1. Jimmy D. Yates
11589 Fuelberth Rd
Pekin Illinois 61554
Home 309-348-1830
Cell 309-642-5178
Email usns42098@yahoo.com
OBJECTIVE
To find long term employment
QUALIFICATIONS
Inspector, pipeline routing for construction feasibility , work space designs , Supervisor & crew chief for global
positioning satellite and conventionalsurvey crews. Also all phases of Pipeline and Highway Construction from
clearing and grubbing to final cleanup. Boundary surveys
INSTRUMENT EXPERIENCE
All Topcon Total stations,Sokkia Set 4A & 3A, Sokkia GPS Tremble TSC 2 And TSC 3 Data Collector, 8 and 10
GPS Systems, Tremble GPS Pro XR/XRS ,all Tremble Equipment & Metro Tech-Line locator
WORK HISTORY
Willbros Eng
2014-2015 Survey for Leech express pickning Compressor sites For construction feasibility
Phillips 66 construction south Texas as built restaking R/W to final clean up
Phillips 66 depth of cover on pipeline crossings in salt water marshes and profile creek and river crossings
Sulpher La
IPS/EPC
2013 – 2014 survey coordinator, pipeline routing for constructon feasibility , workspace designs
Working on boundry ,staking &prelims .
Willbros Eng
2008 –MAY 2013 Survey Coordinator Line MB preliminary survey ,pipeline routing for construction feasibility
And work space designs & Boundary NiSource
Crew Chief on as built in Kentucky on the P line NiSource
Crew Chief on dig ups for replacement and rehabilitation of pipelines NiSource
Crew Chief on a 5 mile as built in West Virginia NiSource
Crew Chief staking for wire lines & pipe replacement Nisource
Crew Chief for placement of 36” pipeline in New York from restaking, placement of pipe, to final cleanup of R/W
Millennium pipeline NiSource
1999- 2007 L. T. MAPPING
Party Chief / Supervisor
St. Joseph MO-Kinder Morgan Rocky Express West – restake for 42” pipeline;
Canadian TX-Oneok – restake and complete asbuilt for 12” pipeline;
Kinder Morgan Rocky Express East-Washington Court House, OH – preliminary survey for
42” Pipeline;
Kinder Morgan Rocky Express West-Beatrice, NE to Mexico, MO- preliminary survey for 42” pipeline And work
space designs
ONG Gas Pipeline – Preliminary survey for 36” pipeline.
Supervisor /Party Chief
Mannford, OK – Plains Pipeline Co.- preliminary and restaking survey for 24” pipeline;
Canadian TX – Koch Pipeline Co – preliminary survey to as built proposed 24” pipeline;
Lake Charles, LA – Sempra Energy Limited – preliminary survey proposed 36” pipeline.
Party Chief for conventional survey crew for Dynegy for 20 mile preliminary survey.
Chico, Texas locating existing pipeline to follow.
Collecting data on well connects and staking well placements in Arkansas and Oklahoma .
2. Asbuilt survey for 36” Terrace 3 for Enbridge. Data collect changes,profile road and streams, chain pipe, stake out
and offset center line pi’s, flag clearing limits. Keep records and drawings of all aspects ofchaining pipe.
Preliminary & asbuilt surveying for 24” Mirant/Bowline construction project. Data collect line changes,profile
roads and streams, chain pipe, stakeout and offset center line pi's flag clearing limits. Preliminary survey for
Hubline Phase 3 project for Maritimes & Northwest. Stakeout and offset center line pi's, flag clearing limits, data
collect line changes,profile roads and streams.
Supervisor Fiber Optic preliminary survey for AT&T fiber optics. Using road right-of-way in Baltimore, Maryland,
Delaware, and New Jersey
Supervisor for Fiber Optic preliminary survey using railroad right-of-way from North Carolina to downtown
Atlanta, GA.
Supervisor. Fiber Optic preliminary survey. Collect data for Williams Company from Houston to Alpine Texas.
Mapping highway right of way from edge of road to right-of-way fence for cable route. Collected all data from
crews, keeping progress going. Worked with 5 crews of mappers.
Supervisor for L.T. Mapping. Fiber Optic preliminary surveying for Williams Company in Kentucky railroad right-
of-way.
1996/1999 FLUOR DANIELS
-Running tight level loops over salt domes for Phillips petroleum Kansas .
-Supervisor Level 3 Communications. Pulling & connecting fiber loops in Denver , Colorado.
-GPS Crew Chief Phillips pipeline preliminary survey and construction asbuilt Witchita to Newton , Kansas
-Fluor Daniels mapping Phillips petroleum pipeline in and around Kansas City, MO
-Fluor Daniels profiling creek crossings for Phillips petroleum pipeline.
-GPS Crew chief for Fluor Daniels The Millenium pipeline in New York doing reroutes and line changes.
-Four Daniels mapping Phillips petroleum pipeline in and aroud Kansas City, MO
-Flour Daniels profiling creek crossings for Phillips Petroleum pipeline.
-GPS Crew Chief Fluor Daniels. The Millenium pipeline in New York doing reroutes and line changes.
-GPS Fluor Daniels. Preliminary survey for Conoco pipeline in Ponca City, Oklahoma .
-GPS Supervisor & Inspectorfor Fluor Daniels. Working on Caspian Sea pipeline in Russia . Preliminary survey
and Pipeline routing for construction feasibility from the Caspian Sea to the Black Sea
-Fluor Daniels GPS Crew Chief on the Millennium Pipeline. Collected data by GPS and conventionalsurvey for
preliminary survey for FERC report. Staked lines and mapping it. Worked with Environmentalist and
Archeologist to map line.
-Preliminary survey and was as built crew chief of chain crew for Texas Eastman from Beaumont to Longview TX
-Replaced 30” line to 36” line for Transco in Maryland .
1994 – 1996 WILBROS ENGINEERING
-Did preliminary survey for Tenneco and Portland Natural Gas in Vermont, New Hampshire, Maine
-Line replacement for Department of Defense on 2 Navy & Marines Base in Hawaii
-Did line changes staking for placement of high power lines for Utah Power and Gas
1978-1994 OKLAHOMA DEPT OF TRANSPORTATION
Senior Highway Construction InspectorII, Oklahoma D.O.T. Inspected all phases ofhighway construction including
utilities relocation, grading, drainage, all concrete paving, drainage structures with proper placement of forms, steel
in walls and deck. Running all required tests on concrete for proper strength,slump and additives. Kept daily
3. diaries of pay quantities,pay estimates, and materials being used on the jobs. .Inspected all phases ofpaving from
the grading setting blue tops to final grade then laying of asphalt sub-base to final concrete road surface.
EDUCATION CERTIFIED
1998 Trimble-Pro XR/XRS NCCER - ID # 4351
1997 G.S. 24-Ashtec Pin map System ISN- ID # 00811886
1987 Concrete construction &Rehabilitation Pipeline Maintained Tech 1 & 2
1985 Material sample school ODOT Abnormal Operating Conditions General
Pipeline
1981 Staking and Surveying school ODOT OQ pertain to LPG & Natural Gas
192-0801 Locating pipelines
Abnormal OPC V2
192-2011 prevention of Accidental
Reference s
Beth Braun Survey Manager Willbros cell 412.439.5488 work 210.399.2297
Derek Klinkenboeg Survey Manager QPS 913.800.1556
Dana Beck cell 817.271.1773