SlideShare ist ein Scribd-Unternehmen logo
1 von 4
5/98 article
R/3 Installation At A Glance:
Selected: June 1994
Installs Completed: February 1995–October 1996
Current release: R/3 Release 3.1G
Modules in use: FI, CO, AM, EIS, SD, MM, PS, PP, PM, PD
Number of users: Approximately 800
Database: Oracle 7.2.3
Operating System: DEC Unix 3.2G
Hardware: Digital Equipment Corporation Alpha
Key Complementary Applications: ADP Payroll, TAXWARE Sales/Use Tax System, Hyperion Pillar,
Systems Union Sun Accounting, Resumix Resumix System
Primary Integrator: In-house personnel
Case Study: Building A Modern Infrastructure At
GTECH With R/3
By Steven J. Tirone
Headquartered in West Greenwich, RI, GTECH is a global manufacturer, facilities management, and
service provider for lottery, gaming, and entertainment organizations. GTECH, with operations on 5
continents, had fiscal year 1997 (ended February) revenue of $904.3M. The company has more than 5,000
employees around the world. It has five core business groups: the GTECH Worldwide Lottery Group,
Dreamport, GameScape, Transactive, and GTECH Worldserv.
In 1994, GTECH decided to move to a modern, unified ERP system. At that time, the company, which
then consisted of the GTECH Worldwide Lottery Group and Transactive, did not have a real business
system. It instead relied on a patchwork of in-house developed systems, accounting packages, and
spreadsheets to maintain its financials, and used the CA-MAXCIM MRP system in its manufacturing
operations. GTECH essentially went with SAP from the initial decision to upgrade. The only other
vendor under consideration, Baan, was new to the U.S. market and was unable to demo its products for
GTECH. In early 1994, SAP was selected to provide GTECH’s business infrastructure.
Implementation
With the decision to completely revamp its IT base, GTECH bought a full suite of R/3 modules, including
Financial Accounting/Asset Accounting (FI), Sales & Distribution (SD), Materials Management (MM),
Project System (PS), Production Planning (PP), and Plant Maintenance (PM) modules, as well as the
Personnel Planning & Development (PD) element of the Human Resources (HR) module. The
implementation, which covered more than 40 U.S. and 20 international sites, was completed in two-and-
a-half years at a cost of $12M.
The implementation cycle began in July 1994 and was carried out in three distinct phases, based on
business processes. During the initial phase, GTECH implemented the FI and SD modules, completing
implementation in February 1995. In the second phase, the company began implementation of the MM
and PS modules in April 1995, finishing in December 1995. The last phase to be implemented targeted
the company’s manufacturing operation, with implementation of the PP, PM, and PD modules beginning
in February 1996 and completing in November 1996.
GTECH chose not to hire a system integrator to carry out the work, instead relying on in-house personnel
supplemented by SAP employees at key points. The effort was led by a steering committee composed of
business champions drawn from vice presidents from the operating units and a program manager from
GTECH’s IT unit in turn supported by sub-program managers. The implementation team, which
numbered up to 100 GTECH personnel, included approximately 20 employees who spent the bulk of their
time on the implementation as well as a handful who were completely dedicated to the effort. Most
employees, however, did not give up their day-to-day responsibilities. The team made every effort to
balance the demands placed on employees, for example, avoid weekend work except during the “go live”
phase.
The effort encountered a certain level of internal resistance to the changeover of systems from personnel
who were comfortable with their existing processes. The steering committee had to mediate, enforcing
internal discipline and driving education among the end-users. Much of the credit for the success of the
implementation is due to the insistence on dependence on internal personnel to carry out the
implementation. Their business knowledge and understanding of in-house issues proved critical in
addressing internal concerns and requirements. All in all, however, GTECH personnel were required to
adapt existing processes to match R/3, as a key element of the implementation was the mandate to avoid
modifying code to keep the project on track.
GTECH’s installation runs primarily on Digital Equipment Alpha servers running on DEC Unix 3.2G and
supporting an Oracle 7.2.3 database. The current R/3 release in use is 3.1G. GTECH plans to upgrade to
R/3 Release 4.0 in 1998, in part because of its support for the Euro unified European currency, which will
substantially impact GTECH’s operations abroad. Again, GTECH plans to stick with release functionality
and avoid code modification to prevent introducing added complexity.
Complementary and Custom Software
The implementation team also attempted to minimize interfaces with other applications, to avoid
synchronization issues and keep the implementation as straightforward as possible. However, as GTECH
has not yet adopted the full R/3 suite, many human resources and certain financial requirements are met
by complementary software applications. GTECH uses ADP Payroll, TAXWARE Sales/Use Tax System,
Hyperion Pillar for enterprise budget planning, and Resumix Resumix System for resume capture. Going
forward, the company expects to adopt the R/3 Treasury (TR) module and the complete Human Resources
(HR) module. In Europe, GTECH uses Systems Union’s Sun Accounting package in conjunction with
SAP software, which will be displaced at all large European sites by R/3 but will be retained at small sales
and support sites. In partnership with SAP, GTECH has also developed an integration interface between
the R/3 Project System module and Microsoft Project.
Results and Lessons Learned
GTECH has realized significant benefits from its complete overhaul of its business infrastructure. The
order entry approval cycle has been cut from 15 days to 1 day, while the month-end close has similarly
been reduced from 17 down to 2 business days. By creating milestone billing procedures, receivables
collection has been improved, leading to the collection of some $250K in previously uncollected revenue.
With the implementation of inventory management, U.S. field inventories have reduced by 25% or $1M,
while revised export shipping processes have reduced customs penalties by $250K per year. The
reengineering of project management, which included the custom-developed integration between
Microsoft Project and Project System, provided central control for all customer projects, preventing cost
overruns and in the process saving more than $5M since 1996.
Among the key lessons GTECH drew from the implementation effort was that management of human
factors is perhaps the critical aspect of a successful implementation. The decision to modify business
processes to fit R/3 rather than attempt to shape the code around existing practices side-stepped one of the
major traditional pitfalls of R/3 implementations, one that has sunk a number of projects. On the other
hand, this decision forced the abandonment of long-established practices and required the enforcement of
whole new disciplines. Again, the company credits its do-it-yourself approach to implementation as vital
to the success of the project, as this tack forced employees to buy-in to R/3. Ultimately, though opinions
were mixed for months after change-over, end-user reaction was enthusiastic a year on as the new ways of
work became familiar.

Weitere ähnliche Inhalte

Ähnlich wie GTECH Implementation - AMR

Identify a law that regulates how employees are treated in t.docx
Identify a law that regulates how employees are treated in t.docxIdentify a law that regulates how employees are treated in t.docx
Identify a law that regulates how employees are treated in t.docx
alanrgibson41217
 
RCLIFFE.resume
RCLIFFE.resumeRCLIFFE.resume
RCLIFFE.resume
Bob Cliffe
 
Curriculum Vitae - Alexandre Lanceiro Souza
Curriculum Vitae - Alexandre Lanceiro SouzaCurriculum Vitae - Alexandre Lanceiro Souza
Curriculum Vitae - Alexandre Lanceiro Souza
Alexandre Lanceiro Souza
 
Michael Haftel Resume-2016
Michael Haftel Resume-2016Michael Haftel Resume-2016
Michael Haftel Resume-2016
Michael Haftel
 
Simon Hall CV May 2014
Simon Hall CV May 2014Simon Hall CV May 2014
Simon Hall CV May 2014
Simon Hall
 
Sysphera - Executive Presentation 15Fev2012
Sysphera - Executive Presentation 15Fev2012Sysphera - Executive Presentation 15Fev2012
Sysphera - Executive Presentation 15Fev2012
antoniodj
 

Ähnlich wie GTECH Implementation - AMR (20)

A Case Study on Business Process Management
A Case Study on Business Process ManagementA Case Study on Business Process Management
A Case Study on Business Process Management
 
Phil Evans Ecm Bio
Phil Evans Ecm BioPhil Evans Ecm Bio
Phil Evans Ecm Bio
 
Bergeron Patrick Resume
Bergeron Patrick ResumeBergeron Patrick Resume
Bergeron Patrick Resume
 
Bergeron Patrick Resume
Bergeron Patrick ResumeBergeron Patrick Resume
Bergeron Patrick Resume
 
Dasilva Robert 2014 Resume
Dasilva Robert 2014 ResumeDasilva Robert 2014 Resume
Dasilva Robert 2014 Resume
 
How a Strategic, Big-Picture Approach to PLM Pays Off
How a Strategic, Big-Picture Approach to PLM Pays OffHow a Strategic, Big-Picture Approach to PLM Pays Off
How a Strategic, Big-Picture Approach to PLM Pays Off
 
Identify a law that regulates how employees are treated in t.docx
Identify a law that regulates how employees are treated in t.docxIdentify a law that regulates how employees are treated in t.docx
Identify a law that regulates how employees are treated in t.docx
 
What IS for the Lean company, by Pierre Delort at the Lean IT Summit
What IS for the Lean company, by Pierre Delort at the Lean IT SummitWhat IS for the Lean company, by Pierre Delort at the Lean IT Summit
What IS for the Lean company, by Pierre Delort at the Lean IT Summit
 
RCLIFFE.resume
RCLIFFE.resumeRCLIFFE.resume
RCLIFFE.resume
 
Erp Implementation Plan | Pridesys IT Ltd
Erp Implementation Plan | Pridesys IT LtdErp Implementation Plan | Pridesys IT Ltd
Erp Implementation Plan | Pridesys IT Ltd
 
Curriculum Vitae - Alexandre Lanceiro Souza
Curriculum Vitae - Alexandre Lanceiro SouzaCurriculum Vitae - Alexandre Lanceiro Souza
Curriculum Vitae - Alexandre Lanceiro Souza
 
Michael Haftel Resume-2016
Michael Haftel Resume-2016Michael Haftel Resume-2016
Michael Haftel Resume-2016
 
T/DG provides all technology components required for implementation of ERP so...
T/DG provides all technology components required for implementation of ERP so...T/DG provides all technology components required for implementation of ERP so...
T/DG provides all technology components required for implementation of ERP so...
 
K0948387
K0948387K0948387
K0948387
 
Enabling Business Transformation with DRM & FDMEE
Enabling Business Transformation with DRM & FDMEEEnabling Business Transformation with DRM & FDMEE
Enabling Business Transformation with DRM & FDMEE
 
Sheldon cousino resume
Sheldon cousino resumeSheldon cousino resume
Sheldon cousino resume
 
Simon Hall CV May 2014
Simon Hall CV May 2014Simon Hall CV May 2014
Simon Hall CV May 2014
 
Sysphera - Executive Presentation 15Fev2012
Sysphera - Executive Presentation 15Fev2012Sysphera - Executive Presentation 15Fev2012
Sysphera - Executive Presentation 15Fev2012
 
Operational excellence through digital in manufacturing industries capgemin...
Operational excellence through digital in manufacturing industries   capgemin...Operational excellence through digital in manufacturing industries   capgemin...
Operational excellence through digital in manufacturing industries capgemin...
 
Shah rakesh executive
Shah rakesh executiveShah rakesh executive
Shah rakesh executive
 

Kürzlich hochgeladen

+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
Health
 
Large-scale Logging Made Easy: Meetup at Deutsche Bank 2024
Large-scale Logging Made Easy: Meetup at Deutsche Bank 2024Large-scale Logging Made Easy: Meetup at Deutsche Bank 2024
Large-scale Logging Made Easy: Meetup at Deutsche Bank 2024
VictoriaMetrics
 
%+27788225528 love spells in Boston Psychic Readings, Attraction spells,Bring...
%+27788225528 love spells in Boston Psychic Readings, Attraction spells,Bring...%+27788225528 love spells in Boston Psychic Readings, Attraction spells,Bring...
%+27788225528 love spells in Boston Psychic Readings, Attraction spells,Bring...
masabamasaba
 

Kürzlich hochgeladen (20)

+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
+971565801893>>SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHAB...
 
Crypto Cloud Review - How To Earn Up To $500 Per DAY Of Bitcoin 100% On AutoP...
Crypto Cloud Review - How To Earn Up To $500 Per DAY Of Bitcoin 100% On AutoP...Crypto Cloud Review - How To Earn Up To $500 Per DAY Of Bitcoin 100% On AutoP...
Crypto Cloud Review - How To Earn Up To $500 Per DAY Of Bitcoin 100% On AutoP...
 
%in Bahrain+277-882-255-28 abortion pills for sale in Bahrain
%in Bahrain+277-882-255-28 abortion pills for sale in Bahrain%in Bahrain+277-882-255-28 abortion pills for sale in Bahrain
%in Bahrain+277-882-255-28 abortion pills for sale in Bahrain
 
Announcing Codolex 2.0 from GDK Software
Announcing Codolex 2.0 from GDK SoftwareAnnouncing Codolex 2.0 from GDK Software
Announcing Codolex 2.0 from GDK Software
 
%in Soweto+277-882-255-28 abortion pills for sale in soweto
%in Soweto+277-882-255-28 abortion pills for sale in soweto%in Soweto+277-882-255-28 abortion pills for sale in soweto
%in Soweto+277-882-255-28 abortion pills for sale in soweto
 
WSO2Con2024 - WSO2's IAM Vision: Identity-Led Digital Transformation
WSO2Con2024 - WSO2's IAM Vision: Identity-Led Digital TransformationWSO2Con2024 - WSO2's IAM Vision: Identity-Led Digital Transformation
WSO2Con2024 - WSO2's IAM Vision: Identity-Led Digital Transformation
 
MarTech Trend 2024 Book : Marketing Technology Trends (2024 Edition) How Data...
MarTech Trend 2024 Book : Marketing Technology Trends (2024 Edition) How Data...MarTech Trend 2024 Book : Marketing Technology Trends (2024 Edition) How Data...
MarTech Trend 2024 Book : Marketing Technology Trends (2024 Edition) How Data...
 
WSO2CON 2024 - Cloud Native Middleware: Domain-Driven Design, Cell-Based Arch...
WSO2CON 2024 - Cloud Native Middleware: Domain-Driven Design, Cell-Based Arch...WSO2CON 2024 - Cloud Native Middleware: Domain-Driven Design, Cell-Based Arch...
WSO2CON 2024 - Cloud Native Middleware: Domain-Driven Design, Cell-Based Arch...
 
%in ivory park+277-882-255-28 abortion pills for sale in ivory park
%in ivory park+277-882-255-28 abortion pills for sale in ivory park %in ivory park+277-882-255-28 abortion pills for sale in ivory park
%in ivory park+277-882-255-28 abortion pills for sale in ivory park
 
What Goes Wrong with Language Definitions and How to Improve the Situation
What Goes Wrong with Language Definitions and How to Improve the SituationWhat Goes Wrong with Language Definitions and How to Improve the Situation
What Goes Wrong with Language Definitions and How to Improve the Situation
 
Large-scale Logging Made Easy: Meetup at Deutsche Bank 2024
Large-scale Logging Made Easy: Meetup at Deutsche Bank 2024Large-scale Logging Made Easy: Meetup at Deutsche Bank 2024
Large-scale Logging Made Easy: Meetup at Deutsche Bank 2024
 
%in Harare+277-882-255-28 abortion pills for sale in Harare
%in Harare+277-882-255-28 abortion pills for sale in Harare%in Harare+277-882-255-28 abortion pills for sale in Harare
%in Harare+277-882-255-28 abortion pills for sale in Harare
 
Artyushina_Guest lecture_YorkU CS May 2024.pptx
Artyushina_Guest lecture_YorkU CS May 2024.pptxArtyushina_Guest lecture_YorkU CS May 2024.pptx
Artyushina_Guest lecture_YorkU CS May 2024.pptx
 
WSO2CON2024 - It's time to go Platformless
WSO2CON2024 - It's time to go PlatformlessWSO2CON2024 - It's time to go Platformless
WSO2CON2024 - It's time to go Platformless
 
WSO2Con2024 - From Code To Cloud: Fast Track Your Cloud Native Journey with C...
WSO2Con2024 - From Code To Cloud: Fast Track Your Cloud Native Journey with C...WSO2Con2024 - From Code To Cloud: Fast Track Your Cloud Native Journey with C...
WSO2Con2024 - From Code To Cloud: Fast Track Your Cloud Native Journey with C...
 
%in Hazyview+277-882-255-28 abortion pills for sale in Hazyview
%in Hazyview+277-882-255-28 abortion pills for sale in Hazyview%in Hazyview+277-882-255-28 abortion pills for sale in Hazyview
%in Hazyview+277-882-255-28 abortion pills for sale in Hazyview
 
%in tembisa+277-882-255-28 abortion pills for sale in tembisa
%in tembisa+277-882-255-28 abortion pills for sale in tembisa%in tembisa+277-882-255-28 abortion pills for sale in tembisa
%in tembisa+277-882-255-28 abortion pills for sale in tembisa
 
tonesoftg
tonesoftgtonesoftg
tonesoftg
 
%+27788225528 love spells in Boston Psychic Readings, Attraction spells,Bring...
%+27788225528 love spells in Boston Psychic Readings, Attraction spells,Bring...%+27788225528 love spells in Boston Psychic Readings, Attraction spells,Bring...
%+27788225528 love spells in Boston Psychic Readings, Attraction spells,Bring...
 
Devoxx UK 2024 - Going serverless with Quarkus, GraalVM native images and AWS...
Devoxx UK 2024 - Going serverless with Quarkus, GraalVM native images and AWS...Devoxx UK 2024 - Going serverless with Quarkus, GraalVM native images and AWS...
Devoxx UK 2024 - Going serverless with Quarkus, GraalVM native images and AWS...
 

GTECH Implementation - AMR

  • 1. 5/98 article R/3 Installation At A Glance: Selected: June 1994 Installs Completed: February 1995–October 1996 Current release: R/3 Release 3.1G Modules in use: FI, CO, AM, EIS, SD, MM, PS, PP, PM, PD Number of users: Approximately 800 Database: Oracle 7.2.3 Operating System: DEC Unix 3.2G Hardware: Digital Equipment Corporation Alpha Key Complementary Applications: ADP Payroll, TAXWARE Sales/Use Tax System, Hyperion Pillar, Systems Union Sun Accounting, Resumix Resumix System Primary Integrator: In-house personnel
  • 2. Case Study: Building A Modern Infrastructure At GTECH With R/3 By Steven J. Tirone Headquartered in West Greenwich, RI, GTECH is a global manufacturer, facilities management, and service provider for lottery, gaming, and entertainment organizations. GTECH, with operations on 5 continents, had fiscal year 1997 (ended February) revenue of $904.3M. The company has more than 5,000 employees around the world. It has five core business groups: the GTECH Worldwide Lottery Group, Dreamport, GameScape, Transactive, and GTECH Worldserv. In 1994, GTECH decided to move to a modern, unified ERP system. At that time, the company, which then consisted of the GTECH Worldwide Lottery Group and Transactive, did not have a real business system. It instead relied on a patchwork of in-house developed systems, accounting packages, and spreadsheets to maintain its financials, and used the CA-MAXCIM MRP system in its manufacturing operations. GTECH essentially went with SAP from the initial decision to upgrade. The only other vendor under consideration, Baan, was new to the U.S. market and was unable to demo its products for GTECH. In early 1994, SAP was selected to provide GTECH’s business infrastructure. Implementation With the decision to completely revamp its IT base, GTECH bought a full suite of R/3 modules, including Financial Accounting/Asset Accounting (FI), Sales & Distribution (SD), Materials Management (MM), Project System (PS), Production Planning (PP), and Plant Maintenance (PM) modules, as well as the Personnel Planning & Development (PD) element of the Human Resources (HR) module. The implementation, which covered more than 40 U.S. and 20 international sites, was completed in two-and- a-half years at a cost of $12M. The implementation cycle began in July 1994 and was carried out in three distinct phases, based on business processes. During the initial phase, GTECH implemented the FI and SD modules, completing implementation in February 1995. In the second phase, the company began implementation of the MM and PS modules in April 1995, finishing in December 1995. The last phase to be implemented targeted the company’s manufacturing operation, with implementation of the PP, PM, and PD modules beginning in February 1996 and completing in November 1996. GTECH chose not to hire a system integrator to carry out the work, instead relying on in-house personnel supplemented by SAP employees at key points. The effort was led by a steering committee composed of business champions drawn from vice presidents from the operating units and a program manager from GTECH’s IT unit in turn supported by sub-program managers. The implementation team, which numbered up to 100 GTECH personnel, included approximately 20 employees who spent the bulk of their time on the implementation as well as a handful who were completely dedicated to the effort. Most employees, however, did not give up their day-to-day responsibilities. The team made every effort to balance the demands placed on employees, for example, avoid weekend work except during the “go live” phase. The effort encountered a certain level of internal resistance to the changeover of systems from personnel who were comfortable with their existing processes. The steering committee had to mediate, enforcing
  • 3. internal discipline and driving education among the end-users. Much of the credit for the success of the implementation is due to the insistence on dependence on internal personnel to carry out the implementation. Their business knowledge and understanding of in-house issues proved critical in addressing internal concerns and requirements. All in all, however, GTECH personnel were required to adapt existing processes to match R/3, as a key element of the implementation was the mandate to avoid modifying code to keep the project on track. GTECH’s installation runs primarily on Digital Equipment Alpha servers running on DEC Unix 3.2G and supporting an Oracle 7.2.3 database. The current R/3 release in use is 3.1G. GTECH plans to upgrade to R/3 Release 4.0 in 1998, in part because of its support for the Euro unified European currency, which will substantially impact GTECH’s operations abroad. Again, GTECH plans to stick with release functionality and avoid code modification to prevent introducing added complexity. Complementary and Custom Software The implementation team also attempted to minimize interfaces with other applications, to avoid synchronization issues and keep the implementation as straightforward as possible. However, as GTECH has not yet adopted the full R/3 suite, many human resources and certain financial requirements are met by complementary software applications. GTECH uses ADP Payroll, TAXWARE Sales/Use Tax System, Hyperion Pillar for enterprise budget planning, and Resumix Resumix System for resume capture. Going forward, the company expects to adopt the R/3 Treasury (TR) module and the complete Human Resources (HR) module. In Europe, GTECH uses Systems Union’s Sun Accounting package in conjunction with SAP software, which will be displaced at all large European sites by R/3 but will be retained at small sales and support sites. In partnership with SAP, GTECH has also developed an integration interface between the R/3 Project System module and Microsoft Project. Results and Lessons Learned GTECH has realized significant benefits from its complete overhaul of its business infrastructure. The order entry approval cycle has been cut from 15 days to 1 day, while the month-end close has similarly been reduced from 17 down to 2 business days. By creating milestone billing procedures, receivables collection has been improved, leading to the collection of some $250K in previously uncollected revenue. With the implementation of inventory management, U.S. field inventories have reduced by 25% or $1M, while revised export shipping processes have reduced customs penalties by $250K per year. The reengineering of project management, which included the custom-developed integration between Microsoft Project and Project System, provided central control for all customer projects, preventing cost overruns and in the process saving more than $5M since 1996. Among the key lessons GTECH drew from the implementation effort was that management of human factors is perhaps the critical aspect of a successful implementation. The decision to modify business processes to fit R/3 rather than attempt to shape the code around existing practices side-stepped one of the major traditional pitfalls of R/3 implementations, one that has sunk a number of projects. On the other hand, this decision forced the abandonment of long-established practices and required the enforcement of whole new disciplines. Again, the company credits its do-it-yourself approach to implementation as vital to the success of the project, as this tack forced employees to buy-in to R/3. Ultimately, though opinions
  • 4. were mixed for months after change-over, end-user reaction was enthusiastic a year on as the new ways of work became familiar.