Tsung Fai, JEFF CHAN
Page 1
Profession
Chartered Quantity Surveyor
Professional Qualifications
MCInstCES
MHKIS
Educational Background
BSc (Hons) in Surveying
HD - BTM (Surveying)
Languages
English
Mandarin Chinese
Cantonese Chinese
Contact
+44(0) 740 538 4186
E-mail
Jeff_fai@hotmail.com
Current Visa Type
Tier 5 YMS Visa
Driving license in the UK
Valid
EMPLOYMENT HISTORY
BBMV Joint Venture
July 2015 – Current
Quantity Surveyor (Current Position)
GammonConstruction Limited
July 2010 – May 2015
Quantity Surveyor (I) (Latest Position)
Projects Reference
BBMV Joint Venture
(Balfour Beatty / BeMo Tunnelling / Morgan
Sindall / Vinci Construction)
July 2015 - Current
Contract C510
Crossrail Liverpool Streetand Whitechapel
Station Tunnels
Location
London
Contract Sum
HK$3,000 Millions
GBP£250 Millions
Form of Contract
NEC 3
Engineering and Construction Contract 2005
Type of Contract
Option C
Target Cost w ith Activity Schedule
Method of Measurement
SMM7
Project Description
Sprayed Concrete Lining (SCL) w orks for both
Whitechapel and Liverpool Street station
tunnels
Main Responsibilities
 As a QS;
 Management of the measurement w orks
of the quantities for the development;
 Management and administration of the
major Sub-Contract accounts, including
assessment of interim payments to the
Sub-Contractors;
 Forecast exercises.
GammonConstruction Limited
2010 – 2011, 2012 - M ay2015
Widening of Tolo Highway/ Fanling
Highway Between Island House
Interchange and Fanling (Stage 1 - Ma Wo to
Tai Hang)
Location
Hong Kong
Contract Sum
HK$2,382 Millions
GBP£198 Millions
Form of Contract
General Conditions of Contract for Civil
Engineering Works 1999 Edition
Type of Contract
Re-measurement Contract
Method of Measurement
Standard Method of Measurement for Civil
Engineering Works 1992 Edition
Project Description
Widening of a section of Tolo Highw ay / Fanling
Highw ay of approximately 3.5km long betw een
Ma Wo and Tai Hang from the existing dual
3-lane carriagewayto a dual 4-lane
carriageway;construction of eight vehicular
bridges and modification /demolition of the
existing bridges; construction of allassociated
interchanges and utilities
Main Responsibilities
 As an AQS (2010-2011);
 As a QS (2012-2015);
 Measurement w orks;
 Forecast exercises;
 Management and administration of the
Sub-Contract accounts, including
sub-letting, tender analysis, holding a
tender interview meeting, production of
Sub-Contract documents and assessment
of interim payment to the
Sub-Contractors;
 Identifying and valuating the variations.
GammonConstruction Limited
2011 - 2012
Foundation and Pipe Pile Wall Works for
Proposed Residential Development at
Austin Station
Location
Hong Kong
Contract Sum
HK$213 Millions
GBP£18 Millions
Form of Contract
Agreement & Schedule of Conditions of
Building Contract for use in Hong Kong Special
Administrative Region Private Edition – Without
Quantities 1999 Edition
Type of Contract
Lump Sum Fixed Price w ithout Quantities
Method of Measurement
SMM4
Project Description
Design, Supply and Installation of bored piles
foundation systemand pipe pile w alls;
Excavation and Installation of shoring,
strutting , w ailing beams and legging w allfor
ELS w orks; Design and Construction of pile
caps
Main Responsibilities
 As an AQS;
 Administered the main contract w orks;
 Preparation of tender documents;
 Tenders analysis;
 Preparation of Sub-contract documents
for sub-contract works;
 Management and administration of
sub-contractors;
 Valuation of variations.
Tsung Fai, JEFF CHAN
Page 2
Supplementary Information to Jeff Chan’s CV
PROFESSIONAL QUALIFICATIONS
MCInstCES
2015
The Chartered Institution of Civil Engineering Surveyors (ICES) began in 1969 as the Association of Surveyors in Civil Engineering
and was incorporated in 1972.Jeff chartered and got the full membership ofthe ICES in Jan 2015.
MHKIS
2014
Jeff passed the APC exam and qualified as a professional Quantity Surveyor in March 2014. Jeff also become the cooperate memb er
of the Hong Kong Institute of Surveyors (HKIS) which is the only surveying professional body incorporated by ordinance in Hong
Kong.
EDUCATIONAL BACKGROUND
BSc (Hons) in Surveying
2008 - 2010
Jeff graduated in 2010 in the Hong Kong Polytechnic University (the PolyU) with a 2:1 grade. He had chosen Quantity Surveying as
his major subject and got a grade A in his final year dissertation, titled “A Critical Study of the Briefing Process of the Public-sector
Design-and-Build Construction Projects in Hong Kong”, which the PolyU has printed an extra copy of his dissertation for other
students’ reference in the library.
Higher Diploma in Building Technology and Management (Surveying)
2006 - 2008
Jeffcompleted a Higher Diploma course in Building Technologyand Management(Surveying) in the PolyU and achieved a Distinction
resultin 2008.
Shatin Government Secondary School
1999 - 2006
Jeff completed his 7-year secondaryschool education in Hong Kong in 2006.
EMPLOYMENT HISTORY
1.) BBMV Joint Venture (BBMV JV)
Four of the world’s leading construction companies have established BBMV, an integrated team to deliver major packages of the
Crossrail Project
Year of employment
July 2015 – Current
Position
Quantity Surveyor
Description
BBMV, the jointventure encompassing Balfour Beatty, BeMo Tunnelling,Morgan Sindall and VINCI Construction,is constructing early
access shafts and Sprayed Concrete Lining (SCL) works for both Whitechapel and Liverpool Streetstation tunnels.
ROUTINE DUTIES AND RESPONSIBILITIES
1.) Contract C510 - Crossrail Liverpool Street and Whitechapel Station Tunnels
Connecting the City, Canary Wharf, the West End and Heathrow Airport to commuter areas east and west of London, Crossrail is a
major new rail link project designed to provide a world-class, affordable railway with high frequency, convenient and accessible
services across the capital. The major construction works for C510 began in April 2011 and includes the construction of the Crossrail
Whitechapel and Liverpool Street Station SCL tunnels.
During Jeff’s employment in BBMV JV, Jeff has participated in this Crossrail project, currently the biggest civil and building project in
London, for over a year and gained first project experience in London as a Quantity Surveyor. Four of the world’s leading construction
companies have established BBMV, an integrated team to deliver major packages ofthe Crossrail Projectefficiently.
Tsung Fai, JEFF CHAN
Page 3
ROUTINE DUTIES AND RESPONSIBILITIES (Cont’d)
MeasurementWorks
Jeff is assigned to manage the measurement works ofthe quantities for the development.
Forecasting and costcontrol exercises
Jeff is also responsible for forecasting final costs ofsubcontractpackages for assuring the certainty of final costs ofthe project.
Managementand administration ofthe Sub-Contractaccounts
Jeff is playing an active role in the management and administration of the Sub-Contract accounts. He is currently managing major
Sub-Contractors accounts in the project, i.e. Temporary Works Design, Soil Excavation & Disposal, Construction of SCL tunnels and
Waterproofing SheetMembrane Installation
EMPLOYMENT HISTORY (Cont’d)
2.) Gammon Construction Limited
The most famous and well-known main-contracting firm in Hong Kong while Balfour Beatty and Jardine are the shareholders of
Gammon
Year of employment
July 2010 – May 2015
Position
Oct 2014 – May 2015
Promoted as Quantity Surveyor (I)
July 2013 – Oct 2014
Promoted as Quantity Surveyor (II)
July 2010 – July 2013
Employed as AssistantQuantity Surveyor
Description
Gammon provided Jeff an all-round 30-month training program that allowed him rotating to different projects and departments. Jeff
has gained his construction knowledge in different aspects, from the pre-construction stage to the post-construction stage, during the
training period and understood the operation ofa large-scale main contracting firm.
Jan 2013 – May 2015 (2 years & 5 months)
Widening of Tolo Highwayproject, Civil (Infrastructure) project
Oct 2012 – Dec 2012 (3 months)
Estimating Department(End of 30-month training program)
July 2012 – Sep 2012 (3 months)
Claims Department
Jun 2012 – Jun 2012 (1 month)
ProcurementDepartment
Apr 2012 – May 2012 (2 months)
Legal and Insurance Department
Aug 2011 – Mar 2012 (8 months)
Foundation and Pipe Pile Wall Works at Austin Station, Foundation Project
Jul 2010 – Jul 2011 (13 months)
Widening of Tolo Highwayproject, Civil (Infrastructure) project
Tsung Fai, JEFF CHAN
Page 4
ROUTINE DUTIES AND RESPONSIBILITIES (Cont’d)
2.) Widening of Tolo Highway Project – Civil (Infrastructure) project
During Jeff’s employment in Gammon, Jeff has participated in this project for over 3 years and has appraised as a key player in the
project.
MeasurementWorks
Jeff was responsible for the measurement works for different nature of works in the Tolo Highway Project, e.g. Reinforced Concrete
Structure for bridges, noise barriers & retaining walls, Landscape Works, Earthworks, Road works and Slope Works. He has been
assigned to take lead as a supervising role for the measurement works of the above-mentioned works. Therefore, he has a strong
knowledge in adopting the Rules ofMeasurementand the Preambles to the contract works.
Forecasting and costcontrol exercises
Jeffwas also responsible for forecasting final costs ofsubcontractpackages,plantand material for assuring the certainty of final costs
of the project.
Managementand administration ofthe Sub-Contractaccounts
Jeff has played a major role in the management and administration of the Sub-Contract accounts. He fully understood the entire
process from the tendering stage to the Final Account stage.
i.) Tendering Stage
Jeff was responsible for sub-letting the main contract works into differentsub-contract packages and he took the role to
decide the procurementmethod for differentsub-contractpackages.
Jeff also involved in preparing the tender documents, including Bills of Quantities, Drawings List, Specifications, Special
Conditions ofSub-Contract,Preambles and Tender Addendum etc.
ii.) Tender Analysis and Tender Report
Once the tenders have been returned,Jeffwas responsible for checking and analyzing the tenders returned and holding
tender interview meetings with tenderers for clarifying the scope of works and tender prices.
Subsequently, Jeff was responsible for preparing the tender reports on a fair and professional basis, which allow the
Senior Quantity Surveyor making the final decision for the tender award.
iii.) Sub-ContractDocuments
Jeff was solely responsible for preparing the Sub-Contract documents once the tender had been awarded. He is
familiarized with the legal procedure offorming sub-contractdocuments with the sub-contractors.
iv.) Interim Payments and Valuation of Variation
In order to manage the sub-contractors efficiently and to secure the adequate cash flow for continuing the sub-contract
works, Jeff assessed the progress of the sub-contract works and made monthly interim payments to respective
sub-contractors regularly. For some sub-contract packages with higher complexity, variation is more likely to occur. He
was responsible for dealing with those variations with the sub-contractors strictly according to the Sub-Contracts
Conditions.
v.) Final Account
Jeff also involved in agreeing final accountwith various sub-contractors thatwere managed byhim.

Weitere ähnliche Inhalte

Was ist angesagt?

CV Henrique Wu ENG Updated
CV Henrique Wu ENG UpdatedCV Henrique Wu ENG Updated
CV Henrique Wu ENG UpdatedHenrique Wu
 
CV Thiep 2015(english)
CV Thiep 2015(english)CV Thiep 2015(english)
CV Thiep 2015(english)pham thiep
 
HOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - Final
HOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - FinalHOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - Final
HOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - FinalHosam Ahmed
 
Cv of Shadrul with Pic
Cv of Shadrul with PicCv of Shadrul with Pic
Cv of Shadrul with PicShadrul Hasan
 
Arul Nathan CV 19 Oct15
Arul Nathan CV  19 Oct15Arul Nathan CV  19 Oct15
Arul Nathan CV 19 Oct15arul nathan
 
Toronto Pearson Airport - Procurement Strategy Study
Toronto Pearson Airport - Procurement Strategy StudyToronto Pearson Airport - Procurement Strategy Study
Toronto Pearson Airport - Procurement Strategy StudyAhmed Mahmoud
 
Structural E.I.T. Armen Miskarov
Structural E.I.T. Armen MiskarovStructural E.I.T. Armen Miskarov
Structural E.I.T. Armen MiskarovArmen Miskarov
 
Iain Cameron CV presentation jun13
Iain Cameron CV presentation jun13Iain Cameron CV presentation jun13
Iain Cameron CV presentation jun13iain_cameron
 
Ahmed Mahmoud Portfolio _ 1.0
Ahmed Mahmoud Portfolio _ 1.0Ahmed Mahmoud Portfolio _ 1.0
Ahmed Mahmoud Portfolio _ 1.0Ahmed Mahmoud
 
CURRICULUM VITAE - 21 02 2016
CURRICULUM VITAE - 21 02 2016CURRICULUM VITAE - 21 02 2016
CURRICULUM VITAE - 21 02 2016Sachin Bhagat
 
Mills Robert CV 2015-2
Mills Robert CV 2015-2Mills Robert CV 2015-2
Mills Robert CV 2015-2Robert Mills
 

Was ist angesagt? (20)

CV Henrique Wu ENG Updated
CV Henrique Wu ENG UpdatedCV Henrique Wu ENG Updated
CV Henrique Wu ENG Updated
 
CV Thiep 2015(english)
CV Thiep 2015(english)CV Thiep 2015(english)
CV Thiep 2015(english)
 
Zain Ul Abideen_281116
Zain Ul Abideen_281116Zain Ul Abideen_281116
Zain Ul Abideen_281116
 
HOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - Final
HOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - FinalHOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - Final
HOSSAM KHALAF - SENIOR COST CONTROL ENGINEER - Final
 
Cv of Shadrul with Pic
Cv of Shadrul with PicCv of Shadrul with Pic
Cv of Shadrul with Pic
 
Mohamed Abdelaal cv
Mohamed Abdelaal cvMohamed Abdelaal cv
Mohamed Abdelaal cv
 
devender DH_updated
devender DH_updateddevender DH_updated
devender DH_updated
 
Arul Nathan CV 19 Oct15
Arul Nathan CV  19 Oct15Arul Nathan CV  19 Oct15
Arul Nathan CV 19 Oct15
 
Resume_Pramod Chaudhari
Resume_Pramod ChaudhariResume_Pramod Chaudhari
Resume_Pramod Chaudhari
 
Toronto Pearson Airport - Procurement Strategy Study
Toronto Pearson Airport - Procurement Strategy StudyToronto Pearson Airport - Procurement Strategy Study
Toronto Pearson Airport - Procurement Strategy Study
 
CV
CVCV
CV
 
CV_Mahmoud_Reda
CV_Mahmoud_RedaCV_Mahmoud_Reda
CV_Mahmoud_Reda
 
Samih.CV docx
Samih.CV docxSamih.CV docx
Samih.CV docx
 
Structural E.I.T. Armen Miskarov
Structural E.I.T. Armen MiskarovStructural E.I.T. Armen Miskarov
Structural E.I.T. Armen Miskarov
 
Iain Cameron CV presentation jun13
Iain Cameron CV presentation jun13Iain Cameron CV presentation jun13
Iain Cameron CV presentation jun13
 
Ahmed Mahmoud Portfolio _ 1.0
Ahmed Mahmoud Portfolio _ 1.0Ahmed Mahmoud Portfolio _ 1.0
Ahmed Mahmoud Portfolio _ 1.0
 
My Resume Full
My Resume FullMy Resume Full
My Resume Full
 
CURRICULUM VITAE - 21 02 2016
CURRICULUM VITAE - 21 02 2016CURRICULUM VITAE - 21 02 2016
CURRICULUM VITAE - 21 02 2016
 
Mills Robert CV 2015-2
Mills Robert CV 2015-2Mills Robert CV 2015-2
Mills Robert CV 2015-2
 
Rao Yagitila CV
Rao Yagitila CVRao Yagitila CV
Rao Yagitila CV
 

Andere mochten auch

Andere mochten auch (20)

A testi jellemzők és a testtartás
A testi jellemzők és a testtartás A testi jellemzők és a testtartás
A testi jellemzők és a testtartás
 
Progress powerpoint final
Progress powerpoint final Progress powerpoint final
Progress powerpoint final
 
Circuito outdoors 2016
Circuito outdoors 2016Circuito outdoors 2016
Circuito outdoors 2016
 
Prueba de informatica mateo haro
Prueba de informatica mateo haroPrueba de informatica mateo haro
Prueba de informatica mateo haro
 
Atencion al cliente lisbeth
Atencion al cliente lisbethAtencion al cliente lisbeth
Atencion al cliente lisbeth
 
عمارة سكنية
عمارة سكنيةعمارة سكنية
عمارة سكنية
 
Makeup for festival look on chloe
Makeup for festival look on chloeMakeup for festival look on chloe
Makeup for festival look on chloe
 
Slideshareu
SlideshareuSlideshareu
Slideshareu
 
Salud y tics
Salud y ticsSalud y tics
Salud y tics
 
REPORT
REPORTREPORT
REPORT
 
Robbie Ames- Presentation for InsideOut Development. March 2016
Robbie Ames- Presentation for InsideOut Development. March 2016 Robbie Ames- Presentation for InsideOut Development. March 2016
Robbie Ames- Presentation for InsideOut Development. March 2016
 
Constructivism theory (narrated)
Constructivism theory (narrated)Constructivism theory (narrated)
Constructivism theory (narrated)
 
الشدة
الشدة الشدة
الشدة
 
Filmnézési szokások (kérdőív)
Filmnézési szokások (kérdőív)Filmnézési szokások (kérdőív)
Filmnézési szokások (kérdőív)
 
Diapostiva
DiapostivaDiapostiva
Diapostiva
 
ForteRisk_CompanyProfile_Mailer
ForteRisk_CompanyProfile_MailerForteRisk_CompanyProfile_Mailer
ForteRisk_CompanyProfile_Mailer
 
Virus y antivirus
Virus y antivirusVirus y antivirus
Virus y antivirus
 
la computadora y sus partes
la computadora y sus partesla computadora y sus partes
la computadora y sus partes
 
métodos de investigación
métodos de investigación métodos de investigación
métodos de investigación
 
Diapostiva
DiapostivaDiapostiva
Diapostiva
 

Ähnlich wie CV-Jeff Chan 2016

Brent Maskell Resume May 2016
Brent Maskell Resume May 2016Brent Maskell Resume May 2016
Brent Maskell Resume May 2016Brent Maskell
 
Zvezdan Kostic Resume Word
Zvezdan Kostic Resume WordZvezdan Kostic Resume Word
Zvezdan Kostic Resume WordZvezdan Kostic
 
Joan Willox Senior CA - Resume
Joan Willox Senior CA - ResumeJoan Willox Senior CA - Resume
Joan Willox Senior CA - ResumeJoan Willox
 
CV AMINUL 19-05-2015
CV AMINUL 19-05-2015CV AMINUL 19-05-2015
CV AMINUL 19-05-2015Aminul Haque
 
Project Performance Analysis And Delivery Methods - Quantitative Analysis
Project Performance Analysis And Delivery Methods - Quantitative AnalysisProject Performance Analysis And Delivery Methods - Quantitative Analysis
Project Performance Analysis And Delivery Methods - Quantitative AnalysisSeta Ohanesian, PMP, LEED AP
 
Joan Willox Senior CA - Resume
Joan Willox Senior CA - ResumeJoan Willox Senior CA - Resume
Joan Willox Senior CA - ResumeJoan Willox
 
Joan Willox Senior CA - Resume
Joan Willox Senior CA - ResumeJoan Willox Senior CA - Resume
Joan Willox Senior CA - ResumeJoan Willox
 
1. article azojete vol 10 1 11 waziri
1. article azojete vol 10 1 11 waziri1. article azojete vol 10 1 11 waziri
1. article azojete vol 10 1 11 waziriOyeniyi Samuel
 
MEASUREMENT PDF
MEASUREMENT PDFMEASUREMENT PDF
MEASUREMENT PDFIDHAMUKI
 
Michael Street CV.2016
Michael Street CV.2016Michael Street CV.2016
Michael Street CV.2016Michael Street
 
K_Niven_CV_June 2015_Rev
K_Niven_CV_June 2015_RevK_Niven_CV_June 2015_Rev
K_Niven_CV_June 2015_RevKeith Niven
 
izharul_cv_updated (1) - Copy - Copy - Copy (3) - Copy
izharul_cv_updated (1) - Copy - Copy - Copy (3) - Copyizharul_cv_updated (1) - Copy - Copy - Copy (3) - Copy
izharul_cv_updated (1) - Copy - Copy - Copy (3) - Copyizharul haque
 
NEC Interview with Wai-Chi Sing of the HK Development Bureau
NEC Interview with Wai-Chi Sing of the HK Development BureauNEC Interview with Wai-Chi Sing of the HK Development Bureau
NEC Interview with Wai-Chi Sing of the HK Development BureauNEC Contracts
 
Project Execution Plan for Bridge Construction
Project Execution Plan for Bridge ConstructionProject Execution Plan for Bridge Construction
Project Execution Plan for Bridge ConstructionDavid H Moloney
 

Ähnlich wie CV-Jeff Chan 2016 (20)

Brent Maskell Resume May 2016
Brent Maskell Resume May 2016Brent Maskell Resume May 2016
Brent Maskell Resume May 2016
 
RW CV
RW CVRW CV
RW CV
 
Zvezdan Kostic Resume Word
Zvezdan Kostic Resume WordZvezdan Kostic Resume Word
Zvezdan Kostic Resume Word
 
Joan Willox Senior CA - Resume
Joan Willox Senior CA - ResumeJoan Willox Senior CA - Resume
Joan Willox Senior CA - Resume
 
CV AMINUL 19-05-2015
CV AMINUL 19-05-2015CV AMINUL 19-05-2015
CV AMINUL 19-05-2015
 
Project Performance Analysis And Delivery Methods - Quantitative Analysis
Project Performance Analysis And Delivery Methods - Quantitative AnalysisProject Performance Analysis And Delivery Methods - Quantitative Analysis
Project Performance Analysis And Delivery Methods - Quantitative Analysis
 
Joan Willox Senior CA - Resume
Joan Willox Senior CA - ResumeJoan Willox Senior CA - Resume
Joan Willox Senior CA - Resume
 
Joan Willox Senior CA - Resume
Joan Willox Senior CA - ResumeJoan Willox Senior CA - Resume
Joan Willox Senior CA - Resume
 
Rafeek's CV
Rafeek's CV Rafeek's CV
Rafeek's CV
 
CV_Emanuil Videnov
CV_Emanuil VidenovCV_Emanuil Videnov
CV_Emanuil Videnov
 
1. article azojete vol 10 1 11 waziri
1. article azojete vol 10 1 11 waziri1. article azojete vol 10 1 11 waziri
1. article azojete vol 10 1 11 waziri
 
MEASUREMENT PDF
MEASUREMENT PDFMEASUREMENT PDF
MEASUREMENT PDF
 
Akhila CV
Akhila CVAkhila CV
Akhila CV
 
Cv
CvCv
Cv
 
CV
CVCV
CV
 
Michael Street CV.2016
Michael Street CV.2016Michael Street CV.2016
Michael Street CV.2016
 
K_Niven_CV_June 2015_Rev
K_Niven_CV_June 2015_RevK_Niven_CV_June 2015_Rev
K_Niven_CV_June 2015_Rev
 
izharul_cv_updated (1) - Copy - Copy - Copy (3) - Copy
izharul_cv_updated (1) - Copy - Copy - Copy (3) - Copyizharul_cv_updated (1) - Copy - Copy - Copy (3) - Copy
izharul_cv_updated (1) - Copy - Copy - Copy (3) - Copy
 
NEC Interview with Wai-Chi Sing of the HK Development Bureau
NEC Interview with Wai-Chi Sing of the HK Development BureauNEC Interview with Wai-Chi Sing of the HK Development Bureau
NEC Interview with Wai-Chi Sing of the HK Development Bureau
 
Project Execution Plan for Bridge Construction
Project Execution Plan for Bridge ConstructionProject Execution Plan for Bridge Construction
Project Execution Plan for Bridge Construction
 

CV-Jeff Chan 2016

  • 1. Tsung Fai, JEFF CHAN Page 1 Profession Chartered Quantity Surveyor Professional Qualifications MCInstCES MHKIS Educational Background BSc (Hons) in Surveying HD - BTM (Surveying) Languages English Mandarin Chinese Cantonese Chinese Contact +44(0) 740 538 4186 E-mail Jeff_fai@hotmail.com Current Visa Type Tier 5 YMS Visa Driving license in the UK Valid EMPLOYMENT HISTORY BBMV Joint Venture July 2015 – Current Quantity Surveyor (Current Position) GammonConstruction Limited July 2010 – May 2015 Quantity Surveyor (I) (Latest Position) Projects Reference BBMV Joint Venture (Balfour Beatty / BeMo Tunnelling / Morgan Sindall / Vinci Construction) July 2015 - Current Contract C510 Crossrail Liverpool Streetand Whitechapel Station Tunnels Location London Contract Sum HK$3,000 Millions GBP£250 Millions Form of Contract NEC 3 Engineering and Construction Contract 2005 Type of Contract Option C Target Cost w ith Activity Schedule Method of Measurement SMM7 Project Description Sprayed Concrete Lining (SCL) w orks for both Whitechapel and Liverpool Street station tunnels Main Responsibilities  As a QS;  Management of the measurement w orks of the quantities for the development;  Management and administration of the major Sub-Contract accounts, including assessment of interim payments to the Sub-Contractors;  Forecast exercises. GammonConstruction Limited 2010 – 2011, 2012 - M ay2015 Widening of Tolo Highway/ Fanling Highway Between Island House Interchange and Fanling (Stage 1 - Ma Wo to Tai Hang) Location Hong Kong Contract Sum HK$2,382 Millions GBP£198 Millions Form of Contract General Conditions of Contract for Civil Engineering Works 1999 Edition Type of Contract Re-measurement Contract Method of Measurement Standard Method of Measurement for Civil Engineering Works 1992 Edition Project Description Widening of a section of Tolo Highw ay / Fanling Highw ay of approximately 3.5km long betw een Ma Wo and Tai Hang from the existing dual 3-lane carriagewayto a dual 4-lane carriageway;construction of eight vehicular bridges and modification /demolition of the existing bridges; construction of allassociated interchanges and utilities Main Responsibilities  As an AQS (2010-2011);  As a QS (2012-2015);  Measurement w orks;  Forecast exercises;  Management and administration of the Sub-Contract accounts, including sub-letting, tender analysis, holding a tender interview meeting, production of Sub-Contract documents and assessment of interim payment to the Sub-Contractors;  Identifying and valuating the variations. GammonConstruction Limited 2011 - 2012 Foundation and Pipe Pile Wall Works for Proposed Residential Development at Austin Station Location Hong Kong Contract Sum HK$213 Millions GBP£18 Millions Form of Contract Agreement & Schedule of Conditions of Building Contract for use in Hong Kong Special Administrative Region Private Edition – Without Quantities 1999 Edition Type of Contract Lump Sum Fixed Price w ithout Quantities Method of Measurement SMM4 Project Description Design, Supply and Installation of bored piles foundation systemand pipe pile w alls; Excavation and Installation of shoring, strutting , w ailing beams and legging w allfor ELS w orks; Design and Construction of pile caps Main Responsibilities  As an AQS;  Administered the main contract w orks;  Preparation of tender documents;  Tenders analysis;  Preparation of Sub-contract documents for sub-contract works;  Management and administration of sub-contractors;  Valuation of variations.
  • 2. Tsung Fai, JEFF CHAN Page 2 Supplementary Information to Jeff Chan’s CV PROFESSIONAL QUALIFICATIONS MCInstCES 2015 The Chartered Institution of Civil Engineering Surveyors (ICES) began in 1969 as the Association of Surveyors in Civil Engineering and was incorporated in 1972.Jeff chartered and got the full membership ofthe ICES in Jan 2015. MHKIS 2014 Jeff passed the APC exam and qualified as a professional Quantity Surveyor in March 2014. Jeff also become the cooperate memb er of the Hong Kong Institute of Surveyors (HKIS) which is the only surveying professional body incorporated by ordinance in Hong Kong. EDUCATIONAL BACKGROUND BSc (Hons) in Surveying 2008 - 2010 Jeff graduated in 2010 in the Hong Kong Polytechnic University (the PolyU) with a 2:1 grade. He had chosen Quantity Surveying as his major subject and got a grade A in his final year dissertation, titled “A Critical Study of the Briefing Process of the Public-sector Design-and-Build Construction Projects in Hong Kong”, which the PolyU has printed an extra copy of his dissertation for other students’ reference in the library. Higher Diploma in Building Technology and Management (Surveying) 2006 - 2008 Jeffcompleted a Higher Diploma course in Building Technologyand Management(Surveying) in the PolyU and achieved a Distinction resultin 2008. Shatin Government Secondary School 1999 - 2006 Jeff completed his 7-year secondaryschool education in Hong Kong in 2006. EMPLOYMENT HISTORY 1.) BBMV Joint Venture (BBMV JV) Four of the world’s leading construction companies have established BBMV, an integrated team to deliver major packages of the Crossrail Project Year of employment July 2015 – Current Position Quantity Surveyor Description BBMV, the jointventure encompassing Balfour Beatty, BeMo Tunnelling,Morgan Sindall and VINCI Construction,is constructing early access shafts and Sprayed Concrete Lining (SCL) works for both Whitechapel and Liverpool Streetstation tunnels. ROUTINE DUTIES AND RESPONSIBILITIES 1.) Contract C510 - Crossrail Liverpool Street and Whitechapel Station Tunnels Connecting the City, Canary Wharf, the West End and Heathrow Airport to commuter areas east and west of London, Crossrail is a major new rail link project designed to provide a world-class, affordable railway with high frequency, convenient and accessible services across the capital. The major construction works for C510 began in April 2011 and includes the construction of the Crossrail Whitechapel and Liverpool Street Station SCL tunnels. During Jeff’s employment in BBMV JV, Jeff has participated in this Crossrail project, currently the biggest civil and building project in London, for over a year and gained first project experience in London as a Quantity Surveyor. Four of the world’s leading construction companies have established BBMV, an integrated team to deliver major packages ofthe Crossrail Projectefficiently.
  • 3. Tsung Fai, JEFF CHAN Page 3 ROUTINE DUTIES AND RESPONSIBILITIES (Cont’d) MeasurementWorks Jeff is assigned to manage the measurement works ofthe quantities for the development. Forecasting and costcontrol exercises Jeff is also responsible for forecasting final costs ofsubcontractpackages for assuring the certainty of final costs ofthe project. Managementand administration ofthe Sub-Contractaccounts Jeff is playing an active role in the management and administration of the Sub-Contract accounts. He is currently managing major Sub-Contractors accounts in the project, i.e. Temporary Works Design, Soil Excavation & Disposal, Construction of SCL tunnels and Waterproofing SheetMembrane Installation EMPLOYMENT HISTORY (Cont’d) 2.) Gammon Construction Limited The most famous and well-known main-contracting firm in Hong Kong while Balfour Beatty and Jardine are the shareholders of Gammon Year of employment July 2010 – May 2015 Position Oct 2014 – May 2015 Promoted as Quantity Surveyor (I) July 2013 – Oct 2014 Promoted as Quantity Surveyor (II) July 2010 – July 2013 Employed as AssistantQuantity Surveyor Description Gammon provided Jeff an all-round 30-month training program that allowed him rotating to different projects and departments. Jeff has gained his construction knowledge in different aspects, from the pre-construction stage to the post-construction stage, during the training period and understood the operation ofa large-scale main contracting firm. Jan 2013 – May 2015 (2 years & 5 months) Widening of Tolo Highwayproject, Civil (Infrastructure) project Oct 2012 – Dec 2012 (3 months) Estimating Department(End of 30-month training program) July 2012 – Sep 2012 (3 months) Claims Department Jun 2012 – Jun 2012 (1 month) ProcurementDepartment Apr 2012 – May 2012 (2 months) Legal and Insurance Department Aug 2011 – Mar 2012 (8 months) Foundation and Pipe Pile Wall Works at Austin Station, Foundation Project Jul 2010 – Jul 2011 (13 months) Widening of Tolo Highwayproject, Civil (Infrastructure) project
  • 4. Tsung Fai, JEFF CHAN Page 4 ROUTINE DUTIES AND RESPONSIBILITIES (Cont’d) 2.) Widening of Tolo Highway Project – Civil (Infrastructure) project During Jeff’s employment in Gammon, Jeff has participated in this project for over 3 years and has appraised as a key player in the project. MeasurementWorks Jeff was responsible for the measurement works for different nature of works in the Tolo Highway Project, e.g. Reinforced Concrete Structure for bridges, noise barriers & retaining walls, Landscape Works, Earthworks, Road works and Slope Works. He has been assigned to take lead as a supervising role for the measurement works of the above-mentioned works. Therefore, he has a strong knowledge in adopting the Rules ofMeasurementand the Preambles to the contract works. Forecasting and costcontrol exercises Jeffwas also responsible for forecasting final costs ofsubcontractpackages,plantand material for assuring the certainty of final costs of the project. Managementand administration ofthe Sub-Contractaccounts Jeff has played a major role in the management and administration of the Sub-Contract accounts. He fully understood the entire process from the tendering stage to the Final Account stage. i.) Tendering Stage Jeff was responsible for sub-letting the main contract works into differentsub-contract packages and he took the role to decide the procurementmethod for differentsub-contractpackages. Jeff also involved in preparing the tender documents, including Bills of Quantities, Drawings List, Specifications, Special Conditions ofSub-Contract,Preambles and Tender Addendum etc. ii.) Tender Analysis and Tender Report Once the tenders have been returned,Jeffwas responsible for checking and analyzing the tenders returned and holding tender interview meetings with tenderers for clarifying the scope of works and tender prices. Subsequently, Jeff was responsible for preparing the tender reports on a fair and professional basis, which allow the Senior Quantity Surveyor making the final decision for the tender award. iii.) Sub-ContractDocuments Jeff was solely responsible for preparing the Sub-Contract documents once the tender had been awarded. He is familiarized with the legal procedure offorming sub-contractdocuments with the sub-contractors. iv.) Interim Payments and Valuation of Variation In order to manage the sub-contractors efficiently and to secure the adequate cash flow for continuing the sub-contract works, Jeff assessed the progress of the sub-contract works and made monthly interim payments to respective sub-contractors regularly. For some sub-contract packages with higher complexity, variation is more likely to occur. He was responsible for dealing with those variations with the sub-contractors strictly according to the Sub-Contracts Conditions. v.) Final Account Jeff also involved in agreeing final accountwith various sub-contractors thatwere managed byhim.