SlideShare ist ein Scribd-Unternehmen logo
1 von 5
Downloaden Sie, um offline zu lesen
James Bullen
B.Eng (Elec)
October 2016 1 of 5
James Bullen
Electrical Engineer (IT/Telecommunications)
Current Role
Field Service Engineer / Control Systems Engineer
Honeywell Process Solutions (Life Cycle and Solutions)
Brisbane, Australia
Areas of Expertise
As a team member of Honeywell Process Solutions - Life Cycle and Solutions, responsibilities include all
aspects of DCS and SIS Engineering, support and troubleshooting with attention to detail and safety
focus. Major functions include:
• Experion control systems configuration, planning and implementation
• Virtualization systems configuration, planning and implementation
• Honeywell DCS and PLC hardware: C300, C200, HC900, MasterLogix, Safety Manager, LCS620
• Experion on and off process migrations
• Simulation environments
• Vendor system configuration and integration (ABB, Allen-Bradley, Bentley Nevada, Bristol Babcock,
Cogent, Emmerson, GE, HIMA, Krohne, Rockwell, Schneider, Siemens, Triconnex, various 3rd party
OPC Servers and PLCs, etc.)
• Protocols: Modbus, Profibus/Profinet, OPC, CEE, CIP, Cisco, ControlNet, etc.
• HMI Graphics design with ASM compliance.
• Advanced troubleshooting of all mentioned systems
• Project conception through to lifecycle support
• Detailed design specification (DDS), Factory acceptance testing (FAT), site acceptance testing (SAT)
and on-site commissioning
• Risk mitigation, assessment and CHAZOPS
• Liaison with clients, project managers, vendors, subcontractors, operators, technicians and other
engineering disciplines.
• Sales support, procurement and engineering estimation
• High standard of drawings and documentation generation
• Electronics/electrical design and troubleshooting (10 years + experience)
Experience Highlights
Honeywell 2011 – 2016
Incitec – Urea Plant C300 Upgrade Project (Port of Brisbane – Queensland) 2016
Lead Engineer
This project involves converting HPM to C300 Logic for all urea plant drives and online cutover strategy.
• Responsible for template generation
• Responsible for all logic generation
• Responsible for developing cutover strategy
• Responsible for FSC safety system logic alterations
• Documentation
APLNG – HIMA Integration Project (Curtis Island – Queensland) 2016
Lead Design Engineer
This project involves aggregating various 3rd party OPC A&E Servers into one redundant OPC Server pair
James Bullen
B.Eng (Elec)
October 2016 2 of 5
and designing filtering profiles to control alarm bursts during a compressor trip. Custom redundancy
management has been developed for integration into Experion Server Alarm Summary.
• Responsible for all Virtual hardware configuration
• Client Liaison with GE Process Personnel
• Documentation
APLNG – Migration and Tech Refresh Upgrade (Curtis Island – Queensland) 2016
Lead Experion Migration Engineer
This project involves migration of an existing R410.8 system to a R432.1 in a virtual environment and
includes software and hardware tech refresh on Dell FX2 Virtual Platform.
• Responsible for generating and executing all Experion software and 3rd Party work packs.
• Responsible for generating IOM CHAZOP Analysis to determine points of plant failure during
shutdown.
• Responsible for all Virtual hardware configuration
• Client Liaison with Process Personnel
• Documentation
Oil Search – CPF Export Pump Station Upgrade (PNG) 2016
Lead Design Engineer
This project involved migration of an existing LCS620 PLC system to a C300 DCS, including software and
hardware configuration.
• Responsible for all Logic creation
• Responsible for all HMI graphics generation
• Responsible for all IO Testing and configuration
• Client Liaison with Process Personnel
• Documentation
Oil Search – CPF Operator Training and Simulation System (PNG) 2015
This project involved setting up and configuring an OTS system for the Central Processing Facility at Oil
Search.
• Assisted Advanced Solutions in configuration and troubleshooting
• Responsible for Remote Access
• Liaison with GES (India)
APLNG – Liquefaction Plant (Curtis Island – Queensland) 2015
Lead Engineer for 3rd Party SCADA design and package integration
Performed on-site design and commissioning of Honeywell DCS and heavily involved with 3rd party
SCADA design and commissioning team.
• Troubleshooting package integration
• Hardware and software auditing
• Systems engineering and administration
• Experion quality checks and DCS logic validation
• 3rd
party PLC code alteration
• Metering system design and commissioning
• NGERS Compliance
• Safety system logic changes
• Loop testing
• Point configuration
• SAT and commissioning
TAE – AGT1500 Turbine Test Cell (Amberley Airforce Base) 2015
Lead Engineer
Design and development of Honeywell AGT1500 Turbine test cell for TAE.
James Bullen
B.Eng (Elec)
October 2016 3 of 5
• Responsible for all Logic generation
• Responsible for all HMI graphics generation
• Responsible for all IO testing and configuration
• Client Liaison with process personnel
• Documentation
Caltex – Area North Experion Upgrade Project (Caltex Oil Refinery – Lytton) 2014
Large project involved upgrading the existing LCN based system to Experion R410.
• System wide and server configuration
• SafeView configuration
• HMIWeb display generation and shape design
• Performed internal and external FAT and SAT
• System Installations, patches, software and security updates
• Point Building and configuration
• Client Liaison with process personnel
• Site Commissioning and ongoing support
• Documentation
Ma’aden Mine and Refinery (Saudi Arabia – Riyadh) 2014
Large global project including an alumina mine, refinery, smelter and train load out system in Saudi
Arabia.
• Responsible for System wide and Server Configuration (6 sets of servers)
• Built Virtual Dev system (200+ nodes)
• Performed internal and external FAT and SAT
• System Installations, patches, software and security updates
• Point Building and configuration
• Client Liaison with process personnel
• Documentation
Xstrata R200.1 to R430.1 Migration (Xstrata Copper Refinery – Townsville) 2013
Lead Engineer
On Process Migration of Copper Refinery in Townsville.
• Responsible for complete system migration, configuration and testing
• Responsible for All C200 module and Rail IO firmware upgrades
• Client Liaison with process personnel
• Alteration of HMI displays and shapes
• Alteration of logic to fit specification
• Performed FAT and SAT
• Documentation
John Dee R200 to R410.2 Migration (John Dee Abattoir – Warwick) 2013
Lead Engineer
On Process Migration of John Dee Abattoir.
• Responsible for complete system migration, configuration and testing
• Responsible for all C200 module and Rail IO firmware upgrades
• Client Liaison with process personnel
• Alteration of CM’s to fit specification
• Performed FAT and SAT
Caltex – C300 Blending Pump Migration (Caltex Oil Refinery – Lytton) 2013
Design and development of Lubricants and Oil Blending system.
James Bullen
B.Eng (Elec)
October 2016 4 of 5
• Assisted with logic generation
• Built test system
• Client liaison with process personnel
• Alteration of HMI displays and shapes
• Performed FAT and SAT
APA Group – Unit 2 Compressor Station (Dalby) 2012
Design and development of Brisbane to Roma pipeline compressor.
• Responsible for HMI graphics generation
• Responsible for point building
• Triconex safety logic implementation
• Client Liaison with process personnel
• Performed FAT and SAT
• Site commissioning and ongoing support
Caltex – Alkylation HF Acid Mitigation System (Caltex Oil Refinery – Lytton) 2012
Lead Engineer
Design and development of the Alkylation HF Gas Safety System.
• Responsible for HMI graphics generation
• Responsible for point building and testing
• Client Liaison with process personnel
• Performed FAT
• Site commissioning
Oil Search – Kumul Offshore Marine Terminal (PNG) 2012
Lead Engineer –
Design and development of Triconex based Fire and Gas Safety System.
• Triconex safety logic implementation
• Responsible for HMI graphics generation
• Responsible for point building and testing
• Performed SAT and FAT
• Generated C&E diagrams
SEQWATER – North Pine ABU (Brisbane)
Primary contract contact
• Various small projects and upgrades
• Contract support and troubleshooting
Origin Energy – ABU Pipeline (Brisbane)
Primary contract contact
• Various small projects and upgrades
• Contract support and troubleshooting
Caltex Lubricants Plant (Lytton)
Primary contract contact
• Various small projects and upgrades
• Contract support and troubleshooting
Incitec – Fertiliser Plant (Lytton)
Primary contract contact
• Various small projects and upgrades
• Contract support and troubleshooting
James Bullen
B.Eng (Elec)
October 2016 5 of 5
Wesfarmers – Curragh Coal Plant (Blackwater)
• Various small projects and upgrades
• Contract support and troubleshooting
Caltex Oil Refinery – (Lytton)
Primary contract contact
• Various small projects and upgrades
• Contract Support and trouble shooting
Qualifications and Training
Education
• Bachelor of Electrical Engineering with Major in IT, Minor in Telecommunications 2005 – 2010
Queensland University of Technology. Final year GPA of 6.5.
Previous Experience
• Royal Brisbane Hospital (QLD Health) - assisting with infrastructure and asset management, HVAC
power design, maintaining and upgrading all control systems, power factor correction systems, power
usage audits, NGERS compliance.
• JLM Audio as electronic design engineer for digital and analogue systems. This role involved ground
up electronics design using Altium Design Explorer, OEM quality control, prototyping and manufacture.
• 10 years of electrical design and consulting in all aspects of professional audio and
troubleshooting/repair.
Courses Attended
• Experion PKS Course: Server Engineering and Configuration Implementation 2012
• Experion PKS Course: Graphics Design and Building Implementation 2013
• Experion PKS Course: Experion Platform Virtualisation 2015
Recent Achievements
• Generating over 500k of collected sales leads revenue in 2016.
• Generating over 330k of collected sales leads revenue in 2015.

Weitere ähnliche Inhalte

Was ist angesagt?

KP Controls CV 1.4
KP Controls CV 1.4KP Controls CV 1.4
KP Controls CV 1.4kevin pratt
 
Rockwell Automation TechED 2017 - AP14 - MRWPCA
Rockwell Automation TechED 2017 - AP14 - MRWPCARockwell Automation TechED 2017 - AP14 - MRWPCA
Rockwell Automation TechED 2017 - AP14 - MRWPCARockwell Automation
 
Resume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experienceResume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experienceDHRUVA MISHRA
 
Modernization Lessons Learned - Part 1
Modernization Lessons Learned - Part 1Modernization Lessons Learned - Part 1
Modernization Lessons Learned - Part 1Emerson Exchange
 
Resume Wynn R Pettitt
Resume Wynn R PettittResume Wynn R Pettitt
Resume Wynn R PettittWynn Pettitt
 
Resume_Jim_Phillips_2015
Resume_Jim_Phillips_2015Resume_Jim_Phillips_2015
Resume_Jim_Phillips_2015j phillips
 
RJCJrResumeMAY2015
RJCJrResumeMAY2015RJCJrResumeMAY2015
RJCJrResumeMAY2015Rob Cockrell
 
Qualifying a high performance memory subsysten for Functional Safety
Qualifying a high performance memory subsysten for Functional SafetyQualifying a high performance memory subsysten for Functional Safety
Qualifying a high performance memory subsysten for Functional SafetyPankaj Singh
 
Rowel Dagondon_Commissioning Engineer_C&A CSU
Rowel Dagondon_Commissioning Engineer_C&A CSURowel Dagondon_Commissioning Engineer_C&A CSU
Rowel Dagondon_Commissioning Engineer_C&A CSURowel Dagondon
 
Resume_Shruti Maurya
Resume_Shruti MauryaResume_Shruti Maurya
Resume_Shruti MauryaSHRUTI MAURYA
 
Jd phillips 2015
Jd phillips 2015Jd phillips 2015
Jd phillips 2015j phillips
 

Was ist angesagt? (20)

KP Controls CV 1.4
KP Controls CV 1.4KP Controls CV 1.4
KP Controls CV 1.4
 
Rockwell Automation TechED 2017 - AP14 - MRWPCA
Rockwell Automation TechED 2017 - AP14 - MRWPCARockwell Automation TechED 2017 - AP14 - MRWPCA
Rockwell Automation TechED 2017 - AP14 - MRWPCA
 
Vinay Singh
Vinay SinghVinay Singh
Vinay Singh
 
Resume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experienceResume_Instrumentation Engineer_9 year experience
Resume_Instrumentation Engineer_9 year experience
 
Modernization Lessons Learned - Part 1
Modernization Lessons Learned - Part 1Modernization Lessons Learned - Part 1
Modernization Lessons Learned - Part 1
 
Resume Wynn R Pettitt
Resume Wynn R PettittResume Wynn R Pettitt
Resume Wynn R Pettitt
 
Atul_T_Biradar_CV
Atul_T_Biradar_CVAtul_T_Biradar_CV
Atul_T_Biradar_CV
 
Resume_Jim_Phillips_2015
Resume_Jim_Phillips_2015Resume_Jim_Phillips_2015
Resume_Jim_Phillips_2015
 
RJCJrResumeMAY2015
RJCJrResumeMAY2015RJCJrResumeMAY2015
RJCJrResumeMAY2015
 
Qualifying a high performance memory subsysten for Functional Safety
Qualifying a high performance memory subsysten for Functional SafetyQualifying a high performance memory subsysten for Functional Safety
Qualifying a high performance memory subsysten for Functional Safety
 
Rowel Dagondon_Commissioning Engineer_C&A CSU
Rowel Dagondon_Commissioning Engineer_C&A CSURowel Dagondon_Commissioning Engineer_C&A CSU
Rowel Dagondon_Commissioning Engineer_C&A CSU
 
Ayush_IE
Ayush_IEAyush_IE
Ayush_IE
 
Resume_Shruti Maurya
Resume_Shruti MauryaResume_Shruti Maurya
Resume_Shruti Maurya
 
BoyleCV
BoyleCVBoyleCV
BoyleCV
 
Shweta-CV
Shweta-CVShweta-CV
Shweta-CV
 
Jeff Ross Resume
Jeff Ross ResumeJeff Ross Resume
Jeff Ross Resume
 
D. Medina's CV (01)
D. Medina's CV (01)D. Medina's CV (01)
D. Medina's CV (01)
 
Control System Engineer Resume
Control System Engineer ResumeControl System Engineer Resume
Control System Engineer Resume
 
CV-Ulysses Bustillo
CV-Ulysses BustilloCV-Ulysses Bustillo
CV-Ulysses Bustillo
 
Jd phillips 2015
Jd phillips 2015Jd phillips 2015
Jd phillips 2015
 

Andere mochten auch (12)

Kashif CV PDF
Kashif CV PDFKashif CV PDF
Kashif CV PDF
 
CV-mohammad Civil engineer
CV-mohammad Civil engineerCV-mohammad Civil engineer
CV-mohammad Civil engineer
 
Sunil ,cv
Sunil ,cvSunil ,cv
Sunil ,cv
 
HD CV SHORT WORD rev 03
HD CV SHORT WORD rev 03HD CV SHORT WORD rev 03
HD CV SHORT WORD rev 03
 
Eng ALMASRI QATAR (TMRSA ENG CV 2 12-2016
Eng  ALMASRI  QATAR (TMRSA ENG CV 2 12-2016Eng  ALMASRI  QATAR (TMRSA ENG CV 2 12-2016
Eng ALMASRI QATAR (TMRSA ENG CV 2 12-2016
 
AMR_SALAMA_CV
AMR_SALAMA_CVAMR_SALAMA_CV
AMR_SALAMA_CV
 
cv document
cv documentcv document
cv document
 
CV OF ELECTRICAL ENGINEER
CV OF ELECTRICAL ENGINEERCV OF ELECTRICAL ENGINEER
CV OF ELECTRICAL ENGINEER
 
Electrical engineer CV
Electrical engineer CVElectrical engineer CV
Electrical engineer CV
 
cv electrical engineer
cv electrical engineercv electrical engineer
cv electrical engineer
 
SALMAN CV Qatar
SALMAN CV QatarSALMAN CV Qatar
SALMAN CV Qatar
 
Sooraj Padman CV
Sooraj Padman CVSooraj Padman CV
Sooraj Padman CV
 

Ähnlich wie James Bullen CV

Resume_Sanjeeth_PLC_Safety_DCS_Engg_3.6+yrs
Resume_Sanjeeth_PLC_Safety_DCS_Engg_3.6+yrsResume_Sanjeeth_PLC_Safety_DCS_Engg_3.6+yrs
Resume_Sanjeeth_PLC_Safety_DCS_Engg_3.6+yrsSanjeeth Thekkada
 
Resume - Jason Lewis
Resume - Jason LewisResume - Jason Lewis
Resume - Jason LewisJason Lewis
 
Rolston Rene _Resume
Rolston Rene _ResumeRolston Rene _Resume
Rolston Rene _ResumeRolston Rene
 
Resume-WILSON EDUARDO SANTAMARIA_012416
Resume-WILSON EDUARDO SANTAMARIA_012416Resume-WILSON EDUARDO SANTAMARIA_012416
Resume-WILSON EDUARDO SANTAMARIA_012416Wilson Santamaria
 
resume-ts-current- edit 02-08
resume-ts-current- edit 02-08resume-ts-current- edit 02-08
resume-ts-current- edit 02-08Thomas Savard
 
CV2015_06_30 -NG van Zyl
CV2015_06_30 -NG van ZylCV2015_06_30 -NG van Zyl
CV2015_06_30 -NG van ZylGerhard van Zyl
 
Resume_DharshanBM
Resume_DharshanBMResume_DharshanBM
Resume_DharshanBMDarshan Bm
 
Merrill_Resume_2015
Merrill_Resume_2015Merrill_Resume_2015
Merrill_Resume_2015Jeff Merrill
 
Twaddle_resume_160523
Twaddle_resume_160523Twaddle_resume_160523
Twaddle_resume_160523Thomas Waddle
 
Nesma autumn conference 2015 - Is FPA a valuable addition to predictable agil...
Nesma autumn conference 2015 - Is FPA a valuable addition to predictable agil...Nesma autumn conference 2015 - Is FPA a valuable addition to predictable agil...
Nesma autumn conference 2015 - Is FPA a valuable addition to predictable agil...Nesma
 

Ähnlich wie James Bullen CV (20)

Mike Leeper Resume
Mike Leeper ResumeMike Leeper Resume
Mike Leeper Resume
 
Resume_Sanjeeth_PLC_Safety_DCS_Engg_3.6+yrs
Resume_Sanjeeth_PLC_Safety_DCS_Engg_3.6+yrsResume_Sanjeeth_PLC_Safety_DCS_Engg_3.6+yrs
Resume_Sanjeeth_PLC_Safety_DCS_Engg_3.6+yrs
 
RamPravesh_Kumar
RamPravesh_KumarRamPravesh_Kumar
RamPravesh_Kumar
 
2015 resume
2015 resume2015 resume
2015 resume
 
Resume - Jason Lewis
Resume - Jason LewisResume - Jason Lewis
Resume - Jason Lewis
 
Rolston Rene _Resume
Rolston Rene _ResumeRolston Rene _Resume
Rolston Rene _Resume
 
Resume william bickford
Resume william bickford Resume william bickford
Resume william bickford
 
resume
resumeresume
resume
 
D'ANGELO - resume
D'ANGELO - resumeD'ANGELO - resume
D'ANGELO - resume
 
Al Mutim Resume
Al Mutim ResumeAl Mutim Resume
Al Mutim Resume
 
Al Mutim Resume
Al Mutim ResumeAl Mutim Resume
Al Mutim Resume
 
Resume-WILSON EDUARDO SANTAMARIA_012416
Resume-WILSON EDUARDO SANTAMARIA_012416Resume-WILSON EDUARDO SANTAMARIA_012416
Resume-WILSON EDUARDO SANTAMARIA_012416
 
resume-ts-current- edit 02-08
resume-ts-current- edit 02-08resume-ts-current- edit 02-08
resume-ts-current- edit 02-08
 
CV2015_06_30 -NG van Zyl
CV2015_06_30 -NG van ZylCV2015_06_30 -NG van Zyl
CV2015_06_30 -NG van Zyl
 
Lidia-Resume-v2
Lidia-Resume-v2Lidia-Resume-v2
Lidia-Resume-v2
 
Resume_DharshanBM
Resume_DharshanBMResume_DharshanBM
Resume_DharshanBM
 
Merrill_Resume_2015
Merrill_Resume_2015Merrill_Resume_2015
Merrill_Resume_2015
 
Twaddle_resume_160523
Twaddle_resume_160523Twaddle_resume_160523
Twaddle_resume_160523
 
MY_CV_1
MY_CV_1MY_CV_1
MY_CV_1
 
Nesma autumn conference 2015 - Is FPA a valuable addition to predictable agil...
Nesma autumn conference 2015 - Is FPA a valuable addition to predictable agil...Nesma autumn conference 2015 - Is FPA a valuable addition to predictable agil...
Nesma autumn conference 2015 - Is FPA a valuable addition to predictable agil...
 

James Bullen CV

  • 1. James Bullen B.Eng (Elec) October 2016 1 of 5 James Bullen Electrical Engineer (IT/Telecommunications) Current Role Field Service Engineer / Control Systems Engineer Honeywell Process Solutions (Life Cycle and Solutions) Brisbane, Australia Areas of Expertise As a team member of Honeywell Process Solutions - Life Cycle and Solutions, responsibilities include all aspects of DCS and SIS Engineering, support and troubleshooting with attention to detail and safety focus. Major functions include: • Experion control systems configuration, planning and implementation • Virtualization systems configuration, planning and implementation • Honeywell DCS and PLC hardware: C300, C200, HC900, MasterLogix, Safety Manager, LCS620 • Experion on and off process migrations • Simulation environments • Vendor system configuration and integration (ABB, Allen-Bradley, Bentley Nevada, Bristol Babcock, Cogent, Emmerson, GE, HIMA, Krohne, Rockwell, Schneider, Siemens, Triconnex, various 3rd party OPC Servers and PLCs, etc.) • Protocols: Modbus, Profibus/Profinet, OPC, CEE, CIP, Cisco, ControlNet, etc. • HMI Graphics design with ASM compliance. • Advanced troubleshooting of all mentioned systems • Project conception through to lifecycle support • Detailed design specification (DDS), Factory acceptance testing (FAT), site acceptance testing (SAT) and on-site commissioning • Risk mitigation, assessment and CHAZOPS • Liaison with clients, project managers, vendors, subcontractors, operators, technicians and other engineering disciplines. • Sales support, procurement and engineering estimation • High standard of drawings and documentation generation • Electronics/electrical design and troubleshooting (10 years + experience) Experience Highlights Honeywell 2011 – 2016 Incitec – Urea Plant C300 Upgrade Project (Port of Brisbane – Queensland) 2016 Lead Engineer This project involves converting HPM to C300 Logic for all urea plant drives and online cutover strategy. • Responsible for template generation • Responsible for all logic generation • Responsible for developing cutover strategy • Responsible for FSC safety system logic alterations • Documentation APLNG – HIMA Integration Project (Curtis Island – Queensland) 2016 Lead Design Engineer This project involves aggregating various 3rd party OPC A&E Servers into one redundant OPC Server pair
  • 2. James Bullen B.Eng (Elec) October 2016 2 of 5 and designing filtering profiles to control alarm bursts during a compressor trip. Custom redundancy management has been developed for integration into Experion Server Alarm Summary. • Responsible for all Virtual hardware configuration • Client Liaison with GE Process Personnel • Documentation APLNG – Migration and Tech Refresh Upgrade (Curtis Island – Queensland) 2016 Lead Experion Migration Engineer This project involves migration of an existing R410.8 system to a R432.1 in a virtual environment and includes software and hardware tech refresh on Dell FX2 Virtual Platform. • Responsible for generating and executing all Experion software and 3rd Party work packs. • Responsible for generating IOM CHAZOP Analysis to determine points of plant failure during shutdown. • Responsible for all Virtual hardware configuration • Client Liaison with Process Personnel • Documentation Oil Search – CPF Export Pump Station Upgrade (PNG) 2016 Lead Design Engineer This project involved migration of an existing LCS620 PLC system to a C300 DCS, including software and hardware configuration. • Responsible for all Logic creation • Responsible for all HMI graphics generation • Responsible for all IO Testing and configuration • Client Liaison with Process Personnel • Documentation Oil Search – CPF Operator Training and Simulation System (PNG) 2015 This project involved setting up and configuring an OTS system for the Central Processing Facility at Oil Search. • Assisted Advanced Solutions in configuration and troubleshooting • Responsible for Remote Access • Liaison with GES (India) APLNG – Liquefaction Plant (Curtis Island – Queensland) 2015 Lead Engineer for 3rd Party SCADA design and package integration Performed on-site design and commissioning of Honeywell DCS and heavily involved with 3rd party SCADA design and commissioning team. • Troubleshooting package integration • Hardware and software auditing • Systems engineering and administration • Experion quality checks and DCS logic validation • 3rd party PLC code alteration • Metering system design and commissioning • NGERS Compliance • Safety system logic changes • Loop testing • Point configuration • SAT and commissioning TAE – AGT1500 Turbine Test Cell (Amberley Airforce Base) 2015 Lead Engineer Design and development of Honeywell AGT1500 Turbine test cell for TAE.
  • 3. James Bullen B.Eng (Elec) October 2016 3 of 5 • Responsible for all Logic generation • Responsible for all HMI graphics generation • Responsible for all IO testing and configuration • Client Liaison with process personnel • Documentation Caltex – Area North Experion Upgrade Project (Caltex Oil Refinery – Lytton) 2014 Large project involved upgrading the existing LCN based system to Experion R410. • System wide and server configuration • SafeView configuration • HMIWeb display generation and shape design • Performed internal and external FAT and SAT • System Installations, patches, software and security updates • Point Building and configuration • Client Liaison with process personnel • Site Commissioning and ongoing support • Documentation Ma’aden Mine and Refinery (Saudi Arabia – Riyadh) 2014 Large global project including an alumina mine, refinery, smelter and train load out system in Saudi Arabia. • Responsible for System wide and Server Configuration (6 sets of servers) • Built Virtual Dev system (200+ nodes) • Performed internal and external FAT and SAT • System Installations, patches, software and security updates • Point Building and configuration • Client Liaison with process personnel • Documentation Xstrata R200.1 to R430.1 Migration (Xstrata Copper Refinery – Townsville) 2013 Lead Engineer On Process Migration of Copper Refinery in Townsville. • Responsible for complete system migration, configuration and testing • Responsible for All C200 module and Rail IO firmware upgrades • Client Liaison with process personnel • Alteration of HMI displays and shapes • Alteration of logic to fit specification • Performed FAT and SAT • Documentation John Dee R200 to R410.2 Migration (John Dee Abattoir – Warwick) 2013 Lead Engineer On Process Migration of John Dee Abattoir. • Responsible for complete system migration, configuration and testing • Responsible for all C200 module and Rail IO firmware upgrades • Client Liaison with process personnel • Alteration of CM’s to fit specification • Performed FAT and SAT Caltex – C300 Blending Pump Migration (Caltex Oil Refinery – Lytton) 2013 Design and development of Lubricants and Oil Blending system.
  • 4. James Bullen B.Eng (Elec) October 2016 4 of 5 • Assisted with logic generation • Built test system • Client liaison with process personnel • Alteration of HMI displays and shapes • Performed FAT and SAT APA Group – Unit 2 Compressor Station (Dalby) 2012 Design and development of Brisbane to Roma pipeline compressor. • Responsible for HMI graphics generation • Responsible for point building • Triconex safety logic implementation • Client Liaison with process personnel • Performed FAT and SAT • Site commissioning and ongoing support Caltex – Alkylation HF Acid Mitigation System (Caltex Oil Refinery – Lytton) 2012 Lead Engineer Design and development of the Alkylation HF Gas Safety System. • Responsible for HMI graphics generation • Responsible for point building and testing • Client Liaison with process personnel • Performed FAT • Site commissioning Oil Search – Kumul Offshore Marine Terminal (PNG) 2012 Lead Engineer – Design and development of Triconex based Fire and Gas Safety System. • Triconex safety logic implementation • Responsible for HMI graphics generation • Responsible for point building and testing • Performed SAT and FAT • Generated C&E diagrams SEQWATER – North Pine ABU (Brisbane) Primary contract contact • Various small projects and upgrades • Contract support and troubleshooting Origin Energy – ABU Pipeline (Brisbane) Primary contract contact • Various small projects and upgrades • Contract support and troubleshooting Caltex Lubricants Plant (Lytton) Primary contract contact • Various small projects and upgrades • Contract support and troubleshooting Incitec – Fertiliser Plant (Lytton) Primary contract contact • Various small projects and upgrades • Contract support and troubleshooting
  • 5. James Bullen B.Eng (Elec) October 2016 5 of 5 Wesfarmers – Curragh Coal Plant (Blackwater) • Various small projects and upgrades • Contract support and troubleshooting Caltex Oil Refinery – (Lytton) Primary contract contact • Various small projects and upgrades • Contract Support and trouble shooting Qualifications and Training Education • Bachelor of Electrical Engineering with Major in IT, Minor in Telecommunications 2005 – 2010 Queensland University of Technology. Final year GPA of 6.5. Previous Experience • Royal Brisbane Hospital (QLD Health) - assisting with infrastructure and asset management, HVAC power design, maintaining and upgrading all control systems, power factor correction systems, power usage audits, NGERS compliance. • JLM Audio as electronic design engineer for digital and analogue systems. This role involved ground up electronics design using Altium Design Explorer, OEM quality control, prototyping and manufacture. • 10 years of electrical design and consulting in all aspects of professional audio and troubleshooting/repair. Courses Attended • Experion PKS Course: Server Engineering and Configuration Implementation 2012 • Experion PKS Course: Graphics Design and Building Implementation 2013 • Experion PKS Course: Experion Platform Virtualisation 2015 Recent Achievements • Generating over 500k of collected sales leads revenue in 2016. • Generating over 330k of collected sales leads revenue in 2015.