Project Delivery Framework - PDF
 To create a common language that can be used across the entire firm for consistent project
interpretation and cross impact project collaboration.
 To provide foundational guidance for newly integrated units to incorporate major processes.
 To enable consistent financial reporting, compilation and aggregation of critical project reporting
and analysis.
 To enable more productive integration of cross-impact and firm-wide processes and tools.
 To enable more effective process development and integration.
 To enable more effective and accurate process analysis, measurement and improvement, in the
future.
 To enable more efficient mobility in the workforce to work in different projects with the same
common understanding and faster startup.

2
Phase Definitions
0.0
Concept

1.0 Initiation

2.0 Requirements

3.0 Design
Project

4.0
Build

5.0
Test

Management

6.0 Implementation

7.0 Project
Closure

Processes

The objective of each phase has been defined to ensure consistency in use of the
phase reference. E.g. When LOBs report a project is in the Requirements phase,
the same kinds of activity are in progress and expectation of the deliverables of that
phase are consistent.
More detailed specific processes will be defined at the LOB level to fit their
organizational construct and governance needs, as well as the firmwide process
requirements.

3
Phase 0.0 Concept
0.0
Concept

1.0 Initiation

2.0 Requirements

3.0 Design
Project

4.0
Build

5.0
Test

Management

6.0 Implementation

7.0 Project
Closure

Processes

•0.0 Concept:
To
 take the ideas and intentions of a group of people and evaluate them to determine if there is
business value for a project and converts them into a formal, planned project request
in a way that
 establishes a convincing business case (cost benefit / strategic need) for the project
 clearly and explicitly defines the business objectives and scope and provides supporting
documentation
 defines the high level business requirements for the project
 gains commitment and approval of the project from the appropriate level of senior management
so that
 a project request can be completed
 the initiation of project scoping and understanding of high level business requirements can
commence by partnering with technology
 project requests can be prioritized based on high level estimated business benefit.

4
Phase 1.0 Initiation
0.0
Concept

1.0
Initiation

2.0 Requirements

3.0 Design
Project

4.0
Build

5.0
Test

Management

6.0 Implementation

7.0 Project
Closure

Processes

1.0 Initiation:
To
 take a request for a project from the sponsor to define high level scope, plans and estimates
in a way that
 elaborates on the business case (cost benefit / strategic need) for the project
 clearly and explicitly defines the project objectives and scope
 defines a project organization structure which can be used to effectively manage and carry out
the necessary project work
 develops an high level schedule of milestone activities and resources required
 produces tangible measures of success for the product
 gains commitment and approval of the project from the appropriate level of senior management
so that
 a high level plan and refined business case estimate can be developed
 detailed requirements analysis and system design can commence
 the probability of producing a high quality product on budget and on schedule is maximized.
5
Phase 2.0 Requirements
0.0
Concept

1.0 Initiation

2.0
Requirements

3.0 Design
Project

4.0
Build

5.0
Test

Management

6.0 Implementation

7.0 Project
Closure

Processes

2.0 Requirements
To
 solicit, analyze and validate detail business, technology, and project requirements
 outline a conceptual “to be” process and architecture.
in a way that
 identifies new or modified business process or function requirements
 identifies existing problems that must be solved and constraints to the conceptual strategy
 identifies current system functions that must be retained or altered
so that
 detailed specifications to support product design or new business processes are created
 a high level conceptual solution strategy is defined.

6
Phase 3.0 Design
0.0
Concept

1.0 Initiation

2.0 Requirements

3.0
Design
Project

4.0
Build

5.0
Test

Management

6.0 Implementation

7.0 Project
Closure

Processes

3.0 Design:
To
 complete a detailed design that fulfills the specified requirements
in a way that
 elaborates on the business case (cost benefit / strategic need) for the project
 provides detailed specifications for product construction, software / hardware selection,
architecture, dependencies, testing, implementation and impacts
so that
 A detailed project plan, business case and estimates are committed to.
 a solution is defined that will provide detail specifications for product development, software
/ hardware selection and testing and implementation.

7
Phase 4.0 Build
0.0
Concept

1.0 Initiation

2.0 Requirements

3.0 Design
Project

4.0
Build

5.0
Test

Management

6.0 Implementation

7.0 Project
Closure

Processes

4.0 Build
To
 build all product components to comply with the requirements and design specifications
 meet required technology and risk controls
in a way that
 produces a functional prototype to demonstrate features and functions (optional)
 ensures the programs / modules compile and integrate
 ensures unit tests are completed and meet expected results
 provides effective test scripts for the testing phase
 enables flexibility for incorporating pilot results
 provides a training plan
so that
 the system is ready for system and user testing
 user documentation and training are ready
 test scripts are ready for test phase.
8
Phase 5.0 Test
0.0
Concept

1.0 Initiation

2.0 Requirements 3.0 Design
Project

4.0
Build
Management

5.0
Test

6.0 Implementation

7.0 Project
Closure

Processes

5.0 Test
To
 perform product testing across all affected applications using prepared test scripts
in a way that
 ensures requirements and design specifications have been met
 determines types and order of tests to be run
so that
 the complete working product is ready for user testing
 the product can be implemented using change management processes.
 stability can be ensured in the production environment

9
Phase 6.0 Implementation
0.0
Concept

1.0 Initiation

2.0 Requirements 3.0 Design
Project

4.0
Build

5.0 Test

Management

6.0
Implementation

7.0 Project
Closure

Processes

6.0 Implementation
To
 prepare for deployment by readying the technical, working and support environments
 validate final production support readiness
in a way that
 enables the end user to utilize the product effectively
 defines tactics to resolve issues that might arise upon implementation
so that
 there is a smooth transition into the production environment and processes
 the product meets strategic results and provides value to the user.

10
Phase 7.0 Project Closure
0.0
Concept

1.0 Initiation

2.0 Requirements 3.0 Design
Project

4.0
Build

5.0 Test

Management

6.0 Implementation

7.0 Project
Closure

Processes

7.0 Project Closure
To
 formally evaluate project processes and close out the project
in a way that
 establishes mechanisms for the continued development or improvement of the final product
 improves the standard process for this type of project
 enhances the estimating model for this type of project
so that
 project resources can be re-deployed
 processes can be continuously improved for more effective project management in the future.

11
Phase Project Management Processes
0.0
Concept

1.0 Initiation

2.0 Requirements 3.0 Design

Project

4.0
Build

5.0 Test

Management

6.0 Implementation

7.0 Project
Closure

Processes

Project Management Processes (continuous throughout the life cycle)

To
 ensure project success by applying effective project management methodologies and
practices
in a way that
 enables effective project progress monitoring and control
 establishes regular checkpoints involving the project team and formal reviews
 controls the quality of products in the project
 manages change and risk to the project
 addresses and tracks issues that arise during the course of the project
so that
 the project is delivered to the satisfaction of the requestor
 requirements and changes are managed and controlled throughout the project.

12

Weitere ähnliche Inhalte

Was ist angesagt?

Introduction-to-project-management
Introduction-to-project-managementIntroduction-to-project-management
Introduction-to-project-managementSavaş Şakar
 
International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...
International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...
International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...Stefan Ondek, PMP, CSPM
 
PMO Presentation
PMO PresentationPMO Presentation
PMO PresentationTURKI , PMP
 
Introduction of Project management ppt
Introduction of Project management pptIntroduction of Project management ppt
Introduction of Project management pptSourabh Kumar
 
Scaling Agile in Regulated Environments: Addressing the Challenges of Complia...
Scaling Agile in Regulated Environments: Addressing the Challenges of Complia...Scaling Agile in Regulated Environments: Addressing the Challenges of Complia...
Scaling Agile in Regulated Environments: Addressing the Challenges of Complia...Cprime
 
PMP Course Presentation.pptx
PMP Course Presentation.pptxPMP Course Presentation.pptx
PMP Course Presentation.pptxKareemBullard1
 
Project Scope Management,PMP Chapter 5,PMBOK,PMP Exam Preparation training
Project Scope Management,PMP Chapter 5,PMBOK,PMP Exam Preparation trainingProject Scope Management,PMP Chapter 5,PMBOK,PMP Exam Preparation training
Project Scope Management,PMP Chapter 5,PMBOK,PMP Exam Preparation trainingJustAcademy
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project ManagementKris Kimmerle
 
Project management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areasProject management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areasMazen Zbib
 
Introduction to PMP Brief Presentation
Introduction to PMP Brief PresentationIntroduction to PMP Brief Presentation
Introduction to PMP Brief Presentationjamilireifij
 
SAFe® - scaled agile framework in practice
SAFe® - scaled agile framework in practiceSAFe® - scaled agile framework in practice
SAFe® - scaled agile framework in practiceIntland Software GmbH
 
Scaled Agile Framework (SAFe) Roles and Meetings
Scaled Agile Framework (SAFe) Roles and MeetingsScaled Agile Framework (SAFe) Roles and Meetings
Scaled Agile Framework (SAFe) Roles and MeetingsRob Betcher
 
The Future of Microsoft Project Portfolio Management (PPM) for Delivering Val...
The Future of Microsoft Project Portfolio Management (PPM) for Delivering Val...The Future of Microsoft Project Portfolio Management (PPM) for Delivering Val...
The Future of Microsoft Project Portfolio Management (PPM) for Delivering Val...OnePlan Solutions
 
Integrating Automated Testing into DevOps
Integrating Automated Testing into DevOpsIntegrating Automated Testing into DevOps
Integrating Automated Testing into DevOpsTechWell
 
Project management methodologies and planning
Project management methodologies and planningProject management methodologies and planning
Project management methodologies and planningDebashis Paul
 

Was ist angesagt? (20)

Introduction-to-project-management
Introduction-to-project-managementIntroduction-to-project-management
Introduction-to-project-management
 
International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...
International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...
International Project Management Standards - PRINCE2, PMI & Co. And Their Ben...
 
PMO Presentation
PMO PresentationPMO Presentation
PMO Presentation
 
Introduction of Project management ppt
Introduction of Project management pptIntroduction of Project management ppt
Introduction of Project management ppt
 
P3O.pdf
P3O.pdfP3O.pdf
P3O.pdf
 
Scaling Agile in Regulated Environments: Addressing the Challenges of Complia...
Scaling Agile in Regulated Environments: Addressing the Challenges of Complia...Scaling Agile in Regulated Environments: Addressing the Challenges of Complia...
Scaling Agile in Regulated Environments: Addressing the Challenges of Complia...
 
PMP Course Presentation.pptx
PMP Course Presentation.pptxPMP Course Presentation.pptx
PMP Course Presentation.pptx
 
Project Scope Management,PMP Chapter 5,PMBOK,PMP Exam Preparation training
Project Scope Management,PMP Chapter 5,PMBOK,PMP Exam Preparation trainingProject Scope Management,PMP Chapter 5,PMBOK,PMP Exam Preparation training
Project Scope Management,PMP Chapter 5,PMBOK,PMP Exam Preparation training
 
Project governance
Project governanceProject governance
Project governance
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
 
Project management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areasProject management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areas
 
Introduction to PMP Brief Presentation
Introduction to PMP Brief PresentationIntroduction to PMP Brief Presentation
Introduction to PMP Brief Presentation
 
Project management
Project managementProject management
Project management
 
SAFe® - scaled agile framework in practice
SAFe® - scaled agile framework in practiceSAFe® - scaled agile framework in practice
SAFe® - scaled agile framework in practice
 
Scaled Agile Framework (SAFe) Roles and Meetings
Scaled Agile Framework (SAFe) Roles and MeetingsScaled Agile Framework (SAFe) Roles and Meetings
Scaled Agile Framework (SAFe) Roles and Meetings
 
AXELOS - MoV® - Management of Value - Foundation
AXELOS - MoV® - Management of Value - FoundationAXELOS - MoV® - Management of Value - Foundation
AXELOS - MoV® - Management of Value - Foundation
 
The Future of Microsoft Project Portfolio Management (PPM) for Delivering Val...
The Future of Microsoft Project Portfolio Management (PPM) for Delivering Val...The Future of Microsoft Project Portfolio Management (PPM) for Delivering Val...
The Future of Microsoft Project Portfolio Management (PPM) for Delivering Val...
 
Integrating Automated Testing into DevOps
Integrating Automated Testing into DevOpsIntegrating Automated Testing into DevOps
Integrating Automated Testing into DevOps
 
Pmp cost chapter 7
Pmp cost chapter 7Pmp cost chapter 7
Pmp cost chapter 7
 
Project management methodologies and planning
Project management methodologies and planningProject management methodologies and planning
Project management methodologies and planning
 

Andere mochten auch

Project delivery, what good looks like
Project delivery, what good looks likeProject delivery, what good looks like
Project delivery, what good looks likeMatthew Rees
 
Project Delivery Methods
Project Delivery MethodsProject Delivery Methods
Project Delivery MethodsStacy Abernathy
 
Project Management Office (PMO)
Project Management Office (PMO)Project Management Office (PMO)
Project Management Office (PMO)Anand Subramaniam
 
A Proven Process & Framework to Manage Your Change Project
A Proven Process & Framework to Manage Your Change ProjectA Proven Process & Framework to Manage Your Change Project
A Proven Process & Framework to Manage Your Change ProjectDon Cook
 
A Proven Process & Framework to Manage Your Change Project
A Proven Process & Framework to Manage Your Change ProjectA Proven Process & Framework to Manage Your Change Project
A Proven Process & Framework to Manage Your Change ProjectDon Cook
 
Flawless Project Delivery
Flawless Project DeliveryFlawless Project Delivery
Flawless Project DeliveryKen Ede
 
Case Study - Project Management
Case Study - Project Management Case Study - Project Management
Case Study - Project Management Jimmy Horn
 
100 Day Plan for Directing a PMO
100 Day Plan for Directing a PMO100 Day Plan for Directing a PMO
100 Day Plan for Directing a PMOJack Brown
 
Discover how agile can enhance your organization’s project delivery
Discover how agile can enhance your organization’s project deliveryDiscover how agile can enhance your organization’s project delivery
Discover how agile can enhance your organization’s project deliveryAXELOS Global Best Practice
 
Use Of I.T. In Agriculture
Use Of I.T. In AgricultureUse Of I.T. In Agriculture
Use Of I.T. In AgriculturePARTH THAKAR
 

Andere mochten auch (12)

Project delivery, what good looks like
Project delivery, what good looks likeProject delivery, what good looks like
Project delivery, what good looks like
 
Project Delivery Methods
Project Delivery MethodsProject Delivery Methods
Project Delivery Methods
 
Project Management Office (PMO)
Project Management Office (PMO)Project Management Office (PMO)
Project Management Office (PMO)
 
A Proven Process & Framework to Manage Your Change Project
A Proven Process & Framework to Manage Your Change ProjectA Proven Process & Framework to Manage Your Change Project
A Proven Process & Framework to Manage Your Change Project
 
A Proven Process & Framework to Manage Your Change Project
A Proven Process & Framework to Manage Your Change ProjectA Proven Process & Framework to Manage Your Change Project
A Proven Process & Framework to Manage Your Change Project
 
Flawless Project Delivery
Flawless Project DeliveryFlawless Project Delivery
Flawless Project Delivery
 
Case Study - Project Management
Case Study - Project Management Case Study - Project Management
Case Study - Project Management
 
Project Implementation
Project ImplementationProject Implementation
Project Implementation
 
100 Day Plan for Directing a PMO
100 Day Plan for Directing a PMO100 Day Plan for Directing a PMO
100 Day Plan for Directing a PMO
 
Discover how agile can enhance your organization’s project delivery
Discover how agile can enhance your organization’s project deliveryDiscover how agile can enhance your organization’s project delivery
Discover how agile can enhance your organization’s project delivery
 
Prince2 Methodology
Prince2 MethodologyPrince2 Methodology
Prince2 Methodology
 
Use Of I.T. In Agriculture
Use Of I.T. In AgricultureUse Of I.T. In Agriculture
Use Of I.T. In Agriculture
 

Ähnlich wie Project Delivery Framework Guide

2.05 scope management 1
2.05 scope management 12.05 scope management 1
2.05 scope management 1reddvise
 
Ray Business Technologies Process Methodology
Ray Business Technologies Process MethodologyRay Business Technologies Process Methodology
Ray Business Technologies Process Methodologyray biztech
 
Plan_QualityManagement
Plan_QualityManagementPlan_QualityManagement
Plan_QualityManagementFahad Saleem
 
Corporate project management model
Corporate project management modelCorporate project management model
Corporate project management modelLatte Media
 
PMP Training - 04 project integration management
PMP Training - 04 project integration managementPMP Training - 04 project integration management
PMP Training - 04 project integration managementejlp12
 
2013 Project Management Institute. A Guide To The Project Management Body Of ...
2013 Project Management Institute. A Guide To The Project Management Body Of ...2013 Project Management Institute. A Guide To The Project Management Body Of ...
2013 Project Management Institute. A Guide To The Project Management Body Of ...Arlene Smith
 
Lec 08 project scope_management
Lec 08 project scope_managementLec 08 project scope_management
Lec 08 project scope_managementSAJID ALI RUK
 
Project Management for IT-related Projects (Logitrain)
Project Management for IT-related Projects (Logitrain)Project Management for IT-related Projects (Logitrain)
Project Management for IT-related Projects (Logitrain)Logitrain: New Zealand
 
Pmp chapter(5) Scope Management
Pmp chapter(5) Scope ManagementPmp chapter(5) Scope Management
Pmp chapter(5) Scope ManagementHisham Ali,PMP
 
DevOps Implementation for Applications Solution - Datasheet
DevOps Implementation for Applications Solution - DatasheetDevOps Implementation for Applications Solution - Datasheet
DevOps Implementation for Applications Solution - DatasheetTodd Erskine
 
Project Management Plan Templatewww.ProjectManagementDocs.com.docx
Project Management Plan Templatewww.ProjectManagementDocs.com.docxProject Management Plan Templatewww.ProjectManagementDocs.com.docx
Project Management Plan Templatewww.ProjectManagementDocs.com.docxwkyra78
 
Presentation by beebejan valiyakath
Presentation by beebejan valiyakathPresentation by beebejan valiyakath
Presentation by beebejan valiyakathPMI_IREP_TP
 
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
Project Management Cycle and  MS Project 2013  By Subodh Kumar PMPProject Management Cycle and  MS Project 2013  By Subodh Kumar PMP
Project Management Cycle and MS Project 2013 By Subodh Kumar PMPSubodh Kumar
 
2.1 integration management
2.1 integration management2.1 integration management
2.1 integration managementIrefuser1
 
Fixed Price Distributed Agile Projects
Fixed Price Distributed Agile ProjectsFixed Price Distributed Agile Projects
Fixed Price Distributed Agile ProjectsRaja Bavani
 
Dev ops I Best Practices I NuggetHub
Dev ops I Best Practices I NuggetHubDev ops I Best Practices I NuggetHub
Dev ops I Best Practices I NuggetHubRichardNowack
 

Ähnlich wie Project Delivery Framework Guide (20)

2.05 scope management 1
2.05 scope management 12.05 scope management 1
2.05 scope management 1
 
Ray Business Technologies Process Methodology
Ray Business Technologies Process MethodologyRay Business Technologies Process Methodology
Ray Business Technologies Process Methodology
 
Plan_QualityManagement
Plan_QualityManagementPlan_QualityManagement
Plan_QualityManagement
 
Corporate project management model
Corporate project management modelCorporate project management model
Corporate project management model
 
PMP Training - 04 project integration management
PMP Training - 04 project integration managementPMP Training - 04 project integration management
PMP Training - 04 project integration management
 
2013 Project Management Institute. A Guide To The Project Management Body Of ...
2013 Project Management Institute. A Guide To The Project Management Body Of ...2013 Project Management Institute. A Guide To The Project Management Body Of ...
2013 Project Management Institute. A Guide To The Project Management Body Of ...
 
Lec 08 project scope_management
Lec 08 project scope_managementLec 08 project scope_management
Lec 08 project scope_management
 
Project Management for IT-related Projects (Logitrain)
Project Management for IT-related Projects (Logitrain)Project Management for IT-related Projects (Logitrain)
Project Management for IT-related Projects (Logitrain)
 
PMP PMBok 5th ch 5 scope management
PMP PMBok 5th ch 5 scope managementPMP PMBok 5th ch 5 scope management
PMP PMBok 5th ch 5 scope management
 
Pmp chapter(5) Scope Management
Pmp chapter(5) Scope ManagementPmp chapter(5) Scope Management
Pmp chapter(5) Scope Management
 
Prince I Iand Babok Ver1 0
Prince I Iand Babok Ver1 0Prince I Iand Babok Ver1 0
Prince I Iand Babok Ver1 0
 
DevOps Implementation for Applications Solution - Datasheet
DevOps Implementation for Applications Solution - DatasheetDevOps Implementation for Applications Solution - Datasheet
DevOps Implementation for Applications Solution - Datasheet
 
Project Management Plan Templatewww.ProjectManagementDocs.com.docx
Project Management Plan Templatewww.ProjectManagementDocs.com.docxProject Management Plan Templatewww.ProjectManagementDocs.com.docx
Project Management Plan Templatewww.ProjectManagementDocs.com.docx
 
Presentation by beebejan valiyakath
Presentation by beebejan valiyakathPresentation by beebejan valiyakath
Presentation by beebejan valiyakath
 
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
Project Management Cycle and  MS Project 2013  By Subodh Kumar PMPProject Management Cycle and  MS Project 2013  By Subodh Kumar PMP
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
 
IT Operations and Maintenance
IT Operations and MaintenanceIT Operations and Maintenance
IT Operations and Maintenance
 
2.1 integration management
2.1 integration management2.1 integration management
2.1 integration management
 
Entra lecture6 PM1.pdf
Entra lecture6 PM1.pdfEntra lecture6 PM1.pdf
Entra lecture6 PM1.pdf
 
Fixed Price Distributed Agile Projects
Fixed Price Distributed Agile ProjectsFixed Price Distributed Agile Projects
Fixed Price Distributed Agile Projects
 
Dev ops I Best Practices I NuggetHub
Dev ops I Best Practices I NuggetHubDev ops I Best Practices I NuggetHub
Dev ops I Best Practices I NuggetHub
 

Mehr von John Napier

JP Morgan Remote to Core Implementation
JP Morgan Remote to Core ImplementationJP Morgan Remote to Core Implementation
JP Morgan Remote to Core ImplementationJohn Napier
 
JP Morgan North American Remote to Core Justification
JP Morgan North American Remote to Core JustificationJP Morgan North American Remote to Core Justification
JP Morgan North American Remote to Core JustificationJohn Napier
 
John Napier PMP, CSM Infrastructure Migration Projects
John Napier PMP, CSM Infrastructure Migration ProjectsJohn Napier PMP, CSM Infrastructure Migration Projects
John Napier PMP, CSM Infrastructure Migration ProjectsJohn Napier
 
Information security trends and concerns
Information security trends and concernsInformation security trends and concerns
Information security trends and concernsJohn Napier
 
American Electric Power Ercot kickoff
American Electric Power Ercot kickoffAmerican Electric Power Ercot kickoff
American Electric Power Ercot kickoffJohn Napier
 
JP Morgan Data Center Technology Town Hall 2008
JP Morgan Data Center Technology Town Hall 2008JP Morgan Data Center Technology Town Hall 2008
JP Morgan Data Center Technology Town Hall 2008John Napier
 
Bio nano elements of early stage valuation and value growth
Bio nano elements of early stage valuation and value growthBio nano elements of early stage valuation and value growth
Bio nano elements of early stage valuation and value growthJohn Napier
 
Lurie children’s hospital opening day
Lurie children’s hospital opening dayLurie children’s hospital opening day
Lurie children’s hospital opening dayJohn Napier
 

Mehr von John Napier (8)

JP Morgan Remote to Core Implementation
JP Morgan Remote to Core ImplementationJP Morgan Remote to Core Implementation
JP Morgan Remote to Core Implementation
 
JP Morgan North American Remote to Core Justification
JP Morgan North American Remote to Core JustificationJP Morgan North American Remote to Core Justification
JP Morgan North American Remote to Core Justification
 
John Napier PMP, CSM Infrastructure Migration Projects
John Napier PMP, CSM Infrastructure Migration ProjectsJohn Napier PMP, CSM Infrastructure Migration Projects
John Napier PMP, CSM Infrastructure Migration Projects
 
Information security trends and concerns
Information security trends and concernsInformation security trends and concerns
Information security trends and concerns
 
American Electric Power Ercot kickoff
American Electric Power Ercot kickoffAmerican Electric Power Ercot kickoff
American Electric Power Ercot kickoff
 
JP Morgan Data Center Technology Town Hall 2008
JP Morgan Data Center Technology Town Hall 2008JP Morgan Data Center Technology Town Hall 2008
JP Morgan Data Center Technology Town Hall 2008
 
Bio nano elements of early stage valuation and value growth
Bio nano elements of early stage valuation and value growthBio nano elements of early stage valuation and value growth
Bio nano elements of early stage valuation and value growth
 
Lurie children’s hospital opening day
Lurie children’s hospital opening dayLurie children’s hospital opening day
Lurie children’s hospital opening day
 

Kürzlich hochgeladen

DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piececharlottematthew16
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxhariprasad279825
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Enterprise Knowledge
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Manik S Magar
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 
The Future of Software Development - Devin AI Innovative Approach.pdf
The Future of Software Development - Devin AI Innovative Approach.pdfThe Future of Software Development - Devin AI Innovative Approach.pdf
The Future of Software Development - Devin AI Innovative Approach.pdfSeasiaInfotech2
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clashcharlottematthew16
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024The Digital Insurer
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Wonjun Hwang
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 

Kürzlich hochgeladen (20)

DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piece
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptx
 
Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024Designing IA for AI - Information Architecture Conference 2024
Designing IA for AI - Information Architecture Conference 2024
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 
The Future of Software Development - Devin AI Innovative Approach.pdf
The Future of Software Development - Devin AI Innovative Approach.pdfThe Future of Software Development - Devin AI Innovative Approach.pdf
The Future of Software Development - Devin AI Innovative Approach.pdf
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clash
 
My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024My INSURER PTE LTD - Insurtech Innovation Award 2024
My INSURER PTE LTD - Insurtech Innovation Award 2024
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 

Project Delivery Framework Guide

  • 2. Project Delivery Framework - PDF  To create a common language that can be used across the entire firm for consistent project interpretation and cross impact project collaboration.  To provide foundational guidance for newly integrated units to incorporate major processes.  To enable consistent financial reporting, compilation and aggregation of critical project reporting and analysis.  To enable more productive integration of cross-impact and firm-wide processes and tools.  To enable more effective process development and integration.  To enable more effective and accurate process analysis, measurement and improvement, in the future.  To enable more efficient mobility in the workforce to work in different projects with the same common understanding and faster startup. 2
  • 3. Phase Definitions 0.0 Concept 1.0 Initiation 2.0 Requirements 3.0 Design Project 4.0 Build 5.0 Test Management 6.0 Implementation 7.0 Project Closure Processes The objective of each phase has been defined to ensure consistency in use of the phase reference. E.g. When LOBs report a project is in the Requirements phase, the same kinds of activity are in progress and expectation of the deliverables of that phase are consistent. More detailed specific processes will be defined at the LOB level to fit their organizational construct and governance needs, as well as the firmwide process requirements. 3
  • 4. Phase 0.0 Concept 0.0 Concept 1.0 Initiation 2.0 Requirements 3.0 Design Project 4.0 Build 5.0 Test Management 6.0 Implementation 7.0 Project Closure Processes •0.0 Concept: To  take the ideas and intentions of a group of people and evaluate them to determine if there is business value for a project and converts them into a formal, planned project request in a way that  establishes a convincing business case (cost benefit / strategic need) for the project  clearly and explicitly defines the business objectives and scope and provides supporting documentation  defines the high level business requirements for the project  gains commitment and approval of the project from the appropriate level of senior management so that  a project request can be completed  the initiation of project scoping and understanding of high level business requirements can commence by partnering with technology  project requests can be prioritized based on high level estimated business benefit. 4
  • 5. Phase 1.0 Initiation 0.0 Concept 1.0 Initiation 2.0 Requirements 3.0 Design Project 4.0 Build 5.0 Test Management 6.0 Implementation 7.0 Project Closure Processes 1.0 Initiation: To  take a request for a project from the sponsor to define high level scope, plans and estimates in a way that  elaborates on the business case (cost benefit / strategic need) for the project  clearly and explicitly defines the project objectives and scope  defines a project organization structure which can be used to effectively manage and carry out the necessary project work  develops an high level schedule of milestone activities and resources required  produces tangible measures of success for the product  gains commitment and approval of the project from the appropriate level of senior management so that  a high level plan and refined business case estimate can be developed  detailed requirements analysis and system design can commence  the probability of producing a high quality product on budget and on schedule is maximized. 5
  • 6. Phase 2.0 Requirements 0.0 Concept 1.0 Initiation 2.0 Requirements 3.0 Design Project 4.0 Build 5.0 Test Management 6.0 Implementation 7.0 Project Closure Processes 2.0 Requirements To  solicit, analyze and validate detail business, technology, and project requirements  outline a conceptual “to be” process and architecture. in a way that  identifies new or modified business process or function requirements  identifies existing problems that must be solved and constraints to the conceptual strategy  identifies current system functions that must be retained or altered so that  detailed specifications to support product design or new business processes are created  a high level conceptual solution strategy is defined. 6
  • 7. Phase 3.0 Design 0.0 Concept 1.0 Initiation 2.0 Requirements 3.0 Design Project 4.0 Build 5.0 Test Management 6.0 Implementation 7.0 Project Closure Processes 3.0 Design: To  complete a detailed design that fulfills the specified requirements in a way that  elaborates on the business case (cost benefit / strategic need) for the project  provides detailed specifications for product construction, software / hardware selection, architecture, dependencies, testing, implementation and impacts so that  A detailed project plan, business case and estimates are committed to.  a solution is defined that will provide detail specifications for product development, software / hardware selection and testing and implementation. 7
  • 8. Phase 4.0 Build 0.0 Concept 1.0 Initiation 2.0 Requirements 3.0 Design Project 4.0 Build 5.0 Test Management 6.0 Implementation 7.0 Project Closure Processes 4.0 Build To  build all product components to comply with the requirements and design specifications  meet required technology and risk controls in a way that  produces a functional prototype to demonstrate features and functions (optional)  ensures the programs / modules compile and integrate  ensures unit tests are completed and meet expected results  provides effective test scripts for the testing phase  enables flexibility for incorporating pilot results  provides a training plan so that  the system is ready for system and user testing  user documentation and training are ready  test scripts are ready for test phase. 8
  • 9. Phase 5.0 Test 0.0 Concept 1.0 Initiation 2.0 Requirements 3.0 Design Project 4.0 Build Management 5.0 Test 6.0 Implementation 7.0 Project Closure Processes 5.0 Test To  perform product testing across all affected applications using prepared test scripts in a way that  ensures requirements and design specifications have been met  determines types and order of tests to be run so that  the complete working product is ready for user testing  the product can be implemented using change management processes.  stability can be ensured in the production environment 9
  • 10. Phase 6.0 Implementation 0.0 Concept 1.0 Initiation 2.0 Requirements 3.0 Design Project 4.0 Build 5.0 Test Management 6.0 Implementation 7.0 Project Closure Processes 6.0 Implementation To  prepare for deployment by readying the technical, working and support environments  validate final production support readiness in a way that  enables the end user to utilize the product effectively  defines tactics to resolve issues that might arise upon implementation so that  there is a smooth transition into the production environment and processes  the product meets strategic results and provides value to the user. 10
  • 11. Phase 7.0 Project Closure 0.0 Concept 1.0 Initiation 2.0 Requirements 3.0 Design Project 4.0 Build 5.0 Test Management 6.0 Implementation 7.0 Project Closure Processes 7.0 Project Closure To  formally evaluate project processes and close out the project in a way that  establishes mechanisms for the continued development or improvement of the final product  improves the standard process for this type of project  enhances the estimating model for this type of project so that  project resources can be re-deployed  processes can be continuously improved for more effective project management in the future. 11
  • 12. Phase Project Management Processes 0.0 Concept 1.0 Initiation 2.0 Requirements 3.0 Design Project 4.0 Build 5.0 Test Management 6.0 Implementation 7.0 Project Closure Processes Project Management Processes (continuous throughout the life cycle) To  ensure project success by applying effective project management methodologies and practices in a way that  enables effective project progress monitoring and control  establishes regular checkpoints involving the project team and formal reviews  controls the quality of products in the project  manages change and risk to the project  addresses and tracks issues that arise during the course of the project so that  the project is delivered to the satisfaction of the requestor  requirements and changes are managed and controlled throughout the project. 12