OVERVIEW
Team Hyperlynx will design, fabricate, and assemble a
pod to win the wheeled vehicle category of the SpaceX
Hyperloop Competition.
We intend to win by reaching the egress area as fast
as possible without crashing. Our design is tailored
to achieve this goal while featuring scalable, real-world
Hyperloop applications such as a modular payload.
John K. Bennett, PhD
Heather M. Underwood, PhD
RJ Duran
Mech. Engineering
Mech. Engineering
Mech. Engineering
Mech. Engineering
Design
Comp. Science
Architecture
Business
Mech. Engineering
Mech. Engineering
Mech. Engineering
TEAM HYPERLYNX
Connor Catterall
Ben Cooper
Nicole Garcia
George Kemp
Andres Lazo
Richard Michalka
Jack Nelson
Richard Paasch
John Spinelli
Mark Urban
Susan Waruinge
Chandler Lacy Mech. Engineering
Team Captain
CU Denver Advisors
Ron Rorrer, PhD
Doug Gallagher
Mech. Engineering
Mech. Engineering
Inworks Advisors
Sponsors
Supporters
Comp. Science
Comp. Science
Indust. Design
Design Description
TOP LEVEL DESIGN
The Hyperlynx Pod will be an
aluminum framed, rail-guided
wheeled vehicle. An ultralight foam
shell shapes the ten-foot long, two-foot
max profile, three-hundred pound pod.
A 12VDC battery powers networked
sensors and actuators, hydraulic disk
brakes, and real-time control systems.
A modular payload is featured
accommodating multiple
passenger/cargo configurationsExploded View
Exploded
Component View
Modular Payload
Body
Rotary Actuator
Master Cylinder
Brake Actuator
High Speed
Wheel Assembly
Secondary
Propulsion Motor
FrameSpaceX Propulsion
Interface
Brake Wheel
Assembly
Acrylic Canopy
DIMENSIONS / MASS
The pod will have a tip-to-tail length of 10.5 ft. The largest cross
section occupies 2.77 ft2
with a maximum height of 2.2 ft and width of
1.7 ft. The pod encloses and interfaces to the central I-beam,
traveling 1 inch above the aluminum sub-track.
10.5 ft 1.7 ft
2.2 ft
Pod Mass by
Subsystem
Total Mass: 300 lbs
Pod subsystems are designed to be as lightweight as possible. Several
methods realize this goal: lean manufacturing techniques reduce part
count and complexity, ultralight composite materials create structural
support at minimum weight cost, and system positioning leverages
natural strength points of the assembly.
MATERIALS
Aerospace Grade
Low Density Foam
1” x 2” 6061 Aluminum Bar
Acrylic
Stainless Steel
Linkage
Rubber Wheel
Aluminum
Brake Rotors
6061 Aluminum Wheel
Mount Assembly
Steel Mounting
Fixtures
Aluminum Wheel
with Polyurethane
Tread
Aluminum
Propulsion
Interface
STABILITY
20 custom machined wheels will hug the rail to keep the
pod laterally and longitudinally stable. The aluminum hub and
polyurethane tread will enclose a ceramic bearing rated up to
50,000 rpm. The design of these wheels was inspired by
technology found on high speed roller coasters.
Four vertical wheels on the flange and one horizontal wheel
on the web will be mounted to an aluminum assembly then
attached to the frame. Four of these assemblies, two
mounted in the front and two in the rear will ensure the pod
safely traverses the tube while traveling at high speeds.
BRAKINGA modified scissor jack linkage system will press four 10
inch diameter wheels outfitted with hydraulic caliper disk
brakes against the web of the central aluminum rail.
A rotary-actuated power
screw drives the linkage
system, allowing the desired
compression force between
the braking wheels and rail to
be adjusted in real time.
The disk brakes will receive
pressurized hydraulic fluid
from an electrically actuated
master cylinder. The master
cylinder actuator is spring
loaded, requiring power to
disengage the brakes, making
the system mechanically
safe.
Braking Assembly
AERODYNAMICS
The profile of the body is designed to accelerate the
air flowing around the pod. The nozzle geometry
created between the front of the pod and the tube will
increase the velocity of the air around the maximum
cross sectional area of the pod. The diverging shape
at the rear allows the high velocity air to expand more
rapidly, further decreasing drag.
Diffuser Nozzle
PAYLOAD
The middle section of the pod will
accommodate a fully removable
modular payload system capable of
housing the SpaceX test dummy.
A modular payload system in a full scale
Hyperloop design will significantly
reduce the cost of construction and
operation of the pods, support multiple
configurations, control weight
distribution, and allow rapid turnaround
of the pods at the station.
Modular Payload
PAYLOADThe payload will feature accommodations to support
the SpaceX dummy during its journey through the
Hyperloop.
Payload Canopy
with Graphic User
Interface
Features include integral
lighting, restraints and a
graphic user interface
featuring real-time pod data
projected directly onto the
canopy.
PAYLOAD CONCEPT
Conceptually, the payload modules would support multiple configurations and a variety of user types.
Single Person / ADA Sleeper Two Person Group / Family / Economy Cargo / Luggage / Freight
Controlling the arrangement of the modules will allow for optimization of weight distribution
according to the loads, improving the pod’s overall stability and performance.
PAYLOAD CONCEPT
A modular payload system would drastically improve turnaround
time once a Hyperloop pod arrives at the station.
This reduces the number of pods required to maintain the
operating schedule of the route, thereby reducing overall cost.
These modules will also optimize maintenance
and upkeep of the system by allowing time for the
modules to be maintained between use in the
system while keeping all pods in circulation.
Hyperloop Station
Concept
POWER
Component Power (Ah)
Linear Actuators 0.5
Rotary Actuator 3.1
Electric Motor 7.5
Controls and
Sensors
1.9
Total 13.0
One Power Stream 12V 22AH Lithium Iron
Phosphate battery outfitted with a quick-clip
terminal will interface into the modular payload.
This terminal will clip into the control board on the
pod, providing power to all components.
Battery Pack
Mounted to Modular
Payload
COMPUTING
Navigation Data
Environmental
Data
Microprocessor
LCD
Display
Brake Actuation
Output
Command
Signal
Light
Gyroscope
Accelerometer
Temperature
Barometer
Sensor Input
Signals
Network
Access Panel
External
Command
Center
SPM Control
Functional Block
Diagram
State Diagram
The embedded computer system
will continuously assess and
manage the condition of the
pod by utilizing real time data
gathered by onboard sensors to
control the pod’s critical
subsystems. The system will also
provide external communication
capabilities allowing for remote
control of all pod systems.
COMPUTING
The BeagleBone Black microcontroller was
chosen for its built in Ethernet/WIFI capability,
as well as the large number of GPIO ports.
The SpaceX provided communication board, an
LCD screen, accelerometer and gyroscope will
be mounted inside an acrylic control box.
This box will be placed underneath the modular
payload, connecting all actuators, motors,
sensors, and the battery. Two antennas will
be mounted at the top of the body and will
interface with the communication board.
Controls Systems Box
CC
C
ABD
D
E
COMPUTING/NAVIGATION
Position Sensor Frequency Picture
A Accelerometer 5.376 kHz
B Gyroscope 400 kHz
C Barometer/Thermometer 3.4 mHz
D Range 400 kHz
E Light 400 kHz
Sensor Map
A network of sensors will communicate
in real time with the microprocessor to
dynamically control the actuators and
motors.
The temperature will be recorded at the
front and top of the pod as well next to
the battery housing.
The gyroscope will measure yaw, pitch,
and roll. The acceleration, light, and
range sensors will feed real time
positioning and speed data to the
microprocessor.
PROPULSIONThe tube integrated propulsion system will interface with the frame
through a machined aluminum disk fastened at the rear of the pod.
This interface sits 10 inches above the aluminum sub-track. This
system will provide the initial impulse and will accelerate the pod at
2.8 g’s for 800 feet.
A pinned link connected to an electric actuator with a 2 inch stroke will
lower a roller outfitted with an electric motor. This system will allow
the pod to travel in and out of the ingress and egress holding areas.
This secondary system will allow the pod to travel up to 5 mph.
Propulsion Interface and
Secondary Propulsion Motor
SAFETY
The Hyperlynx safety package is redundant
and incorporates electrical and mechanical
mechanisms to prevent damage to the pod,
tube, as well as avoid injury to all personnel
operating the pod.
A complete safety plan has been assembled to
highlight safety features of the pod, both
mechanically and electrically. It also explains
hazardous material handling procedures in
addition to safety, health and environmental
considerations.
The FEMA identifies several modes of failure
and lists actions to mitigate failures.
SAFETY FEATURES OVERVIEW
Several sensors mounted within and
around the pod will monitor pressure,
speed, temperature, battery life and
overall pod health. If any of these
become critical, the pod will execute a
braking sequence to stop then enter a
low power state to prevent damage to
the pod or the environment.
In the case of complete power loss, a spring, mounted
between the rear dust cylinder and the end of the push
rod, will manually actuate the master cylinder. This will
apply brake pressure and slow the pod to a stop.
Spring Loaded
Brake Actuator
HAZMAT / STORED ENERGY
Our operational pod will contain brake fluid and
a single Lithium Iron Phosphate battery.
Team Hyperlynx will be trained in proper
handling and spill procedures of all hazardous
materials.
All documentation, MSDS, and a complete spill
kit, will be present during all transportation and
testing of systems that contain the hazardous
materials.
For complete hazardous material considerations
see the Safety Plan.
Pod Analysis
THERMAL PROFILE
The thermal profile on the outer shell of the pod is seen
below. The thermal simulation was performed after the
initial acceleration impulse at a speed of 260 mph, with
a tube pressure of 0.02 psi, and a ambient temperature of
100 ℉. The temperature of the pod remained under 105℉.
Temperature ℉
Thermal Simulation Results
AERODYNAMICS
The aerodynamic coefficients
of the Hyperlynx Pod were
found using computational
fluid dynamics and verified
with wind tunnel
experiments.
CD = 0.247 CL = -0.00467
CFD and Wind Tunnel
Prototype
TRAJECTORY
The pod will accelerate for the first 800 feet
and reach a speed of 260 mph.
At a distance of 800 feet from the end of
the tube, the power screw and disk brakes
actuate slowing the pod down at a rate of
1.7 g’s.
The braking sequence will take 5 seconds.
Coast Brake
Tscrew
FclampFclamp
FclampFclamp
BRAKING
The braking system will use a
series of linkages and a central
power screw to gain mechanical
advantage and compress four
braking wheels against the rail.
This symmetrical system ensures
equal force is applied on both
sides of the rail. The central
screw (Tscrew) provides up to 13 ft-
lbs of force, and transfers rotary
motion to a linear clamping force
(Fclamp) up to 1000 lbs.
Finite element analysis
of the linkage system
shows under maximum
loading conditions, the
linkage will not fail.
The maximum stress is
located on the center
link where the power
screw is threaded.
This linkage will be
manufactured out of
stainless steel.
Braking Linkage
Free Body Diagram /
Stress Analysis
VIBRATIONUsing software-based mode shape and frequency analysis,
part features are optimized by reinforcing critical points
tending towards unwanted shapes at resonance.
All vibrations that do transmit through the pod will be
damped using a 0.125-inch layer of natural rubber
between contact points of the pod, module and frame.
Structural Design Cases
ACCELERATION
A stress study was performed on the
frame to determine if the frame would
withstand the large force applied at the
rear of the pod during the acceleration
phase. The brake mount cross
beam had the highest stresses and
will not fail or yield under maximum
loading conditions.
143 lbs from Front
Caster
158 lbs from rear
caster
870 lbs from the
propulsion interface
98 lbs from Support
Beam
855 lb-in from braking
torque
Maximum Stress = 4,830 psi
NOMINAL DECELERATION
169 lbs from Front
wheels
131 lbs from rear
wheels
98 lbs from support
beam
4400 lb-in from
braking torque
In the deceleration stress study, the brake
support cross beam yielded the highest stress.
This was due to the large loading on the cross
beam from the torque generated by the braking
assembly. This stress is within the yield
strength of 6061 aluminum alloy.
Maximum Stress = 24,540 psi
END-OF-TUBE NOMINAL CRASH
255 lbs from front
wheels
4000 lbs on front of
frame
45 lbs from rear
wheels
3720 lb-in from
braking torque
For the end-of-tube-nominal crash a
force of 4000 lbs was applied to the
front of the frame to simulate the crash
scenario. These force values were
based on a deceleration rate of 400
ft/s². The frame stress exceeds yield in
the front.
Pod Production
PRODUCTION SCHEDULE
Preliminary Production Schedule
CONSTRUCTION COST
Pod Construction Cost
$8,455
Transportation & Misc. Expenses
$9,250
Total Project Cost
$17,705
Funds Raised
$9,663
Remaining Funds Required for Project
Completion
$8,042
Scalability Comments
INFRASTRUCTURE
With respect to the proposed Hyperloop route from Los
Angeles to San Francisco, a longer pod outfitted with
multiple payload modules would increase efficiency
while traveling longer distances.
The shape of the pod would be scaled to accommodate
a larger tube and bigger payloads. Full-scale pods of the
current design would weigh 1000 lbs unloaded. The pod
design allows for easy and low cost upgrades such as a
front facing compressor, rotor-stator system, or levitation
system. The high speed wheel assembly offers lateral
stability that non-wheeled Hyperloop pods lack.
Full-scale Hyperloop pods using this design can be cost
effective, with an estimated build price of under $100,000
per pod, excluding payload modules.
Full Size Pod
½ scale competition pod
OPERATION / MAINTENANCE
Features such as the modular payload, battery
location, and material choice allow for seamless
operation and maintenance of Hyperloop pods.
When a hyperloop pod arrives at the station, the
modules will be loaded and pre-staged with fully
charged batteries, passengers and freight. This will
provide fast turn around time, minimizing time in
the station. .
Maintenance would include periodic changing of
braking wheels, calipers, brake fluid, and high
speed wheel assemblies.
Hyperloop Station Concept
VISION
The Hyperloop has many potential crossovers with other emerging technologies, such as
virtual reality, vehicle automation, and ever-growing consumer access to powerful smart
telecommunication technology. These concepts, when considered as part of a larger
hierarchy, could lead to a paradigm shift.
The automation of
transportation infrastructure
allows us to envision a
conceptual “physical
internet” in which our ability
to traverse our real world
would become as effortless
as browsing a web page.
This system would create
entirely new ways for users
to live their lives.
Thank you.
www.denverhyperlynx.com

Weitere ähnliche Inhalte

Was ist angesagt?

Hyperloop- A 21st century transportation revolution
Hyperloop- A 21st century transportation revolutionHyperloop- A 21st century transportation revolution
Hyperloop- A 21st century transportation revolutionGyanendra Awasthi
 
Hyperloop- A 21st century transportation revolution
Hyperloop- A 21st century transportation revolutionHyperloop- A 21st century transportation revolution
Hyperloop- A 21st century transportation revolutionGyanendra Awasthi
 
Hyperloop VTU Seminar Report
Hyperloop VTU Seminar ReportHyperloop VTU Seminar Report
Hyperloop VTU Seminar ReportUmar Ahmed
 
Hyperloop presentation by ER.Washique Ahemad
Hyperloop presentation by ER.Washique AhemadHyperloop presentation by ER.Washique Ahemad
Hyperloop presentation by ER.Washique AhemadWashique Ahmad
 
Hyperloop presentation
Hyperloop presentationHyperloop presentation
Hyperloop presentationSazzad Shawon
 
FINAL Hyperloop Structure Analysis- Pylon,Columns,and Carriage
FINAL Hyperloop Structure Analysis- Pylon,Columns,and CarriageFINAL Hyperloop Structure Analysis- Pylon,Columns,and Carriage
FINAL Hyperloop Structure Analysis- Pylon,Columns,and Carriagenaman gupta
 
Hyperloop tansportation
Hyperloop tansportation Hyperloop tansportation
Hyperloop tansportation Debraj Maji
 

Was ist angesagt? (20)

Hyperloop- A 21st century transportation revolution
Hyperloop- A 21st century transportation revolutionHyperloop- A 21st century transportation revolution
Hyperloop- A 21st century transportation revolution
 
Hyperloop transportation system
Hyperloop  transportation systemHyperloop  transportation system
Hyperloop transportation system
 
Hyperloop- A 21st century transportation revolution
Hyperloop- A 21st century transportation revolutionHyperloop- A 21st century transportation revolution
Hyperloop- A 21st century transportation revolution
 
Hyperloop
HyperloopHyperloop
Hyperloop
 
Hyperloop
HyperloopHyperloop
Hyperloop
 
Hyperloop project
Hyperloop projectHyperloop project
Hyperloop project
 
Seminar hyperloop
Seminar hyperloopSeminar hyperloop
Seminar hyperloop
 
Hyperloop VTU Seminar Report
Hyperloop VTU Seminar ReportHyperloop VTU Seminar Report
Hyperloop VTU Seminar Report
 
Hyperloop presentation by ER.Washique Ahemad
Hyperloop presentation by ER.Washique AhemadHyperloop presentation by ER.Washique Ahemad
Hyperloop presentation by ER.Washique Ahemad
 
Hyperloop technogy
Hyperloop technogyHyperloop technogy
Hyperloop technogy
 
About Hyperloop
About HyperloopAbout Hyperloop
About Hyperloop
 
VacuumTubeTrain
VacuumTubeTrainVacuumTubeTrain
VacuumTubeTrain
 
Hyperloop ppt
Hyperloop pptHyperloop ppt
Hyperloop ppt
 
Hyperloop presentation
Hyperloop presentationHyperloop presentation
Hyperloop presentation
 
FINAL Hyperloop Structure Analysis- Pylon,Columns,and Carriage
FINAL Hyperloop Structure Analysis- Pylon,Columns,and CarriageFINAL Hyperloop Structure Analysis- Pylon,Columns,and Carriage
FINAL Hyperloop Structure Analysis- Pylon,Columns,and Carriage
 
Hyperloop seminar reports
Hyperloop seminar reportsHyperloop seminar reports
Hyperloop seminar reports
 
Hyperloop
HyperloopHyperloop
Hyperloop
 
Hyperloop tansportation
Hyperloop tansportation Hyperloop tansportation
Hyperloop tansportation
 
Hyperloop
HyperloopHyperloop
Hyperloop
 
HYPERLOOP TRAIN
HYPERLOOP TRAINHYPERLOOP TRAIN
HYPERLOOP TRAIN
 

Andere mochten auch

Team Hyperlynx Hyperloop Pod Modular Payload Concept Proposal
Team Hyperlynx Hyperloop Pod Modular Payload Concept ProposalTeam Hyperlynx Hyperloop Pod Modular Payload Concept Proposal
Team Hyperlynx Hyperloop Pod Modular Payload Concept ProposalJack Nelson
 
Hyperloop transportation system
Hyperloop transportation systemHyperloop transportation system
Hyperloop transportation systemDhananjay Kumar
 
The Hyperloop - Fancy Commute at 800 MPH?
The Hyperloop - Fancy Commute at 800 MPH?The Hyperloop - Fancy Commute at 800 MPH?
The Hyperloop - Fancy Commute at 800 MPH?Stinson
 
Hyperloop - The future of Transportation
Hyperloop - The future of TransportationHyperloop - The future of Transportation
Hyperloop - The future of TransportationShubham Agarwal
 
Hyperloop Presentation - Babbitt
Hyperloop Presentation - BabbittHyperloop Presentation - Babbitt
Hyperloop Presentation - BabbittTess Audley Babbitt
 
Pod Competition Full Pod Final Presentation; LEHIGH HYPERLOOP
Pod Competition Full Pod Final Presentation; LEHIGH HYPERLOOPPod Competition Full Pod Final Presentation; LEHIGH HYPERLOOP
Pod Competition Full Pod Final Presentation; LEHIGH HYPERLOOPSeamus Cullinane
 
Vactrain an insight into Hyperloop
Vactrain an  insight into HyperloopVactrain an  insight into Hyperloop
Vactrain an insight into HyperloopAvin Ganapathi
 
Hyperloop i Norden
Hyperloop i NordenHyperloop i Norden
Hyperloop i Nordeninsam
 
Appcelerator Hyperloop: Overview, Architecture & Demo
Appcelerator Hyperloop: Overview, Architecture & DemoAppcelerator Hyperloop: Overview, Architecture & Demo
Appcelerator Hyperloop: Overview, Architecture & DemoHans Knoechel
 
hyperloop transportation
hyperloop transportationhyperloop transportation
hyperloop transportationYadu Krishna T
 

Andere mochten auch (18)

Team Hyperlynx Hyperloop Pod Modular Payload Concept Proposal
Team Hyperlynx Hyperloop Pod Modular Payload Concept ProposalTeam Hyperlynx Hyperloop Pod Modular Payload Concept Proposal
Team Hyperlynx Hyperloop Pod Modular Payload Concept Proposal
 
Hyperloop transportation system
Hyperloop transportation systemHyperloop transportation system
Hyperloop transportation system
 
Hyperloop
HyperloopHyperloop
Hyperloop
 
Hyperloop
HyperloopHyperloop
Hyperloop
 
Hyperloop
HyperloopHyperloop
Hyperloop
 
Hyperloop
HyperloopHyperloop
Hyperloop
 
The Hyperloop - Fancy Commute at 800 MPH?
The Hyperloop - Fancy Commute at 800 MPH?The Hyperloop - Fancy Commute at 800 MPH?
The Hyperloop - Fancy Commute at 800 MPH?
 
Hyperloop final
Hyperloop finalHyperloop final
Hyperloop final
 
Hyperloop
HyperloopHyperloop
Hyperloop
 
Hyperloop - The future of Transportation
Hyperloop - The future of TransportationHyperloop - The future of Transportation
Hyperloop - The future of Transportation
 
Hyperloop Presentation - Babbitt
Hyperloop Presentation - BabbittHyperloop Presentation - Babbitt
Hyperloop Presentation - Babbitt
 
Pod Competition Full Pod Final Presentation; LEHIGH HYPERLOOP
Pod Competition Full Pod Final Presentation; LEHIGH HYPERLOOPPod Competition Full Pod Final Presentation; LEHIGH HYPERLOOP
Pod Competition Full Pod Final Presentation; LEHIGH HYPERLOOP
 
Hyperloop introduction
Hyperloop introductionHyperloop introduction
Hyperloop introduction
 
Vactrain an insight into Hyperloop
Vactrain an  insight into HyperloopVactrain an  insight into Hyperloop
Vactrain an insight into Hyperloop
 
Hyperloop i Norden
Hyperloop i NordenHyperloop i Norden
Hyperloop i Norden
 
Appcelerator Hyperloop: Overview, Architecture & Demo
Appcelerator Hyperloop: Overview, Architecture & DemoAppcelerator Hyperloop: Overview, Architecture & Demo
Appcelerator Hyperloop: Overview, Architecture & Demo
 
hyperloop transportation
hyperloop transportationhyperloop transportation
hyperloop transportation
 
THE HYPERLOOP
THE HYPERLOOPTHE HYPERLOOP
THE HYPERLOOP
 

Ähnlich wie Team Hyperlynx SpaceX Hyperloop Pod Final Design

IRJET- Design and Fabrication of Hexacopter for Surveillance
IRJET-  	  Design and Fabrication of Hexacopter for SurveillanceIRJET-  	  Design and Fabrication of Hexacopter for Surveillance
IRJET- Design and Fabrication of Hexacopter for SurveillanceIRJET Journal
 
4.remote control mini forklift
4.remote control mini forklift4.remote control mini forklift
4.remote control mini forkliftSathis Kumar
 
Professional Profile - Stan Tschernenko
Professional Profile - Stan TschernenkoProfessional Profile - Stan Tschernenko
Professional Profile - Stan TschernenkoStan Tschernenko
 
Sackett Systems - Battery Exchange Experts
Sackett Systems - Battery Exchange ExpertsSackett Systems - Battery Exchange Experts
Sackett Systems - Battery Exchange ExpertsGinny Gilbert
 
Hy Wire Car Technology
Hy Wire Car TechnologyHy Wire Car Technology
Hy Wire Car TechnologyVishal Singh
 
Overhead crane modernizations
Overhead crane modernizationsOverhead crane modernizations
Overhead crane modernizationsKonecranes
 
Research on Optimization, Dynamics and Stability of Stairclimbing Wheelchair
Research on Optimization, Dynamics and Stability of Stairclimbing WheelchairResearch on Optimization, Dynamics and Stability of Stairclimbing Wheelchair
Research on Optimization, Dynamics and Stability of Stairclimbing WheelchairIJERA Editor
 
SRM_Journal_RS2015
SRM_Journal_RS2015SRM_Journal_RS2015
SRM_Journal_RS2015Aniket Ray
 
ROBOCON 2015 Documentation
ROBOCON 2015 DocumentationROBOCON 2015 Documentation
ROBOCON 2015 DocumentationVamsi Krishna
 
Induction charging project
Induction charging projectInduction charging project
Induction charging projectJoshua Pedrero
 
IRJET- Hyperloop Transportation System
IRJET- Hyperloop Transportation SystemIRJET- Hyperloop Transportation System
IRJET- Hyperloop Transportation SystemIRJET Journal
 
REMOTE OPERATED FORK LIFT
REMOTE OPERATED FORK LIFTREMOTE OPERATED FORK LIFT
REMOTE OPERATED FORK LIFTSuchit Moon
 
Systems Focused Product Development Of The Hypercar
Systems Focused Product Development Of The HypercarSystems Focused Product Development Of The Hypercar
Systems Focused Product Development Of The HypercarDavid F. Taggart
 
Concept of Operations
Concept of OperationsConcept of Operations
Concept of OperationsIan Carlson
 
Solar Impulse - A flying Laboratory (ENG)
Solar Impulse - A flying Laboratory (ENG)Solar Impulse - A flying Laboratory (ENG)
Solar Impulse - A flying Laboratory (ENG)Solar Impulse
 
Solar Impulse - A Flying Laboratory (DE)
Solar Impulse - A Flying Laboratory (DE)Solar Impulse - A Flying Laboratory (DE)
Solar Impulse - A Flying Laboratory (DE)Solar Impulse
 
IRJET- Prototype Model of Hyperloop Transportation System based on BLDC M...
IRJET-  	  Prototype Model of Hyperloop Transportation System based on BLDC M...IRJET-  	  Prototype Model of Hyperloop Transportation System based on BLDC M...
IRJET- Prototype Model of Hyperloop Transportation System based on BLDC M...IRJET Journal
 
project report
project reportproject report
project reportArijit Roy
 

Ähnlich wie Team Hyperlynx SpaceX Hyperloop Pod Final Design (20)

IRJET- Design and Fabrication of Hexacopter for Surveillance
IRJET-  	  Design and Fabrication of Hexacopter for SurveillanceIRJET-  	  Design and Fabrication of Hexacopter for Surveillance
IRJET- Design and Fabrication of Hexacopter for Surveillance
 
4.remote control mini forklift
4.remote control mini forklift4.remote control mini forklift
4.remote control mini forklift
 
Professional Profile - Stan Tschernenko
Professional Profile - Stan TschernenkoProfessional Profile - Stan Tschernenko
Professional Profile - Stan Tschernenko
 
Sackett Systems - Battery Exchange Experts
Sackett Systems - Battery Exchange ExpertsSackett Systems - Battery Exchange Experts
Sackett Systems - Battery Exchange Experts
 
Hy Wire Car Technology
Hy Wire Car TechnologyHy Wire Car Technology
Hy Wire Car Technology
 
Overhead crane modernizations
Overhead crane modernizationsOverhead crane modernizations
Overhead crane modernizations
 
Research on Optimization, Dynamics and Stability of Stairclimbing Wheelchair
Research on Optimization, Dynamics and Stability of Stairclimbing WheelchairResearch on Optimization, Dynamics and Stability of Stairclimbing Wheelchair
Research on Optimization, Dynamics and Stability of Stairclimbing Wheelchair
 
Surveillance Chopper
Surveillance Chopper Surveillance Chopper
Surveillance Chopper
 
SRM_Journal_RS2015
SRM_Journal_RS2015SRM_Journal_RS2015
SRM_Journal_RS2015
 
SRMAUV Journal
SRMAUV JournalSRMAUV Journal
SRMAUV Journal
 
ROBOCON 2015 Documentation
ROBOCON 2015 DocumentationROBOCON 2015 Documentation
ROBOCON 2015 Documentation
 
Induction charging project
Induction charging projectInduction charging project
Induction charging project
 
IRJET- Hyperloop Transportation System
IRJET- Hyperloop Transportation SystemIRJET- Hyperloop Transportation System
IRJET- Hyperloop Transportation System
 
REMOTE OPERATED FORK LIFT
REMOTE OPERATED FORK LIFTREMOTE OPERATED FORK LIFT
REMOTE OPERATED FORK LIFT
 
Systems Focused Product Development Of The Hypercar
Systems Focused Product Development Of The HypercarSystems Focused Product Development Of The Hypercar
Systems Focused Product Development Of The Hypercar
 
Concept of Operations
Concept of OperationsConcept of Operations
Concept of Operations
 
Solar Impulse - A flying Laboratory (ENG)
Solar Impulse - A flying Laboratory (ENG)Solar Impulse - A flying Laboratory (ENG)
Solar Impulse - A flying Laboratory (ENG)
 
Solar Impulse - A Flying Laboratory (DE)
Solar Impulse - A Flying Laboratory (DE)Solar Impulse - A Flying Laboratory (DE)
Solar Impulse - A Flying Laboratory (DE)
 
IRJET- Prototype Model of Hyperloop Transportation System based on BLDC M...
IRJET-  	  Prototype Model of Hyperloop Transportation System based on BLDC M...IRJET-  	  Prototype Model of Hyperloop Transportation System based on BLDC M...
IRJET- Prototype Model of Hyperloop Transportation System based on BLDC M...
 
project report
project reportproject report
project report
 

Kürzlich hochgeladen

UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 

Kürzlich hochgeladen (20)

UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 

Team Hyperlynx SpaceX Hyperloop Pod Final Design

  • 1.
  • 2. OVERVIEW Team Hyperlynx will design, fabricate, and assemble a pod to win the wheeled vehicle category of the SpaceX Hyperloop Competition. We intend to win by reaching the egress area as fast as possible without crashing. Our design is tailored to achieve this goal while featuring scalable, real-world Hyperloop applications such as a modular payload.
  • 3. John K. Bennett, PhD Heather M. Underwood, PhD RJ Duran Mech. Engineering Mech. Engineering Mech. Engineering Mech. Engineering Design Comp. Science Architecture Business Mech. Engineering Mech. Engineering Mech. Engineering TEAM HYPERLYNX Connor Catterall Ben Cooper Nicole Garcia George Kemp Andres Lazo Richard Michalka Jack Nelson Richard Paasch John Spinelli Mark Urban Susan Waruinge Chandler Lacy Mech. Engineering Team Captain CU Denver Advisors Ron Rorrer, PhD Doug Gallagher Mech. Engineering Mech. Engineering Inworks Advisors Sponsors Supporters Comp. Science Comp. Science Indust. Design
  • 5. TOP LEVEL DESIGN The Hyperlynx Pod will be an aluminum framed, rail-guided wheeled vehicle. An ultralight foam shell shapes the ten-foot long, two-foot max profile, three-hundred pound pod. A 12VDC battery powers networked sensors and actuators, hydraulic disk brakes, and real-time control systems. A modular payload is featured accommodating multiple passenger/cargo configurationsExploded View
  • 6. Exploded Component View Modular Payload Body Rotary Actuator Master Cylinder Brake Actuator High Speed Wheel Assembly Secondary Propulsion Motor FrameSpaceX Propulsion Interface Brake Wheel Assembly Acrylic Canopy
  • 7. DIMENSIONS / MASS The pod will have a tip-to-tail length of 10.5 ft. The largest cross section occupies 2.77 ft2 with a maximum height of 2.2 ft and width of 1.7 ft. The pod encloses and interfaces to the central I-beam, traveling 1 inch above the aluminum sub-track. 10.5 ft 1.7 ft 2.2 ft Pod Mass by Subsystem Total Mass: 300 lbs Pod subsystems are designed to be as lightweight as possible. Several methods realize this goal: lean manufacturing techniques reduce part count and complexity, ultralight composite materials create structural support at minimum weight cost, and system positioning leverages natural strength points of the assembly.
  • 8. MATERIALS Aerospace Grade Low Density Foam 1” x 2” 6061 Aluminum Bar Acrylic Stainless Steel Linkage Rubber Wheel Aluminum Brake Rotors 6061 Aluminum Wheel Mount Assembly Steel Mounting Fixtures Aluminum Wheel with Polyurethane Tread Aluminum Propulsion Interface
  • 9. STABILITY 20 custom machined wheels will hug the rail to keep the pod laterally and longitudinally stable. The aluminum hub and polyurethane tread will enclose a ceramic bearing rated up to 50,000 rpm. The design of these wheels was inspired by technology found on high speed roller coasters. Four vertical wheels on the flange and one horizontal wheel on the web will be mounted to an aluminum assembly then attached to the frame. Four of these assemblies, two mounted in the front and two in the rear will ensure the pod safely traverses the tube while traveling at high speeds.
  • 10. BRAKINGA modified scissor jack linkage system will press four 10 inch diameter wheels outfitted with hydraulic caliper disk brakes against the web of the central aluminum rail. A rotary-actuated power screw drives the linkage system, allowing the desired compression force between the braking wheels and rail to be adjusted in real time. The disk brakes will receive pressurized hydraulic fluid from an electrically actuated master cylinder. The master cylinder actuator is spring loaded, requiring power to disengage the brakes, making the system mechanically safe. Braking Assembly
  • 11. AERODYNAMICS The profile of the body is designed to accelerate the air flowing around the pod. The nozzle geometry created between the front of the pod and the tube will increase the velocity of the air around the maximum cross sectional area of the pod. The diverging shape at the rear allows the high velocity air to expand more rapidly, further decreasing drag. Diffuser Nozzle
  • 12. PAYLOAD The middle section of the pod will accommodate a fully removable modular payload system capable of housing the SpaceX test dummy. A modular payload system in a full scale Hyperloop design will significantly reduce the cost of construction and operation of the pods, support multiple configurations, control weight distribution, and allow rapid turnaround of the pods at the station. Modular Payload
  • 13. PAYLOADThe payload will feature accommodations to support the SpaceX dummy during its journey through the Hyperloop. Payload Canopy with Graphic User Interface Features include integral lighting, restraints and a graphic user interface featuring real-time pod data projected directly onto the canopy.
  • 14. PAYLOAD CONCEPT Conceptually, the payload modules would support multiple configurations and a variety of user types. Single Person / ADA Sleeper Two Person Group / Family / Economy Cargo / Luggage / Freight Controlling the arrangement of the modules will allow for optimization of weight distribution according to the loads, improving the pod’s overall stability and performance.
  • 15. PAYLOAD CONCEPT A modular payload system would drastically improve turnaround time once a Hyperloop pod arrives at the station. This reduces the number of pods required to maintain the operating schedule of the route, thereby reducing overall cost. These modules will also optimize maintenance and upkeep of the system by allowing time for the modules to be maintained between use in the system while keeping all pods in circulation. Hyperloop Station Concept
  • 16. POWER Component Power (Ah) Linear Actuators 0.5 Rotary Actuator 3.1 Electric Motor 7.5 Controls and Sensors 1.9 Total 13.0 One Power Stream 12V 22AH Lithium Iron Phosphate battery outfitted with a quick-clip terminal will interface into the modular payload. This terminal will clip into the control board on the pod, providing power to all components. Battery Pack Mounted to Modular Payload
  • 17. COMPUTING Navigation Data Environmental Data Microprocessor LCD Display Brake Actuation Output Command Signal Light Gyroscope Accelerometer Temperature Barometer Sensor Input Signals Network Access Panel External Command Center SPM Control Functional Block Diagram State Diagram The embedded computer system will continuously assess and manage the condition of the pod by utilizing real time data gathered by onboard sensors to control the pod’s critical subsystems. The system will also provide external communication capabilities allowing for remote control of all pod systems.
  • 18. COMPUTING The BeagleBone Black microcontroller was chosen for its built in Ethernet/WIFI capability, as well as the large number of GPIO ports. The SpaceX provided communication board, an LCD screen, accelerometer and gyroscope will be mounted inside an acrylic control box. This box will be placed underneath the modular payload, connecting all actuators, motors, sensors, and the battery. Two antennas will be mounted at the top of the body and will interface with the communication board. Controls Systems Box
  • 19. CC C ABD D E COMPUTING/NAVIGATION Position Sensor Frequency Picture A Accelerometer 5.376 kHz B Gyroscope 400 kHz C Barometer/Thermometer 3.4 mHz D Range 400 kHz E Light 400 kHz Sensor Map A network of sensors will communicate in real time with the microprocessor to dynamically control the actuators and motors. The temperature will be recorded at the front and top of the pod as well next to the battery housing. The gyroscope will measure yaw, pitch, and roll. The acceleration, light, and range sensors will feed real time positioning and speed data to the microprocessor.
  • 20. PROPULSIONThe tube integrated propulsion system will interface with the frame through a machined aluminum disk fastened at the rear of the pod. This interface sits 10 inches above the aluminum sub-track. This system will provide the initial impulse and will accelerate the pod at 2.8 g’s for 800 feet. A pinned link connected to an electric actuator with a 2 inch stroke will lower a roller outfitted with an electric motor. This system will allow the pod to travel in and out of the ingress and egress holding areas. This secondary system will allow the pod to travel up to 5 mph. Propulsion Interface and Secondary Propulsion Motor
  • 21. SAFETY The Hyperlynx safety package is redundant and incorporates electrical and mechanical mechanisms to prevent damage to the pod, tube, as well as avoid injury to all personnel operating the pod. A complete safety plan has been assembled to highlight safety features of the pod, both mechanically and electrically. It also explains hazardous material handling procedures in addition to safety, health and environmental considerations. The FEMA identifies several modes of failure and lists actions to mitigate failures.
  • 22. SAFETY FEATURES OVERVIEW Several sensors mounted within and around the pod will monitor pressure, speed, temperature, battery life and overall pod health. If any of these become critical, the pod will execute a braking sequence to stop then enter a low power state to prevent damage to the pod or the environment. In the case of complete power loss, a spring, mounted between the rear dust cylinder and the end of the push rod, will manually actuate the master cylinder. This will apply brake pressure and slow the pod to a stop. Spring Loaded Brake Actuator
  • 23. HAZMAT / STORED ENERGY Our operational pod will contain brake fluid and a single Lithium Iron Phosphate battery. Team Hyperlynx will be trained in proper handling and spill procedures of all hazardous materials. All documentation, MSDS, and a complete spill kit, will be present during all transportation and testing of systems that contain the hazardous materials. For complete hazardous material considerations see the Safety Plan.
  • 25. THERMAL PROFILE The thermal profile on the outer shell of the pod is seen below. The thermal simulation was performed after the initial acceleration impulse at a speed of 260 mph, with a tube pressure of 0.02 psi, and a ambient temperature of 100 ℉. The temperature of the pod remained under 105℉. Temperature ℉ Thermal Simulation Results
  • 26. AERODYNAMICS The aerodynamic coefficients of the Hyperlynx Pod were found using computational fluid dynamics and verified with wind tunnel experiments. CD = 0.247 CL = -0.00467 CFD and Wind Tunnel Prototype
  • 27. TRAJECTORY The pod will accelerate for the first 800 feet and reach a speed of 260 mph. At a distance of 800 feet from the end of the tube, the power screw and disk brakes actuate slowing the pod down at a rate of 1.7 g’s. The braking sequence will take 5 seconds. Coast Brake
  • 28. Tscrew FclampFclamp FclampFclamp BRAKING The braking system will use a series of linkages and a central power screw to gain mechanical advantage and compress four braking wheels against the rail. This symmetrical system ensures equal force is applied on both sides of the rail. The central screw (Tscrew) provides up to 13 ft- lbs of force, and transfers rotary motion to a linear clamping force (Fclamp) up to 1000 lbs. Finite element analysis of the linkage system shows under maximum loading conditions, the linkage will not fail. The maximum stress is located on the center link where the power screw is threaded. This linkage will be manufactured out of stainless steel. Braking Linkage Free Body Diagram / Stress Analysis
  • 29. VIBRATIONUsing software-based mode shape and frequency analysis, part features are optimized by reinforcing critical points tending towards unwanted shapes at resonance. All vibrations that do transmit through the pod will be damped using a 0.125-inch layer of natural rubber between contact points of the pod, module and frame.
  • 31. ACCELERATION A stress study was performed on the frame to determine if the frame would withstand the large force applied at the rear of the pod during the acceleration phase. The brake mount cross beam had the highest stresses and will not fail or yield under maximum loading conditions. 143 lbs from Front Caster 158 lbs from rear caster 870 lbs from the propulsion interface 98 lbs from Support Beam 855 lb-in from braking torque Maximum Stress = 4,830 psi
  • 32. NOMINAL DECELERATION 169 lbs from Front wheels 131 lbs from rear wheels 98 lbs from support beam 4400 lb-in from braking torque In the deceleration stress study, the brake support cross beam yielded the highest stress. This was due to the large loading on the cross beam from the torque generated by the braking assembly. This stress is within the yield strength of 6061 aluminum alloy. Maximum Stress = 24,540 psi
  • 33. END-OF-TUBE NOMINAL CRASH 255 lbs from front wheels 4000 lbs on front of frame 45 lbs from rear wheels 3720 lb-in from braking torque For the end-of-tube-nominal crash a force of 4000 lbs was applied to the front of the frame to simulate the crash scenario. These force values were based on a deceleration rate of 400 ft/s². The frame stress exceeds yield in the front.
  • 36. CONSTRUCTION COST Pod Construction Cost $8,455 Transportation & Misc. Expenses $9,250 Total Project Cost $17,705 Funds Raised $9,663 Remaining Funds Required for Project Completion $8,042
  • 38. INFRASTRUCTURE With respect to the proposed Hyperloop route from Los Angeles to San Francisco, a longer pod outfitted with multiple payload modules would increase efficiency while traveling longer distances. The shape of the pod would be scaled to accommodate a larger tube and bigger payloads. Full-scale pods of the current design would weigh 1000 lbs unloaded. The pod design allows for easy and low cost upgrades such as a front facing compressor, rotor-stator system, or levitation system. The high speed wheel assembly offers lateral stability that non-wheeled Hyperloop pods lack. Full-scale Hyperloop pods using this design can be cost effective, with an estimated build price of under $100,000 per pod, excluding payload modules. Full Size Pod ½ scale competition pod
  • 39. OPERATION / MAINTENANCE Features such as the modular payload, battery location, and material choice allow for seamless operation and maintenance of Hyperloop pods. When a hyperloop pod arrives at the station, the modules will be loaded and pre-staged with fully charged batteries, passengers and freight. This will provide fast turn around time, minimizing time in the station. . Maintenance would include periodic changing of braking wheels, calipers, brake fluid, and high speed wheel assemblies. Hyperloop Station Concept
  • 40. VISION The Hyperloop has many potential crossovers with other emerging technologies, such as virtual reality, vehicle automation, and ever-growing consumer access to powerful smart telecommunication technology. These concepts, when considered as part of a larger hierarchy, could lead to a paradigm shift. The automation of transportation infrastructure allows us to envision a conceptual “physical internet” in which our ability to traverse our real world would become as effortless as browsing a web page. This system would create entirely new ways for users to live their lives.