Marine Planning in Pentland Firth and Orkney Waters
James Green
Development and Marine Planning
Orkney Islands Council
SuperGen Doctoral Training Programme
Getting to Grips with the Marine Environment ‐ II
Heriot‐Watt University
June 2014
Content
• Brief introduction to marine planning
• Pilot Pentland Firth and Orkney Waters
Marine Spatial Plan
• Land use planning and marine
infrastructure
What is marine spatial planning?
‘Marine spatial planning is a public process of analysing and allocating
the spatial and temporal distribution of human activities in marine
areas to achieve ecological, economic, and social objectives that
usually have been specified through a political process’ (UNESCO).
Why develop a plan?
• Sustainable development
• Strategic vision and spatial strategy
• Promote efficient use of space
• Stakeholder knowledge and buy-in
• Engage local communities
• Build consensus and find common ground
• Provide greater certainty for developers
• Reduce risk in the licensing process
• Monitoring and adaption
Marine Planning in Scotland
• Marine (Scotland) Act 2010
- National marine plan and atlas
- Regional marine plans
- Provision for Marine Planning
Partnerships
- Licensing
- Marine Protected Areas
‘A public authority must take any authorisation
or enforcement decision in accordance with the
appropriate marine plans, unless relevant
considerations indicate otherwise’ Section 15(1).
Pilot Pentland Firth and Orkney Waters Marine
Spatial Plan
www.scotland.gov.uk/Topics/marine/seamanagement/regional/pentlandorkney
The plan area
The plan area
Pilot Pentland Firth and Orkney Waters Marine
Spatial Plan
Pilot Pentland Firth and Orkney Waters Marine
Spatial Plan
Working Group
• Marine Scotland (Lead)
• Highland Council
• Orkney Islands Council Advisory Group
• Scottish Natural Heritage
• Scottish Environment Protection
Agency
• Historic Scotland
• Highlands and Islands Enterprise
• Orkney Harbour Authority
• Scrabster Harbour Trust
• Royal Yachting Association
Stakeholders
For example:
• Local communities;
• Commercial fisheries;
• Marine renewables;
• Aquaculture; and
• Recreational interests.
How is the plan being
delivered?
Working
Group
Advisory
Group
Stakeholders Stakeholders
Stakeholders
Orkney
Local
Communities
Caithness
and
Sutherland
Local
Communities
Pilot Pentland Firth and Orkney Waters Marine
Spatial Plan
Pilot Pentland Firth and Orkney Waters Marine
Spatial Plan
• Set out the plan making process for consultation,
November 2012Plan Scheme
• Stakeholder Events in July 2013
• Included draft Environmental Report
Planning Issues and
Options
• Responded to stakeholder contributions
• Outlines Working Group actions for drafting the plan
Consultation Analysis
and Report
• Structured discussion to develop policies
• Will take place from July to the end of 2014
Stakeholder Focus
Groups
• Formal 12 week consultation (Start 2015)
Draft Marine Spatial
Plan
• Will include Post Adoption Statement and HRA, 2015
Final Plan and
associated documents
• Lessons learned
• Review of pilot process
Review
Pilot Pentland Firth and Orkney Waters Marine
Spatial Plan
The PFOW marine spatial plan is non statutory and, if approved by
Scottish Ministers, will be:
• A material consideration in the determination of marine
licensing, works licenses and Section 36 applications
• Can be adopted as Planning Policy Advice
or as Supplementary Guidance to the appropriate Local
Development Plan
Pilot Pentland Firth and Orkney Waters
Marine Spatial Plan
The status of the plan
• Local Development Plans and planning guidance
• Masterplanning and Development Briefs
• Investment in port and harbour infrastructure
Land use planning and marine infrastructure
Land use planning
• Overlap with marine plans across the
intertidal zone
• Local Development Plans and the
coastal zone
• Integrating land based and marine
development
• The aquaculture anomaly
Masterplanning and Development Briefs
• Coordinate development and
infrastructure
• Engage businesses and end users
• Identifies environmental constraints /
sensitivities
• Developer contributions and funding
Hatston
Stromness
Lyness
Port and harbour investment
Lyness Hoy
Lyness
• Marine renewables (O&M), aquaculture, heritage
• Land in Council ownership
• Enterprise Area
• £2.97m investment to upgrade the wharf (OIC and
ERDF)
• Over 300,000 sq.m. of lay down areas available
adjacent to quay edge
• Sheltered deep water anchorage within Scapa Flow
• HIE Engineering hubs in planning
• Regular connectivity to Orkney Mainland
Hatston Pier, Kirkwall
• Ferry terminal, cruise ships, marine renewables
• Council owned land and Enterprise Area
• £8 million to extend the pier (OIC and ERDF)
• Accommodate vessels up to 385 meters LOA and 10.5
meter drafts
• Support marine renewables in the North Isles
• Regular connectivity to Aberdeen (Sea) and UK (Air)
Hatston, Kirkwall
Copland's Dock Stromness
Copland's Dock Stromness
• Council land
• Ten hectares of laydown land
• Total quay edge of 337 meters
• £10.6m jointly funded by OIC, ERDF and Scottish
Government
• Renewables support vessels, aquaculture, fishing vessels
and freight
• Access to sheltered waters in Scapa Flow
Marine Planning – A Council Perspective
James Green
Development and Marine Planning
Orkney Islands Council
james.green@orkney.gov.uk

Weitere ähnliche Inhalte

Was ist angesagt?

Chris scott canoe trails
Chris scott canoe trailsChris scott canoe trails
Chris scott canoe trails
southtippcoco
 
2014 06 mel nicholls
2014   06 mel nicholls2014   06 mel nicholls
2014 06 mel nicholls
SevernEstuary
 
ICES Conference Poster FINAL
ICES Conference Poster FINALICES Conference Poster FINAL
ICES Conference Poster FINAL
James Green
 
Celtic Seas Partnership- Caroline Salthouse
Celtic Seas Partnership- Caroline SalthouseCeltic Seas Partnership- Caroline Salthouse
Celtic Seas Partnership- Caroline Salthouse
rebeccalynam
 
International MSP RI Panel May 2012
International MSP RI Panel May 2012International MSP RI Panel May 2012
International MSP RI Panel May 2012
riseagrant
 

Was ist angesagt? (20)

Chris scott canoe trails
Chris scott canoe trailsChris scott canoe trails
Chris scott canoe trails
 
2007 05 Severn River Basin District - Working together - Mark Scott, Environm...
2007 05 Severn River Basin District - Working together - Mark Scott, Environm...2007 05 Severn River Basin District - Working together - Mark Scott, Environm...
2007 05 Severn River Basin District - Working together - Mark Scott, Environm...
 
Proposed MCZ Allonby Bay- Laurence Browning
Proposed MCZ Allonby Bay- Laurence BrowningProposed MCZ Allonby Bay- Laurence Browning
Proposed MCZ Allonby Bay- Laurence Browning
 
2014 06 mel nicholls
2014   06 mel nicholls2014   06 mel nicholls
2014 06 mel nicholls
 
Development of a Maritime Spatial Plan: The Latvian Recipe
Development of a Maritime Spatial Plan: The Latvian RecipeDevelopment of a Maritime Spatial Plan: The Latvian Recipe
Development of a Maritime Spatial Plan: The Latvian Recipe
 
Fisheries in Sweden*
Fisheries in Sweden*Fisheries in Sweden*
Fisheries in Sweden*
 
Finding Inspiration in History and the Natural World
Finding Inspiration in History and the Natural WorldFinding Inspiration in History and the Natural World
Finding Inspiration in History and the Natural World
 
Sam Bryan - Sustainable Severn Forum 2015
Sam Bryan - Sustainable Severn Forum 2015Sam Bryan - Sustainable Severn Forum 2015
Sam Bryan - Sustainable Severn Forum 2015
 
ICES Conference Poster FINAL
ICES Conference Poster FINALICES Conference Poster FINAL
ICES Conference Poster FINAL
 
Celtic Seas Partnership- Caroline Salthouse
Celtic Seas Partnership- Caroline SalthouseCeltic Seas Partnership- Caroline Salthouse
Celtic Seas Partnership- Caroline Salthouse
 
Baltic SCOPE kick-off - Southwest Baltic Case *
Baltic SCOPE kick-off - Southwest Baltic Case *Baltic SCOPE kick-off - Southwest Baltic Case *
Baltic SCOPE kick-off - Southwest Baltic Case *
 
Nisqually River Water Trail Plan
Nisqually River Water Trail Plan Nisqually River Water Trail Plan
Nisqually River Water Trail Plan
 
International MSP RI Panel May 2012
International MSP RI Panel May 2012International MSP RI Panel May 2012
International MSP RI Panel May 2012
 
John Harrison - Sustainable Severn Forum 2015
John Harrison - Sustainable Severn Forum 2015John Harrison - Sustainable Severn Forum 2015
John Harrison - Sustainable Severn Forum 2015
 
2010 02 The Marine Management Organisation and the Role of Partnerships – Ste...
2010 02 The Marine Management Organisation and the Role of Partnerships – Ste...2010 02 The Marine Management Organisation and the Role of Partnerships – Ste...
2010 02 The Marine Management Organisation and the Role of Partnerships – Ste...
 
Presentation steyning 2019
Presentation steyning 2019Presentation steyning 2019
Presentation steyning 2019
 
Baltic SCOPE stakeholder workshop on SHIPPING *
Baltic SCOPE stakeholder workshop on SHIPPING *Baltic SCOPE stakeholder workshop on SHIPPING *
Baltic SCOPE stakeholder workshop on SHIPPING *
 
Martyn Evans - Sustainable Severn Forum 2015
Martyn Evans - Sustainable Severn Forum 2015Martyn Evans - Sustainable Severn Forum 2015
Martyn Evans - Sustainable Severn Forum 2015
 
Shipping in the Western Baltic*
Shipping in the Western Baltic*Shipping in the Western Baltic*
Shipping in the Western Baltic*
 
Draft_VCS-2013
Draft_VCS-2013Draft_VCS-2013
Draft_VCS-2013
 

Andere mochten auch

AWS Summit 2014 - Perth - Keynote
AWS Summit 2014 - Perth - KeynoteAWS Summit 2014 - Perth - Keynote
AWS Summit 2014 - Perth - Keynote
Amazon Web Services
 

Andere mochten auch (20)

Somali 2009 PNEB (PUNTLAND NATIONAL EXAMINATION BOARD)
Somali  2009 PNEB (PUNTLAND NATIONAL EXAMINATION BOARD)Somali  2009 PNEB (PUNTLAND NATIONAL EXAMINATION BOARD)
Somali 2009 PNEB (PUNTLAND NATIONAL EXAMINATION BOARD)
 
10 tips
10 tips10 tips
10 tips
 
AWS Summit 2014 - Perth - Keynote
AWS Summit 2014 - Perth - KeynoteAWS Summit 2014 - Perth - Keynote
AWS Summit 2014 - Perth - Keynote
 
Account-Based Marketing - MicroMedia Väitös 19.5
Account-Based Marketing - MicroMedia Väitös 19.5Account-Based Marketing - MicroMedia Väitös 19.5
Account-Based Marketing - MicroMedia Väitös 19.5
 
Preguntas de reflexion (video)
Preguntas de reflexion (video)Preguntas de reflexion (video)
Preguntas de reflexion (video)
 
shoulder dislocationcation
shoulder dislocationcationshoulder dislocationcation
shoulder dislocationcation
 
52320669
5232066952320669
52320669
 
Folleto obtenido
Folleto obtenidoFolleto obtenido
Folleto obtenido
 
Yritysesittely Administer
Yritysesittely AdministerYritysesittely Administer
Yritysesittely Administer
 
Presentacion ingles
Presentacion inglesPresentacion ingles
Presentacion ingles
 
Konversioiden vaikutus liiketoimintaan
Konversioiden vaikutus liiketoimintaanKonversioiden vaikutus liiketoimintaan
Konversioiden vaikutus liiketoimintaan
 
Chemistry 2012 PUNTLAND NATIONAL EXAMINATION BOARD (PNEB)
Chemistry  2012 PUNTLAND NATIONAL EXAMINATION BOARD (PNEB)Chemistry  2012 PUNTLAND NATIONAL EXAMINATION BOARD (PNEB)
Chemistry 2012 PUNTLAND NATIONAL EXAMINATION BOARD (PNEB)
 
AWS June 2016 Webinar Series - Amazon Aurora Deep Dive - Optimizing Database ...
AWS June 2016 Webinar Series - Amazon Aurora Deep Dive - Optimizing Database ...AWS June 2016 Webinar Series - Amazon Aurora Deep Dive - Optimizing Database ...
AWS June 2016 Webinar Series - Amazon Aurora Deep Dive - Optimizing Database ...
 
Getting Started with Amazon Aurora
Getting Started with Amazon AuroraGetting Started with Amazon Aurora
Getting Started with Amazon Aurora
 
Golang workshop
Golang workshopGolang workshop
Golang workshop
 
database migration simple, cross-engine and cross-platform migrations with ...
database migration   simple, cross-engine and cross-platform migrations with ...database migration   simple, cross-engine and cross-platform migrations with ...
database migration simple, cross-engine and cross-platform migrations with ...
 
Atelier 23 VEM7 - Comment garder le contrôle de son établissement sur le web ?
Atelier 23 VEM7 - Comment garder le contrôle de son établissement sur le web ?Atelier 23 VEM7 - Comment garder le contrôle de son établissement sur le web ?
Atelier 23 VEM7 - Comment garder le contrôle de son établissement sur le web ?
 
Development and Test on AWS
Development and Test on AWSDevelopment and Test on AWS
Development and Test on AWS
 
05 - Quelles stratégies d'acquisition et de sécurisation des terres pour les ...
05 - Quelles stratégies d'acquisition et de sécurisation des terres pour les ...05 - Quelles stratégies d'acquisition et de sécurisation des terres pour les ...
05 - Quelles stratégies d'acquisition et de sécurisation des terres pour les ...
 
Instructivo notificación accidentes inpsasel (1)
Instructivo notificación accidentes inpsasel (1)Instructivo notificación accidentes inpsasel (1)
Instructivo notificación accidentes inpsasel (1)
 

Ähnlich wie Doctoral Training Heriot Watt University FINAL

Presentation For Nwnwsfc December 09
Presentation For Nwnwsfc December 09Presentation For Nwnwsfc December 09
Presentation For Nwnwsfc December 09
kieran04
 
Romania Agricultural Pollution Control (2) presentation
Romania Agricultural Pollution Control (2) presentationRomania Agricultural Pollution Control (2) presentation
Romania Agricultural Pollution Control (2) presentation
Iwl Pcu
 
2014 05 paula whitfield
2014   05 paula whitfield2014   05 paula whitfield
2014 05 paula whitfield
SevernEstuary
 
Transformational Projects – the Orkney story so far
Transformational Projects – the Orkney story so farTransformational Projects – the Orkney story so far
Transformational Projects – the Orkney story so far
PMIUKChapter
 

Ähnlich wie Doctoral Training Heriot Watt University FINAL (20)

PFOW MSP Final
PFOW MSP FinalPFOW MSP Final
PFOW MSP Final
 
MSP in the North Sea and Atlantic Ocean at the 2nd Baltic Maritime Spatial Pl...
MSP in the North Sea and Atlantic Ocean at the 2nd Baltic Maritime Spatial Pl...MSP in the North Sea and Atlantic Ocean at the 2nd Baltic Maritime Spatial Pl...
MSP in the North Sea and Atlantic Ocean at the 2nd Baltic Maritime Spatial Pl...
 
GGSD 2017 Session 2 - Keynote Presentation by Susanna Fuller
GGSD 2017 Session 2 - Keynote Presentation by Susanna FullerGGSD 2017 Session 2 - Keynote Presentation by Susanna Fuller
GGSD 2017 Session 2 - Keynote Presentation by Susanna Fuller
 
Update on MCH and MSP – what is going on in the European sea basins? at the 2...
Update on MCH and MSP – what is going on in the European sea basins? at the 2...Update on MCH and MSP – what is going on in the European sea basins? at the 2...
Update on MCH and MSP – what is going on in the European sea basins? at the 2...
 
WAMM North East Regional Workshop York 29 Jan 2020
WAMM North East Regional Workshop York 29 Jan 2020WAMM North East Regional Workshop York 29 Jan 2020
WAMM North East Regional Workshop York 29 Jan 2020
 
2009 02 Severn Estuary Partnership - Jonathan Mullard
2009 02 Severn Estuary Partnership - Jonathan Mullard 2009 02 Severn Estuary Partnership - Jonathan Mullard
2009 02 Severn Estuary Partnership - Jonathan Mullard
 
Presentation For Nwnwsfc December 09
Presentation For Nwnwsfc December 09Presentation For Nwnwsfc December 09
Presentation For Nwnwsfc December 09
 
2007 07 Working Together for Coastal Planning - Tim Stojanovic, EU Corepoint ...
2007 07 Working Together for Coastal Planning - Tim Stojanovic, EU Corepoint ...2007 07 Working Together for Coastal Planning - Tim Stojanovic, EU Corepoint ...
2007 07 Working Together for Coastal Planning - Tim Stojanovic, EU Corepoint ...
 
Romania Agricultural Pollution Control (2) presentation
Romania Agricultural Pollution Control (2) presentationRomania Agricultural Pollution Control (2) presentation
Romania Agricultural Pollution Control (2) presentation
 
Dave Baxter EA
Dave Baxter EADave Baxter EA
Dave Baxter EA
 
The Cool Route Project: Coastal Tourism Development
The Cool Route Project: Coastal Tourism Development The Cool Route Project: Coastal Tourism Development
The Cool Route Project: Coastal Tourism Development
 
Intertidal habitat creation as compensation for the impacts of dredging assoc...
Intertidal habitat creation as compensation for the impacts of dredging assoc...Intertidal habitat creation as compensation for the impacts of dredging assoc...
Intertidal habitat creation as compensation for the impacts of dredging assoc...
 
Adrian shepherd
Adrian shepherdAdrian shepherd
Adrian shepherd
 
Approved Kashwakamak Lake Sustainability Plan - July 2016
Approved Kashwakamak Lake Sustainability Plan - July 2016Approved Kashwakamak Lake Sustainability Plan - July 2016
Approved Kashwakamak Lake Sustainability Plan - July 2016
 
Public-Private Partnerships In Ocean Sustainability: Industry Leadership and...
Public-Private Partnerships  In Ocean Sustainability: Industry Leadership and...Public-Private Partnerships  In Ocean Sustainability: Industry Leadership and...
Public-Private Partnerships In Ocean Sustainability: Industry Leadership and...
 
2014 05 paula whitfield
2014   05 paula whitfield2014   05 paula whitfield
2014 05 paula whitfield
 
Keynote presentation at the Houting project - Martin janes
Keynote presentation at the Houting project - Martin janesKeynote presentation at the Houting project - Martin janes
Keynote presentation at the Houting project - Martin janes
 
3. Fernanda Balata NEFs Blue New Deal
3. Fernanda Balata  NEFs Blue New Deal3. Fernanda Balata  NEFs Blue New Deal
3. Fernanda Balata NEFs Blue New Deal
 
Massachusetts_Ocean_Plan.ppt
Massachusetts_Ocean_Plan.pptMassachusetts_Ocean_Plan.ppt
Massachusetts_Ocean_Plan.ppt
 
Transformational Projects – the Orkney story so far
Transformational Projects – the Orkney story so farTransformational Projects – the Orkney story so far
Transformational Projects – the Orkney story so far
 

Doctoral Training Heriot Watt University FINAL

  • 1. Marine Planning in Pentland Firth and Orkney Waters James Green Development and Marine Planning Orkney Islands Council SuperGen Doctoral Training Programme Getting to Grips with the Marine Environment ‐ II Heriot‐Watt University June 2014
  • 2. Content • Brief introduction to marine planning • Pilot Pentland Firth and Orkney Waters Marine Spatial Plan • Land use planning and marine infrastructure
  • 3. What is marine spatial planning? ‘Marine spatial planning is a public process of analysing and allocating the spatial and temporal distribution of human activities in marine areas to achieve ecological, economic, and social objectives that usually have been specified through a political process’ (UNESCO).
  • 4. Why develop a plan? • Sustainable development • Strategic vision and spatial strategy • Promote efficient use of space • Stakeholder knowledge and buy-in • Engage local communities • Build consensus and find common ground • Provide greater certainty for developers • Reduce risk in the licensing process • Monitoring and adaption
  • 5. Marine Planning in Scotland • Marine (Scotland) Act 2010 - National marine plan and atlas - Regional marine plans - Provision for Marine Planning Partnerships - Licensing - Marine Protected Areas ‘A public authority must take any authorisation or enforcement decision in accordance with the appropriate marine plans, unless relevant considerations indicate otherwise’ Section 15(1).
  • 6. Pilot Pentland Firth and Orkney Waters Marine Spatial Plan www.scotland.gov.uk/Topics/marine/seamanagement/regional/pentlandorkney
  • 7. The plan area The plan area Pilot Pentland Firth and Orkney Waters Marine Spatial Plan
  • 8. Pilot Pentland Firth and Orkney Waters Marine Spatial Plan Working Group • Marine Scotland (Lead) • Highland Council • Orkney Islands Council Advisory Group • Scottish Natural Heritage • Scottish Environment Protection Agency • Historic Scotland • Highlands and Islands Enterprise • Orkney Harbour Authority • Scrabster Harbour Trust • Royal Yachting Association Stakeholders For example: • Local communities; • Commercial fisheries; • Marine renewables; • Aquaculture; and • Recreational interests. How is the plan being delivered?
  • 10. Pilot Pentland Firth and Orkney Waters Marine Spatial Plan • Set out the plan making process for consultation, November 2012Plan Scheme • Stakeholder Events in July 2013 • Included draft Environmental Report Planning Issues and Options • Responded to stakeholder contributions • Outlines Working Group actions for drafting the plan Consultation Analysis and Report • Structured discussion to develop policies • Will take place from July to the end of 2014 Stakeholder Focus Groups • Formal 12 week consultation (Start 2015) Draft Marine Spatial Plan • Will include Post Adoption Statement and HRA, 2015 Final Plan and associated documents • Lessons learned • Review of pilot process Review
  • 11. Pilot Pentland Firth and Orkney Waters Marine Spatial Plan
  • 12. The PFOW marine spatial plan is non statutory and, if approved by Scottish Ministers, will be: • A material consideration in the determination of marine licensing, works licenses and Section 36 applications • Can be adopted as Planning Policy Advice or as Supplementary Guidance to the appropriate Local Development Plan Pilot Pentland Firth and Orkney Waters Marine Spatial Plan The status of the plan
  • 13. • Local Development Plans and planning guidance • Masterplanning and Development Briefs • Investment in port and harbour infrastructure Land use planning and marine infrastructure
  • 14. Land use planning • Overlap with marine plans across the intertidal zone • Local Development Plans and the coastal zone • Integrating land based and marine development • The aquaculture anomaly
  • 15. Masterplanning and Development Briefs • Coordinate development and infrastructure • Engage businesses and end users • Identifies environmental constraints / sensitivities • Developer contributions and funding
  • 18. Lyness • Marine renewables (O&M), aquaculture, heritage • Land in Council ownership • Enterprise Area • £2.97m investment to upgrade the wharf (OIC and ERDF) • Over 300,000 sq.m. of lay down areas available adjacent to quay edge • Sheltered deep water anchorage within Scapa Flow • HIE Engineering hubs in planning • Regular connectivity to Orkney Mainland
  • 20. • Ferry terminal, cruise ships, marine renewables • Council owned land and Enterprise Area • £8 million to extend the pier (OIC and ERDF) • Accommodate vessels up to 385 meters LOA and 10.5 meter drafts • Support marine renewables in the North Isles • Regular connectivity to Aberdeen (Sea) and UK (Air) Hatston, Kirkwall
  • 22. Copland's Dock Stromness • Council land • Ten hectares of laydown land • Total quay edge of 337 meters • £10.6m jointly funded by OIC, ERDF and Scottish Government • Renewables support vessels, aquaculture, fishing vessels and freight • Access to sheltered waters in Scapa Flow
  • 23. Marine Planning – A Council Perspective James Green Development and Marine Planning Orkney Islands Council james.green@orkney.gov.uk