Produced general arrangement drawings using Revit Architecture to produce a 3D building model of Sligo Nursing College. The model hosted all the relevant building information and drawings such as plans, sections, elevations details, 3D details and renders which are required to construct the building.
2. UP
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
C
11960825030750
973010685
17330865
7975
30185
D
1 2 3 4 5 6 7
8 9 10
1a 2a 3a 4a 5a 6a 7a 8a
9a
E
F
B
A
9b
SVP SVP
RWP
45 m²
Therapy Room
018
10 m²
Store
017
RWP
SVP
RWP
Gulley
Gulley
25 m²
Plant
012
19 m²
Clinical Technicians
Office
016
1540
9 m²
Comms.
014
10 m²
Prep.
018
70 m²
Clinical Skills Room I
007
RWP SVP
SVP
4 m²
Cleaners Store
009
10 m²
Enabling Bathroom
010
10 m²
Clinical Skills Bedroom
022
6 m²
Ass. Bath
005
RWP
RWP
RWP
19 m²
Female Toilet
021
3 m²
Male Toilet
019
5 m²
Assi. WC
020
79 m²
Nursing Corridor
011
Lift
5 m²
Submissions
026
55 m²
Lecture Theater
002
36 m²
Store
003
62 m²
Milling Space
001
108 m²
Student Center
004
RWP
SVP
RWP
RWP
A - A
SAC - 008
1
SAC - 009
1
SAC - 011
1
SAC - 010
G
013
G
009
G
008
G
007
G
021
G
005
G
017
G
018
G
019
G
014
G
006
G
016
G
004
F
022
G
024
G
002
G
012
G
015
G
WD-013
G
WD - 022
G
WD - 002
G
WD - 003
1000
1000
1565
1000
10001065
Screen
001
Screen
002
-
---
Sim
1
SAC - 012
Sim
-
---
Sim
-
---
Sim
2
SAC - 012
Sim
3
SAC - 012
Sim
-
---
Sim
-
---
Sim
5
SAC - 012
Sim
4
SAC - 012
Sim
71 m²
Clinical Skills Room II
008
26 m²
Clinical Skills Living
023
Vending Machines
18 m²
Stair Shaft
027
1042
900665 750
1500
1215
1955
1000 1000 1500
1000
1187
1000
1500
1521
1200
1100
3416
9800
1614
2073
4775
1000
1205
1580
1032912
1000
1000
665 1095
4707
685 685
1000
1000
1500
1459
FRM
025
3280 3800
5007
5007
5007
4982 2525
7975
5025 5000 5000 5000 5000 5025 8775 5775 5575
8300
6085
11482
BSc ARCHITECTURAL TECHNOLOGY
TITLE
NAME
DATE
SCALE
GROUP
DWG. NO
Jonathan Flanagan
Architectural Technology Year 4
26/05/15
Major Project in CAD4/BIM
26/05/201513:14:02
Ground Floor Plan
1:100
SAC_002
Door Schedule Ground Floor
Level Mark Height Width
01 Ground Floor Plan
01 Ground
Floor Plan
WD - 002 2030 950
01 Ground
Floor Plan
2030 950
01 Ground
Floor Plan
013 2063 1000
01 Ground
Floor Plan
009 2063 1065
01 Ground
Floor Plan
008 2063 1000
01 Ground
Floor Plan
007 2063 1000
01 Ground
Floor Plan
021 2063 1000
01 Ground
Floor Plan
005 2063 1500
01 Ground
Floor Plan
WD - 022 2290 1691
01 Ground
Floor Plan
WD - 003 2140 1657
01 Ground
Floor Plan
WD-002 2030 950
01 Ground
Floor Plan
2192 270
01 Ground
Floor Plan
017 2063 1000
01 Ground
Floor Plan
018 2063 1000
01 Ground
Floor Plan
019 2063 1000
01 Ground
Floor Plan
014 2063 1000
01 Ground
Floor Plan
WD-013 2192 838
01 Ground
Floor Plan
WD - 14 2192 1536
01 Ground
Floor Plan
0 0
01 Ground
Floor Plan
006 2063 1500
01 Ground
Floor Plan
016 2063 1000
01 Ground
Floor Plan
58 2110 775
01 Ground
Floor Plan
59 2110 775
01 Ground
Floor Plan
60 2110 775
01 Ground
Floor Plan
61 2110 775
01 Ground
Floor Plan
62 2110 775
01 Ground
Floor Plan
004 2063 1100
01 Ground
Floor Plan
022 2110 1521
01 Ground
Floor Plan
024 2063 1000
01 Ground
Floor Plan
002 2063 1200
01 Ground
Floor Plan
WD- 101 2140 1657
01 Ground
Floor Plan
012 2063 1500
01 Ground
Floor Plan
015 2063 1565
01 Ground
Floor Plan
110 2290 900
01 Ground
Floor Plan
027 2063 1215
01 Ground
Floor Plan
028 2063 1500
01 Ground Floor Plan: 36
Grand Total: 36
3. DN
UP
C
D
1 2 3 4 5 6 7
8 9 10
1a 2a 3a 4a 5a 6a 7a 8a
9a
E
F
B
A
9b
41 m²
40 Person Classroom
107
57 m²
Communications Lab I
109
44 m²
Communications Lab
II
110
15 m²
Male Toilet
111
22 m²
Female Toilet
114
4 m²
Cleaners Store
113
5 m²
Assi. WC
112
173 m²
Lecture Theatre
154
SVP SVP
RWP
RWP
SVP
RWP
RWP
SVP
RWP
RWP
RWP
RWP
RWP
Lift
Science Bench
Science
Bench
Science
Bench
Void to
below
9800
A - A
SAC - 008
1
SAC - 009
1
SAC - 011
1
SAC - 010
1
7 m²
Store / Photocopying
102
18 m²
Office
103
101 m²
Multi Media Laboratory
104
42 m²
40 Person Classroom
105
42 m²
40 Person Classroom
106
76 m²
Corridor
108
64 m²
Milling Space
101
21 m²
Stair Shaft
024
F
111
F
113
F
114
F
115
F
112
F
108
F
29
F
110
F
64
F
65
F
WD- 101
F
107
F
106
F
106
F
103
F
101F
102
F
104
F
109
F
100
1100mmHighWall
Entrance
Link Bridge
1500
100010001500
1521
10001000
1500100010001000
1215 1000
1000 1000 1000 1000
585
1300
720
900
1580
15001500
557557758775502550005000500050005025
8300
6085
3280 3800
5007
5007
5007
4982 2525
7975
11482
BSc ARCHITECTURAL TECHNOLOGY
TITLE
NAME
DATE
SCALE
GROUP
DWG. NO
Jonathan Flanagan
Architectural Technology Year 4
26/05/15
Major Project in CAD4/BIM
26/05/201513:14:19
First Floor Plan
1:100
SAC_003
Door Schedule First Floor
Level
Mar
k
Heig
ht
Widt
h
02 First Floor Plan
02 First
Floor Plan
111 2063 1000
02 First
Floor Plan
113 2063 1000
02 First
Floor Plan
114 2063 1000
02 First
Floor Plan
115 2063 1000
02 First
Floor Plan
112 2063 1000
02 First
Floor Plan
108 2063 1215
02 First
Floor Plan
29 2110 1521
02 First
Floor Plan
110 2063 1000
02 First
Floor Plan
64 2063 1500
02 First
Floor Plan
65 2063 1500
02 First
Floor Plan
66 2110 700
02 First
Floor Plan
67 2110 700
02 First
Floor Plan
68 2110 700
02 First
Floor Plan
69 2110 700
02 First
Floor Plan
70 2110 700
02 First
Floor Plan
71 2110 700
02 First
Floor Plan
72 2110 700
02 First
Floor Plan
73 2110 700
02 First
Floor Plan
74 2110 700
02 First
Floor Plan
107 2063 1000
02 First
Floor Plan
106 2063 1000
02 First
Floor Plan
106 2063 1000
02 First
Floor Plan
103 2063 1000
02 First
Floor Plan
101 2063 1000
02 First
Floor Plan
102 2063 1500
02 First
Floor Plan
104 2063 1500
02 First
Floor Plan
109 2063 1000
02 First
Floor Plan
112 2290 900
02 First
Floor Plan
100 2063 1500
02 First Floor Plan: 29
Grand Total: 29
4. C
D
1 2 3 4 5 6 7
8 9 10
1a 2a 3a 4a 5a 6a 7a 8a
9a
E
F
B
A
9b
Void
To
Below
Ladder Access To Lower Roof
With Mansafe For Ladder Fall
Arrest System As Per
Specification
RWP
SVP
RWP
RWP SVP
SVP
RWP
RWP
RWP
RWP
A - A
SAC - 008
1
SAC - 009
1
SAC - 011
21 m²
Teaching Resource 1
201 9 m²
Student Room I
203
9 m²
Student Room II
204
278 m²
Library
000
21 m²
Stair Shaft
024
16 m²
Control
000
16 m²
Photo Copy
206
38 m²
Office
207
27 m²
Reserve Store
208
26 m²
Room
202
32 m²
Room
205
10
Reading 10
Reading
20
Reading
19440
Volumes
Lift
S
201
S
206
S
S
200
S
203
S
202
S
207
S
204
S
205
1000
1000
10001000
10001215
1000
1000
900
6085
3280 3800
5007
5007
5007
4982 2525
7975
8775 5775 5575
11482
8300
502550005000500050005025
1540
18880
685
3450
BSc ARCHITECTURAL TECHNOLOGY
TITLE
NAME
DATE
SCALE
GROUP
DWG. NO
Jonathan Flanagan
Architectural Technology Year 4
26/05/15
Major Project in CAD4/BIM
26/05/201513:14:33
Second Floor Plan
1:100
SAC_004
Door Schedule Second Floor
Level Mark
Heig
ht
Widt
h
03 Second Floor Plan
03 Second
Floor Plan
201 206
3
1000
03 Second
Floor Plan
206 206
3
1000
03 Second
Floor Plan
242
0
950
03 Second
Floor Plan
200 206
3
1000
03 Second
Floor Plan
203 206
3
1000
03 Second
Floor Plan
202 206
3
1000
03 Second
Floor Plan
207 206
3
1215
03 Second
Floor Plan
204 206
3
1000
03 Second
Floor Plan
205 206
3
1000
03 Second
Floor Plan
111 229
0
900
03 Second
Floor Plan
WD -
014
03 Second Floor Plan: 11
Grand Total: 11
6. 01 Ground Floor Plan
4500
03 Second Floor Plan
12400
04 Roof Plan
16075
04 Parapet Level
16440
02 First Floor Plan
8450
12345678910
03.5 Parapet Level
13075
1
SAC - 009
1
SAC - 010
W-070
W-071
W-097
W-079
W-088
W-108
W-107
W-087
W-118
W-086W-084W-082W-080
W-095W-093W-091W-089
W-072 W-076W-075W-074W-073 W-077 W-078
W-081
W-090
W-083
W-092
W-085
W-094
W-117W-116W-115W-114W-113W-112W-111W-110
W-100
W-106W-105W-103W-102W-101W-099W-098
W-109
W-104W-096
01 Ground Floor Plan
4500
03 Second Floor Plan
12400
04 Roof Plan
16075
02 First Floor Plan
8450
1 2 3 4 5 6 7 8 9 10
00 Ground Level
3000
1
SAC - 009
1
SAC - 010
OPENING VENTS TO BE AUTOMATIC
OPENING IN THE EVENT OF SMOKE
BEING DETECTED. TOTAL AREA
PROVIDED: 4.64SQM
AOV LINKED INTO THE FIRE PANEL FOR
OPERATION BY THE FIRE BRIGADE.
TOTAL AREA PROVIDED: 8.24SQM
W-014 W-015 W-016 W-017
W-001 W-012W-010W-008W-006W-004W-003W-002
W-018 W-019 W-020 W-021 W-022 W-024 W-026 W-028
W-042 W-043 W-044 W-045 W-046 W-049 W-051 W-053
W-030 W-031 W-032 W-033 W-034 W-036 W-038 W-040
W-009
W-025
W-037
W-050
W-011
W-027
W-039
W-052
W-013
W-029
W-041
W-054
W-007
W-023
W-035
W-048
W-065 W-066 W-067 W-068 W-069W-055 W-056 W-057 W-058 W-059 W-060 W-061 W-062 W-063 W-064
BSc ARCHITECTURAL TECHNOLOGY
TITLE
NAME
DATE
SCALE
GROUP
DWG. NO
Jonathan Flanagan
Architectural Technology Year 4
26/05/15
Major Project in CAD4/BIM
26/05/201513:14:39
North Elevation
South Elevation 1:100
SAC_006
7. 01 Ground Floor Plan
4500
03 Second Floor Plan
12400
04 Roof Plan
16075
04 Parapet Level
16440
02 First Floor Plan
8450
CD
03.5 Parapet Level
13075
00 Ground Level
3000
W-134 W-135 W-136 W-137 W-139
W-133
01 Ground Floor Plan
4500
03 Second Floor Plan
12400
04 Roof Plan
16075
02 First Floor Plan
8450
C D
00 Ground Level
3000
W-122 W-123
W-124 W-125
W-131 W-132W-128 W-129 W-130
W-121
W-119 W-120
W-126 W-127
BSc ARCHITECTURAL TECHNOLOGY
TITLE
NAME
DATE
SCALE
GROUP
DWG. NO
Jonathan Flanagan
Architectural Technology Year 4
26/05/15
Major Project in CAD4/BIM
26/05/201513:14:44
East Elevation
West Elevation
1:100
SAC_007
8. 01 Ground Floor Plan
4500
03 Second Floor Plan
12400
04 Roof Plan
16075
02 First Floor Plan
8450
F A9b
01.1 GF Ceiling
7685
03.5 Parapet Level
13075
00 Ground Level
3000
1
SAC - 011
02.1 First Floor Plan Ceiling
11345
Second Floor Plan Ceiling
15495
00.1 Basement
275
101 m²
Multi Media Laboratory
104
15 m²
Male Toilet
111
10 m²
Clinical Skills Bedroom
022
6 m²
Ass. Bath
005
79 m²
Nursing Corridor
011
1
SAC - 014
Sim
5 m²
Assi. WC
112
32 m²
Room
205
278 m²
Library
000
-
---
Sim
2
SAC - 015
Sim
1
SAC - 015
Sim
3
SAC - 015
Sim
3095
28953115
BSc ARCHITECTURAL TECHNOLOGY
TITLE
NAME
DATE
SCALE
GROUP
DWG. NO
Jonathan Flanagan
Architectural Technology Year 4
26/05/15
Major Project in CAD4/BIM
26/05/201513:14:48
Section A-A
1:50
SAC_008
9. 01 Ground Floor Plan
4500
03 Second Floor Plan
12400
04 Roof Plan
16075
02 First Floor Plan
8450
CD
01.1 GF Ceiling
7685
03.5 Parapet Level
13075
00 Ground Level
3000
02.1 First Floor Plan Ceiling
11345
Second Floor Plan Ceiling
15495
250
Milling Space
001
Milling Space
101
Reserve Store
208
Office
207
Student Center
004
BSc ARCHITECTURAL TECHNOLOGY
TITLE
NAME
DATE
SCALE
GROUP
DWG. NO
Jonathan Flanagan
Architectural Technology Year 4
26/05/15
Major Project in CAD4/BIM
26/05/201513:14:50
Section B-B
1:50
SAC_009
10. 01 Ground Floor Plan
4500
C D
Theatre Ceiling
11400
Theatre Lower Ceiling
10850
Store
003
Student Center
004
Lecture Theatre
154
ACOUSTIC PANELLING TO 30% OF WALL
ELEVATION.
CAVITY WALL WITH BLOCK OUTER LEAF, 18MM
COLOURED RENDER.
50MM CAVITY WITH 60 THERMAWALL TW50
KINGSPAN OR SIMILAR APPROVED
215MM CONC BLOCK INNER LEAF WITH 12.5MM
PLASTER SKIM FINISH.
COPING:
POLYESTER POWDER COATED ALUMINIUM
COPING - SECRET FIXED ON INSULATED DPC
ON 100MM CONC. BLOCK ON SIDE.
COLOUR: TBC
FIXING IN ACCORDANCE WITH
MANUFACTURERS INSTRUCTIONS
GYPTONE QUATRO 20 600X600 ACOUSTIC
CEILING TILE WITH TEGULAR EDGE WITH MF
PLASTERBOARD PAINTED SURROUND.
ROOF:
IKO 4.5 MM CERAMIC COATED
ROCK GRANULAR CAP SHEET
IKO 3 MM UNDERLAY
IKO PROTECTORBOARD
TAPERED POLYISOCYANURATE INSULATION
IKO 2 MM STRUCTURAL SCREED TO ENGINEERS DETAIL
PRE-CAST STEPPED CONCRETE
LECTURE THEATRE FLOOR TO
ENGINEERS DETAILS.
PPC ALUMINIUM CURTAIN WALLING WITH
GLAZED OUTER PANELS AND CERAMIC
INSULATED INNER SPANDREL PANELS
WHERE INDICATED ON WINDOW SCHEDULE
1
SAC - 013
-
---
3
SAC - 014
3
SAC - 013
4
SAC - 013
BSc ARCHITECTURAL TECHNOLOGY
TITLE
NAME
DATE
SCALE
GROUP
DWG. NO
Jonathan Flanagan
Architectural Technology Year 4
26/05/15
Major Project in CAD4/BIM
26/05/201513:14:51
Section C-C
1:50
SAC_010
11. 01 Ground Floor Plan
4500
03 Second Floor Plan
12400
04 Roof Plan
16075
02 First Floor Plan
8450
1a 2a 3a 4a 5a 6a 7a 8a 9a
01.1 GF Ceiling
7685
00 Ground Level
3000
A - A
SAC - 008
02.1 First Floor Plan Ceiling
11345
Second Floor Plan Ceiling
15495
00.1 Basement
275
Roof:
IKO 4.5 mm ceramic coated
rock granular Cap Sheet
IKO 3 mm Underlay
IKO Protectorboard
Tapered Polyisocyanurate Insulation
IKO 2 mm Structural Screed to
Engineers Detail
278 m²
Library
000
173 m²
Lecture Theatre
154
5 m²
Submissions
026
62 m²
Milling Space
001
79 m²
Nursing Corridor
011
Cavity wall with block outer leaf,
18mm coloured render.
50mm cavity with 60 thermawall
TW50 Kingspan or similar approved
215mm conc block inner leaf with
12.5mm plaster skim finish.
COPING:
Polyester Powder Coated Aluminium Coping
-
Secret fixed on Insulated DPC on 100mm
Conc. block on side.
Colour: TBC
Fixing in accordance with manufacturers
instructions
COPING:
Polyester Powder Coated
Aluminium Coping - Secret
fixed on Insulated DPC on
100mm Conc. block on side.
Colour: TBC
Fixing in accordance with
manufacturers instructions
PPC aluminium curtain walling with glazed outer
panels and ceramic insulated inner spandrel
panels where indicated on window schedule
Corridor
108
Milling Space
101
BSc ARCHITECTURAL TECHNOLOGY
TITLE
NAME
DATE
SCALE
GROUP
DWG. NO
Jonathan Flanagan
Architectural Technology Year 4
26/05/15
Major Project in CAD4/BIM
26/05/201513:14:54
Section D-D
1:100
SAC_011
12. 400 x 400mm PRECAST CONCRETE COLUMN TO STRUCTURAL ENGINEERS DETAIL
15mm INTERNAL PLASTER
75mm KINGSPAN TW50 INSULATION BETWEEN 50 x 75mm BATTENS AT 400mm c/s
12mm WBP PLYWOOD DECKING
38 x 50mm TREATED SW BATTENS AT 400mm c/s
120 x 25mm WESTERN RED CEDAR CLADDING TO PROFILE INDICATED
120mm ROCKWOOL INSULATION TO ACHIEVE U-VALUE OF 0.27W/m2K
12mm WBP PLYWOOD DECKING
PPC VERTICAL PRESSING TO WINDOW SUBCONTRACTORS DESIGN AND DETAIL
WITH D.P.C. UNDERLAY
38 x 50mm TREATED SW BATTENS AT 400mm c/s
TYVEK HOUSEWRAP BREATHER MEMBRANE
120 x 25mm SHIPLAP-PROFILE WESTERN RED CEDAR CLADDING
ALUMINIUM CURTAING WALLING AS PER WINDOW SCHEDULE
EPDM MEMBRANE BEDDED IN MASTIC AND MECHANICALLY FIXED TO BUILDING FABRIC TO PROVIDE AIR SEAL
AIR LEAKAGE RATE TO BE NOT MORE THAN 10pa/m3/hr
150 x 50mm TREATED SW FRAMING
ALL JOINTS AND FIXINGS TO BE SEALED TO MANUFACTURERS INSTRUCTION
TYVEK HOUSEWRAP BREATHER MEMBRANE
ALL JOINTS AND FIXINGS TO BE SEALED TO MANUFACTURERS INSTRUCTION
10mm PLYWOOD GROUND
18mm MDF CILL WITH 10 x 10mm REBATE
EXPAMET FEATURE BEAD TO FORM SHADOW GAP
STEEL FRAME TO ENGINEERS DETAIL
HORIZONTAL TIMBER BATTENS (IN VIEW)
PPC ALUMINIUM FASCIA LAPPED OVER PRESSING
215mm CONCRETE SOLID BLOCKWORK
ALUMINIUM CURTAIN WALLING
AS PER WINDOW SCHEDULE
120 x 25mm WESTERN RED CEDAR CLADDING
TO PROFILE INDICATED
ALL FIXINGS TO BE BRASS OR STAINLESS STEEL
BREATHER MEMBRANE
12mm WBP PLYWOOD SHEETHING
75mm KINGSPAN TW55 INSULATION
BETWEEN 50 x 75mm HORIZONTAL BATTENS AT 400mm c/s
38 x 50mm TREATED SW BATTENS AT 400mm c/s
PPC VERTICAL PRESSING TO WINDOW
SUBCONTRACTORS DESIGN AND DETAIL
WITH D.P.C. UNDERLAY TO BE LAPPED OVER
BREATHER MEMBRANE
EPDM MEMBRANE FIXED
TO BUILDING FABRIC
TO PROVIDE AIR SEAL
WITH LEAKAGE RATE
NOT MORE THAN 10pa/m3/hr
TIMBER BATTENS 50x25 mm
EXPAMET STAINLESS STEEL ANGLE BEAD 506
VERTICAL D.P.C. EXTENDING NOT LESS THAN 50mm INTO CAVITY
25mm KINSPAN TW50 INSULATION
ALUMINIUM WINDOW
AS PER WINDOW SCHEDULE
15mm INTERNAL PLASTER
18mm MDF INTERNAL LINING WITH 10 x 10mm QUIRK
10mm PLYWOOD GROUND
EPDM MEMBRANE FIXED TO BUILDING
FABRIC
AIR LEAKAGE RATE TO BE NOT MORE
THAN 10pa/m3/hr
EXPAMET STAINLESS STEEL
ANGLE BEAD 506
VERTICAL D.P.C. EXTENDING NOT LESS THAN 50mm INTO CAVITY
25mm KINSPAN TW50 INSULATION
15mm INTERNAL PLASTER
215mm CONCRETE SOLID BLOCKWORK
60mm KINGSPAN TW50 INSULATION
TO GIVE OVERALL U-VALUE OF 0.27W/m2K
40mm CLEAR CAVITY
100mm CONCRETE SOLID BLOCKWORK
18mm SELF-FINISHED EXTERNAL RENDER
DOOR
AS PER SCHEDULE
18mm MDF INTERNAL LINING
WITH 10 x 10mm QUIRK
10mm PLYWOOD GROUND
EXPAMET STAINLESS STEEL
ANGLE BEAD 506
BSc ARCHITECTURAL TECHNOLOGY
TITLE
NAME
DATE
SCALE
GROUP
DWG. NO
Jonathan Flanagan
Architectural Technology Year 4
26/05/15
Major Project in CAD4/BIM
26/05/201513:14:55
1 : 5
000 T-8101
1
1 : 5
006 T-5004
2 1 : 5
007 T-5005
3
1 : 5
021 T-5015 .
4
1 : 5
022 T-5016 .
5
1:5
SAC_012
13. SECONDARY STEEL ANGLE TO
STRUCTURAL ENGINEERS DETAIL
ALUMINIUM CURTAIN WALLING AS
PER WINDOW SCHEDULE
'GYPROC MF' SUSPENDED CEILING
SYSTEM INSTALLED TO
MANUFACTURERS DETAILS.
70mm KINGSPAN KOOLTHERM K15
INSULATION TO ACHIEVE OVERALL
U-VALUE OF 0.27 W/m2K
GALVANISED STEEL ANGLE TO
STRUCTURAL ENGINEERS DETAIL
CONCRETE DOWNSTAND TO
STRUCTURAL ENGINEERS DETAIL
25mm KINGSPAN KOOLTHERM K15
INSULATION
EGLINTON TROWELTEX RENDER ON
10mm BLUCLAD BOARD ON RICHTER
SUSPENSION SYSTEM RS 9.2 TO
SPECIALIST SUBCONTRACTORS
DESIGN, DETAIL AND INSTALLATION
CRANKED FLASHING / D.P.C.
BAUDER GRP EDGE
TRIM IN DARK GREY
TREATED SW PLANKS
FIXED BY MAIN
CONTRACTOR
75mm KINGSPAN TW53
INSULATION WITH SELF-
FINISHED RENDER FINISH
BAUDER GREEN ROOF
D
SECRET FIXED PPC PRESSED ALUMINIUM
CAPPING RAL 7016 ON TYVEK 1060
BREATHER MEMBRANE BONDED TO 18MM
WBP PLYWOOD
TREATED SW GROUNDS
INNER BLOCKWORK FACE IN LINE WITH FACE
OF RC COLUMNS
35MM THERMAWALL TW53 ZERO ODP
INSULATION APPLIED ACCORDING TO MFRS.
INSTRUCTIONS
SELF FINISHED COLOURED RENDER
35MM THERMAWALL TW53 ZERO ODP
INSULATION APPLIED ACCORDING TO MFRS.
INSTRUCTIONS
BAUDER 30MM PIR FLATBOARD INSULATION
TO UPSTAND
BAUDER INSULATED FILLET PIECE
ROOF:
IKO 4.5 MM CERAMIC COATED
ROCK GRANULAR CAP SHEET
IKO 3 MM UNDERLAY
IKO PROTECTORBOARD
TAPERED POLYISOCYANURATE INSULATION
IKO 2 MM STRUCTURAL SCREED TO
ENGINEERS DETAIL
BSc ARCHITECTURAL TECHNOLOGY
TITLE
NAME
DATE
SCALE
GROUP
DWG. NO
Jonathan Flanagan
Architectural Technology Year 4
26/05/15
Major Project in CAD4/BIM
26/05/201513:14:59
1:5
SAC_013
1 : 5
C-C - Theatre Cantilever
1
1 : 5
C-C - Theatre Eaves
3
1 : 5
C-C - Theatre Parapet
4
14. TYVEK HOUSEWRAP BREATHER MEMBRANE
CONTINUOUS RADON MEMBRANE INSTALLED TO MANUFACTURERS INSTRUCTION
50mm SAND BLINDING
60MM KINGSPAN TF70 FLOOR INSULATION
TO ACHIEVE OVERALL U-VALUE OF 0.25 W/m2K
R.C. RETAINING WALL WITH WATERPROOF BITUMINOUS PAINT TO OUTER FACE
TO STRUCTURAL ENGINEERS DETAIL
INSECT SCREEN
75MM POWER-FLOATED CONCRETE SCREED
120 x 25MM HORIZONTAL BEVELLED T+G
WESTERN RED CEDDAR TIMBER CLADDING
38 x 50MM TREATED SW BATTENS
AT 40MM c/s (IN VIEW)
12MM WBP PLYWOOD SHEATHING
STEEL FRAMING TO STRUCTURAL ENGINEERS DETAIL (IN VIEW)
PRECAST CONCRETE COLUMN (IN VIEW)
TO STRUCTURAL ENGINEERS DETAIL
15mm INTERNAL PLASTER
100 x 18MM MDF SKIRTING BOARD
WITH EXPAMET BEAD OVER TO FORM SHADOW GAP
18MM RENDER
D.P.C. LAPPED OVER RADON MEMBRANE
POLYSAFE PRESTIGE VENYL FLOOR
12MM WBP PLYWOOD SHEETING
18MM RENDER
PERINSUL INSULATION BLOCK
150MM R.C. SLAB TO
STRUCTURAL ENGINEERS DETAIL
100MM ROCKWOOL INSULATION
TO ACHIEVE U-VALUE OF 0.27W/m2K
TIMBER BATTERNS ON FLATSTEEL
Selected finish on 75mm screed on
150mm Reinforced Conc. floor to
engineers details on
60mm Thermafloor TF70 by
Kinsgpan or similar approved on
Monarflex RMB400 radon barrier or
similar approved to manufacturers
specification and detail on blinded
well compacted hardcore to
engineers details.
120 x 25mm western red cedar
cladding on 2 layers 50 x 50mm SW
battens on 215mm conc blockwork
50mm cavity with 60mm thermawall
TW50 Kingspan or similar approved
215mm conc block inner leaf with
12.5mm plaster skim finish.
475
150613815 405 215 15
506015075
100
TYVEK HOUSEWRAP BREATHER MEMBRANE
120 x 25mm HORIZONTAL SHIPLAP-PROFILE
WESTERN RED CEDAR TIMBER CLADDING
38 x 50mm TREATED SW BATTENS
AT 400mm c/s (IN VIEW)
12mm WBP PLYWOOD SHEATHING
100 mm ROCKWOOL INSULATION
TO ACHIEVE U-VALUE OF 0.27W/m2K
PRECAST CONCRETE COLUMN (IN VIEW)
TO STRUCTURAL ENGINEERS DETAIL
15MM INTERNAL PLASTER
STEELFRAME
TO STRUCTURAL ENGINEERS DETAIL
18mm PLYWOOD DECKING
INTEGRAL ALUMINIUM CILL
TO WINDOW MANUFACTURERS DETAIL
ALUMINIUM CURTAIN WALLING
AS PER WINDOW SCHEDULE
140 x 18mm MDF CILL WITH 10 x 10mm REBATE
TOP OF BLOCKWORK +5.625
50mm TREATED SW GROUND
BREATHER MEMBRANE CARRIED UP CILL
TO ACT AS SEPARATING MEMBRANE
EPDM MEMBRANE FIXED TO BUILDING FABRIC
AIR LEAKAGE RATE TO BE NOT MORE THAN 10pa/m3/hr
TIMBER BATTENS ON FLATSTEEL
125 x 50mm WESTERN RED CEDAR LOUVRES SUPPORTED BY S.S. RODS
ALL STEEL AND CONNECTIONS TO STRUCTURAL ENGINEERS DETAIL
SEE DRAWING 05015-T-5044 FOR FURTHER DETAIL
1812
11812
25
95215
50
75mm KINGSPAN TW53 INSULATION
SELF FINISHED RENDER FINISH
AIR HANDLING UNIT
ON 50mm PAVING SLABS
ON 50mm EXTRUDED INSULATION /
STROZONE BEARING
LEAD/ METAL FLASHING
KINGSPAN TW53 INSULATION
50 X 75mm BATTENS WITH SONIC
INSULATION TO ALL VOIDS
IKO 4.5 mm CERAMIC COATED ROCK
GRANULAR CAPSHEET
IKO 3 mm UNDERLAY
IKO 3.2 mm PROTECTBOARD
POLYISOCYANURATE INSULATION
IKO 2 mm VAPOUR BARRIER
75 mm SCREED TO ENGINEERS DETAIL
BSc ARCHITECTURAL TECHNOLOGY
TITLE
NAME
DATE
SCALE
GROUP
DWG. NO
Jonathan Flanagan
Architectural Technology Year 4
26/05/15
Major Project in CAD4/BIM
26/05/201514:17:13
1 : 5
001 T-5001
1
1 : 5
010 T-5007
2
1:5
SAC_014
1 : 5
C-C - Theatre Air Unit Flat Roof
3
15. 75
PRECAST CONCRETE SLAB
TO STRUCTURAL ENGINEERS DETAIL
35mm KINGSPAN TW53 INSULATION
WITH SELF-FINISHED RENDER FINISH
120 x 25mm SHIPLAP-PROFILE
WESTERN RED CEDAR CLADDING
38 x 50mm TREATED SW BATTENS
AT 400mm c/s (IN VIEW)
BREATHER MEMBRANE
12mm WBP PLYWOOD SHEATHING
75 x 50mm TREATED
SW BATTENS AT 40mm c/s
75mm KINGSPAN TW55 INSULATION
TO GIVE OVERALL U-VALUE OF 0.27W/m2K
TREATED SW GROUNDS
50-100 mm GRAVEL COVERING TO ROOF FINISH
IKO 4 mm SMOOTH BASE SHEET
IKO 3 mm UNDERLAY
IKO PROTECTORBOARD
TAPERED POLYISOCYANURATE
INSULATION MIN. 125 mm
IKO 2 mm GLASSGUM
VAPOUR BARRIER
STRUCTURAL SCREED
PPC PRESSED ALUMINIUM CAPPING
ON TYVEK 1060 BREATHER MEMBRANE
BONDED TO 18MM WBP PLYWOOD
INSECT MESH
LEAD/ METAL FLASHING
15 215 3535 38
50
2563675
705
243286
28
541
26 75
min.150
STRUCTURAL SCREED
PRECAST CONCRETE SLAB TO STRUCTURAL ENGINEERS DETAIL
15mm INTERNAL PLASTER
18mm SELF-FINISHED
EXTERNAL RENDER
PERINSUL INSULATION BLOCK
50mm TREATED SW GROUND
140 x 18mm MDF CILL WITH 10 x 10mm QUIRK
INTEGRAL ALUMINIUM CILL
TO WINDOW MANUFACTURERS DETAIL
ROOF / 2nd FLOOR S.L. +12.325
2nd FLOOR F.F.L. +12.400
EPDM MEMBRANE FIXED TO BUILDING FABRIC
AIR LEAKAGE RATE TO BE NOT MORE THAN 10pa/m3/hr
IKO ROOF SYSTEM
LEAD FLASHING
GRAVEL COVERING TO ROOF FINISH
CENTRELINEOFSTEELCOLUMNS-GRIDLINEF
NOTE:
LINE OF EXTERNAL PARAPET CAPPING BY
ROOFER MITRES WITH ALUM WINDOW CILL
CRANKED FLASHING / D.P.C.
BAND BEAM TO STRUCTURAL
ENGINEERS DETAIL
15075
100
675
152156040100
25
335
450
675
738
18
12 103
203
ROOF:
IKO 4.5MM CERAMIC COATED
ROCK GRANULARCAP SHEET
IKO 3MM UNDERLAY
IKO PROTECTORBOARD
TAPERED POLYISOCYANURATE INSULATION
IKO 2MM STRUCTURAL SCREED TO ENGINEERS DETAIL
LIGHTWEIGHT STRUCTURAL SCREED TO STRUCTURAL ENGINEERS DETAIL
PRECAST CONCRETE SLAB TO STRUCTURAL ENGINEERS DETAIL
COPING:
POLYESTER POWDER COATED
ALUMINIUM
COPING - SECRET FIXED ON
INSULATED DPC ON 100MM CONC.
BLOCK ON SIDE.
COLOUR: TBC
FIXING IN ACCORDANCE WITH
MANUFACTURERS INSTRUCTIONS
70mm KINGSPAN KOOLTHERM K15 INSULATION
TO ACHIEVE OVERALL U-VALUE OF 0.27 W/m2K
EGLINTON TROWELTEX RENDER ON 10MM BLUCLAD BOARD
ON RICHTER SUSPENSION SYSTEM RS9.2 TO SPECIALIST
CONTRACTORS DESIGN, DETAIL AND INSTALLATION.
ALUMINIUM CURTAIN WALLING AS PER WINDOW SCHEDULE
BSc ARCHITECTURAL TECHNOLOGY
TITLE
NAME
DATE
SCALE
GROUP
DWG. NO
Jonathan Flanagan
Architectural Technology Year 4
26/05/15
Major Project in CAD4/BIM
26/05/201513:38:35
1 : 5
023 T-5017
1
1 : 5
024 T-5036
2
1 : 5
026 T-5019
3
1:5
SAC_015