INDONESIA
INFRASTRUCTURE
INITIATIVE
IURSP – Monitoring dan Evaluasi
IURSP – Monitoring and Evaluation
Workshop 3
Steve Brown
VicRoads International
Projects
2
Monitoring dan Evaluasi
Monitoring and Evaluation
Perlu membuat kerangka kerja
Monitoring dan Evaluasi untuk proyek
Hal ini akan membantu dalam
menyampaikan hasil proyek secara
efisien dan efektif
•Need to develop a Monitoring and Evaluation framework for
the project
•This will assist in delivering the project outcomes efficiently and
effectively
3
Monitoring
Monitoring
Rencana pelaksanaan dapat dibuat untuk
menggambarkan apa yang dibutuhkan
untuk mencapai setiap keluaran - tanggal
perkiraan dapat ditetapkan saat
pencapaian proyek (milestones)
An implementation plan can be developed to describe what is
required to deliver each output – target dates can be set against
milestones
4
Keluaran-keluaran Proyek
Project Outputs
Setiap masing-masing bagian dari proyek
harus dianggap sebagai keluaran yang
berbeda
Misalnya tempat penyeberangan pejalan
kaki, peningkatan trotoar atau perubahan
terhadap garis marka jalan, masing-masing
bisa diidentifikasi sebagai keluaran
berbeda
Each individual part of the project should be treated as a separate
output
Eg. a pedestrian crossing, an upgraded sidewalk or a change to
the road linemarking could each be identified as separate outputs
5
6
Keluaran-keluaran Proyek
Project Outputs
Mengidentifikasi keluaran yang akan
disampaikan
Beberapa keluaran mungkin adalah hasil-hasil
sementara yang akan berkontribusi terhadap
proyek secara keseluruhan
Setiap keluaran biayanya harus dihitung
tersendiri dan memiliki kerangka waktu untuk
pelaksanaannya
Identify the outputs that will be delivered
Some of these may be interim outputs that will contribute to the overall
project
Each output should be costed individually and have a timeframe for
implementation
7
Monitoring
Monitoring
Rencana pelaksanaan harus menunjukkan
apa yang akan dicapai dari bulan ke bulan dan
berapa pengeluaran kumulatif yang kan
dikeluarkan
Selama pelaksanaan, proyek harus dipantau
berdasarkan rencana yang ada untuk melihat
pencapaian tanggal dan biaya yang
diperkirakan
The Implementation plan should show month by month what will be
delivered and what the cumulative expenditure will be
During implementation, the project should be monitored against the
plan to see how the target dates and costs are being achieved
8
Rencana Monitoring – Laporan Akhir Maret
MONITORING PLAN EXAMPLE-End ofMarch Report
Cumulative Expenditure
Keluaran Cost Start Date Start Date Comp Date Comp Date Jan Jan Feb Feb Mar Mar
Output Perkiraan Perkiraan Aktual Perkiraan Aktual Perkiraan Aktual Perkiraan Aktual Perkiraan Aktual
Est Est Act Est Act Est Act Est Act Est Act
(Rp M) (Rp M) (Rp M) (Rp M) (Rp M) (Rp M) (Rp M)
Membangun kembali Trotoar
Rebuild Sidewalk
Design 20 15/01/01 15/02/28 5 2 20 18 20 18
Services 100 15/02/01 15/04/30 5 5 65 60
Traffic management 20 15/02/01 15/05/31 3 3 10 10
Remove sidewalk 80 15/02/01 15/02/28 80 56 80 80
Reinstate drainage 100 15/03/01 15/04/30 60 37
Install new sidewalk 120 15/03/01 15/05/31 20 5
9
Rencana Monitoring – Laporan Akhir Maret
Monitoring Plan – End of March report
Keluaran : Membangun kembali Trotoar
Output : Rebuild Sidewalk
0
100
200
300
400
500
600
Jan Feb Mar Apr May
Perkiraan
(Estimated)
Aktual (Actual)
Expenditure(RupM)
10
Monitoring
Monitoring
Jika kemajuan pencapaian berbeda dari
rencana
Identifikasi apa yang dapat dilakukan
untuk kembali ke rencana semula
atau, implikasi apa yang memungkinkan
untuk mencapai kerangka waktu, biaya
atau keluaran akhir
If delivery progress differs from the plan
Identify what can be done to get back on track
or, what implications there may be in achieving the final
timeframe, cost or outcomes
11
Evaluasi
Evaluation
Pada saat penyelesaian proyek atau
pencapaian proyek yang signifikan,
evaluasi dapat dilakukan untuk menilai
apakah hasil dan keluaran telah dicapai
At the completion of the project or at the achievement of
significant milestones, an evaluation can be undertaken to
assess whether the objectives and outcomes have been
achieved
12
Evaluasi
Evaluation
Hal ini dapat dilakukan segera setelah
akhir pencapaian hasil untuk menilai
dampak jangka pendek tetapi perlu
dilanjutkan ke dalam jangka menengah
dan panjang untuk memastikan
hasilnya sepenuhnya dikembangkan
dan berkelanjutan
This can be done soon after the end of delivery to assess short
term impacts but needs to be continued into the medium and
long term to make sure the effects are fully developed and are
sustainable
13
Mengidentifikasi Tujuan dan Hasil
Proyek
Identify Project Objectives and Outcomes
Mengidentifikasi baik dalam jangka
pendek dan jangka panjang
Berdasarkan pada kebutuhan dan
meningkatkan keselamatan bagi para
pengguna jalan dan masyarakat
Identify in both the short term and the longer term
Based on needs and improved safety for road users and the
community
14
Pengumpulan Data
Data Collection
Untuk melihat apakah tujuan dan hasil
berhasil disampaikan maka penting
untuk memiliki data yang bagus
sebelum dan setelah implementasi
In order to see if objectives and outcomes are delivered it is
important to have good data both before and after the
implementation
15
TERIMA KASIH
THANK YOU
Steve Brown
VicRoads International Projects

Weitere ähnliche Inhalte

Ähnlich wie MONITORING DAN EVALUASI INFRASTRUKTUR

MPPL - EAS - SI Administrasi CV. Termitech Rizky Abadi
MPPL - EAS - SI Administrasi CV. Termitech Rizky AbadiMPPL - EAS - SI Administrasi CV. Termitech Rizky Abadi
MPPL - EAS - SI Administrasi CV. Termitech Rizky AbadiIrsyad Rizaldi
 
Project Charter.pdf
Project Charter.pdfProject Charter.pdf
Project Charter.pdfrulyirawan2
 
Evaluasi Akhir Semester - MPPL - Sistem Informasi Administrasi CV. Termitech ...
Evaluasi Akhir Semester - MPPL - Sistem Informasi Administrasi CV. Termitech ...Evaluasi Akhir Semester - MPPL - Sistem Informasi Administrasi CV. Termitech ...
Evaluasi Akhir Semester - MPPL - Sistem Informasi Administrasi CV. Termitech ...Ferdinand Jason
 
Kuliah ii evaluasi perencanaan pembangunan daerah
Kuliah ii evaluasi perencanaan pembangunan daerahKuliah ii evaluasi perencanaan pembangunan daerah
Kuliah ii evaluasi perencanaan pembangunan daerahR Khairil Adi
 
2006 12-teknik pelaporan
2006 12-teknik pelaporan2006 12-teknik pelaporan
2006 12-teknik pelaporanahmad fuadi
 
Manajemen Kontruksi J 8.01.pdf
Manajemen Kontruksi J 8.01.pdfManajemen Kontruksi J 8.01.pdf
Manajemen Kontruksi J 8.01.pdfTami1998
 
Ppsi pertemuan-5-scope-management
Ppsi pertemuan-5-scope-managementPpsi pertemuan-5-scope-management
Ppsi pertemuan-5-scope-managementAbrianto Nugraha
 
mATERI 11 qU.pptx
mATERI 11 qU.pptxmATERI 11 qU.pptx
mATERI 11 qU.pptxmasruq
 
Ahli Muda Bidang Keahlian Manajemen Konstruksi JENJANG 7.pptx
Ahli Muda Bidang Keahlian  Manajemen Konstruksi JENJANG 7.pptxAhli Muda Bidang Keahlian  Manajemen Konstruksi JENJANG 7.pptx
Ahli Muda Bidang Keahlian Manajemen Konstruksi JENJANG 7.pptxboynugraha727
 
Manajemen Biaya PL.pptx
Manajemen Biaya PL.pptxManajemen Biaya PL.pptx
Manajemen Biaya PL.pptxFajar Baskoro
 

Ähnlich wie MONITORING DAN EVALUASI INFRASTRUKTUR (20)

EAS MPPL
EAS MPPLEAS MPPL
EAS MPPL
 
MPPL - EAS - SI Administrasi CV. Termitech Rizky Abadi
MPPL - EAS - SI Administrasi CV. Termitech Rizky AbadiMPPL - EAS - SI Administrasi CV. Termitech Rizky Abadi
MPPL - EAS - SI Administrasi CV. Termitech Rizky Abadi
 
Eas mppl
Eas mpplEas mppl
Eas mppl
 
Eas mppl
Eas mpplEas mppl
Eas mppl
 
Ppsi pertemuan-4
Ppsi pertemuan-4Ppsi pertemuan-4
Ppsi pertemuan-4
 
Monitoring
MonitoringMonitoring
Monitoring
 
Project Charter.pdf
Project Charter.pdfProject Charter.pdf
Project Charter.pdf
 
Evaluasi Akhir Semester - MPPL - Sistem Informasi Administrasi CV. Termitech ...
Evaluasi Akhir Semester - MPPL - Sistem Informasi Administrasi CV. Termitech ...Evaluasi Akhir Semester - MPPL - Sistem Informasi Administrasi CV. Termitech ...
Evaluasi Akhir Semester - MPPL - Sistem Informasi Administrasi CV. Termitech ...
 
Kuliah ii evaluasi perencanaan pembangunan daerah
Kuliah ii evaluasi perencanaan pembangunan daerahKuliah ii evaluasi perencanaan pembangunan daerah
Kuliah ii evaluasi perencanaan pembangunan daerah
 
2006 12-teknik pelaporan
2006 12-teknik pelaporan2006 12-teknik pelaporan
2006 12-teknik pelaporan
 
Manajemen Kontruksi J 8.01.pdf
Manajemen Kontruksi J 8.01.pdfManajemen Kontruksi J 8.01.pdf
Manajemen Kontruksi J 8.01.pdf
 
UAS MPPL
UAS MPPLUAS MPPL
UAS MPPL
 
Ppsi pertemuan-5
Ppsi pertemuan-5Ppsi pertemuan-5
Ppsi pertemuan-5
 
Ppsi pertemuan-5-scope-management
Ppsi pertemuan-5-scope-managementPpsi pertemuan-5-scope-management
Ppsi pertemuan-5-scope-management
 
mATERI 11 qU.pptx
mATERI 11 qU.pptxmATERI 11 qU.pptx
mATERI 11 qU.pptx
 
Kurva s jasa konsultansi
Kurva s jasa konsultansiKurva s jasa konsultansi
Kurva s jasa konsultansi
 
EAS MPPL E 2019
EAS MPPL E 2019EAS MPPL E 2019
EAS MPPL E 2019
 
Ahli Muda Bidang Keahlian Manajemen Konstruksi JENJANG 7.pptx
Ahli Muda Bidang Keahlian  Manajemen Konstruksi JENJANG 7.pptxAhli Muda Bidang Keahlian  Manajemen Konstruksi JENJANG 7.pptx
Ahli Muda Bidang Keahlian Manajemen Konstruksi JENJANG 7.pptx
 
project-charter.pptx
project-charter.pptxproject-charter.pptx
project-charter.pptx
 
Manajemen Biaya PL.pptx
Manajemen Biaya PL.pptxManajemen Biaya PL.pptx
Manajemen Biaya PL.pptx
 

Mehr von Indonesia Infrastructure Initiative

Indonesian railways revitalisation bambang susantono, vice minister for tra...
Indonesian railways revitalisation   bambang susantono, vice minister for tra...Indonesian railways revitalisation   bambang susantono, vice minister for tra...
Indonesian railways revitalisation bambang susantono, vice minister for tra...Indonesia Infrastructure Initiative
 
Railway function in developing multimodal transportation in java
Railway function in developing multimodal transportation in javaRailway function in developing multimodal transportation in java
Railway function in developing multimodal transportation in javaIndonesia Infrastructure Initiative
 
Development of multimodal transportation and inter regional connectivitiy
Development of multimodal transportation and inter regional connectivitiyDevelopment of multimodal transportation and inter regional connectivitiy
Development of multimodal transportation and inter regional connectivitiyIndonesia Infrastructure Initiative
 

Mehr von Indonesia Infrastructure Initiative (20)

Presentasi Sanitasi INDII
Presentasi Sanitasi INDIIPresentasi Sanitasi INDII
Presentasi Sanitasi INDII
 
Balikpapan Public Diplomacy 25 May 2015
Balikpapan  Public Diplomacy 25 May 2015Balikpapan  Public Diplomacy 25 May 2015
Balikpapan Public Diplomacy 25 May 2015
 
World experience-in-railway-restructuring
World experience-in-railway-restructuringWorld experience-in-railway-restructuring
World experience-in-railway-restructuring
 
Indonesian railways revitalisation bambang susantono, vice minister for tra...
Indonesian railways revitalisation   bambang susantono, vice minister for tra...Indonesian railways revitalisation   bambang susantono, vice minister for tra...
Indonesian railways revitalisation bambang susantono, vice minister for tra...
 
WS2 Infrastructure Issues
WS2 Infrastructure IssuesWS2 Infrastructure Issues
WS2 Infrastructure Issues
 
Development of multimodal transport in north java corridor
Development of multimodal transport in north java corridorDevelopment of multimodal transport in north java corridor
Development of multimodal transport in north java corridor
 
Railway function in developing multimodal transportation in java
Railway function in developing multimodal transportation in javaRailway function in developing multimodal transportation in java
Railway function in developing multimodal transportation in java
 
The role of ipc in developing multimodal transportation in java
The role of ipc in developing multimodal transportation in javaThe role of ipc in developing multimodal transportation in java
The role of ipc in developing multimodal transportation in java
 
Government strategy in developing multimodal transportation
Government strategy in developing multimodal transportationGovernment strategy in developing multimodal transportation
Government strategy in developing multimodal transportation
 
The role of ferry in developing multimodal transportation
The role of ferry in developing multimodal transportationThe role of ferry in developing multimodal transportation
The role of ferry in developing multimodal transportation
 
Development of multimodal transportation and inter regional connectivitiy
Development of multimodal transportation and inter regional connectivitiyDevelopment of multimodal transportation and inter regional connectivitiy
Development of multimodal transportation and inter regional connectivitiy
 
Ws3 safe system approach (bahasa version)
Ws3 safe system approach (bahasa version)Ws3 safe system approach (bahasa version)
Ws3 safe system approach (bahasa version)
 
Ws3 safe system supporting vru (english version)
Ws3 safe system supporting vru (english version)Ws3 safe system supporting vru (english version)
Ws3 safe system supporting vru (english version)
 
Ws3 safe system supporting vru (bahasa version)
Ws3 safe system supporting vru (bahasa version)Ws3 safe system supporting vru (bahasa version)
Ws3 safe system supporting vru (bahasa version)
 
Ws3 presentation
Ws3 presentationWs3 presentation
Ws3 presentation
 
Ws3 infrastructure related to pedestrian safety
Ws3 infrastructure related to pedestrian safetyWs3 infrastructure related to pedestrian safety
Ws3 infrastructure related to pedestrian safety
 
Ws3 gender and disability presentation
Ws3 gender and disability presentationWs3 gender and disability presentation
Ws3 gender and disability presentation
 
Ws2 introduction
Ws2 introductionWs2 introduction
Ws2 introduction
 
Workshop #2 safe system approach
Workshop #2 safe system approachWorkshop #2 safe system approach
Workshop #2 safe system approach
 
Workshop #2 safe system approach english
Workshop #2 safe system approach englishWorkshop #2 safe system approach english
Workshop #2 safe system approach english
 

Kürzlich hochgeladen

Materi Membangun Budaya Ber-Integritas Antikorupsi bagi ASN .pptx
Materi Membangun Budaya Ber-Integritas Antikorupsi bagi ASN .pptxMateri Membangun Budaya Ber-Integritas Antikorupsi bagi ASN .pptx
Materi Membangun Budaya Ber-Integritas Antikorupsi bagi ASN .pptxBudyHermawan3
 
INDIKATOR DAN SUB INDIKATOR MCP PELAYANAN PUBLIK.pdf
INDIKATOR DAN SUB INDIKATOR MCP PELAYANAN PUBLIK.pdfINDIKATOR DAN SUB INDIKATOR MCP PELAYANAN PUBLIK.pdf
INDIKATOR DAN SUB INDIKATOR MCP PELAYANAN PUBLIK.pdfNetraHartana
 
Agenda III - Organisasi Digital - updated.pdf
Agenda III - Organisasi Digital - updated.pdfAgenda III - Organisasi Digital - updated.pdf
Agenda III - Organisasi Digital - updated.pdfHeru Syah Putra
 
mata pelajaran geografi ANTROPOSFER 2.ppt
mata pelajaran geografi ANTROPOSFER 2.pptmata pelajaran geografi ANTROPOSFER 2.ppt
mata pelajaran geografi ANTROPOSFER 2.pptMuhammadNorman9
 
Manajemen Kontrak pada Aplikasi SPANpptx
Manajemen Kontrak pada Aplikasi SPANpptxManajemen Kontrak pada Aplikasi SPANpptx
Manajemen Kontrak pada Aplikasi SPANpptxyovi2305
 
2024.03.27_Konsep dan Potret Inflasi Indonesia _Workshop RCE_Badan Pusat Stat...
2024.03.27_Konsep dan Potret Inflasi Indonesia _Workshop RCE_Badan Pusat Stat...2024.03.27_Konsep dan Potret Inflasi Indonesia _Workshop RCE_Badan Pusat Stat...
2024.03.27_Konsep dan Potret Inflasi Indonesia _Workshop RCE_Badan Pusat Stat...iman333159
 
RUNDOWN ACARA ORIENTASI CPNS DAN PPPK TAHUN 2024.pdf
RUNDOWN ACARA ORIENTASI CPNS DAN PPPK TAHUN 2024.pdfRUNDOWN ACARA ORIENTASI CPNS DAN PPPK TAHUN 2024.pdf
RUNDOWN ACARA ORIENTASI CPNS DAN PPPK TAHUN 2024.pdfNezaPurna
 
UUD NRI TAHUN 1945 TENTANG HAK DAN KEWAJIBAN PASAL 28D AYAT 1
UUD NRI TAHUN 1945 TENTANG HAK DAN KEWAJIBAN PASAL 28D AYAT 1UUD NRI TAHUN 1945 TENTANG HAK DAN KEWAJIBAN PASAL 28D AYAT 1
UUD NRI TAHUN 1945 TENTANG HAK DAN KEWAJIBAN PASAL 28D AYAT 1RomaDoni5
 
Sosialisasi OSS RBA dan SIINAs Tahun 2024
Sosialisasi OSS RBA dan SIINAs Tahun 2024Sosialisasi OSS RBA dan SIINAs Tahun 2024
Sosialisasi OSS RBA dan SIINAs Tahun 2024DEDI45443
 
emka_Slide Recall Modul Melakukan Perencanaan PBJP Level 1 V3.1.pptx
emka_Slide Recall Modul Melakukan Perencanaan PBJP Level 1 V3.1.pptxemka_Slide Recall Modul Melakukan Perencanaan PBJP Level 1 V3.1.pptx
emka_Slide Recall Modul Melakukan Perencanaan PBJP Level 1 V3.1.pptxAmandaJesica
 
Aksi Nyata KKTP.pdAksi Nyata KKTP.pdf.pptxAksi Nyata KKTP.pdf.pptxAksi Nyata ...
Aksi Nyata KKTP.pdAksi Nyata KKTP.pdf.pptxAksi Nyata KKTP.pdf.pptxAksi Nyata ...Aksi Nyata KKTP.pdAksi Nyata KKTP.pdf.pptxAksi Nyata KKTP.pdf.pptxAksi Nyata ...
Aksi Nyata KKTP.pdAksi Nyata KKTP.pdf.pptxAksi Nyata KKTP.pdf.pptxAksi Nyata ...citraislamiah02
 
SOSIALISASI RETRIBUSI PELAYANAN PERSAMPAHAN DI KOTA MAKASSAR.pptx
SOSIALISASI RETRIBUSI PELAYANAN PERSAMPAHAN DI KOTA MAKASSAR.pptxSOSIALISASI RETRIBUSI PELAYANAN PERSAMPAHAN DI KOTA MAKASSAR.pptx
SOSIALISASI RETRIBUSI PELAYANAN PERSAMPAHAN DI KOTA MAKASSAR.pptxwansyahrahman77
 
Upaya Indonesia dalam menyelesaikan sengketa dengan Timor Timur hingga tercip...
Upaya Indonesia dalam menyelesaikan sengketa dengan Timor Timur hingga tercip...Upaya Indonesia dalam menyelesaikan sengketa dengan Timor Timur hingga tercip...
Upaya Indonesia dalam menyelesaikan sengketa dengan Timor Timur hingga tercip...mayfanalf
 
evaluasi essay agenda 3 pelatihan kepemimpinan administrator
evaluasi essay agenda 3 pelatihan kepemimpinan administratorevaluasi essay agenda 3 pelatihan kepemimpinan administrator
evaluasi essay agenda 3 pelatihan kepemimpinan administratorDi Prihantony
 

Kürzlich hochgeladen (14)

Materi Membangun Budaya Ber-Integritas Antikorupsi bagi ASN .pptx
Materi Membangun Budaya Ber-Integritas Antikorupsi bagi ASN .pptxMateri Membangun Budaya Ber-Integritas Antikorupsi bagi ASN .pptx
Materi Membangun Budaya Ber-Integritas Antikorupsi bagi ASN .pptx
 
INDIKATOR DAN SUB INDIKATOR MCP PELAYANAN PUBLIK.pdf
INDIKATOR DAN SUB INDIKATOR MCP PELAYANAN PUBLIK.pdfINDIKATOR DAN SUB INDIKATOR MCP PELAYANAN PUBLIK.pdf
INDIKATOR DAN SUB INDIKATOR MCP PELAYANAN PUBLIK.pdf
 
Agenda III - Organisasi Digital - updated.pdf
Agenda III - Organisasi Digital - updated.pdfAgenda III - Organisasi Digital - updated.pdf
Agenda III - Organisasi Digital - updated.pdf
 
mata pelajaran geografi ANTROPOSFER 2.ppt
mata pelajaran geografi ANTROPOSFER 2.pptmata pelajaran geografi ANTROPOSFER 2.ppt
mata pelajaran geografi ANTROPOSFER 2.ppt
 
Manajemen Kontrak pada Aplikasi SPANpptx
Manajemen Kontrak pada Aplikasi SPANpptxManajemen Kontrak pada Aplikasi SPANpptx
Manajemen Kontrak pada Aplikasi SPANpptx
 
2024.03.27_Konsep dan Potret Inflasi Indonesia _Workshop RCE_Badan Pusat Stat...
2024.03.27_Konsep dan Potret Inflasi Indonesia _Workshop RCE_Badan Pusat Stat...2024.03.27_Konsep dan Potret Inflasi Indonesia _Workshop RCE_Badan Pusat Stat...
2024.03.27_Konsep dan Potret Inflasi Indonesia _Workshop RCE_Badan Pusat Stat...
 
RUNDOWN ACARA ORIENTASI CPNS DAN PPPK TAHUN 2024.pdf
RUNDOWN ACARA ORIENTASI CPNS DAN PPPK TAHUN 2024.pdfRUNDOWN ACARA ORIENTASI CPNS DAN PPPK TAHUN 2024.pdf
RUNDOWN ACARA ORIENTASI CPNS DAN PPPK TAHUN 2024.pdf
 
UUD NRI TAHUN 1945 TENTANG HAK DAN KEWAJIBAN PASAL 28D AYAT 1
UUD NRI TAHUN 1945 TENTANG HAK DAN KEWAJIBAN PASAL 28D AYAT 1UUD NRI TAHUN 1945 TENTANG HAK DAN KEWAJIBAN PASAL 28D AYAT 1
UUD NRI TAHUN 1945 TENTANG HAK DAN KEWAJIBAN PASAL 28D AYAT 1
 
Sosialisasi OSS RBA dan SIINAs Tahun 2024
Sosialisasi OSS RBA dan SIINAs Tahun 2024Sosialisasi OSS RBA dan SIINAs Tahun 2024
Sosialisasi OSS RBA dan SIINAs Tahun 2024
 
emka_Slide Recall Modul Melakukan Perencanaan PBJP Level 1 V3.1.pptx
emka_Slide Recall Modul Melakukan Perencanaan PBJP Level 1 V3.1.pptxemka_Slide Recall Modul Melakukan Perencanaan PBJP Level 1 V3.1.pptx
emka_Slide Recall Modul Melakukan Perencanaan PBJP Level 1 V3.1.pptx
 
Aksi Nyata KKTP.pdAksi Nyata KKTP.pdf.pptxAksi Nyata KKTP.pdf.pptxAksi Nyata ...
Aksi Nyata KKTP.pdAksi Nyata KKTP.pdf.pptxAksi Nyata KKTP.pdf.pptxAksi Nyata ...Aksi Nyata KKTP.pdAksi Nyata KKTP.pdf.pptxAksi Nyata KKTP.pdf.pptxAksi Nyata ...
Aksi Nyata KKTP.pdAksi Nyata KKTP.pdf.pptxAksi Nyata KKTP.pdf.pptxAksi Nyata ...
 
SOSIALISASI RETRIBUSI PELAYANAN PERSAMPAHAN DI KOTA MAKASSAR.pptx
SOSIALISASI RETRIBUSI PELAYANAN PERSAMPAHAN DI KOTA MAKASSAR.pptxSOSIALISASI RETRIBUSI PELAYANAN PERSAMPAHAN DI KOTA MAKASSAR.pptx
SOSIALISASI RETRIBUSI PELAYANAN PERSAMPAHAN DI KOTA MAKASSAR.pptx
 
Upaya Indonesia dalam menyelesaikan sengketa dengan Timor Timur hingga tercip...
Upaya Indonesia dalam menyelesaikan sengketa dengan Timor Timur hingga tercip...Upaya Indonesia dalam menyelesaikan sengketa dengan Timor Timur hingga tercip...
Upaya Indonesia dalam menyelesaikan sengketa dengan Timor Timur hingga tercip...
 
evaluasi essay agenda 3 pelatihan kepemimpinan administrator
evaluasi essay agenda 3 pelatihan kepemimpinan administratorevaluasi essay agenda 3 pelatihan kepemimpinan administrator
evaluasi essay agenda 3 pelatihan kepemimpinan administrator
 

MONITORING DAN EVALUASI INFRASTRUKTUR

  • 1. INDONESIA INFRASTRUCTURE INITIATIVE IURSP – Monitoring dan Evaluasi IURSP – Monitoring and Evaluation Workshop 3 Steve Brown VicRoads International Projects
  • 2. 2 Monitoring dan Evaluasi Monitoring and Evaluation Perlu membuat kerangka kerja Monitoring dan Evaluasi untuk proyek Hal ini akan membantu dalam menyampaikan hasil proyek secara efisien dan efektif •Need to develop a Monitoring and Evaluation framework for the project •This will assist in delivering the project outcomes efficiently and effectively
  • 3. 3 Monitoring Monitoring Rencana pelaksanaan dapat dibuat untuk menggambarkan apa yang dibutuhkan untuk mencapai setiap keluaran - tanggal perkiraan dapat ditetapkan saat pencapaian proyek (milestones) An implementation plan can be developed to describe what is required to deliver each output – target dates can be set against milestones
  • 4. 4 Keluaran-keluaran Proyek Project Outputs Setiap masing-masing bagian dari proyek harus dianggap sebagai keluaran yang berbeda Misalnya tempat penyeberangan pejalan kaki, peningkatan trotoar atau perubahan terhadap garis marka jalan, masing-masing bisa diidentifikasi sebagai keluaran berbeda Each individual part of the project should be treated as a separate output Eg. a pedestrian crossing, an upgraded sidewalk or a change to the road linemarking could each be identified as separate outputs
  • 5. 5
  • 6. 6 Keluaran-keluaran Proyek Project Outputs Mengidentifikasi keluaran yang akan disampaikan Beberapa keluaran mungkin adalah hasil-hasil sementara yang akan berkontribusi terhadap proyek secara keseluruhan Setiap keluaran biayanya harus dihitung tersendiri dan memiliki kerangka waktu untuk pelaksanaannya Identify the outputs that will be delivered Some of these may be interim outputs that will contribute to the overall project Each output should be costed individually and have a timeframe for implementation
  • 7. 7 Monitoring Monitoring Rencana pelaksanaan harus menunjukkan apa yang akan dicapai dari bulan ke bulan dan berapa pengeluaran kumulatif yang kan dikeluarkan Selama pelaksanaan, proyek harus dipantau berdasarkan rencana yang ada untuk melihat pencapaian tanggal dan biaya yang diperkirakan The Implementation plan should show month by month what will be delivered and what the cumulative expenditure will be During implementation, the project should be monitored against the plan to see how the target dates and costs are being achieved
  • 8. 8 Rencana Monitoring – Laporan Akhir Maret MONITORING PLAN EXAMPLE-End ofMarch Report Cumulative Expenditure Keluaran Cost Start Date Start Date Comp Date Comp Date Jan Jan Feb Feb Mar Mar Output Perkiraan Perkiraan Aktual Perkiraan Aktual Perkiraan Aktual Perkiraan Aktual Perkiraan Aktual Est Est Act Est Act Est Act Est Act Est Act (Rp M) (Rp M) (Rp M) (Rp M) (Rp M) (Rp M) (Rp M) Membangun kembali Trotoar Rebuild Sidewalk Design 20 15/01/01 15/02/28 5 2 20 18 20 18 Services 100 15/02/01 15/04/30 5 5 65 60 Traffic management 20 15/02/01 15/05/31 3 3 10 10 Remove sidewalk 80 15/02/01 15/02/28 80 56 80 80 Reinstate drainage 100 15/03/01 15/04/30 60 37 Install new sidewalk 120 15/03/01 15/05/31 20 5
  • 9. 9 Rencana Monitoring – Laporan Akhir Maret Monitoring Plan – End of March report Keluaran : Membangun kembali Trotoar Output : Rebuild Sidewalk 0 100 200 300 400 500 600 Jan Feb Mar Apr May Perkiraan (Estimated) Aktual (Actual) Expenditure(RupM)
  • 10. 10 Monitoring Monitoring Jika kemajuan pencapaian berbeda dari rencana Identifikasi apa yang dapat dilakukan untuk kembali ke rencana semula atau, implikasi apa yang memungkinkan untuk mencapai kerangka waktu, biaya atau keluaran akhir If delivery progress differs from the plan Identify what can be done to get back on track or, what implications there may be in achieving the final timeframe, cost or outcomes
  • 11. 11 Evaluasi Evaluation Pada saat penyelesaian proyek atau pencapaian proyek yang signifikan, evaluasi dapat dilakukan untuk menilai apakah hasil dan keluaran telah dicapai At the completion of the project or at the achievement of significant milestones, an evaluation can be undertaken to assess whether the objectives and outcomes have been achieved
  • 12. 12 Evaluasi Evaluation Hal ini dapat dilakukan segera setelah akhir pencapaian hasil untuk menilai dampak jangka pendek tetapi perlu dilanjutkan ke dalam jangka menengah dan panjang untuk memastikan hasilnya sepenuhnya dikembangkan dan berkelanjutan This can be done soon after the end of delivery to assess short term impacts but needs to be continued into the medium and long term to make sure the effects are fully developed and are sustainable
  • 13. 13 Mengidentifikasi Tujuan dan Hasil Proyek Identify Project Objectives and Outcomes Mengidentifikasi baik dalam jangka pendek dan jangka panjang Berdasarkan pada kebutuhan dan meningkatkan keselamatan bagi para pengguna jalan dan masyarakat Identify in both the short term and the longer term Based on needs and improved safety for road users and the community
  • 14. 14 Pengumpulan Data Data Collection Untuk melihat apakah tujuan dan hasil berhasil disampaikan maka penting untuk memiliki data yang bagus sebelum dan setelah implementasi In order to see if objectives and outcomes are delivered it is important to have good data both before and after the implementation
  • 15. 15 TERIMA KASIH THANK YOU Steve Brown VicRoads International Projects