SlideShare ist ein Scribd-Unternehmen logo
1 von 2
Jose Ramos
3530 Brookwood Dr.
La Porte, Texas 77571
832-707-0846
Jramos59@yahoo.com
Summary
Seasoned operations professional with more than 15 years in the chemical plant industry and 9 years in leading teams.
Assumed progressively responsible positions, leading and managing all aspects of chemical plant operations including rail
and truck loading and unloading, chemical operations including continuous and batch reactions, downstream processing,
distillation, filtration and drying operations. P roficient in all Microsoft Office products and daily create well written
documents such as Operating Instructions, Standard Operating Procedures, Check Lists, Lock Out and Tag Out Lists,
Shutdown Plans, etc. I exhibit strong leadership skills and motivate teams to excel through coaching, guidance and leading
by example. I take great pride in leading my team to excel meeting all short and long term goals established for the team.
The team performs in a professional manner, maintains safe work practices an d safe work areas as a paramount objective,
and accomplishes the tasks at hand correctly the first time.
Employment History
Sun Products Corp., Pasadena Texas 5/2012-Current
Day Operations Supervisor - Surfactants
Experienced leader in all aspects of producing Sulfur based Sulfonic Acids Surfactants. Also experienced in processing and
handling of hazardous materials consumed in or produced during this process including Sulfuric Acid, Hydrogen Peroxide,
Methanol, Ethanol and Caustic. Experienced in the production of amides and a variety of other specialty surfactants for
consumer goods and the oil industries.
Have extensive knowledge in falling film reactors , distillation columns, batch reactors, turbo tube dryers, air handling
systems, air drying and conversion of sulfur to SO2 and SO3 gas. Have extensive experience in dry material handling
systems, bucket elevators, rotary valves, vibrating screens and screw conveyors.
Day to day responsibilities include planning and scheduling product changeovers, raw material deliveries, coordinating
outbound shipments, managing of operations schedule, overtime, vacation absence coverage, etc. and planning day to day
activities for the Surfactants operating unit.
Instrumental in the design and implementation of the high performance work team concept at Sun Products in 2012 to 2015
time period.
In charge of Console/Board operation as well as training new operators on console.
Programmer/writer of all PLC logic and updates for the process control computers used throughout the facility.
Proficient in the writing or revisions to a ll SOP’S for our facility.
Proficient in the leading of Root Cause Analysis Investigations in all aspects of the process areas in the facility.
Typically plan and coordinate all major shutdowns with Maintenance team.
Worked with team to implement PSM at our facility.
Key player on getting our facility air permit together with EHS Dept.
Sun Products Corp., Pasadena Texas 5/2007-5/2012
Unit Lead – Surfactants
Led approximately 8 team members in all operations for the Surfactants production unit, including unit startup, continuous
operations and shutdown. Responsible for producing in -specification product at optimum production rates and achieving
the plant designed OEE rates.
Completed the current versions of the SOP’s for the Surfactants unit starting with the original OEM documentation and
applying the operating learning from 10 years of continuous production. Led efforts to review and signoff all SOP’s with a
cross functional team formed from engineering and production.
Increased OEE by taking part of a team to increase production rates by 20% from 2009-2010.
Implemented team to assist in increasing CPM from 52% to 59%in 2010-2011.
Tessenderlo Kerley Inc. Pasadena, Texas 10/2000-5/2007
Operations/Assistant Plant Manager
In charge of daily operations and reported directly to the plant manager.
Maintained daily inventory and oversaw any Ship or Barge Transfers that were done at our docking terminal.
Diagnosed and corrected problems accurately and promptly; interacted with the plant manager, maintenance manager,
equipment vendors, and maintenance contractors.
 Processes that I was involved with were H2S, NH3, Bi-Sulfites, Polysulfide’s, and Thiosulfates to name a few.
 Maintained training of all new operators entering o ur facilities.
Tessenderlo Kerley Inc Artesia, New Mexico 2/1999-10/2000
Maintaining chemical processes from refinery tail gas unit which supplied our facility with H2S.
Proficient in Sodium Hydrosulfide, Ammonium Sulfide, And Ammonium Polysulfide Solutions.
Involved in PSM’S and writing SOP’S
EDUCATION
Allen Bradley SLC -500 Training
Emergency Response Team with annual training in College Station
Rope Rescue Training
Hazmat Certified
PSM
KMS
Operational Discipline
HAZWOPER Certified
1st
Aid CPR Trained
AED Trained
SAP Training
Excel AND Word Proficient
QI Macros
SPC Charting
Six Sigma
KMS Training
Continued Education with San Jac College for Leadership and Management training
Lake Arthur High School, Lake Arthur, New Mexico Graduated 1997

Weitere ähnliche Inhalte

Was ist angesagt?

Parsed PD Susie Pfuderer Lange Resume 1
Parsed PD Susie Pfuderer Lange Resume 1Parsed PD Susie Pfuderer Lange Resume 1
Parsed PD Susie Pfuderer Lange Resume 1Susie Lange
 
Luis Leyva-Flores Plastics
Luis Leyva-Flores PlasticsLuis Leyva-Flores Plastics
Luis Leyva-Flores PlasticsLuis LeyvaFlores
 
Steve Fallon - Resume 5-2016
Steve Fallon - Resume 5-2016Steve Fallon - Resume 5-2016
Steve Fallon - Resume 5-2016Steve Fallon
 
Resume for Bobby Cathey
Resume for Bobby CatheyResume for Bobby Cathey
Resume for Bobby CatheyBobby Cathey
 
Asad Latest CV
Asad Latest CVAsad Latest CV
Asad Latest CVasad khan
 
resume_clement_linkedin-profile_senior-level
resume_clement_linkedin-profile_senior-levelresume_clement_linkedin-profile_senior-level
resume_clement_linkedin-profile_senior-levelclement amal
 
SEEKING FOR JOB WITH 5 YEARS PETROCHEMICAL INDUSTRIAL EXPERIENCE
SEEKING FOR JOB WITH 5 YEARS PETROCHEMICAL INDUSTRIAL EXPERIENCESEEKING FOR JOB WITH 5 YEARS PETROCHEMICAL INDUSTRIAL EXPERIENCE
SEEKING FOR JOB WITH 5 YEARS PETROCHEMICAL INDUSTRIAL EXPERIENCESEBTAIN ABID
 
Brochure_PME Construction DIGITAL
Brochure_PME Construction DIGITALBrochure_PME Construction DIGITAL
Brochure_PME Construction DIGITALJared Durand
 

Was ist angesagt? (20)

Patrick Rafferty 2016
Patrick Rafferty 2016Patrick Rafferty 2016
Patrick Rafferty 2016
 
Parsed PD Susie Pfuderer Lange Resume 1
Parsed PD Susie Pfuderer Lange Resume 1Parsed PD Susie Pfuderer Lange Resume 1
Parsed PD Susie Pfuderer Lange Resume 1
 
kamran 2016
kamran 2016kamran 2016
kamran 2016
 
Luis Leyva-Flores Plastics
Luis Leyva-Flores PlasticsLuis Leyva-Flores Plastics
Luis Leyva-Flores Plastics
 
MDHRESUME II
MDHRESUME IIMDHRESUME II
MDHRESUME II
 
Assume 15
Assume 15Assume 15
Assume 15
 
Steve Fallon - Resume 5-2016
Steve Fallon - Resume 5-2016Steve Fallon - Resume 5-2016
Steve Fallon - Resume 5-2016
 
Art's Resume
Art's ResumeArt's Resume
Art's Resume
 
final draft cv
final draft cvfinal draft cv
final draft cv
 
Resume for Bobby Cathey
Resume for Bobby CatheyResume for Bobby Cathey
Resume for Bobby Cathey
 
Asad Latest CV
Asad Latest CVAsad Latest CV
Asad Latest CV
 
Franco#12
Franco#12Franco#12
Franco#12
 
Resume
ResumeResume
Resume
 
resume_clement_linkedin-profile_senior-level
resume_clement_linkedin-profile_senior-levelresume_clement_linkedin-profile_senior-level
resume_clement_linkedin-profile_senior-level
 
CV_RF_English 2015
CV_RF_English 2015CV_RF_English 2015
CV_RF_English 2015
 
SANGWENI S Resume
SANGWENI S ResumeSANGWENI S Resume
SANGWENI S Resume
 
leonard-quigley-resume
leonard-quigley-resumeleonard-quigley-resume
leonard-quigley-resume
 
Cv rojalyn gilbuena 2019
Cv rojalyn gilbuena 2019Cv rojalyn gilbuena 2019
Cv rojalyn gilbuena 2019
 
SEEKING FOR JOB WITH 5 YEARS PETROCHEMICAL INDUSTRIAL EXPERIENCE
SEEKING FOR JOB WITH 5 YEARS PETROCHEMICAL INDUSTRIAL EXPERIENCESEEKING FOR JOB WITH 5 YEARS PETROCHEMICAL INDUSTRIAL EXPERIENCE
SEEKING FOR JOB WITH 5 YEARS PETROCHEMICAL INDUSTRIAL EXPERIENCE
 
Brochure_PME Construction DIGITAL
Brochure_PME Construction DIGITALBrochure_PME Construction DIGITAL
Brochure_PME Construction DIGITAL
 

Ähnlich wie Resume JR

BRENT TAYLOR10812
BRENT TAYLOR10812 BRENT TAYLOR10812
BRENT TAYLOR10812 taylor Brent
 
JITENDRA P DHOLE RESUME Updated 05042016
JITENDRA P DHOLE  RESUME Updated 05042016JITENDRA P DHOLE  RESUME Updated 05042016
JITENDRA P DHOLE RESUME Updated 05042016JITENDRA DHOLE
 
Adam Turner resume 2016 Word 97
Adam Turner resume 2016 Word 97Adam Turner resume 2016 Word 97
Adam Turner resume 2016 Word 97Adam Turner
 
Abdullah Al-Obaidi Resaume (updated) 5
Abdullah Al-Obaidi Resaume (updated) 5Abdullah Al-Obaidi Resaume (updated) 5
Abdullah Al-Obaidi Resaume (updated) 5Al Obaidi Abdullah
 
Abdullah Al-Obaidi Resaume (updated) 5
Abdullah Al-Obaidi Resaume (updated) 5Abdullah Al-Obaidi Resaume (updated) 5
Abdullah Al-Obaidi Resaume (updated) 5Al Obaidi Abdullah
 
Elrique Mckay - CV 2016
Elrique Mckay - CV 2016Elrique Mckay - CV 2016
Elrique Mckay - CV 2016McKay Elrique
 
new format CV format AR Le Grange
new format CV format AR Le Grangenew format CV format AR Le Grange
new format CV format AR Le Grangealec le grange
 
Ahmed M. Lajhar CV,UPDATED
Ahmed M. Lajhar CV,UPDATEDAhmed M. Lajhar CV,UPDATED
Ahmed M. Lajhar CV,UPDATEDahmedlajhar
 
debasish_das_ resume maaden
debasish_das_ resume maadendebasish_das_ resume maaden
debasish_das_ resume maadendebasish das
 
resume- Jase Parr
resume- Jase Parrresume- Jase Parr
resume- Jase ParrJase Parr
 
Hussam Maghrabi curriculum vitae1
Hussam Maghrabi curriculum vitae1Hussam Maghrabi curriculum vitae1
Hussam Maghrabi curriculum vitae1Hussam maghrabi
 
Wendell Spencer Resume Mar 2015
Wendell Spencer Resume Mar 2015Wendell Spencer Resume Mar 2015
Wendell Spencer Resume Mar 2015wendell spencer
 
Bruce Gee CV
Bruce Gee CVBruce Gee CV
Bruce Gee CVBruce Gee
 

Ähnlich wie Resume JR (20)

BRENT TAYLOR10812
BRENT TAYLOR10812 BRENT TAYLOR10812
BRENT TAYLOR10812
 
GSL_Resume
GSL_ResumeGSL_Resume
GSL_Resume
 
JITENDRA P DHOLE RESUME Updated 05042016
JITENDRA P DHOLE  RESUME Updated 05042016JITENDRA P DHOLE  RESUME Updated 05042016
JITENDRA P DHOLE RESUME Updated 05042016
 
Robert-Calderon (1)
Robert-Calderon (1)Robert-Calderon (1)
Robert-Calderon (1)
 
Adam Turner resume 2016 Word 97
Adam Turner resume 2016 Word 97Adam Turner resume 2016 Word 97
Adam Turner resume 2016 Word 97
 
Abdullah Al-Obaidi Resaume (updated) 5
Abdullah Al-Obaidi Resaume (updated) 5Abdullah Al-Obaidi Resaume (updated) 5
Abdullah Al-Obaidi Resaume (updated) 5
 
Abdullah Al-Obaidi Resaume (updated) 5
Abdullah Al-Obaidi Resaume (updated) 5Abdullah Al-Obaidi Resaume (updated) 5
Abdullah Al-Obaidi Resaume (updated) 5
 
Gattu Hari
Gattu HariGattu Hari
Gattu Hari
 
Elrique Mckay - CV 2016
Elrique Mckay - CV 2016Elrique Mckay - CV 2016
Elrique Mckay - CV 2016
 
new format CV format AR Le Grange
new format CV format AR Le Grangenew format CV format AR Le Grange
new format CV format AR Le Grange
 
Ahmed M. Lajhar CV,UPDATED
Ahmed M. Lajhar CV,UPDATEDAhmed M. Lajhar CV,UPDATED
Ahmed M. Lajhar CV,UPDATED
 
Circulem viate
Circulem viateCirculem viate
Circulem viate
 
LANDMARK AGENCY CAREER OPPORTUNITIES
LANDMARK AGENCY CAREER OPPORTUNITIESLANDMARK AGENCY CAREER OPPORTUNITIES
LANDMARK AGENCY CAREER OPPORTUNITIES
 
debasish_das_ resume maaden
debasish_das_ resume maadendebasish_das_ resume maaden
debasish_das_ resume maaden
 
resume- Jase Parr
resume- Jase Parrresume- Jase Parr
resume- Jase Parr
 
Hussam Maghrabi curriculum vitae1
Hussam Maghrabi curriculum vitae1Hussam Maghrabi curriculum vitae1
Hussam Maghrabi curriculum vitae1
 
Mahmood CV (2015)
Mahmood CV (2015)Mahmood CV (2015)
Mahmood CV (2015)
 
Wendell Spencer Resume Mar 2015
Wendell Spencer Resume Mar 2015Wendell Spencer Resume Mar 2015
Wendell Spencer Resume Mar 2015
 
Bruce Gee CV
Bruce Gee CVBruce Gee CV
Bruce Gee CV
 
Mr.Shamim CV
Mr.Shamim CVMr.Shamim CV
Mr.Shamim CV
 

Resume JR

  • 1. Jose Ramos 3530 Brookwood Dr. La Porte, Texas 77571 832-707-0846 Jramos59@yahoo.com Summary Seasoned operations professional with more than 15 years in the chemical plant industry and 9 years in leading teams. Assumed progressively responsible positions, leading and managing all aspects of chemical plant operations including rail and truck loading and unloading, chemical operations including continuous and batch reactions, downstream processing, distillation, filtration and drying operations. P roficient in all Microsoft Office products and daily create well written documents such as Operating Instructions, Standard Operating Procedures, Check Lists, Lock Out and Tag Out Lists, Shutdown Plans, etc. I exhibit strong leadership skills and motivate teams to excel through coaching, guidance and leading by example. I take great pride in leading my team to excel meeting all short and long term goals established for the team. The team performs in a professional manner, maintains safe work practices an d safe work areas as a paramount objective, and accomplishes the tasks at hand correctly the first time. Employment History Sun Products Corp., Pasadena Texas 5/2012-Current Day Operations Supervisor - Surfactants Experienced leader in all aspects of producing Sulfur based Sulfonic Acids Surfactants. Also experienced in processing and handling of hazardous materials consumed in or produced during this process including Sulfuric Acid, Hydrogen Peroxide, Methanol, Ethanol and Caustic. Experienced in the production of amides and a variety of other specialty surfactants for consumer goods and the oil industries. Have extensive knowledge in falling film reactors , distillation columns, batch reactors, turbo tube dryers, air handling systems, air drying and conversion of sulfur to SO2 and SO3 gas. Have extensive experience in dry material handling systems, bucket elevators, rotary valves, vibrating screens and screw conveyors. Day to day responsibilities include planning and scheduling product changeovers, raw material deliveries, coordinating outbound shipments, managing of operations schedule, overtime, vacation absence coverage, etc. and planning day to day activities for the Surfactants operating unit. Instrumental in the design and implementation of the high performance work team concept at Sun Products in 2012 to 2015 time period. In charge of Console/Board operation as well as training new operators on console. Programmer/writer of all PLC logic and updates for the process control computers used throughout the facility. Proficient in the writing or revisions to a ll SOP’S for our facility. Proficient in the leading of Root Cause Analysis Investigations in all aspects of the process areas in the facility. Typically plan and coordinate all major shutdowns with Maintenance team. Worked with team to implement PSM at our facility. Key player on getting our facility air permit together with EHS Dept. Sun Products Corp., Pasadena Texas 5/2007-5/2012 Unit Lead – Surfactants Led approximately 8 team members in all operations for the Surfactants production unit, including unit startup, continuous operations and shutdown. Responsible for producing in -specification product at optimum production rates and achieving the plant designed OEE rates. Completed the current versions of the SOP’s for the Surfactants unit starting with the original OEM documentation and applying the operating learning from 10 years of continuous production. Led efforts to review and signoff all SOP’s with a cross functional team formed from engineering and production. Increased OEE by taking part of a team to increase production rates by 20% from 2009-2010. Implemented team to assist in increasing CPM from 52% to 59%in 2010-2011.
  • 2. Tessenderlo Kerley Inc. Pasadena, Texas 10/2000-5/2007 Operations/Assistant Plant Manager In charge of daily operations and reported directly to the plant manager. Maintained daily inventory and oversaw any Ship or Barge Transfers that were done at our docking terminal. Diagnosed and corrected problems accurately and promptly; interacted with the plant manager, maintenance manager, equipment vendors, and maintenance contractors.  Processes that I was involved with were H2S, NH3, Bi-Sulfites, Polysulfide’s, and Thiosulfates to name a few.  Maintained training of all new operators entering o ur facilities. Tessenderlo Kerley Inc Artesia, New Mexico 2/1999-10/2000 Maintaining chemical processes from refinery tail gas unit which supplied our facility with H2S. Proficient in Sodium Hydrosulfide, Ammonium Sulfide, And Ammonium Polysulfide Solutions. Involved in PSM’S and writing SOP’S EDUCATION Allen Bradley SLC -500 Training Emergency Response Team with annual training in College Station Rope Rescue Training Hazmat Certified PSM KMS Operational Discipline HAZWOPER Certified 1st Aid CPR Trained AED Trained SAP Training Excel AND Word Proficient QI Macros SPC Charting Six Sigma KMS Training Continued Education with San Jac College for Leadership and Management training Lake Arthur High School, Lake Arthur, New Mexico Graduated 1997