J McNaughton*, S Harper*, R Sinclair*, B Sellar#
07/09/2015
Measuring and Modelling the Power Curve
of a Commercial-Scale Tidal Turbine
11th EWTEC, Nantes, France
*Alstom Ocean Energy, Bristol. #University of Edinburgh
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 09/05/2016 – P 2
Overview
• Introduction
• The IEC Methodology
• Numerical Prediction
• Measured Power Curves
• Sensitivity to Reference Velocity
• Conclusions
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 09/05/2016 – P 3
Introduction
ReDAPT (Reliable Data Acquisition Platform for Tidal)
• Commissioned and funded by Energy Technologies
Institute
• Accelerate tidal energy industry
• Academic and Industrial Collaboration
• Alstom Ocean’s 1MW turbine deployed at EMEC
• Understand environment and improve modelling
• Project outcomes and reports available online:
http://www.eti.co.uk/project/redapt/
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 09/05/2016 – P 4
Introduction
ReDAPT (Reliable Data Acquisition Platform for Tidal)
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 09/05/2016 – P 5
Introduction
Performance Curves
• Measureable performance of tidal turbine
• Easy to understand, compare, sell
• Required for yield and grid predictions
• Key challenges:
−Prediction in the design stage
−Verification of the performance once operational
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 09/05/2016 – P 6
Overview
• Introduction
• The IEC Methodology
• Numerical Prediction
• Measured Power Curves
• Sensitivity to Reference Velocity
• Conclusions
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 09/05/2016 – P 7
IEC Methodology
Overview
• IEC Technical Standard (IEC/TS) 62600-200
• Basic procedure:
−Measure flow and power concurrently
−Align and process datasets
−Time average power and reference velocity
−Velocity binning
−Interpolate missing data
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 09/05/2016 – P 8
IEC Methodology
Flow profiler positioning
• Two choices for flow
profiler position
• In-line
−Single profiler for each
tide
−More representative flow
• Adjacent
−Two profilers
−Average of velocity
−Error checking
• Beam spread should be
inside the box
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 09/05/2016 – P 9
IEC Methodology
Flow profiler positioning
• Two choices for flow
profiler position
• In-line
−Single profiler for each
tide
−More representative flow
• Adjacent
−Two profilers
−Average of velocity
−Error checking
• Beam spread should be
inside the box
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 09/05/2016 – P 10
IEC Methodology
Method of bins
• Representative of power
available in the flow
Uj =
1
A
Uk,j
3
Ak
S
k=1
1/3
A = Ak
S
k=1
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 09/05/2016 – P 11
IEC Methodology
Power Curve Validity
• Minimum criteria:
−15 concurrent days
−80% turbine availability
−180 hours sampled data
−90% of swept area measured
−10 vertical bins (max bin size 1 m)
• Time averaging:
−2 – 10 minutes period
−Minimum 90% of valid data points per period
• Velocity binning:
−Maximum 0.1m/s bin size
−At least 30 minutes of time-averaged data
−Maximum 10% interpolated velocity bins
−No successive interpolated bins
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 09/05/2016 – P 12
Overview
• Introduction
• The IEC Methodology
• Numerical Prediction
• Measured Power Curves
• Sensitivity to Reference Velocity
• Conclusions
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 09/05/2016 – P 13
Tidal Bladed (DNV-GL)
Numerical Prediction
• Industry-standard Blade Element Momentum code for loads
calculations
• Key inputs:
− Hydrofoil datasets
− Drivetrain efficiencies
− Control system definition
− Environmental conditions
• Steady:
− Idealised conditions
− Fast calculations to run
• Dynamic:
− Site specific
− Several hundred representative ten-minute simulations
− Mean power weighted according to lifetime probability
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 09/05/2016 – P 14
Overview
• Introduction
• The IEC methodology
• Numerical Prediction
• Measured Power Curves
• Sensitivity to Reference Velocity
• Conclusions
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 09/05/2016 – P 15
Measured Power Curves
Flow-sensors
ADCP SBD
Sensor
name
Teledyne
RDI
Workhorse
Sentinel
Nortek
AD2CP
No. beams 4 1
Operating
frequency
600 kHz 1 MHz
Sampling
frequency
0.5 Hz 4 Hz
Bin size 1 m 0.4 m
Range 50 m 10 m
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 09/05/2016 – P 16
Data Processing
Measured Power Curves
• Seabed ADCPs processed to give reference velocity
• ADCP and power datasets are aligned and then averaged
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 09/05/2016 – P 17
Presented Power Curve
Measured Power Curves
• Significant power
fluctuations over ten-
minute sample
• Time & velocity
averaging smoothens
curve
• Flood and ebb curves
different around rated
• Numerical prediction
close to measured
curve
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 09/05/2016 – P 18
Presented Power Curve
Measured Power Curves
• Significant power
fluctuations over ten-
minute sample
• Time & velocity
averaging smoothens
curve
• Flood and ebb curves
different around rated
• Numerical prediction
close to measured
curve
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 09/05/2016 – P 19
Presented Power Curve
Measured Power Curves
• Significant power
fluctuations over ten-
minute sample
• Time & velocity
averaging smoothens
curve
• Flood and ebb curves
different around rated
• Numerical prediction
close to measured
curve
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 09/05/2016 – P 20
Presented Power Curve
Measured Power Curves
• Significant power
fluctuations over ten-
minute sample
• Time & velocity
averaging smoothens
curve
• Flood and ebb curves
different around rated
• Numerical prediction
close to measured
curve
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 09/05/2016 – P 21
Presented Power Curve
Measured Power Curves
• Significant power
fluctuations over ten-
minute sample
• Time & velocity
averaging smoothens
curve
• Flood and ebb curves
different around rated
• Numerical prediction
close to measured
curve
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 09/05/2016 – P 22
Overview
• Introduction
• The IEC Methodology
• Numerical Prediction
• Measured Power Curves
• Sensitivity to Reference Velocity
• Conclusions
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 09/05/2016 – P 23
Flow Profiler Location
Sensitivity to Reference Velocity
• Investigation into
reference velocity
from different In-line
ADCPs
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 09/05/2016 – P 24
Flow Profiler Location
Sensitivity to Reference Velocity
• Investigation into
reference velocity
from different In-line
ADCPs
• Less “power per flow
bin” for further
upstream ADCP
• Insufficient dataset to
draw firm conclusions
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 09/05/2016 – P 25
Turbine-mounted flow sensor
Sensitivity to Reference Velocity
• Nose-mounted SBD:
−Beam velocity only
−Max range 10 m
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 09/05/2016 – P 26
Turbine-mounted flow sensor
Sensitivity to Reference Velocity
• Nose-mounted SBD:
−Beam velocity only
−Max range 10 m
−Hub-height
• Calibration issue or
turbine influence?
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 09/05/2016 – P 27
Turbine-mounted flow sensor
Sensitivity to Reference Velocity
• Nose-mounted SBD:
−Beam velocity only
−Max range 10 m
−Hub-height
• Calibration issue or
turbine influence?
• Hardware & setup not
right for this use but
not the end of the
story
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 09/05/2016 – P 28
Overview
• Introduction
• The IEC Methodology
• Numerical Prediction
• Measured Power Curves
• Sensitivity to Reference Velocity
• Conclusions
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 09/05/2016 – P 29
Conclusions
• IEC/TS 62600-200:
− Robust procedure with stringent criteria
− Not easy to do, but for a reason
− ADCP position does influence results
• Numerical prediction (Tidal Bladed) close to measured
• Nose-mounted sensor:
− Promising but different hardware required
− Unable to replace IEC method for certified power curve (at present)
• Other IEC/TS 62600-200 assessment:
− Adjacent ADCP configuration
− Sensitivity to reference velocities and averaging periods
© ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Presentation title - 09/05/2016 – P 30
Conclusions & Ongoing work
This research was conducted as part of the Reliable Data
Acquisition Platform for Tidal (ReDAPT) project
commissioned and funded by the Energy Technologies
Institute (ETI).
The authors would also like to thank Greg Pittam at Alstom
Ocean Energy and Duncan Sutherland and Sam Harding
at the University of Edinburgh.
www.alstom.com

Weitere ähnliche Inhalte

Andere mochten auch (17)

Tipo Carioca - junho 2013
Tipo Carioca - junho 2013Tipo Carioca - junho 2013
Tipo Carioca - junho 2013
 
Asd
AsdAsd
Asd
 
Powerpoint lorena
Powerpoint lorenaPowerpoint lorena
Powerpoint lorena
 
phd_presentation_feb14,15
phd_presentation_feb14,15phd_presentation_feb14,15
phd_presentation_feb14,15
 
Copia cambiada de manual para residentes review2
Copia cambiada de manual  para residentes review2Copia cambiada de manual  para residentes review2
Copia cambiada de manual para residentes review2
 
PeopleSoft Keynote: PeopleSoft Investment Strategy and Roadmap
PeopleSoft Keynote:  PeopleSoft Investment Strategy and RoadmapPeopleSoft Keynote:  PeopleSoft Investment Strategy and Roadmap
PeopleSoft Keynote: PeopleSoft Investment Strategy and Roadmap
 
Contributing to StrongLoop LoopBack (and other open source projects)
Contributing to StrongLoop LoopBack (and other open source projects)Contributing to StrongLoop LoopBack (and other open source projects)
Contributing to StrongLoop LoopBack (and other open source projects)
 
Marketing in Japan: Section 1 Part 1 of 3
Marketing in Japan: Section 1 Part 1 of 3Marketing in Japan: Section 1 Part 1 of 3
Marketing in Japan: Section 1 Part 1 of 3
 
Chess camp 4. elementary endgames
Chess camp 4. elementary endgamesChess camp 4. elementary endgames
Chess camp 4. elementary endgames
 
Bilang rangkaian nombor
Bilang rangkaian nomborBilang rangkaian nombor
Bilang rangkaian nombor
 
Trauma craneo encefalico
Trauma craneo encefalicoTrauma craneo encefalico
Trauma craneo encefalico
 
Agenda
AgendaAgenda
Agenda
 
Inscripción talleres fig
Inscripción talleres figInscripción talleres fig
Inscripción talleres fig
 
Material del IFS CUENTO CONTIGO PARA VIVIR LA LECTURA
Material del IFS CUENTO CONTIGO PARA VIVIR LA LECTURAMaterial del IFS CUENTO CONTIGO PARA VIVIR LA LECTURA
Material del IFS CUENTO CONTIGO PARA VIVIR LA LECTURA
 
Circular62 16
Circular62 16Circular62 16
Circular62 16
 
Ppt blog
Ppt blogPpt blog
Ppt blog
 
What is ETL?
What is ETL?What is ETL?
What is ETL?
 

Ähnlich wie EWTEC_Presentation_v2

Mobile Monday Switzerland #38 - Alstom Power presentation on Mobility and Ser...
Mobile Monday Switzerland #38 - Alstom Power presentation on Mobility and Ser...Mobile Monday Switzerland #38 - Alstom Power presentation on Mobility and Ser...
Mobile Monday Switzerland #38 - Alstom Power presentation on Mobility and Ser...MobileMonday Switzerland
 
Ward gommeren | energieopslag op zee
Ward gommeren  | energieopslag op zeeWard gommeren  | energieopslag op zee
Ward gommeren | energieopslag op zeeGreenbridge nv
 
sydney_light_rail_project_presentationpdf
sydney_light_rail_project_presentationpdfsydney_light_rail_project_presentationpdf
sydney_light_rail_project_presentationpdfmaputi
 
Digital-Substation-ALSTOM.pdf
Digital-Substation-ALSTOM.pdfDigital-Substation-ALSTOM.pdf
Digital-Substation-ALSTOM.pdfssuserfaf8d6
 
Lifting Presentation.
Lifting Presentation.Lifting Presentation.
Lifting Presentation.paul doherty
 
Estimating the cost of a CCS System - Jean-François Léandri, Alstom
Estimating the cost of a CCS System - Jean-François Léandri, AlstomEstimating the cost of a CCS System - Jean-François Léandri, Alstom
Estimating the cost of a CCS System - Jean-François Léandri, AlstomGlobal CCS Institute
 
3dprinting alstom transport - ensam conference
3dprinting alstom transport - ensam conference3dprinting alstom transport - ensam conference
3dprinting alstom transport - ensam conferencechristophe eschenbrenner
 
Alstom - Innovative Infrastructure Finance by Giles Dickson at GIB Summit
Alstom - Innovative Infrastructure Finance by Giles Dickson at GIB SummitAlstom - Innovative Infrastructure Finance by Giles Dickson at GIB Summit
Alstom - Innovative Infrastructure Finance by Giles Dickson at GIB SummitGlobal Infrastructure Basel Foundation
 
4 nicolas serrie - alstom
4   nicolas serrie - alstom4   nicolas serrie - alstom
4 nicolas serrie - alstomjohannaparans
 
Join alstom center of excellence interiors 2016
Join alstom center of excellence interiors 2016Join alstom center of excellence interiors 2016
Join alstom center of excellence interiors 2016Aurélien GOZET
 
01. thermal services indonesia
01. thermal services indonesia01. thermal services indonesia
01. thermal services indonesiaMas Zuhad
 
Lanner client TST discuss simulation application and benefit
Lanner client TST discuss simulation application and benefitLanner client TST discuss simulation application and benefit
Lanner client TST discuss simulation application and benefitLanner
 
oa predictive asset management executive briefing v20
oa predictive asset management executive briefing v20oa predictive asset management executive briefing v20
oa predictive asset management executive briefing v20Ralph Overbeck
 
Innovations™ Magazine VII NO.3 2015
Innovations™ Magazine VII NO.3 2015 Innovations™ Magazine VII NO.3 2015
Innovations™ Magazine VII NO.3 2015 T.D. Williamson
 
RAJA Who Is Alstom Presentation pptx
RAJA Who Is Alstom Presentation pptxRAJA Who Is Alstom Presentation pptx
RAJA Who Is Alstom Presentation pptxBadger4460
 
16 00 meed - 17sept13 - creation of new mass transit system
16 00 meed - 17sept13 - creation of new mass transit system16 00 meed - 17sept13 - creation of new mass transit system
16 00 meed - 17sept13 - creation of new mass transit systemIbrahim Al-Hudhaif
 

Ähnlich wie EWTEC_Presentation_v2 (20)

Mobile Monday Switzerland #38 - Alstom Power presentation on Mobility and Ser...
Mobile Monday Switzerland #38 - Alstom Power presentation on Mobility and Ser...Mobile Monday Switzerland #38 - Alstom Power presentation on Mobility and Ser...
Mobile Monday Switzerland #38 - Alstom Power presentation on Mobility and Ser...
 
Ward gommeren | energieopslag op zee
Ward gommeren  | energieopslag op zeeWard gommeren  | energieopslag op zee
Ward gommeren | energieopslag op zee
 
sydney_light_rail_project_presentationpdf
sydney_light_rail_project_presentationpdfsydney_light_rail_project_presentationpdf
sydney_light_rail_project_presentationpdf
 
Digital-Substation-ALSTOM.pdf
Digital-Substation-ALSTOM.pdfDigital-Substation-ALSTOM.pdf
Digital-Substation-ALSTOM.pdf
 
CCS Economics and Financing - Philip Sharman, Evenlode Associates, at the UKC...
CCS Economics and Financing - Philip Sharman, Evenlode Associates, at the UKC...CCS Economics and Financing - Philip Sharman, Evenlode Associates, at the UKC...
CCS Economics and Financing - Philip Sharman, Evenlode Associates, at the UKC...
 
ADDITIVE MANUFACTURING: ALSTOM REX
ADDITIVE MANUFACTURING: ALSTOM REXADDITIVE MANUFACTURING: ALSTOM REX
ADDITIVE MANUFACTURING: ALSTOM REX
 
Lifting Presentation.
Lifting Presentation.Lifting Presentation.
Lifting Presentation.
 
Estimating the cost of a CCS System - Jean-François Léandri, Alstom
Estimating the cost of a CCS System - Jean-François Léandri, AlstomEstimating the cost of a CCS System - Jean-François Léandri, Alstom
Estimating the cost of a CCS System - Jean-François Léandri, Alstom
 
Progettare la Crescita: il ruolo etico-sociale dell’impresa - Luca Villa | Wo...
Progettare la Crescita: il ruolo etico-sociale dell’impresa - Luca Villa | Wo...Progettare la Crescita: il ruolo etico-sociale dell’impresa - Luca Villa | Wo...
Progettare la Crescita: il ruolo etico-sociale dell’impresa - Luca Villa | Wo...
 
3dprinting alstom transport - ensam conference
3dprinting alstom transport - ensam conference3dprinting alstom transport - ensam conference
3dprinting alstom transport - ensam conference
 
Alstom - Innovative Infrastructure Finance by Giles Dickson at GIB Summit
Alstom - Innovative Infrastructure Finance by Giles Dickson at GIB SummitAlstom - Innovative Infrastructure Finance by Giles Dickson at GIB Summit
Alstom - Innovative Infrastructure Finance by Giles Dickson at GIB Summit
 
4 nicolas serrie - alstom
4   nicolas serrie - alstom4   nicolas serrie - alstom
4 nicolas serrie - alstom
 
Join alstom center of excellence interiors 2016
Join alstom center of excellence interiors 2016Join alstom center of excellence interiors 2016
Join alstom center of excellence interiors 2016
 
01. thermal services indonesia
01. thermal services indonesia01. thermal services indonesia
01. thermal services indonesia
 
Lanner client TST discuss simulation application and benefit
Lanner client TST discuss simulation application and benefitLanner client TST discuss simulation application and benefit
Lanner client TST discuss simulation application and benefit
 
oa predictive asset management executive briefing v20
oa predictive asset management executive briefing v20oa predictive asset management executive briefing v20
oa predictive asset management executive briefing v20
 
Innovations™ Magazine VII NO.3 2015
Innovations™ Magazine VII NO.3 2015 Innovations™ Magazine VII NO.3 2015
Innovations™ Magazine VII NO.3 2015
 
WE share the power_July2015
WE share the power_July2015WE share the power_July2015
WE share the power_July2015
 
RAJA Who Is Alstom Presentation pptx
RAJA Who Is Alstom Presentation pptxRAJA Who Is Alstom Presentation pptx
RAJA Who Is Alstom Presentation pptx
 
16 00 meed - 17sept13 - creation of new mass transit system
16 00 meed - 17sept13 - creation of new mass transit system16 00 meed - 17sept13 - creation of new mass transit system
16 00 meed - 17sept13 - creation of new mass transit system
 

EWTEC_Presentation_v2

  • 1. J McNaughton*, S Harper*, R Sinclair*, B Sellar# 07/09/2015 Measuring and Modelling the Power Curve of a Commercial-Scale Tidal Turbine 11th EWTEC, Nantes, France *Alstom Ocean Energy, Bristol. #University of Edinburgh
  • 2. © ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Presentation title - 09/05/2016 – P 2 Overview • Introduction • The IEC Methodology • Numerical Prediction • Measured Power Curves • Sensitivity to Reference Velocity • Conclusions
  • 3. © ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Presentation title - 09/05/2016 – P 3 Introduction ReDAPT (Reliable Data Acquisition Platform for Tidal) • Commissioned and funded by Energy Technologies Institute • Accelerate tidal energy industry • Academic and Industrial Collaboration • Alstom Ocean’s 1MW turbine deployed at EMEC • Understand environment and improve modelling • Project outcomes and reports available online: http://www.eti.co.uk/project/redapt/
  • 4. © ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Presentation title - 09/05/2016 – P 4 Introduction ReDAPT (Reliable Data Acquisition Platform for Tidal)
  • 5. © ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Presentation title - 09/05/2016 – P 5 Introduction Performance Curves • Measureable performance of tidal turbine • Easy to understand, compare, sell • Required for yield and grid predictions • Key challenges: −Prediction in the design stage −Verification of the performance once operational
  • 6. © ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Presentation title - 09/05/2016 – P 6 Overview • Introduction • The IEC Methodology • Numerical Prediction • Measured Power Curves • Sensitivity to Reference Velocity • Conclusions
  • 7. © ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Presentation title - 09/05/2016 – P 7 IEC Methodology Overview • IEC Technical Standard (IEC/TS) 62600-200 • Basic procedure: −Measure flow and power concurrently −Align and process datasets −Time average power and reference velocity −Velocity binning −Interpolate missing data
  • 8. © ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Presentation title - 09/05/2016 – P 8 IEC Methodology Flow profiler positioning • Two choices for flow profiler position • In-line −Single profiler for each tide −More representative flow • Adjacent −Two profilers −Average of velocity −Error checking • Beam spread should be inside the box
  • 9. © ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Presentation title - 09/05/2016 – P 9 IEC Methodology Flow profiler positioning • Two choices for flow profiler position • In-line −Single profiler for each tide −More representative flow • Adjacent −Two profilers −Average of velocity −Error checking • Beam spread should be inside the box
  • 10. © ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Presentation title - 09/05/2016 – P 10 IEC Methodology Method of bins • Representative of power available in the flow Uj = 1 A Uk,j 3 Ak S k=1 1/3 A = Ak S k=1
  • 11. © ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Presentation title - 09/05/2016 – P 11 IEC Methodology Power Curve Validity • Minimum criteria: −15 concurrent days −80% turbine availability −180 hours sampled data −90% of swept area measured −10 vertical bins (max bin size 1 m) • Time averaging: −2 – 10 minutes period −Minimum 90% of valid data points per period • Velocity binning: −Maximum 0.1m/s bin size −At least 30 minutes of time-averaged data −Maximum 10% interpolated velocity bins −No successive interpolated bins
  • 12. © ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Presentation title - 09/05/2016 – P 12 Overview • Introduction • The IEC Methodology • Numerical Prediction • Measured Power Curves • Sensitivity to Reference Velocity • Conclusions
  • 13. © ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Presentation title - 09/05/2016 – P 13 Tidal Bladed (DNV-GL) Numerical Prediction • Industry-standard Blade Element Momentum code for loads calculations • Key inputs: − Hydrofoil datasets − Drivetrain efficiencies − Control system definition − Environmental conditions • Steady: − Idealised conditions − Fast calculations to run • Dynamic: − Site specific − Several hundred representative ten-minute simulations − Mean power weighted according to lifetime probability
  • 14. © ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Presentation title - 09/05/2016 – P 14 Overview • Introduction • The IEC methodology • Numerical Prediction • Measured Power Curves • Sensitivity to Reference Velocity • Conclusions
  • 15. © ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Presentation title - 09/05/2016 – P 15 Measured Power Curves Flow-sensors ADCP SBD Sensor name Teledyne RDI Workhorse Sentinel Nortek AD2CP No. beams 4 1 Operating frequency 600 kHz 1 MHz Sampling frequency 0.5 Hz 4 Hz Bin size 1 m 0.4 m Range 50 m 10 m
  • 16. © ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Presentation title - 09/05/2016 – P 16 Data Processing Measured Power Curves • Seabed ADCPs processed to give reference velocity • ADCP and power datasets are aligned and then averaged
  • 17. © ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Presentation title - 09/05/2016 – P 17 Presented Power Curve Measured Power Curves • Significant power fluctuations over ten- minute sample • Time & velocity averaging smoothens curve • Flood and ebb curves different around rated • Numerical prediction close to measured curve
  • 18. © ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Presentation title - 09/05/2016 – P 18 Presented Power Curve Measured Power Curves • Significant power fluctuations over ten- minute sample • Time & velocity averaging smoothens curve • Flood and ebb curves different around rated • Numerical prediction close to measured curve
  • 19. © ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Presentation title - 09/05/2016 – P 19 Presented Power Curve Measured Power Curves • Significant power fluctuations over ten- minute sample • Time & velocity averaging smoothens curve • Flood and ebb curves different around rated • Numerical prediction close to measured curve
  • 20. © ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Presentation title - 09/05/2016 – P 20 Presented Power Curve Measured Power Curves • Significant power fluctuations over ten- minute sample • Time & velocity averaging smoothens curve • Flood and ebb curves different around rated • Numerical prediction close to measured curve
  • 21. © ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Presentation title - 09/05/2016 – P 21 Presented Power Curve Measured Power Curves • Significant power fluctuations over ten- minute sample • Time & velocity averaging smoothens curve • Flood and ebb curves different around rated • Numerical prediction close to measured curve
  • 22. © ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Presentation title - 09/05/2016 – P 22 Overview • Introduction • The IEC Methodology • Numerical Prediction • Measured Power Curves • Sensitivity to Reference Velocity • Conclusions
  • 23. © ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Presentation title - 09/05/2016 – P 23 Flow Profiler Location Sensitivity to Reference Velocity • Investigation into reference velocity from different In-line ADCPs
  • 24. © ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Presentation title - 09/05/2016 – P 24 Flow Profiler Location Sensitivity to Reference Velocity • Investigation into reference velocity from different In-line ADCPs • Less “power per flow bin” for further upstream ADCP • Insufficient dataset to draw firm conclusions
  • 25. © ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Presentation title - 09/05/2016 – P 25 Turbine-mounted flow sensor Sensitivity to Reference Velocity • Nose-mounted SBD: −Beam velocity only −Max range 10 m
  • 26. © ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Presentation title - 09/05/2016 – P 26 Turbine-mounted flow sensor Sensitivity to Reference Velocity • Nose-mounted SBD: −Beam velocity only −Max range 10 m −Hub-height • Calibration issue or turbine influence?
  • 27. © ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Presentation title - 09/05/2016 – P 27 Turbine-mounted flow sensor Sensitivity to Reference Velocity • Nose-mounted SBD: −Beam velocity only −Max range 10 m −Hub-height • Calibration issue or turbine influence? • Hardware & setup not right for this use but not the end of the story
  • 28. © ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Presentation title - 09/05/2016 – P 28 Overview • Introduction • The IEC Methodology • Numerical Prediction • Measured Power Curves • Sensitivity to Reference Velocity • Conclusions
  • 29. © ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Presentation title - 09/05/2016 – P 29 Conclusions • IEC/TS 62600-200: − Robust procedure with stringent criteria − Not easy to do, but for a reason − ADCP position does influence results • Numerical prediction (Tidal Bladed) close to measured • Nose-mounted sensor: − Promising but different hardware required − Unable to replace IEC method for certified power curve (at present) • Other IEC/TS 62600-200 assessment: − Adjacent ADCP configuration − Sensitivity to reference velocities and averaging periods
  • 30. © ALSTOM 2015. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited. Presentation title - 09/05/2016 – P 30 Conclusions & Ongoing work This research was conducted as part of the Reliable Data Acquisition Platform for Tidal (ReDAPT) project commissioned and funded by the Energy Technologies Institute (ETI). The authors would also like to thank Greg Pittam at Alstom Ocean Energy and Duncan Sutherland and Sam Harding at the University of Edinburgh.