min Target setup Time < 5min LAST UPDATED Item # Action Item Who Due Date Status Comments 1 5S work station (label tools, screws, nuts & fixtures) Brent 14-Nov Completed 2 Fabricate welding fixture for 6/22 parts, Andrey 14-Nov Completed 3 Program needed changes for new fixture Earl 21-Nov Open Critical for next step 4 Redo Setup video for BLUE GROUP (228/229 PARTS) Julian/Wayne/Carl 25-Nov Open Will have to do video with 5 Program all parts to run on both sides 9/22 parts ? Earl 30-Jan-14 Open 6 Implement a setup/downtime tracking sheet –Julian Nov Julian 14-Nov Completed 7 Implement a suggestion log for operators Julian 14-Nov Completed 8 Etch in GRIDS onto the welding fixture Brent 14-Nov OVERDUE 9 Post “To Do List” at Robot 9 cell Julian 14-Nov Completed 10 Decide if Air Gun or Air Rachet is more feasible Earl 20-Nov Open 11 See if Robot cn position for Ream from the front side Earl 20-Nov Open 12 Anti Spatter tank Earl Earl 21-Nov Open New hose ordered 13 Colour Code the fixtures as per the setup sheet Brent 19-Nov Overdue 40% completed 14 Next Job Board Earl 26-Nov Open 15 Complete SMED training Julian 15-Nov Completed 16 Separate External from Internal Set-Up action items (1st pass) Brent/Julian 18-Nov Completed SMED 1st Rev = Internal SetUp 38min > 18min 17 Develop a DRAFT Set-UP SOP Brent/Julian 26-Nov Open 40% completed. Need to validate new setup time 18 19 November 22, 2013
  • 26. 27 The spring- loaded, one- handed clamp with quick-set, magnetic V- Pad. Quick MagSpring Clamps OPTIONS
  • 31. 32
  • 32. 33
  • 33. 34 1/12/2016 Department Reference # Confirmed By Date Chapter Rev. PageIssuer Production manager Rivet Cell 7.2- Shadow Boards 111May 11, 2006Scheduler Cleaning Station Rags Shovel Straw Broom Cleaner Push Broom Colour coded cart used for storing riveting anvils, blocks for the fixture, and stands Stands Blocks Riveting Anvils Backing Blocks
  • 36. Robot 9 SMED SOP=ZERO SETUP TIME SIDE A CHANGEOVER step # Operation Est Time (min) 1 PREPARE NEXT WO MATERIAL 4 2 GET NEEDED FIXTURES/TOOLS/CLAMPS 3 3 UNLOAD LAST PARTS FROM SIDE 1 1 4 INSPECT AND TOUCH UP PARTS 2 5 TACK PARTS 2 (EXTERNAL SETUP) 6 TAKE DOWN FIXTURE FROM SIDE 1 4 BEING DONE 7 LOAD PARTS ONTO SIDE 1 1 WHILE ROBOT rUNNING 8 START WELDING SIDE 1 0 TOTAL TIME FOR SETUP= 16 WELD CYCLE STARTED = 8 T SETUP TIME CLOCK STARTS AFTER 8 MIN SIDE B CHANGEOVER EXTERNAL SETUP 7 TAKE DOWN FIXTURE FROM SIDE 2 5 INCLUDED IN 8 LOAD PARTS ONTO SIDE21 1 WELD CYCLE (8MIN) 9 START WELDING SIDE 2 0 TOTAL SETUP TIME SIDE B= 6 TOTAL INTERNAL SETUP TIME= 0 TOTAL EXTERNAL SETUP TIME= 12 OLD SETUP TIME (MIN)= 38 DEC 4 SETUP (MIN) = 0 SETUP TIME IMPROVEMENT (MIN) = -38 WHILE THE ROBOT IS WELDING SIDE B, LOST TIME=0 MIN GOAL IS TO CHANGE STATION A BEFORE ROBOT FINISHES WELDING SIDE B DURING WELD CYCLE (8MIN) THE FOLLOWING WAS DONE
  • 37. SET-UP PROCESS STEPS ORIGINAL SETUP TIME Min NEW SETUP TIME Min Set-up FIND TOOLS 7.5 1 - Clamp Adjustment 1 0 - Clamps 2.1 0 - Wrenching 2.3 0 - Finite Reaming (1 time) 2 0 - Spacers 1 0 - Find Jigs 5 1 - Tack 4 pcs. 1.2 1 Material Preperation 7 1 TOTAL SET-UP TIME 29.1 4 ROBOT 9 SMED 25 MIN Reduction
  • 38. Robot 9 SetUp Time Savings (228/229 parts) OLD SetUp Time for Robot 9 SetUp Time (Min) SetUp Time (Hrs) Number SetUps/Shift Total SetUp Time/Shift Total SetUp Time/Day SetUp Time/Week SetUp Time/Year Machine Rate Annual Lost Productivity 38 0.63 2 1.27 2.53 12.67 595.33 $ 100.00 $ 59,533.33 DEC 4TH SetUp Time for Robot 9= ZERO SETUP TIME SetUp Time (Min) SetUp Time (Hrs) Number SetUps/Shift Total SetUp Time/Shift Total SetUp Time/Day SetUp Time/Week SetUp Time/Year Machine Rate Annual Lost Productivity 5 0.08 2 0.17 0.33 1.67 78.33 $ 100.00 $ 7,833.33 Hrs Saved 517.00 $ 51,700.00ANNUAL SAVINGS =