SlideShare ist ein Scribd-Unternehmen logo
1 von 1
Downloaden Sie, um offline zu lesen
CONTAINER NET
Length Width Height SIZES CAPACITY
41.5' 98" 51.5" 20' - 40' 12,100 lbs / 5,500 kg
71,390 lbs /
32,450 kg
20' Pallets:
10 plts Target wt.: 11,000lbs Target wt.: 11,000lbs Target wt.: 11,000lbs Target wt.: 11,000lbs
max. wt: 11,250lbs max. wt: 11,250lbs max. wt: 11,250lbs max. wt: 11,250lbs
40' Pallets:
21 plts Target wt.: 11,000lbs Target wt.: 11,000lbs Target wt.: 11,000lbs Target wt.: 11,000lbs
max. wt: 11,250lbs max. wt: 11,250lbs max. wt: 11,250lbs max. wt: 11,250lbs
* Note. Total weight greater than indicated requires an Overweight permit.
TARE
Section 1 Section 2 Section 3
Container Size Loading Plan (Based on Plts & Wt.)
Section 4
3 plts 2 plts 2 plts 3 plts
OVERALL
GROSS
CAPACITY
> 3,666lbs ea, find lighter plts.
Too heavy
> 5,500lbs ea, find lighter plts. Too
heavy
> 5,500lbs ea, find lighter plts. Too
heavy
> 3,666lbs ea, find lighter
plts. Too heavy
< 3,666lbs ea, it's Ok to load in
this section.
< 5,500lbs ea, it's Ok to load in this
section.
< 5,500lbs ea, it's Ok to load in this
section.
< 3,666lbs ea, it's Ok to
load in this section.
< 2,200lbs ea, it's Ok to load in this
section.
< 2,200lbs ea, it's Ok to load in this
section.
< 2,200lbs ea, it's Ok to
load in this section.
Section 1 Section 2 Section 3 Section 4
83,600 lbs / 38,000 kg
6 plts
> 1,830lbs ea, find lighter plts.
Too heavy
> 2,200lbs ea, find lighter plts. Too
heavy
> 2,200lbs ea, find lighter plts. Too
heavy
> 2,200lbs ea, find lighter
plts. Too heavy
5 plts 5 plts 5 plts
< 1,830lbs ea, it's Ok to load in
this section.
By: James Thomas (Distribution Center Logistics Manager)

Weitere ähnliche Inhalte

Andere mochten auch

Andere mochten auch (7)

Power point lesson 02
Power point lesson 02Power point lesson 02
Power point lesson 02
 
Lebanon roofing 888 778 0212
Lebanon roofing  888 778 0212Lebanon roofing  888 778 0212
Lebanon roofing 888 778 0212
 
James-ref
James-refJames-ref
James-ref
 
Sonya recommendation letter--
Sonya recommendation letter--Sonya recommendation letter--
Sonya recommendation letter--
 
Zaza Hotel Letter 7-4-15
Zaza Hotel Letter 7-4-15Zaza Hotel Letter 7-4-15
Zaza Hotel Letter 7-4-15
 
Backtrack 4 nessus
Backtrack 4 nessusBacktrack 4 nessus
Backtrack 4 nessus
 
Nike Corporat Culture
Nike Corporat CultureNike Corporat Culture
Nike Corporat Culture
 

Mehr von James Thomas

Organizational Pyramid
Organizational PyramidOrganizational Pyramid
Organizational PyramidJames Thomas
 
Creating a flexiable and fast acting Operation
Creating a flexiable and fast acting OperationCreating a flexiable and fast acting Operation
Creating a flexiable and fast acting OperationJames Thomas
 
Creating a flexiable and fast acting Operation
Creating a flexiable and fast acting OperationCreating a flexiable and fast acting Operation
Creating a flexiable and fast acting OperationJames Thomas
 
LAYOUT-by-velocity-by-weight
LAYOUT-by-velocity-by-weightLAYOUT-by-velocity-by-weight
LAYOUT-by-velocity-by-weightJames Thomas
 
Truck loading layout-containers
Truck loading layout-containersTruck loading layout-containers
Truck loading layout-containersJames Thomas
 
shipping process- flow
shipping process- flowshipping process- flow
shipping process- flowJames Thomas
 
Forecaste and usage chart example- 2016
Forecaste and usage chart example- 2016Forecaste and usage chart example- 2016
Forecaste and usage chart example- 2016James Thomas
 
Forecaste and usage chart example- 2016
Forecaste and usage chart example- 2016Forecaste and usage chart example- 2016
Forecaste and usage chart example- 2016James Thomas
 
Production Schedule Report 2016-rv
Production Schedule Report 2016-rvProduction Schedule Report 2016-rv
Production Schedule Report 2016-rvJames Thomas
 
House OF Cheatham_Freight Matrix example
House OF Cheatham_Freight Matrix exampleHouse OF Cheatham_Freight Matrix example
House OF Cheatham_Freight Matrix exampleJames Thomas
 
Truck loading layout
Truck loading layoutTruck loading layout
Truck loading layoutJames Thomas
 
Truck loading layout-containers
Truck loading layout-containersTruck loading layout-containers
Truck loading layout-containersJames Thomas
 
Truck loading layout
Truck loading layoutTruck loading layout
Truck loading layoutJames Thomas
 
Truck loading layout
Truck loading layoutTruck loading layout
Truck loading layoutJames Thomas
 
James Reference Letter
James Reference LetterJames Reference Letter
James Reference LetterJames Thomas
 
James Thomas ref letter
James Thomas ref letterJames Thomas ref letter
James Thomas ref letterJames Thomas
 
How to develop a bond among employees
How to develop a bond among employeesHow to develop a bond among employees
How to develop a bond among employeesJames Thomas
 
Duplicate shipments and wrong item shipped
Duplicate shipments and wrong item shippedDuplicate shipments and wrong item shipped
Duplicate shipments and wrong item shippedJames Thomas
 
Improving Operations Efficiency- Issue 1
Improving Operations Efficiency- Issue 1Improving Operations Efficiency- Issue 1
Improving Operations Efficiency- Issue 1James Thomas
 

Mehr von James Thomas (20)

Organizational Pyramid
Organizational PyramidOrganizational Pyramid
Organizational Pyramid
 
Creating a flexiable and fast acting Operation
Creating a flexiable and fast acting OperationCreating a flexiable and fast acting Operation
Creating a flexiable and fast acting Operation
 
Creating a flexiable and fast acting Operation
Creating a flexiable and fast acting OperationCreating a flexiable and fast acting Operation
Creating a flexiable and fast acting Operation
 
LAYOUT-by-velocity-by-weight
LAYOUT-by-velocity-by-weightLAYOUT-by-velocity-by-weight
LAYOUT-by-velocity-by-weight
 
Truck loading layout-containers
Truck loading layout-containersTruck loading layout-containers
Truck loading layout-containers
 
shipping process- flow
shipping process- flowshipping process- flow
shipping process- flow
 
Forecaste and usage chart example- 2016
Forecaste and usage chart example- 2016Forecaste and usage chart example- 2016
Forecaste and usage chart example- 2016
 
Forecaste and usage chart example- 2016
Forecaste and usage chart example- 2016Forecaste and usage chart example- 2016
Forecaste and usage chart example- 2016
 
Production Schedule Report 2016-rv
Production Schedule Report 2016-rvProduction Schedule Report 2016-rv
Production Schedule Report 2016-rv
 
House OF Cheatham_Freight Matrix example
House OF Cheatham_Freight Matrix exampleHouse OF Cheatham_Freight Matrix example
House OF Cheatham_Freight Matrix example
 
Truck loading layout
Truck loading layoutTruck loading layout
Truck loading layout
 
Truck loading layout-containers
Truck loading layout-containersTruck loading layout-containers
Truck loading layout-containers
 
Truck loading layout
Truck loading layoutTruck loading layout
Truck loading layout
 
Truck loading layout
Truck loading layoutTruck loading layout
Truck loading layout
 
James Reference Letter
James Reference LetterJames Reference Letter
James Reference Letter
 
James Thomas ref letter
James Thomas ref letterJames Thomas ref letter
James Thomas ref letter
 
reference-cl
reference-clreference-cl
reference-cl
 
How to develop a bond among employees
How to develop a bond among employeesHow to develop a bond among employees
How to develop a bond among employees
 
Duplicate shipments and wrong item shipped
Duplicate shipments and wrong item shippedDuplicate shipments and wrong item shipped
Duplicate shipments and wrong item shipped
 
Improving Operations Efficiency- Issue 1
Improving Operations Efficiency- Issue 1Improving Operations Efficiency- Issue 1
Improving Operations Efficiency- Issue 1
 

Truck loading layout-containers

  • 1. CONTAINER NET Length Width Height SIZES CAPACITY 41.5' 98" 51.5" 20' - 40' 12,100 lbs / 5,500 kg 71,390 lbs / 32,450 kg 20' Pallets: 10 plts Target wt.: 11,000lbs Target wt.: 11,000lbs Target wt.: 11,000lbs Target wt.: 11,000lbs max. wt: 11,250lbs max. wt: 11,250lbs max. wt: 11,250lbs max. wt: 11,250lbs 40' Pallets: 21 plts Target wt.: 11,000lbs Target wt.: 11,000lbs Target wt.: 11,000lbs Target wt.: 11,000lbs max. wt: 11,250lbs max. wt: 11,250lbs max. wt: 11,250lbs max. wt: 11,250lbs * Note. Total weight greater than indicated requires an Overweight permit. TARE Section 1 Section 2 Section 3 Container Size Loading Plan (Based on Plts & Wt.) Section 4 3 plts 2 plts 2 plts 3 plts OVERALL GROSS CAPACITY > 3,666lbs ea, find lighter plts. Too heavy > 5,500lbs ea, find lighter plts. Too heavy > 5,500lbs ea, find lighter plts. Too heavy > 3,666lbs ea, find lighter plts. Too heavy < 3,666lbs ea, it's Ok to load in this section. < 5,500lbs ea, it's Ok to load in this section. < 5,500lbs ea, it's Ok to load in this section. < 3,666lbs ea, it's Ok to load in this section. < 2,200lbs ea, it's Ok to load in this section. < 2,200lbs ea, it's Ok to load in this section. < 2,200lbs ea, it's Ok to load in this section. Section 1 Section 2 Section 3 Section 4 83,600 lbs / 38,000 kg 6 plts > 1,830lbs ea, find lighter plts. Too heavy > 2,200lbs ea, find lighter plts. Too heavy > 2,200lbs ea, find lighter plts. Too heavy > 2,200lbs ea, find lighter plts. Too heavy 5 plts 5 plts 5 plts < 1,830lbs ea, it's Ok to load in this section. By: James Thomas (Distribution Center Logistics Manager)