SlideShare ist ein Scribd-Unternehmen logo
1 von 25
Downloaden Sie, um offline zu lesen
© 2013 IBM Corporation
Rational Team Concert
Traditional Development Real-Time Planning
and In-Context Collaboration (Part 2: Demonstration)
Don Cunningham, Rational CTP
don.cunningham@us.ibm.com
3 – April – 2013
© 2013 IBM Corporation
Business needs software & systems development
that supports agility…
Must Deliver:
More solutions
More flexibility
More quality
More value
-yet-
Less risk
Less costs
Less or flat resources
Resources
Business
Needs
Effective software & systems development
promotes a delicate balance of resources,
reducing costs while delivering more, higher-
quality business solutions.
© 2013 IBM Corporation
3
Rational Team Concert is the core of our CLM Solution
Improve productivity with an integrated ALM solution
Rational
Requirements
Composer
Rational
Team Concert
Rational
Quality
Manager
IBM Rational Collaborative
Lifecycle Management Solution
Architect
Analyst Developer
Quality
Professional
Deployment
Engineer
 Optimize your team through
support of the 5 ALM Imperatives
• Real-time planning
• Lifecycle traceability
• In-context collaboration
• Development Intelligence
• Continuous Improvement
 Get up and running quickly
 Extend as your needs evolve
 Support heterogeneous
development across multiple
platforms and technologies
© 2013 IBM Corporation
Real-time dynamic planning
4
• Plans live outside
of ALM environment
• Manual, error-prone updates
• Separate from team activities
and assignments
• Plans fully integrated with execution
• Continuous planning
• Instantly see the impact of changes
to delivery dates
What is the impact of business trade-offs on our current delivery dates?
© 2013 IBM Corporation
Team collaboration across silos
5
• Silo’d teams; disconnected data
• Important discussions are lost to email -
project records are missing the “real
reason” for decisions
• Unified team shares linked data
• ALM environment tracks what is
important for delivering
• “Am I blocking others”
• “Are others waiting for my approval”
www
Every artifact is a web link. Traceability is automated as you perform work.
Empower teams AND provide flexibility to utilize resources from anywhere.
© 2013 IBM Corporation
Rational Team Concert
Software
Configuration
Management
Change
Management
Work Items
Build
Management
Planning Project Transparency
© 2013 IBM Corporation
Rational Team Concert
Software
Configuration
Management
Change
Management
Work Items
Build
Management
Planning Project Transparency
© 2013 IBM Corporation
Traditional Plans
 Release plan
This type of plan is the highest-level plan. It provides a brief overview of the project goals.
Although you can create a release plan for any phase, create this type of plan for an overall
release.
 Phase plan
This type of plan displays the goals to be achieved in a phase. You can create a phase plan
and assign work items that are to be completed in that phase.
 Cross Project plan
This type of plan tracks the schedule of work items in other projects. You can create a cross
project plan, create a tracking work item and add Tracks link to work items in different
projects/plans.
8
© 2013 IBM Corporation
Demonstration #1 – Formal Project Creation
1. Formal Project Creation
2. Review Plans Created
3. Create Backlog Plan
4. Query Work Items Assigned to Me
5. Move Work Items to Requirements Plan
© 2013 IBM Corporation
Project Management Capabilities
 Resource management
The Plan view has an additional Resources tab to manage the allocation of resources to the plan. You can
search for resources with specific start and finish dates and work hours, and add them to the plan. You can
edit or remove these allocations any time. You can also view and manage the use of resources within the
plan period. Warnings are displayed when the work assignments for a resource exceed the availability of
the resource for the plan period.
 Risk management
You can create risk work items to identify problems that might arise during the project, and then create risk
actions to mitigate or counter those problems.
 Gantt chart and critical path
You can use the Gantt chart in the Plan view to see a graphical representation of the plan schedule,
including work item durations and dependencies. The critical path identifies work items that have negative
or no slack and consequently can delay the project.
10
© 2013 IBM Corporation
Demonstration #2 – Resource Management
 User Work Area
o Work Week Allocation
o Project Allocation
 Project Plan Resource Allocation
o Project Exception
© 2013 IBM Corporation
Rational Team Concert
Software
Configuration
Management
Change
Management
Work Items
Build
Management
Planning Project Transparency
© 2013 IBM Corporation
Formal Project Template – Work Items
 Defect – correct verification test finding
 Task – activity to do something in the project
 Project Change Request – Change something in a project
 Business Need – Define a need for some feature
 Issue – Unforeseen project need that needs to be addressed
 Risk – Identify and quantify risk of something happening
 Risk Action – Activity to mitigate risk occurrence
 Milestone – A date something needs to start or end
13
© 2013 IBM Corporation
Demonstration #3 – Project Plan Development
 Review Work Items Created
 Create Risk & Risk Action Work Items
 Create Risk Parent – Child Relationship
© 2013 IBM Corporation
Dependencies and Constraints
Dependencies
 Finish-to-start
Constraints
 As soon as possible
 Start no earlier than
 Finish no later than
15
© 2013 IBM Corporation
Creating Dependency – Link Relationship
16
© 2013 IBM Corporation
Constraints
17
© 2013 IBM Corporation
Critical Path
18
© 2013 IBM Corporation
Demonstration #4 – Project Plan Development
 Add Task & Milestone Work Items
 Create a Dependencies
 Create a Planned Snapshot
 Compare Snapshots
 Review Schedule Variance
© 2013 IBM Corporation
Summary
Formal Project Template
 Traditional Project Management (Waterfall, Iterative)
 Project Plans (Release, Plan, Cross Project)
 Work Items (Task, Project Change Requests, Risk, Milestone)
 Dependency and Constraints (As Soon As Possible, Dates)
Benefits (Real-Time Updates)
 Project Status
 Critical Path Analysis
 Resource Management
 Risk Identification & Mitigation
20
© 2013 IBM Corporation
Delivering greater value with reduced cost..
Pains
 Information was distributed
 No single view of work, productivity, quality, etc across the
enterprise
 Supporting Multiple Tools: Mingle, Rally, Xplanner,
Version One
Goals
 Lower our maintenance cost by moving to a single
platform
 Gain visibility into work across the enterprise
through reporting
 Lower training costs
 Reduce time spent on work item mgmt and
planning
Results
Summary of Annual Savings - Total $ 4.79 M
 Planning automation - $ 389 K
 Daily scrum meetings time reduced - $ 810 K
 Quality Improvement - $ 194 K
 Reduced effort to manage work items - $1.2 M
 Project reporting - $ 130 K
 Reduced time determining project status - $987 K
 Reduced time to establish new teams - $ 432 K
 Reduction of duplicate efforts - $ 648 K
“We are able to build dashboards and wikis to push information back to the
project teams, They don’t have to waste time coming down and waiting for
status reports , they can actually see real time information on a daily basis as
opposed to waiting for a weekly or biweekly report, tremendous benefit across
the organization as a whole”.
Bryan Alltop, Iteration Manager Competency Leader
Video Link
© 2013 IBM Corporation
For more information
 Find out more about Rational Team Concert
• http://ibm.com/rational/rtc
 Explore Rational Team Concert tutorials, demos, downloads
and other developer learning resources
• https://jazz.net/projects/rational-team-concert/
 Check for the latest RTC integrations
• http://jazz.net/projects/rational-team-concert/integrations/
 Watch a customer video testimonial (4 min)
• http://www.mdma.tv/tc/short.html
 Try the RTC ROI Calculator
• http://www.ibm.com/rational/rtc/roi
© 2013 IBM Corporation
Presentation Resources
The traditional scheduler in IBM Rational Team Concert 4.0
Traditional planning: Managing formal projects in Rational Team Concert 4.0
Microsoft Project integration with Rational Team Concert, Version 4.0
Sharoon Shetty Kuriyala, IBM
Last updated: May 18, 2012
Build basis: Rational Team Concert 4.0
23
© 2013 IBM Corporation24
www.ibm.com/software/rational
© 2013 IBM Corporation25
© Copyright IBM Corporation 2011. All rights reserved. The information contained in these materials is provided for informational purposes only, and is provided AS IS without warranty of any kind,
express or implied. IBM shall not be responsible for any damages arising out of the use of, or otherwise related to, these materials. Nothing contained in these materials is intended to, nor shall have
the effect of, creating any warranties or representations from IBM or its suppliers or licensors, or altering the terms and conditions of the applicable license agreement governing the use of IBM
software. References in these materials to IBM products, programs, or services do not imply that they will be available in all countries in which IBM operates. Product release dates and/or capabilities
referenced in these materials may change at any time at IBM’s sole discretion based on market opportunities or other factors, and are not intended to be a commitment to future product or feature
availability in any way. IBM, the IBM logo, Rational, the Rational logo, Telelogic, the Telelogic logo, and other IBM products and services are trademarks of the International Business Machines
Corporation, in the United States, other countries or both. Other company, product, or service names may be trademarks or service marks of others.
www.ibm.com/software/rational

Weitere ähnliche Inhalte

Was ist angesagt?

Case Study: Experiences Using IBM Rational Method Composer to Deliver a BPM I...
Case Study: Experiences Using IBM Rational Method Composer to Deliver a BPM I...Case Study: Experiences Using IBM Rational Method Composer to Deliver a BPM I...
Case Study: Experiences Using IBM Rational Method Composer to Deliver a BPM I...
ghodgkinson
 
Improving Predictability and Efficiency with Kanban Metrics using Rational In...
Improving Predictability and Efficiency with Kanban Metrics using Rational In...Improving Predictability and Efficiency with Kanban Metrics using Rational In...
Improving Predictability and Efficiency with Kanban Metrics using Rational In...
Paulo Lacerda
 

Was ist angesagt? (20)

Activites and Time Planning
 Activites and Time Planning Activites and Time Planning
Activites and Time Planning
 
Oracle Fusion HCM Adoption Workshop
Oracle Fusion HCM Adoption WorkshopOracle Fusion HCM Adoption Workshop
Oracle Fusion HCM Adoption Workshop
 
Scrum With Ms Project
Scrum With Ms ProjectScrum With Ms Project
Scrum With Ms Project
 
Rsc 2009 Understanding Ibm Rational Method Composer
Rsc 2009   Understanding Ibm Rational Method ComposerRsc 2009   Understanding Ibm Rational Method Composer
Rsc 2009 Understanding Ibm Rational Method Composer
 
Project Management on SAP Business One for Consulting and Software Companies
Project Management on SAP Business One for Consulting and Software CompaniesProject Management on SAP Business One for Consulting and Software Companies
Project Management on SAP Business One for Consulting and Software Companies
 
EPM Episode #002 Microsoft Project Server 2013 Functional Features
EPM Episode #002 Microsoft Project Server 2013 Functional FeaturesEPM Episode #002 Microsoft Project Server 2013 Functional Features
EPM Episode #002 Microsoft Project Server 2013 Functional Features
 
DHS - Using functions points to estimate agile development programs (v2)
DHS - Using functions points to estimate agile development programs (v2)DHS - Using functions points to estimate agile development programs (v2)
DHS - Using functions points to estimate agile development programs (v2)
 
Case Study: Experiences Using IBM Rational Method Composer to Deliver a BPM I...
Case Study: Experiences Using IBM Rational Method Composer to Deliver a BPM I...Case Study: Experiences Using IBM Rational Method Composer to Deliver a BPM I...
Case Study: Experiences Using IBM Rational Method Composer to Deliver a BPM I...
 
ERP - Implementation is The Challenge
ERP - Implementation is The ChallengeERP - Implementation is The Challenge
ERP - Implementation is The Challenge
 
Project Management and IT − Recorded Webinar by Dennis Drogseth
Project Management and IT − Recorded Webinar by Dennis DrogsethProject Management and IT − Recorded Webinar by Dennis Drogseth
Project Management and IT − Recorded Webinar by Dennis Drogseth
 
Building Formulas And Dashboard In Ms Project
Building Formulas And Dashboard In Ms ProjectBuilding Formulas And Dashboard In Ms Project
Building Formulas And Dashboard In Ms Project
 
Improving Predictability and Efficiency with Kanban Metrics using Rational In...
Improving Predictability and Efficiency with Kanban Metrics using Rational In...Improving Predictability and Efficiency with Kanban Metrics using Rational In...
Improving Predictability and Efficiency with Kanban Metrics using Rational In...
 
ERP/SAP Project Charter
ERP/SAP Project CharterERP/SAP Project Charter
ERP/SAP Project Charter
 
Using the PeopleSoft HCM 9.2 PUM (PeopleSoft Update Manager) for Upgrades and...
Using the PeopleSoft HCM 9.2 PUM (PeopleSoft Update Manager) for Upgrades and...Using the PeopleSoft HCM 9.2 PUM (PeopleSoft Update Manager) for Upgrades and...
Using the PeopleSoft HCM 9.2 PUM (PeopleSoft Update Manager) for Upgrades and...
 
ServiceDesk Plus Project Management
ServiceDesk Plus Project ManagementServiceDesk Plus Project Management
ServiceDesk Plus Project Management
 
MIPRO Consulting - PeopleSoft HCM 9.2
MIPRO Consulting - PeopleSoft HCM 9.2MIPRO Consulting - PeopleSoft HCM 9.2
MIPRO Consulting - PeopleSoft HCM 9.2
 
BPM BlueWorks Workshop Scenario
BPM BlueWorks Workshop ScenarioBPM BlueWorks Workshop Scenario
BPM BlueWorks Workshop Scenario
 
Using Microsoft Project 2003
Using Microsoft Project 2003Using Microsoft Project 2003
Using Microsoft Project 2003
 
Business process analysis and design – importance of having a common language...
Business process analysis and design – importance of having a common language...Business process analysis and design – importance of having a common language...
Business process analysis and design – importance of having a common language...
 
8 Steps To Microsoft Project Success
8 Steps To Microsoft Project Success8 Steps To Microsoft Project Success
8 Steps To Microsoft Project Success
 

Ähnlich wie 4.3.2013 Tool Demo - Traditional Development RTC Planning In Context Collaboration

IBM UrbanCode Deploy Quick Start Service Offering
IBM UrbanCode Deploy Quick Start Service OfferingIBM UrbanCode Deploy Quick Start Service Offering
IBM UrbanCode Deploy Quick Start Service Offering
IBM Rational software
 
Ibmmobilefirstdevopsdc 140311164526-phpapp02
Ibmmobilefirstdevopsdc 140311164526-phpapp02Ibmmobilefirstdevopsdc 140311164526-phpapp02
Ibmmobilefirstdevopsdc 140311164526-phpapp02
Shetal Patel
 
Assisted deployment services offering overview
Assisted deployment services offering overviewAssisted deployment services offering overview
Assisted deployment services offering overview
IBM Rational software
 
Introducing agilealm
Introducing agilealmIntroducing agilealm
Introducing agilealm
Matt Holitza
 

Ähnlich wie 4.3.2013 Tool Demo - Traditional Development RTC Planning In Context Collaboration (20)

IBM UrbanCode Deploy Quick Start Service Offering
IBM UrbanCode Deploy Quick Start Service OfferingIBM UrbanCode Deploy Quick Start Service Offering
IBM UrbanCode Deploy Quick Start Service Offering
 
IBM MobileFirst DevOps IEG DC Event
IBM MobileFirst DevOps IEG DC EventIBM MobileFirst DevOps IEG DC Event
IBM MobileFirst DevOps IEG DC Event
 
Ibmmobilefirstdevopsdc 140311164526-phpapp02
Ibmmobilefirstdevopsdc 140311164526-phpapp02Ibmmobilefirstdevopsdc 140311164526-phpapp02
Ibmmobilefirstdevopsdc 140311164526-phpapp02
 
Assisted deployment services offering overview
Assisted deployment services offering overviewAssisted deployment services offering overview
Assisted deployment services offering overview
 
Innovate presentation
Innovate presentationInnovate presentation
Innovate presentation
 
Innovate session-2333
Innovate session-2333Innovate session-2333
Innovate session-2333
 
IBM Rational
IBM RationalIBM Rational
IBM Rational
 
Metrics for Mofel-Based Systems Development
Metrics for Mofel-Based Systems DevelopmentMetrics for Mofel-Based Systems Development
Metrics for Mofel-Based Systems Development
 
Comparison and Analysis of Project Management software
Comparison and Analysis of Project Management softwareComparison and Analysis of Project Management software
Comparison and Analysis of Project Management software
 
IBM Z for the Digital Enterprise 2018 - Automate Delivery Pipeline
IBM Z for the Digital Enterprise 2018 - Automate Delivery PipelineIBM Z for the Digital Enterprise 2018 - Automate Delivery Pipeline
IBM Z for the Digital Enterprise 2018 - Automate Delivery Pipeline
 
From Continuous Integration to DevOps - Japan Innovate 2013
From Continuous Integration to DevOps - Japan Innovate 2013From Continuous Integration to DevOps - Japan Innovate 2013
From Continuous Integration to DevOps - Japan Innovate 2013
 
SSE SE Practices Introduction
SSE SE Practices IntroductionSSE SE Practices Introduction
SSE SE Practices Introduction
 
Avoiding the Release Weekend
Avoiding the Release Weekend Avoiding the Release Weekend
Avoiding the Release Weekend
 
Platform Health Assessment at Department of Homeland Security Citizenship and...
Platform Health Assessment at Department of Homeland Security Citizenship and...Platform Health Assessment at Department of Homeland Security Citizenship and...
Platform Health Assessment at Department of Homeland Security Citizenship and...
 
Primavera Training P6
Primavera Training P6Primavera Training P6
Primavera Training P6
 
Building the case for custom software
Building the case for custom softwareBuilding the case for custom software
Building the case for custom software
 
Introducing the Rational Solution for Agile ALM
Introducing the Rational Solution for Agile ALMIntroducing the Rational Solution for Agile ALM
Introducing the Rational Solution for Agile ALM
 
Introducing agilealm
Introducing agilealmIntroducing agilealm
Introducing agilealm
 
PlanENDoc
PlanENDocPlanENDoc
PlanENDoc
 
Rapid Application Development & Prototyping
Rapid Application Development & PrototypingRapid Application Development & Prototyping
Rapid Application Development & Prototyping
 

Mehr von IBM Rational

6.13.2013 2013 - Software, System, & IT Architecture - Good Design is Good Bu...
6.13.2013 2013 - Software, System, & IT Architecture - Good Design is Good Bu...6.13.2013 2013 - Software, System, & IT Architecture - Good Design is Good Bu...
6.13.2013 2013 - Software, System, & IT Architecture - Good Design is Good Bu...
IBM Rational
 
120906 inchron rhapsody enlightenment
120906 inchron rhapsody enlightenment120906 inchron rhapsody enlightenment
120906 inchron rhapsody enlightenment
IBM Rational
 

Mehr von IBM Rational (15)

10.15.2013 System Development - Rational Solution for Audit Compliance - Repo...
10.15.2013 System Development - Rational Solution for Audit Compliance - Repo...10.15.2013 System Development - Rational Solution for Audit Compliance - Repo...
10.15.2013 System Development - Rational Solution for Audit Compliance - Repo...
 
9.16.2013 Enlightenment Series - Managing parallel development with RTC: A st...
9.16.2013 Enlightenment Series - Managing parallel development with RTC: A st...9.16.2013 Enlightenment Series - Managing parallel development with RTC: A st...
9.16.2013 Enlightenment Series - Managing parallel development with RTC: A st...
 
10.8.2013 Continuous Delivery - Mobile Applications
10.8.2013 Continuous Delivery - Mobile Applications10.8.2013 Continuous Delivery - Mobile Applications
10.8.2013 Continuous Delivery - Mobile Applications
 
6.18.2013 System Development - Change/Configuration and Collaboration - RTC
6.18.2013 System Development - Change/Configuration and Collaboration - RTC6.18.2013 System Development - Change/Configuration and Collaboration - RTC
6.18.2013 System Development - Change/Configuration and Collaboration - RTC
 
4.9.2013 Continuous Delivery - Extending Agile Development; A Lean Approach
4.9.2013 Continuous Delivery - Extending Agile Development; A Lean Approach4.9.2013 Continuous Delivery - Extending Agile Development; A Lean Approach
4.9.2013 Continuous Delivery - Extending Agile Development; A Lean Approach
 
4.16.2013 Prj & Port Mgmt SftDev - What is Application Portfolio Management -...
4.16.2013 Prj & Port Mgmt SftDev - What is Application Portfolio Management -...4.16.2013 Prj & Port Mgmt SftDev - What is Application Portfolio Management -...
4.16.2013 Prj & Port Mgmt SftDev - What is Application Portfolio Management -...
 
4.4.2013 Software Quality - Regression Testing Automated and Manual - RFT/RQM
4.4.2013 Software Quality - Regression Testing Automated and Manual - RFT/RQM4.4.2013 Software Quality - Regression Testing Automated and Manual - RFT/RQM
4.4.2013 Software Quality - Regression Testing Automated and Manual - RFT/RQM
 
6.18.2013 - 2013 - Prj & Port Mgmt SftDev - Portfolio Management - For the ...
6.18.2013 -  2013 - Prj & Port Mgmt SftDev - Portfolio Management -  For the ...6.18.2013 -  2013 - Prj & Port Mgmt SftDev - Portfolio Management -  For the ...
6.18.2013 - 2013 - Prj & Port Mgmt SftDev - Portfolio Management - For the ...
 
6.13.2013 2013 - Software, System, & IT Architecture - Good Design is Good Bu...
6.13.2013 2013 - Software, System, & IT Architecture - Good Design is Good Bu...6.13.2013 2013 - Software, System, & IT Architecture - Good Design is Good Bu...
6.13.2013 2013 - Software, System, & IT Architecture - Good Design is Good Bu...
 
6.11.2013 - 2013 - Continuous Delivery - Testing for Agile Through Continuo...
6.11.2013   - 2013 - Continuous Delivery - Testing for Agile Through Continuo...6.11.2013   - 2013 - Continuous Delivery - Testing for Agile Through Continuo...
6.11.2013 - 2013 - Continuous Delivery - Testing for Agile Through Continuo...
 
6.11.2013 - 2013 - Mobile Dev - Distributed Build for Mobile with Rational ...
6.11.2013 -   2013 - Mobile Dev - Distributed Build for Mobile with Rational ...6.11.2013 -   2013 - Mobile Dev - Distributed Build for Mobile with Rational ...
6.11.2013 - 2013 - Mobile Dev - Distributed Build for Mobile with Rational ...
 
5.2.2013 2013 2013 - Software, System, & IT Architecture - Good Design is G...
5.2.2013 2013   2013 - Software, System, & IT Architecture - Good Design is G...5.2.2013 2013   2013 - Software, System, & IT Architecture - Good Design is G...
5.2.2013 2013 2013 - Software, System, & IT Architecture - Good Design is G...
 
4.4.2013 Software, System, & IT Architecture - Good Design is Good Business:...
4.4.2013  Software, System, & IT Architecture - Good Design is Good Business:...4.4.2013  Software, System, & IT Architecture - Good Design is Good Business:...
4.4.2013 Software, System, & IT Architecture - Good Design is Good Business:...
 
120906 inchron rhapsody enlightenment
120906 inchron rhapsody enlightenment120906 inchron rhapsody enlightenment
120906 inchron rhapsody enlightenment
 
Importing with ease july 2012
Importing with ease july 2012Importing with ease july 2012
Importing with ease july 2012
 

Kürzlich hochgeladen

Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
WSO2
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Victor Rentea
 

Kürzlich hochgeladen (20)

Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..Understanding the FAA Part 107 License ..
Understanding the FAA Part 107 License ..
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering Developers
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024Finding Java's Hidden Performance Traps @ DevoxxUK 2024
Finding Java's Hidden Performance Traps @ DevoxxUK 2024
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
Spring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUKSpring Boot vs Quarkus the ultimate battle - DevoxxUK
Spring Boot vs Quarkus the ultimate battle - DevoxxUK
 

4.3.2013 Tool Demo - Traditional Development RTC Planning In Context Collaboration

  • 1. © 2013 IBM Corporation Rational Team Concert Traditional Development Real-Time Planning and In-Context Collaboration (Part 2: Demonstration) Don Cunningham, Rational CTP don.cunningham@us.ibm.com 3 – April – 2013
  • 2. © 2013 IBM Corporation Business needs software & systems development that supports agility… Must Deliver: More solutions More flexibility More quality More value -yet- Less risk Less costs Less or flat resources Resources Business Needs Effective software & systems development promotes a delicate balance of resources, reducing costs while delivering more, higher- quality business solutions.
  • 3. © 2013 IBM Corporation 3 Rational Team Concert is the core of our CLM Solution Improve productivity with an integrated ALM solution Rational Requirements Composer Rational Team Concert Rational Quality Manager IBM Rational Collaborative Lifecycle Management Solution Architect Analyst Developer Quality Professional Deployment Engineer  Optimize your team through support of the 5 ALM Imperatives • Real-time planning • Lifecycle traceability • In-context collaboration • Development Intelligence • Continuous Improvement  Get up and running quickly  Extend as your needs evolve  Support heterogeneous development across multiple platforms and technologies
  • 4. © 2013 IBM Corporation Real-time dynamic planning 4 • Plans live outside of ALM environment • Manual, error-prone updates • Separate from team activities and assignments • Plans fully integrated with execution • Continuous planning • Instantly see the impact of changes to delivery dates What is the impact of business trade-offs on our current delivery dates?
  • 5. © 2013 IBM Corporation Team collaboration across silos 5 • Silo’d teams; disconnected data • Important discussions are lost to email - project records are missing the “real reason” for decisions • Unified team shares linked data • ALM environment tracks what is important for delivering • “Am I blocking others” • “Are others waiting for my approval” www Every artifact is a web link. Traceability is automated as you perform work. Empower teams AND provide flexibility to utilize resources from anywhere.
  • 6. © 2013 IBM Corporation Rational Team Concert Software Configuration Management Change Management Work Items Build Management Planning Project Transparency
  • 7. © 2013 IBM Corporation Rational Team Concert Software Configuration Management Change Management Work Items Build Management Planning Project Transparency
  • 8. © 2013 IBM Corporation Traditional Plans  Release plan This type of plan is the highest-level plan. It provides a brief overview of the project goals. Although you can create a release plan for any phase, create this type of plan for an overall release.  Phase plan This type of plan displays the goals to be achieved in a phase. You can create a phase plan and assign work items that are to be completed in that phase.  Cross Project plan This type of plan tracks the schedule of work items in other projects. You can create a cross project plan, create a tracking work item and add Tracks link to work items in different projects/plans. 8
  • 9. © 2013 IBM Corporation Demonstration #1 – Formal Project Creation 1. Formal Project Creation 2. Review Plans Created 3. Create Backlog Plan 4. Query Work Items Assigned to Me 5. Move Work Items to Requirements Plan
  • 10. © 2013 IBM Corporation Project Management Capabilities  Resource management The Plan view has an additional Resources tab to manage the allocation of resources to the plan. You can search for resources with specific start and finish dates and work hours, and add them to the plan. You can edit or remove these allocations any time. You can also view and manage the use of resources within the plan period. Warnings are displayed when the work assignments for a resource exceed the availability of the resource for the plan period.  Risk management You can create risk work items to identify problems that might arise during the project, and then create risk actions to mitigate or counter those problems.  Gantt chart and critical path You can use the Gantt chart in the Plan view to see a graphical representation of the plan schedule, including work item durations and dependencies. The critical path identifies work items that have negative or no slack and consequently can delay the project. 10
  • 11. © 2013 IBM Corporation Demonstration #2 – Resource Management  User Work Area o Work Week Allocation o Project Allocation  Project Plan Resource Allocation o Project Exception
  • 12. © 2013 IBM Corporation Rational Team Concert Software Configuration Management Change Management Work Items Build Management Planning Project Transparency
  • 13. © 2013 IBM Corporation Formal Project Template – Work Items  Defect – correct verification test finding  Task – activity to do something in the project  Project Change Request – Change something in a project  Business Need – Define a need for some feature  Issue – Unforeseen project need that needs to be addressed  Risk – Identify and quantify risk of something happening  Risk Action – Activity to mitigate risk occurrence  Milestone – A date something needs to start or end 13
  • 14. © 2013 IBM Corporation Demonstration #3 – Project Plan Development  Review Work Items Created  Create Risk & Risk Action Work Items  Create Risk Parent – Child Relationship
  • 15. © 2013 IBM Corporation Dependencies and Constraints Dependencies  Finish-to-start Constraints  As soon as possible  Start no earlier than  Finish no later than 15
  • 16. © 2013 IBM Corporation Creating Dependency – Link Relationship 16
  • 17. © 2013 IBM Corporation Constraints 17
  • 18. © 2013 IBM Corporation Critical Path 18
  • 19. © 2013 IBM Corporation Demonstration #4 – Project Plan Development  Add Task & Milestone Work Items  Create a Dependencies  Create a Planned Snapshot  Compare Snapshots  Review Schedule Variance
  • 20. © 2013 IBM Corporation Summary Formal Project Template  Traditional Project Management (Waterfall, Iterative)  Project Plans (Release, Plan, Cross Project)  Work Items (Task, Project Change Requests, Risk, Milestone)  Dependency and Constraints (As Soon As Possible, Dates) Benefits (Real-Time Updates)  Project Status  Critical Path Analysis  Resource Management  Risk Identification & Mitigation 20
  • 21. © 2013 IBM Corporation Delivering greater value with reduced cost.. Pains  Information was distributed  No single view of work, productivity, quality, etc across the enterprise  Supporting Multiple Tools: Mingle, Rally, Xplanner, Version One Goals  Lower our maintenance cost by moving to a single platform  Gain visibility into work across the enterprise through reporting  Lower training costs  Reduce time spent on work item mgmt and planning Results Summary of Annual Savings - Total $ 4.79 M  Planning automation - $ 389 K  Daily scrum meetings time reduced - $ 810 K  Quality Improvement - $ 194 K  Reduced effort to manage work items - $1.2 M  Project reporting - $ 130 K  Reduced time determining project status - $987 K  Reduced time to establish new teams - $ 432 K  Reduction of duplicate efforts - $ 648 K “We are able to build dashboards and wikis to push information back to the project teams, They don’t have to waste time coming down and waiting for status reports , they can actually see real time information on a daily basis as opposed to waiting for a weekly or biweekly report, tremendous benefit across the organization as a whole”. Bryan Alltop, Iteration Manager Competency Leader Video Link
  • 22. © 2013 IBM Corporation For more information  Find out more about Rational Team Concert • http://ibm.com/rational/rtc  Explore Rational Team Concert tutorials, demos, downloads and other developer learning resources • https://jazz.net/projects/rational-team-concert/  Check for the latest RTC integrations • http://jazz.net/projects/rational-team-concert/integrations/  Watch a customer video testimonial (4 min) • http://www.mdma.tv/tc/short.html  Try the RTC ROI Calculator • http://www.ibm.com/rational/rtc/roi
  • 23. © 2013 IBM Corporation Presentation Resources The traditional scheduler in IBM Rational Team Concert 4.0 Traditional planning: Managing formal projects in Rational Team Concert 4.0 Microsoft Project integration with Rational Team Concert, Version 4.0 Sharoon Shetty Kuriyala, IBM Last updated: May 18, 2012 Build basis: Rational Team Concert 4.0 23
  • 24. © 2013 IBM Corporation24 www.ibm.com/software/rational
  • 25. © 2013 IBM Corporation25 © Copyright IBM Corporation 2011. All rights reserved. The information contained in these materials is provided for informational purposes only, and is provided AS IS without warranty of any kind, express or implied. IBM shall not be responsible for any damages arising out of the use of, or otherwise related to, these materials. Nothing contained in these materials is intended to, nor shall have the effect of, creating any warranties or representations from IBM or its suppliers or licensors, or altering the terms and conditions of the applicable license agreement governing the use of IBM software. References in these materials to IBM products, programs, or services do not imply that they will be available in all countries in which IBM operates. Product release dates and/or capabilities referenced in these materials may change at any time at IBM’s sole discretion based on market opportunities or other factors, and are not intended to be a commitment to future product or feature availability in any way. IBM, the IBM logo, Rational, the Rational logo, Telelogic, the Telelogic logo, and other IBM products and services are trademarks of the International Business Machines Corporation, in the United States, other countries or both. Other company, product, or service names may be trademarks or service marks of others. www.ibm.com/software/rational