Process Yield and
Productivity Improvement
Strategy
John Glenning
September 1, 2014
© John Glenning 2014
SAFETY:
“Safety First”
Safety is everybody's job
Try to eliminate at least 1 safety issue a week. In one year, you will have
eliminated over 50 potential safety issues
A Safety issue could be the water that is on the floor that could be a slip
hazard or a sharp corner on a machine that could be a scrap hazard.
Look for loose wires, unsupported pipes, open cutting blades, unsupported
cabinets, etc… and fix them
Process Yield and Productivity Improvement
Strategy
© John Glenning 2014
YIELDS VS DEFECTS
Do not focus on the yield. Yield is an “effect”, not a “cause”
If you reduce/eliminate defects, yields will eventually improve
Most defect inspections are “first defect found” and that is labelled the cause
of the defective product
First defect found does not find the most common defect. It finds the easiest
defect to inspect for.
Process Yield and Productivity Improvement
Strategy
© John Glenning 2014
YIELD VS DEFECTS-UNLAYERING THE PRODUCT
If a part has one defect or 100 defects, the part is defective
Count all the defects and their numbers.
Focus on the top total defect category and eliminate that defect category.
This is the shortest path to yield improvement.
Then continue on the next top defect
Keep doing this and yields will increase
Process Yield and Productivity Improvement
Strategy
© John Glenning 2014
“THE LOW HANGING FRUIT”
The “Low Hanging Fruit” is where you have problems that are obvious and
quick and easy to solve. Solve these first.
Top of the list is the Equipment operating improperly and is not it being
properly maintained. Next on the list is Handling Damage.
You have made the product correctly and then damaged the product. Work
with the Operations Team to understand why handling is important and how
they should be handling the product(s)
Use the Operators for ideas or observations. They are on the “front lines”
and know what is happening.
Process Yield and Productivity Improvement
Strategy
© John Glenning 2014
Understand your chemistries
Identified the chemistry conditions that give consistently stable product (find
the “flat spots” on the curve)
Understand how the chemistries are controlled
Consider using Redundant Sensors
Redundant sensors are early warning signs of problems
If both sensors are tracking in the same directions, you could have a process,
equipment or chemistry problem
If both sensors are tracking in different directions or magnitude, you have a
sensor problem
Process Yield and Productivity Improvement
Strategy
© John Glenning 2014
OPTIMIZING YOUR PROCESSES
1. Start Out small.
2. Use the Operators to help identify key variables. They know what are
important.
3. Run DOEs (Design of Experiments)
4. Identify key process variables through Regression Analysis
5. Follow up with a “Method of Steepest Assent” experiments
6. Keep running this until product yields start to increase
7. This is your new processing conditions
8. Consider Repeating this cycle
Process Yield and Productivity Improvement
Strategy
© John Glenning 2014
ATTAINMENT
Attainment is the point in process improvement, where it does not make
economic sense for the business to improve the Process
Here, the cost of the improvement is greater than the additional revenue to
the business
A first sign of Attainment is key metrics (like yield) have topped off
In and of itself, yield topping off does not necessary mean you have reach
Attainment
On the other hand, if yields, as an example, are at 95% and you are seeing
no further improvements, it is a reasonable assumption that you have
reached Attainment
Process Yield and Productivity Improvement
Strategy
© John Glenning 2014
ATTAINMENT
Attainment may include the following:
On-Time Delivery to Commit
Manufacturing Cycle Time
Time to Make Changeovers
Yield
Incoming Supplier Quality
Throughput
Capacity Utilization
Equipment Effectiveness
Scheduling
WIP Inventory/Turns
Planned vs. Unplanned Maintenance
New Product Introduction
Energy Cost
On-Time delivery
Process Yield and Productivity Improvement
Strategy
© John Glenning 2014
CRITICAL SPARES LIST
Lean Theory says that you keep what you need in the plant for immediate
needs. This can breakdown if unexpected problems suddenly occur, like
unexpected equipment failure or a problem with a key supplier.
Critical Spares list includes:
1. Machine
1. Module in machine
2. Location in the module
3. Number needed
4. Supplier
5. Lead time
6. Minimum inventory
7. Part number
8. Cost
Process Yield and Productivity Improvement
Strategy
© John Glenning 2014
THE VISUAL FACTORY
You should be able to quickly look around and quickly assess if there are
problems on the floor
Things to look for:
1. Inventory of spare parts vs reorder point
2. Inventory of raw material vs reorder point
3. Inventory of chemicals vs reorder point
4. What products are where in production
5. High Price Spares vs unplanned downtime-Business Decision
Process Yield and Productivity Improvement
Strategy
© John Glenning 2014
NEW PRODUCT DEVELOPMENT:
The regular introduction of new and upgraded products is critical for any
business to keep growing and expanding.
Always be in close contact with you customers to understand their needs and
wants.
Always be in close contact with you suppliers to understand future needs
This gives the business time to plan what is needed for the future.
Process Yield and Productivity Improvement
Strategy
© John Glenning 2014
DON’T LISTEN TO WHAT THEY SAY, LISTEN TO THE WORDS THEY CHOOSE:
An Engineer’s people skills, often are more important than their technical
skills.
It is important to listen to the people on the floor. They will tell you what is
going on in a “folksy way”. Ask opened questions. You can get a lot of good
information.
Share credit generously. Everyone wants to be a part of successes.
Process Yield and Productivity Improvement
Strategy
© John Glenning 2014
END OF PRESENTATION

Weitere ähnliche Inhalte

Was ist angesagt?

SMED Setup & Lead Time Reduction
SMED Setup & Lead Time ReductionSMED Setup & Lead Time Reduction
SMED Setup & Lead Time ReductionAnand Subramaniam
 
Principle 4 heijunka
Principle 4 heijunkaPrinciple 4 heijunka
Principle 4 heijunkaNeha Jagare
 
Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)Brian Thomas
 
Bottleneck Analysis Theory Of Constraints (TOC)
Bottleneck Analysis Theory Of Constraints (TOC)Bottleneck Analysis Theory Of Constraints (TOC)
Bottleneck Analysis Theory Of Constraints (TOC)Self-employed
 
Value Stream Mapping Process
Value Stream Mapping ProcessValue Stream Mapping Process
Value Stream Mapping ProcessAnand Subramaniam
 
TPM for lean manufacturing chp4 step of “jlshu hozen “activities
TPM for lean manufacturing  chp4 step of “jlshu hozen “activitiesTPM for lean manufacturing  chp4 step of “jlshu hozen “activities
TPM for lean manufacturing chp4 step of “jlshu hozen “activities博行 門眞
 
Lean Manufacturing Tools
Lean Manufacturing ToolsLean Manufacturing Tools
Lean Manufacturing ToolsJagriti Prasad
 
History of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 PrincipalHistory of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 PrincipalSumon Kumar Kundu
 
Awareness of iatf 16949
Awareness of iatf 16949Awareness of iatf 16949
Awareness of iatf 16949Pavan Patil
 

Was ist angesagt? (20)

Leading a Lean Implementation
Leading a Lean ImplementationLeading a Lean Implementation
Leading a Lean Implementation
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Lean Management
Lean ManagementLean Management
Lean Management
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment Effectiveness
 
SMED Setup & Lead Time Reduction
SMED Setup & Lead Time ReductionSMED Setup & Lead Time Reduction
SMED Setup & Lead Time Reduction
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
Principle 4 heijunka
Principle 4 heijunkaPrinciple 4 heijunka
Principle 4 heijunka
 
Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)
 
Lean Continuous Improvement Overview
Lean Continuous Improvement OverviewLean Continuous Improvement Overview
Lean Continuous Improvement Overview
 
Bottleneck Analysis Theory Of Constraints (TOC)
Bottleneck Analysis Theory Of Constraints (TOC)Bottleneck Analysis Theory Of Constraints (TOC)
Bottleneck Analysis Theory Of Constraints (TOC)
 
Value Stream Mapping Process
Value Stream Mapping ProcessValue Stream Mapping Process
Value Stream Mapping Process
 
1 piece flow training
1 piece flow training1 piece flow training
1 piece flow training
 
OEE
OEEOEE
OEE
 
TPM for lean manufacturing chp4 step of “jlshu hozen “activities
TPM for lean manufacturing  chp4 step of “jlshu hozen “activitiesTPM for lean manufacturing  chp4 step of “jlshu hozen “activities
TPM for lean manufacturing chp4 step of “jlshu hozen “activities
 
Lean Manufacturing Tools
Lean Manufacturing ToolsLean Manufacturing Tools
Lean Manufacturing Tools
 
History of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 PrincipalHistory of Lean manufacturing & TPS 14 Principal
History of Lean manufacturing & TPS 14 Principal
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
Lean manufacturing ppt
Lean manufacturing pptLean manufacturing ppt
Lean manufacturing ppt
 
Awareness of iatf 16949
Awareness of iatf 16949Awareness of iatf 16949
Awareness of iatf 16949
 
OEE
OEEOEE
OEE
 

Ähnlich wie Yield and productivity improvements

Manufacturing & Process Development Strategy
Manufacturing & Process Development StrategyManufacturing & Process Development Strategy
Manufacturing & Process Development StrategyJohn Glenning
 
Manufacturing & Process Development Strategy
Manufacturing & Process Development StrategyManufacturing & Process Development Strategy
Manufacturing & Process Development StrategyJohn Glenning
 
Products Liability & the Middle Market
Products Liability & the Middle MarketProducts Liability & the Middle Market
Products Liability & the Middle MarketDPSchneider
 
10 Things an Operations Supervisor can do Today to Improve Reliability
10 Things an Operations Supervisor can do Today to Improve Reliability10 Things an Operations Supervisor can do Today to Improve Reliability
10 Things an Operations Supervisor can do Today to Improve ReliabilityRicky Smith CMRP, CMRT
 
7 Tips to Avoid Poor Quality Production
7 Tips to Avoid Poor Quality Production7 Tips to Avoid Poor Quality Production
7 Tips to Avoid Poor Quality ProductionMark Wardell
 
Four Quick Ways To Unlock Hidden Manufacturing Capacity
Four Quick Ways To Unlock Hidden Manufacturing CapacityFour Quick Ways To Unlock Hidden Manufacturing Capacity
Four Quick Ways To Unlock Hidden Manufacturing CapacityGlobal Business Professor
 
Eric Ries - The lean startup
Eric Ries - The lean startupEric Ries - The lean startup
Eric Ries - The lean startupmomentummi
 
Eric Ries - The Lean Startup - Google Tech Talk
Eric Ries - The Lean Startup - Google Tech TalkEric Ries - The Lean Startup - Google Tech Talk
Eric Ries - The Lean Startup - Google Tech TalkEric Ries
 
2011 03 11 eric ries - the lean startup sxsw
2011 03 11 eric ries - the lean startup sxsw2011 03 11 eric ries - the lean startup sxsw
2011 03 11 eric ries - the lean startup sxswEric Ries
 
eric ries - the lean startup dogpatch LUXr nyc
eric ries - the lean startup dogpatch LUXr nyceric ries - the lean startup dogpatch LUXr nyc
eric ries - the lean startup dogpatch LUXr nycEric Ries
 
Eric Ries StartupDay 2011 Speech
Eric Ries StartupDay 2011 SpeechEric Ries StartupDay 2011 Speech
Eric Ries StartupDay 2011 SpeechStartup Weekend
 
Coralie_Bailly-Lean_Manufacturing_any_size_company
Coralie_Bailly-Lean_Manufacturing_any_size_companyCoralie_Bailly-Lean_Manufacturing_any_size_company
Coralie_Bailly-Lean_Manufacturing_any_size_companyCoralie Bailly
 
Top Tips for Improving your Quality Management
Top Tips for Improving your Quality ManagementTop Tips for Improving your Quality Management
Top Tips for Improving your Quality ManagementClaire Healey
 
Process design focuses on.pdf
 Process design focuses on.pdf Process design focuses on.pdf
Process design focuses on.pdfaludin007
 
Winning Product Sustainability Programs, Approaches, and Metrics - tim greiner
Winning Product Sustainability Programs, Approaches, and Metrics - tim greinerWinning Product Sustainability Programs, Approaches, and Metrics - tim greiner
Winning Product Sustainability Programs, Approaches, and Metrics - tim greinerSustainable Brands
 
Pillars of productivity redux final -photo
 Pillars of productivity redux final -photo Pillars of productivity redux final -photo
Pillars of productivity redux final -photoRon Luken
 

Ähnlich wie Yield and productivity improvements (20)

Manufacturing & Process Development Strategy
Manufacturing & Process Development StrategyManufacturing & Process Development Strategy
Manufacturing & Process Development Strategy
 
Manufacturing & Process Development Strategy
Manufacturing & Process Development StrategyManufacturing & Process Development Strategy
Manufacturing & Process Development Strategy
 
Products Liability & the Middle Market
Products Liability & the Middle MarketProducts Liability & the Middle Market
Products Liability & the Middle Market
 
10 Things an Operations Supervisor can do Today to Improve Reliability
10 Things an Operations Supervisor can do Today to Improve Reliability10 Things an Operations Supervisor can do Today to Improve Reliability
10 Things an Operations Supervisor can do Today to Improve Reliability
 
Continuous safety improvement
Continuous safety improvementContinuous safety improvement
Continuous safety improvement
 
7 Tips to Avoid Poor Quality Production
7 Tips to Avoid Poor Quality Production7 Tips to Avoid Poor Quality Production
7 Tips to Avoid Poor Quality Production
 
Four Quick Ways To Unlock Hidden Manufacturing Capacity
Four Quick Ways To Unlock Hidden Manufacturing CapacityFour Quick Ways To Unlock Hidden Manufacturing Capacity
Four Quick Ways To Unlock Hidden Manufacturing Capacity
 
Continuous safety improvement
Continuous safety improvementContinuous safety improvement
Continuous safety improvement
 
Eric Ries - The lean startup
Eric Ries - The lean startupEric Ries - The lean startup
Eric Ries - The lean startup
 
Eric Ries - The Lean Startup - Google Tech Talk
Eric Ries - The Lean Startup - Google Tech TalkEric Ries - The Lean Startup - Google Tech Talk
Eric Ries - The Lean Startup - Google Tech Talk
 
2011 03 11 eric ries - the lean startup sxsw
2011 03 11 eric ries - the lean startup sxsw2011 03 11 eric ries - the lean startup sxsw
2011 03 11 eric ries - the lean startup sxsw
 
Quality
QualityQuality
Quality
 
eric ries - the lean startup dogpatch LUXr nyc
eric ries - the lean startup dogpatch LUXr nyceric ries - the lean startup dogpatch LUXr nyc
eric ries - the lean startup dogpatch LUXr nyc
 
Eric Ries StartupDay 2011 Speech
Eric Ries StartupDay 2011 SpeechEric Ries StartupDay 2011 Speech
Eric Ries StartupDay 2011 Speech
 
Coralie_Bailly-Lean_Manufacturing_any_size_company
Coralie_Bailly-Lean_Manufacturing_any_size_companyCoralie_Bailly-Lean_Manufacturing_any_size_company
Coralie_Bailly-Lean_Manufacturing_any_size_company
 
Top Tips for Improving your Quality Management
Top Tips for Improving your Quality ManagementTop Tips for Improving your Quality Management
Top Tips for Improving your Quality Management
 
Perfect Reliability
Perfect ReliabilityPerfect Reliability
Perfect Reliability
 
Process design focuses on.pdf
 Process design focuses on.pdf Process design focuses on.pdf
Process design focuses on.pdf
 
Winning Product Sustainability Programs, Approaches, and Metrics - tim greiner
Winning Product Sustainability Programs, Approaches, and Metrics - tim greinerWinning Product Sustainability Programs, Approaches, and Metrics - tim greiner
Winning Product Sustainability Programs, Approaches, and Metrics - tim greiner
 
Pillars of productivity redux final -photo
 Pillars of productivity redux final -photo Pillars of productivity redux final -photo
Pillars of productivity redux final -photo
 

Mehr von John Glenning

SCALE-UP OF MICROCHANNEL REACTORS FOR FISCHER-TROPSCH
SCALE-UP OF MICROCHANNEL REACTORS FOR FISCHER-TROPSCHSCALE-UP OF MICROCHANNEL REACTORS FOR FISCHER-TROPSCH
SCALE-UP OF MICROCHANNEL REACTORS FOR FISCHER-TROPSCHJohn Glenning
 
Jim Betar Letter of Recommendation
Jim Betar Letter of RecommendationJim Betar Letter of Recommendation
Jim Betar Letter of RecommendationJohn Glenning
 
Letter of Recommendation-Bill Lafer
Letter of Recommendation-Bill LaferLetter of Recommendation-Bill Lafer
Letter of Recommendation-Bill LaferJohn Glenning
 
John Glenning's Process Deveiopment and Manufacturing Strategy December 2008
John Glenning's Process Deveiopment and Manufacturing Strategy December 2008John Glenning's Process Deveiopment and Manufacturing Strategy December 2008
John Glenning's Process Deveiopment and Manufacturing Strategy December 2008John Glenning
 
Fluid Head Technology
Fluid Head TechnologyFluid Head Technology
Fluid Head TechnologyJohn Glenning
 
Yield and Productivity Improvements
Yield and Productivity ImprovementsYield and Productivity Improvements
Yield and Productivity ImprovementsJohn Glenning
 
Workforce New York.PDF
Workforce New York.PDFWorkforce New York.PDF
Workforce New York.PDFJohn Glenning
 
Tompkins Community Action.PDF
Tompkins Community Action.PDFTompkins Community Action.PDF
Tompkins Community Action.PDFJohn Glenning
 
Fluid Head Technology
Fluid Head TechnologyFluid Head Technology
Fluid Head TechnologyJohn Glenning
 
Fluid Head Technology NYS Governor
Fluid Head Technology NYS GovernorFluid Head Technology NYS Governor
Fluid Head Technology NYS GovernorJohn Glenning
 
Hutchinson Technology eliminating 500 jobs
Hutchinson Technology eliminating 500 jobsHutchinson Technology eliminating 500 jobs
Hutchinson Technology eliminating 500 jobsJohn Glenning
 
Equipment Operations for Production and Development
Equipment Operations for Production and DevelopmentEquipment Operations for Production and Development
Equipment Operations for Production and DevelopmentJohn Glenning
 
Photo-Lithography and Wet Processing (Develop, Etch and Strip)
Photo-Lithography and Wet Processing (Develop, Etch and Strip)Photo-Lithography and Wet Processing (Develop, Etch and Strip)
Photo-Lithography and Wet Processing (Develop, Etch and Strip)John Glenning
 
Steward Advanced Materials fryxell_glenn
Steward Advanced Materials fryxell_glennSteward Advanced Materials fryxell_glenn
Steward Advanced Materials fryxell_glennJohn Glenning
 
Steward Advanced Materials 137_aqueous_phase_mercury_removal_strategies
Steward Advanced Materials 137_aqueous_phase_mercury_removal_strategiesSteward Advanced Materials 137_aqueous_phase_mercury_removal_strategies
Steward Advanced Materials 137_aqueous_phase_mercury_removal_strategiesJohn Glenning
 

Mehr von John Glenning (20)

SCALE-UP OF MICROCHANNEL REACTORS FOR FISCHER-TROPSCH
SCALE-UP OF MICROCHANNEL REACTORS FOR FISCHER-TROPSCHSCALE-UP OF MICROCHANNEL REACTORS FOR FISCHER-TROPSCH
SCALE-UP OF MICROCHANNEL REACTORS FOR FISCHER-TROPSCH
 
Jim Betar Letter of Recommendation
Jim Betar Letter of RecommendationJim Betar Letter of Recommendation
Jim Betar Letter of Recommendation
 
Letter of Recommendation-Bill Lafer
Letter of Recommendation-Bill LaferLetter of Recommendation-Bill Lafer
Letter of Recommendation-Bill Lafer
 
Velocys1
Velocys1Velocys1
Velocys1
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 
John Glenning's Process Deveiopment and Manufacturing Strategy December 2008
John Glenning's Process Deveiopment and Manufacturing Strategy December 2008John Glenning's Process Deveiopment and Manufacturing Strategy December 2008
John Glenning's Process Deveiopment and Manufacturing Strategy December 2008
 
Fluid Head Technology
Fluid Head TechnologyFluid Head Technology
Fluid Head Technology
 
Yield and Productivity Improvements
Yield and Productivity ImprovementsYield and Productivity Improvements
Yield and Productivity Improvements
 
Workforce New York.PDF
Workforce New York.PDFWorkforce New York.PDF
Workforce New York.PDF
 
Tompkins Community Action.PDF
Tompkins Community Action.PDFTompkins Community Action.PDF
Tompkins Community Action.PDF
 
Ed McLeskey.PDF
Ed McLeskey.PDFEd McLeskey.PDF
Ed McLeskey.PDF
 
Fluid Head Technology
Fluid Head TechnologyFluid Head Technology
Fluid Head Technology
 
Fluid Head Technology NYS Governor
Fluid Head Technology NYS GovernorFluid Head Technology NYS Governor
Fluid Head Technology NYS Governor
 
How To Read People
How To Read PeopleHow To Read People
How To Read People
 
Hutchinson Technology eliminating 500 jobs
Hutchinson Technology eliminating 500 jobsHutchinson Technology eliminating 500 jobs
Hutchinson Technology eliminating 500 jobs
 
Equipment Operations for Production and Development
Equipment Operations for Production and DevelopmentEquipment Operations for Production and Development
Equipment Operations for Production and Development
 
Photo-Lithography and Wet Processing (Develop, Etch and Strip)
Photo-Lithography and Wet Processing (Develop, Etch and Strip)Photo-Lithography and Wet Processing (Develop, Etch and Strip)
Photo-Lithography and Wet Processing (Develop, Etch and Strip)
 
Photo lithography
Photo lithographyPhoto lithography
Photo lithography
 
Steward Advanced Materials fryxell_glenn
Steward Advanced Materials fryxell_glennSteward Advanced Materials fryxell_glenn
Steward Advanced Materials fryxell_glenn
 
Steward Advanced Materials 137_aqueous_phase_mercury_removal_strategies
Steward Advanced Materials 137_aqueous_phase_mercury_removal_strategiesSteward Advanced Materials 137_aqueous_phase_mercury_removal_strategies
Steward Advanced Materials 137_aqueous_phase_mercury_removal_strategies
 

Kürzlich hochgeladen

Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLManishPatel169454
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 

Kürzlich hochgeladen (20)

Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 

Yield and productivity improvements

  • 1. © John Glenning 2014 Process Yield and Productivity Improvement Strategy John Glenning September 1, 2014
  • 2. © John Glenning 2014 SAFETY: “Safety First” Safety is everybody's job Try to eliminate at least 1 safety issue a week. In one year, you will have eliminated over 50 potential safety issues A Safety issue could be the water that is on the floor that could be a slip hazard or a sharp corner on a machine that could be a scrap hazard. Look for loose wires, unsupported pipes, open cutting blades, unsupported cabinets, etc… and fix them Process Yield and Productivity Improvement Strategy
  • 3. © John Glenning 2014 YIELDS VS DEFECTS Do not focus on the yield. Yield is an “effect”, not a “cause” If you reduce/eliminate defects, yields will eventually improve Most defect inspections are “first defect found” and that is labelled the cause of the defective product First defect found does not find the most common defect. It finds the easiest defect to inspect for. Process Yield and Productivity Improvement Strategy
  • 4. © John Glenning 2014 YIELD VS DEFECTS-UNLAYERING THE PRODUCT If a part has one defect or 100 defects, the part is defective Count all the defects and their numbers. Focus on the top total defect category and eliminate that defect category. This is the shortest path to yield improvement. Then continue on the next top defect Keep doing this and yields will increase Process Yield and Productivity Improvement Strategy
  • 5. © John Glenning 2014 “THE LOW HANGING FRUIT” The “Low Hanging Fruit” is where you have problems that are obvious and quick and easy to solve. Solve these first. Top of the list is the Equipment operating improperly and is not it being properly maintained. Next on the list is Handling Damage. You have made the product correctly and then damaged the product. Work with the Operations Team to understand why handling is important and how they should be handling the product(s) Use the Operators for ideas or observations. They are on the “front lines” and know what is happening. Process Yield and Productivity Improvement Strategy
  • 6. © John Glenning 2014 Understand your chemistries Identified the chemistry conditions that give consistently stable product (find the “flat spots” on the curve) Understand how the chemistries are controlled Consider using Redundant Sensors Redundant sensors are early warning signs of problems If both sensors are tracking in the same directions, you could have a process, equipment or chemistry problem If both sensors are tracking in different directions or magnitude, you have a sensor problem Process Yield and Productivity Improvement Strategy
  • 7. © John Glenning 2014 OPTIMIZING YOUR PROCESSES 1. Start Out small. 2. Use the Operators to help identify key variables. They know what are important. 3. Run DOEs (Design of Experiments) 4. Identify key process variables through Regression Analysis 5. Follow up with a “Method of Steepest Assent” experiments 6. Keep running this until product yields start to increase 7. This is your new processing conditions 8. Consider Repeating this cycle Process Yield and Productivity Improvement Strategy
  • 8. © John Glenning 2014 ATTAINMENT Attainment is the point in process improvement, where it does not make economic sense for the business to improve the Process Here, the cost of the improvement is greater than the additional revenue to the business A first sign of Attainment is key metrics (like yield) have topped off In and of itself, yield topping off does not necessary mean you have reach Attainment On the other hand, if yields, as an example, are at 95% and you are seeing no further improvements, it is a reasonable assumption that you have reached Attainment Process Yield and Productivity Improvement Strategy
  • 9. © John Glenning 2014 ATTAINMENT Attainment may include the following: On-Time Delivery to Commit Manufacturing Cycle Time Time to Make Changeovers Yield Incoming Supplier Quality Throughput Capacity Utilization Equipment Effectiveness Scheduling WIP Inventory/Turns Planned vs. Unplanned Maintenance New Product Introduction Energy Cost On-Time delivery Process Yield and Productivity Improvement Strategy
  • 10. © John Glenning 2014 CRITICAL SPARES LIST Lean Theory says that you keep what you need in the plant for immediate needs. This can breakdown if unexpected problems suddenly occur, like unexpected equipment failure or a problem with a key supplier. Critical Spares list includes: 1. Machine 1. Module in machine 2. Location in the module 3. Number needed 4. Supplier 5. Lead time 6. Minimum inventory 7. Part number 8. Cost Process Yield and Productivity Improvement Strategy
  • 11. © John Glenning 2014 THE VISUAL FACTORY You should be able to quickly look around and quickly assess if there are problems on the floor Things to look for: 1. Inventory of spare parts vs reorder point 2. Inventory of raw material vs reorder point 3. Inventory of chemicals vs reorder point 4. What products are where in production 5. High Price Spares vs unplanned downtime-Business Decision Process Yield and Productivity Improvement Strategy
  • 12. © John Glenning 2014 NEW PRODUCT DEVELOPMENT: The regular introduction of new and upgraded products is critical for any business to keep growing and expanding. Always be in close contact with you customers to understand their needs and wants. Always be in close contact with you suppliers to understand future needs This gives the business time to plan what is needed for the future. Process Yield and Productivity Improvement Strategy
  • 13. © John Glenning 2014 DON’T LISTEN TO WHAT THEY SAY, LISTEN TO THE WORDS THEY CHOOSE: An Engineer’s people skills, often are more important than their technical skills. It is important to listen to the people on the floor. They will tell you what is going on in a “folksy way”. Ask opened questions. You can get a lot of good information. Share credit generously. Everyone wants to be a part of successes. Process Yield and Productivity Improvement Strategy
  • 14. © John Glenning 2014 END OF PRESENTATION