   Kaizen is a system in which every employee is
    encouraged to come up with small
    improvement suggestions in their area of work
    on a regular basis
   This is a continuous exercise
INTRODUCTION:

   Masaaki Imai is known
    as the developer of
    Kaizen
   KAI means 'change' or
    'the action to correct'.
    ZEN means 'good'


                               “LEAN GURU” AND THE
                               FATHER OF CONTINUOUS
                               IMPROVEMENT (CI)
1.   Quality
2.   Effort
3.   Involvement of all employees
4.   Willingness to change
5.   Communication
1.   Seiko- Tidiness/Proper arrangement
2.   Seiton- Orderliness
3.   Seiso- Cleanliness
4.   Seiketsu- Personal cleanliness
5.   Shitsuke- Discipline
   Identification of materials, equipment and
    tools, data and information which are
    necessary or not necessary
   Discarding or giving another destination to
    unnecessary items and providing the necessary
    space for the necessary items which you
    require to perform the necessary task
   It is not only essential to tidy the place but also
    arrange them in the orderly fashion.
   Every equipment or data or anything should be
    placed in its appropriate and unique place.
    It reduces confusion and avoids wastage of
    time.
   Apart from a place being tidy and orderly it
    should be clean.
   The shop floor should be free of wastage , oil
    spills, cotton wastes, etc.
   The tools , machines and the entire
    organization should be free from dirt.
   Organization should also identify and
    eliminate any source of dirt, dust or trash.
   Maintaining good sanitary conditions and
    maintaining good personal hygiene.
   A person should be clean and his cloths should
    be clean.
   Seiketsu also talks about keeping good sanitary
    conditions in common places in an
    organization such as bathrooms, toilets,
    kitchen, etc.
   Self discipline is the best disciplining strategy were
    one doesn’t need an external authority to
    discipline oneself.
   Job discipline is the habit and skill development to
    perform the job according to standards, to observe
    company rules and policies at all times, fulfill
    required, written and other informal specification
    and requirement in the organization.
   This habit of discipline is developed as a result of
    excursing mental, moral and physical strength.
   Acceptance quality level is an inspection standard
    describing the maximum number of defects that could
    be considered acceptable during the random
    sampling of an inspection.
   The defects found during inspection are sometimes
    classified into three levels: critical, major and minor.
    Critical defects are those that render the product
    unsafe or hazardous for the end user.
    Major defects can result in the product's failure,
    reducing its marketability, usability or saleability.
   Minor defects do not affect the product's marketability
    or usability, but represent workmanship defects that
    make the product fall short of defined quality
    standards.
   This is a method of cost reduction and
    productivity improvement.
   The employees are working in the
    organization at different levels.
   While on the job they get number of ideas
    in their mind to do some improvements.
   Every improvement yields some gains
   To garner these gains suggestion scheme is
    implemented.
1.   Scheme Coordinator
2.   Suggestion Scheme Committee
3.   The Suggestion Evaluator
4.   The Suggestor
1.   Appoint suggestion committee and suggestion
     coordinator .
2.   The suggestion committee should create suitable rules
      to suit the company culture. These rules can be later
     amended.
3.   The form is prepared and got printed
4.   Total sincerity and transparency should be displayed
5.    Take the membership of
     (INSSAN INDIAN NATIONAL
     SUGGESTION SCHEMES ASSOCIATION)
   Give a subject for each month Motivate
    employees to think about that subject.
    Provide basic data for utilities
    that company is using.
   Give token gift for each given suggestion.
   Annual awards for different purposes can
    be announced
   Respond to all written suggestions
    immediately in writing.
   High light the suggestions publicly.
   Award to be given immediately for best
    suggestions.
   Establish categories for regular awards.
   Awarding presentation should be big function.
   Kaizen are generally a group activity
   Suggestion Scheme is an individual activity
   Kaizen focuses on pain areas
   Suggestion scheme aims at cost reduction
   Kaizen is small continuous improvement
   Suggestion Scheme can give big benefits
   Kaizen motivates employees and suggestion
    scheme focuses on award for cost reduction
A stem and leaf diagram provides a visual
summary of your data.
This diagram provides a partial sorting of the
data and allows you to detect the distributional
pattern of the data.
   Split the data into two pieces, stem and leaf.
   Arrange the stems from low to high.
   Attach each leaf to the appropriate stem.
Question:-    29 students were set a simple task. Their completion times
                 to the nearest second were:
                 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49
                 42 58 65 45 44 43 51 45 38 46 44 52 43 47
             (a) set these data into a stem and leaf diagram
             (b) find the median time taken

Answer (a):-    (1) key: 4|7 means 47
                (2) put values into preliminary diagram:
                    Completion times

                    3
                    4
  stem
                    5                        leaf
                    6
                    7
Question:-    29 students were set a simple task. Their completion times
                 to the nearest second were:
                 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49
                 42 58 65 45 44 43 51 45 38 46 44 52 43 47
             (a) set these data into a stem and leaf diagram
             (b) find the median

Answer (a):-    (1) key: 4|7 means 47
                (2) put values into preliminary diagram:
                    Completion times

                    3
                    4      7
                    5
                    6
                    7
Question:-    29 students were set a simple task. Their completion times
                 to the nearest second were:
                 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49
                 42 58 65 45 44 43 51 45 38 46 44 52 43 47
             (a) set these data into a stem and leaf diagram
             (b) find the median

Answer (a):-    (1) key: 4|7 means 47
                (2) put values into preliminary diagram:
                    Completion times

                    3
                    4      7
                    5
                    6      1
                    7
Question:-    29 students were set a simple task. Their completion times
                 to the nearest second were:
                 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49
                 42 58 65 45 44 43 51 45 38 46 44 52 43 47
             (a) set these data into a stem and leaf diagram
             (b) find the median

Answer (a):-    (1) key: 4|7 means 47
                (2) put values into preliminary diagram:
                    Completion times

                    3
                    4      7
                    5      3
                    6      1
                    7
Question:-    29 students were set a simple task. Their completion times
                 to the nearest second were:
                 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49
                 42 58 65 45 44 43 51 45 38 46 44 52 43 47
             (a) set these data into a stem and leaf diagram
             (b) find the median

Answer (a):-    (1) key: 4|7 means 47
                (2) put values into preliminary diagram:
                    Completion times

                    3
                    4      7 3
                    5      3
                    6      1
                    7
Question:-    29 students were set a simple task. Their completion times
                 to the nearest second were:
                 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49
                 42 58 65 45 44 43 51 45 38 46 44 52 43 47
             (a) set these data into a stem and leaf diagram
             (b) find the median

Answer (a):-    (1) key: 4|7 means 47
                (2) put values into preliminary diagram:
                    Completion times

                    3
                    4      7 3 6
                    5      3
                    6      1
                    7
Question:-    29 students were set a simple task. Their completion times
                 to the nearest second were:
                 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49
                 42 58 65 45 44 43 51 45 38 46 44 52 43 47
             (a) set these data into a stem and leaf diagram
             (b) find the median

Answer (a):-    (1) key: 4|7 means 47
                (2) put values into preliminary diagram:
                    Completion times

                    3
                    4      7 3 6 6
                    5      3
                    6      1
                    7
Question:-    29 students were set a simple task. Their completion times
                 to the nearest second were:
                 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49
                 42 58 65 45 44 43 51 45 38 46 44 52 43 47
             (a) set these data into a stem and leaf diagram
             (b) find the median

Answer (a):-    (1) key: 4|7 means 47
                (2) put values into preliminary diagram:
                    Completion times

                    3
                    4      7 3 6 6
                    5      3
                    6      1 8
                    7
Question:-    29 students were set a simple task. Their completion times
                 to the nearest second were:
                 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49
                 42 58 65 45 44 43 51 45 38 46 44 52 43 47
             (a) set these data into a stem and leaf diagram
             (b) find the median

Answer (a):-    (1) key: 4|7 means 47
                (2) put values into preliminary diagram:
                    Completion times

                    3
                    4      7 3 6 6 8
                    5      3
                    6      1 8
                    7
Question:-    29 students were set a simple task. Their completion times
                 to the nearest second were:
                 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49
                 42 58 65 45 44 43 51 45 38 46 44 52 43 47
             (a) set these data into a stem and leaf diagram
             (b) find the median

Answer (a):-    (1) key: 4|7 means 47
                (2) put values into preliminary diagram:
                    Completion times

                    3
                    4      7 3 6 6 8
                    5      3
                    6      1 8
                    7      2
Question:-    29 students were set a simple task. Their completion times
                 to the nearest second were:
                 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49
                 42 58 65 45 44 43 51 45 38 46 44 52 43 47
             (a) set these data into a stem and leaf diagram
             (b) find the median

Answer (a):-    (1) key: 4|7 means 47
                (2) put values into preliminary diagram:
                    Completion times

                    3
                    4      7 3 6 6 8
                    5      3 7
                    6      1 8
                    7      2
Question:-    29 students were set a simple task. Their completion times
                 to the nearest second were:
                 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49
                 42 58 65 45 44 43 51 45 38 46 44 52 43 47
             (a) set these data into a stem and leaf diagram
             (b) find the median

Answer (a):-    (1) key: 4|7 means 47
                (2) put values into preliminary diagram:
                    Completion times

                    3
                    4      7 3 6 6 8 8 1 9
                    5      3 7 4
                    6      1 8 3
                    7      2
Question:-    29 students were set a simple task. Their completion times
                 to the nearest second were:
                 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49
                 42 58 65 45 44 43 51 45 38 46 44 52 43 47
             (a) set these data into a stem and leaf diagram
             (b) find the median

Answer (a):-    (1) key: 4|7 means 47
                (2) put values into preliminary diagram:
                    Completion times

                    3
                    4      7 3 6 6 8 8 1 9 2
                    5      3 7 4
                    6      1 8 3
                    7      2
Question:-    29 students were set a simple task. Their completion times
                 to the nearest second were:
                 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49
                 42 58 65 45 44 43 51 45 38 46 44 52 43 47
             (a) set these data into a stem and leaf diagram
             (b) find the median

Answer (a):-    (1) key: 4|7 means 47
                (2) put values into preliminary diagram:
                    Completion times

                    3
                    4      7 3 6 6 8 8 1 9 2
                    5      3 7 4 8
                    6      1 8 3
                    7      2
Question:-    29 students were set a simple task. Their completion times
                 to the nearest second were:
                 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49
                 42 58 65 45 44 43 51 45 38 46 44 52 43 47
             (a) set these data into a stem and leaf diagram
             (b) find the median

Answer (a):-    (1) key: 4|7 means 47
                (2) put values into preliminary diagram:
                    Completion times

                    3
                    4      7 3 6 6 8 8 1 9 2
                    5      3 7 4 8
                    6      1 8 3 5
                    7      2
Question:-    29 students were set a simple task. Their completion times
                 to the nearest second were:
                 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49
                 42 58 65 45 44 43 51 45 38 46 44 52 43 47
             (a) set these data into a stem and leaf diagram
             (b) find the median

Answer (a):-    (1) key: 4|7 means 47
                (2) put values into preliminary diagram:
                    Completion times

                    3
                    4      7 3 6 6 8 8 1 9 2 5
                    5      3 7 4 8
                    6      1 8 3 5
                    7      2
Question:-    29 students were set a simple task. Their completion times
                 to the nearest second were:
                 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49
                 42 58 65 45 44 43 51 45 38 46 44 52 43 47
             (a) set these data into a stem and leaf diagram
             (b) find the median, quartiles and inter-quartile range

Answer (a):-    (1) key: 4|7 means 47
                (2) put values into preliminary diagram:
                    Completion times

                    3
                    4      7 3 6 6 8 8 1 9 2 5 4
                    5      3 7 4 8
                    6      1 8 3 5
                    7      2
Question:-    29 students were set a simple task. Their completion times
                 to the nearest second were:
                 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49
                 42 58 65 45 44 43 51 45 38 46 44 52 43 47
             (a) set these data into a stem and leaf diagram
             (b) find the median

Answer (a):-    (1) key: 4|7 means 47
                (2) put values into preliminary diagram:
                    Completion times

                    3
                    4      7 3 6 6 8 8 1 9 2 5 4 3
                    5      3 7 4 8
                    6      1 8 3 5
                    7      2
Question:-    29 students were set a simple task. Their completion times
                 to the nearest second were:
                 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49
                 42 58 65 45 44 43 51 45 38 46 44 52 43 47
             (a) set these data into a stem and leaf diagram
             (b) find the median

Answer (a):-    (1) key: 4|7 means 47
                (2) put values into preliminary diagram:
                    Completion times

                    3
                    4      7 3 6 6 8 8 1 9 2 5 4 3
                    5      3 7 4 8 1
                    6      1 8 3 5
                    7      2
Question:-    29 students were set a simple task. Their completion times
                 to the nearest second were:
                 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49
                 42 58 65 45 44 43 51 45 38 46 44 52 43 47
             (a) set these data into a stem and leaf diagram
             (b) find the median

Answer (a):-    (1) key: 4|7 means 47
                (2) put values into preliminary diagram:
                    Completion times

                    3
                    4      7 3 6 6 8 8 1 9 2 5 4 3 5
                    5      3 7 4 8 1
                    6      1 8 3 5
                    7      2
Question:-    29 students were set a simple task. Their completion times
                 to the nearest second were:
                 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49
                 42 58 65 45 44 43 51 45 38 46 44 52 43 47
             (a) set these data into a stem and leaf diagram
             (b) find the median

Answer (a):-    (1) key: 4|7 means 47
                (2) put values into preliminary diagram:
                    Completion times

                    3      8
                    4      7 3 6 6 8 8 1 9 2 5 4 3 5
                    5      3 7 4 8 1
                    6      1 8 3 5
                    7      2
Question:-    29 students were set a simple task. Their completion times
                 to the nearest second were:
                 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49
                 42 58 65 45 44 43 51 45 38 46 44 52 43 47
             (a) set these data into a stem and leaf diagram
             (b) find the median

Answer (a):-    (1) key: 4|7 means 47
                (2) put values into preliminary diagram:
                    Completion times

                    3      8
                    4      7 3 6 6 8 8 1 9 2 5 4 3 5 6
                    5      3 7 4 8 1
                    6      1 8 3 5
                    7      2
Question:-    29 students were set a simple task. Their completion times
                 to the nearest second were:
                 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49
                 42 58 65 45 44 43 51 45 38 46 44 52 43 47
             (a) set these data into a stem and leaf diagram
             (b) find the median

Answer (a):-    (1) key: 4|7 means 47
                (2) put values into preliminary diagram:
                    Completion times

                    3      8
                    4      7 3 6 6 8 8 1 9 2 5 4 3 5 6 4
                    5      3 7 4 8 1
                    6      1 8 3 5
                    7      2
Question:-    29 students were set a simple task. Their completion times
                 to the nearest second were:
                 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49
                 42 58 65 45 44 43 51 45 38 46 44 52 43 47
             (a) set these data into a stem and leaf diagram
             (b) find the median

Answer (a):-    (1) key: 4|7 means 47
                (2) put values into preliminary diagram:
                    Completion times

                    3      8
                    4      7 3 6 6 8 8 1 9 2 5 4 3 5 6 4
                    5      3 7 4 8 1 2
                    6      1 8 3 5
                    7      2
Question:-    29 students were set a simple task. Their completion times
                 to the nearest second were:
                 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49
                 42 58 65 45 44 43 51 45 38 46 44 52 43 47
             (a) set these data into a stem and leaf diagram
             (b) find the median

Answer (a):-    (1) key: 4|7 means 47
                (2) put values into preliminary diagram:
                    Completion times

                    3      8
                    4      7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3
                    5      3 7 4 8 1 2
                    6      1 8 3 5
                    7      2
Question:-    29 students were set a simple task. Their completion times
                 to the nearest second were:
                 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49
                 42 58 65 45 44 43 51 45 38 46 44 52 43 47
             (a) set these data into a stem and leaf diagram
             (b) find the median

Answer (a):-    (1) key: 4|7 means 47
                (2) put values into preliminary diagram:
                    Completion times

                    3      8
                    4      7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7
                    5      3 7 4 8 1 2
                    6      1 8 3 5
                    7      2
Question:-    29 students were set a simple task. Their completion times
                 to the nearest second were:
                 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49
                 42 58 65 45 44 43 51 45 38 46 44 52 43 47
             (a) set these data into a stem and leaf diagram
             (b) find the median

Answer (a):-    (1) key: 4|7 means 47
                (2) put values into preliminary diagram:
                    Completion times

                    3      8
                    4      7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7
                    5      3 7 4 8 1 2
                    6      1 8 3 5
                    7      2
                (3) re draw diagram with leafs in numerical order:
Answer (a):-   (3) re draw diagram with leafs in numerical order:
          Completion times

           3     8
           4     7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7
           5     3 7 4 8 1 2
           6     1 8 3 5
           7     2

          Completion times

           3
           4
           5
           6
           7
Answer (a):-   (3) re draw diagram with leafs in numerical order:
          Completion times

           3     8
           4     7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7
           5     3 7 4 8 1 2
           6     1 8 3 5
           7     2

          Completion times

           3     8
           4
           5
           6
           7
Answer (a):-   (3) re draw diagram with leafs in numerical order:
          Completion times

           3     8
           4     7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7
           5     3 7 4 8 1 2
           6     1 8 3 5
           7     2

          Completion times

           3     8
           4     1
           5
           6
           7
Answer (a):-   (3) re draw diagram with leafs in numerical order:
          Completion times

           3     8
           4     7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7
           5     3 7 4 8 1 2
           6     1 8 3 5
           7     2

          Completion times

           3     8
           4     1 2
           5
           6
           7
Answer (a):-   (3) re draw diagram with leafs in numerical order:
          Completion times

           3     8
           4     7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7
           5     3 7 4 8 1 2
           6     1 8 3 5
           7     2

          Completion times

           3     8
           4     1 2 3
           5
           6
           7
Answer (a):-   (3) re draw diagram with leafs in numerical order:
          Completion times

           3     8
           4     7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7
           5     3 7 4 8 1 2
           6     1 8 3 5
           7     2

          Completion times

           3     8
           4     1 2 3 3
           5
           6
           7
Answer (a):-   (3) re draw diagram with leafs in numerical order:
          Completion times

           3     8
           4     7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7
           5     3 7 4 8 1 2
           6     1 8 3 5
           7     2

          Completion times

           3     8
           4     1 2 3 3 3
           5
           6
           7
Answer (a):-   (3) re draw diagram with leafs in numerical order:
          Completion times

           3     8
           4     7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7
           5     3 7 4 8 1 2
           6     1 8 3 5
           7     2

          Completion times

           3     8
           4     1 2 3 3 3 4
           5
           6
           7
Answer (a):-   (3) re draw diagram with leafs in numerical order:
          Completion times

           3     8
           4     7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7
           5     3 7 4 8 1 2
           6     1 8 3 5
           7     2

          Completion times

           3     8
           4     1 2 3 3 3 4 4
           5
           6
           7
Answer (a):-   (3) re draw diagram with leafs in numerical order:
          Completion times

           3     8
           4     7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7
           5     3 7 4 8 1 2
           6     1 8 3 5
           7     2

          Completion times

           3     8
           4     1 2 3 3 3 4 4 5
           5
           6
           7
Answer (a):-   (3) re draw diagram with leafs in numerical order:
          Completion times

           3     8
           4     7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7
           5     3 7 4 8 1 2
           6     1 8 3 5
           7     2

          Completion times

           3     8
           4     1 2 3 3 3 4 4 5 5
           5
           6
           7
Answer (a):-   (3) re draw diagram with leafs in numerical order:
          Completion times

           3     8
           4     7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7
           5     3 7 4 8 1 2
           6     1 8 3 5
           7     2

          Completion times

           3     8
           4     1 2 3 3 3 4 4 5 5 6
           5
           6
           7
Answer (a):-   (3) re draw diagram with leafs in numerical order:
          Completion times

           3     8
           4     7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7
           5     3 7 4 8 1 2
           6     1 8 3 5
           7     2

          Completion times

           3     8
           4     1 2 3 3 3 4 4 5 5 6 6
           5
           6
           7
Answer (a):-   (3) re draw diagram with leafs in numerical order:
          Completion times

           3     8
           4     7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7
           5     3 7 4 8 1 2
           6     1 8 3 5
           7     2

          Completion times

           3     8
           4     1 2 3 3 3 4 4 5 5 6 6 6
           5
           6
           7
Answer (a):-   (3) re draw diagram with leafs in numerical order:
          Completion times

           3     8
           4     7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7
           5     3 7 4 8 1 2
           6     1 8 3 5
           7     2

          Completion times

           3     8
           4     1 2 3 3 3 4 4 5 5 6 6 6 7
           5
           6
           7
Answer (a):-   (3) re draw diagram with leafs in numerical order:
          Completion times

           3     8
           4     7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7
           5     3 7 4 8 1 2
           6     1 8 3 5
           7     2

          Completion times

           3     8
           4     1 2 3 3 3 4 4 5 5 6 6 6 7 7
           5
           6
           7
Answer (a):-   (3) re draw diagram with leafs in numerical order:
          Completion times

           3     8
           4     7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7
           5     3 7 4 8 1 2
           6     1 8 3 5
           7     2

          Completion times

           3     8
           4     1 2 3 3 3 4 4 5 5 6 6 6 7 7 8
           5
           6
           7
Answer (a):-   (3) re draw diagram with leafs in numerical order:
          Completion times

           3     8
           4     7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7
           5     3 7 4 8 1 2
           6     1 8 3 5
           7     2

          Completion times

           3     8
           4     1 2 3 3 3 4 4 5 5 6 6 6 7 7 8 8
           5
           6
           7
Answer (a):-   (3) re draw diagram with leafs in numerical order:
          Completion times

           3     8
           4     7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7
           5     3 7 4 8 1 2
           6     1 8 3 5
           7     2

          Completion times

           3     8
           4     1 2 3 3 3 4 4 5 5 6 6 6 7 7 8 8 9
           5
           6
           7
Answer (a):-   (3) re draw diagram with leafs in numerical order:
          Completion times

           3     8
           4     7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7
           5     3 7 4 8 1 2
           6     1 8 3 5
           7     2

          Completion times

           3     8
           4     1 2 3 3 3 4 4 5 5 6 6 6 7 7 8 8 9
           5     1
           6
           7
Answer (a):-   (3) re draw diagram with leafs in numerical order:
          Completion times

           3     8
           4     7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7
           5     3 7 4 8 1 2
           6     1 8 3 5
           7     2

          Completion times

           3     8
           4     1 2 3 3 3 4 4 5 5 6 6 6 7 7 8 8 9
           5     1 2
           6
           7
Answer (a):-   (3) re draw diagram with leafs in numerical order:
          Completion times

           3     8
           4     7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7
           5     3 7 4 8 1 2
           6     1 8 3 5
           7     2

          Completion times

           3     8
           4     1 2 3 3 3 4 4 5 5 6 6 6 7 7 8 8 9
           5     1 2 3
           6
           7
Answer (a):-   (3) re draw diagram with leafs in numerical order:
          Completion times

           3     8
           4     7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7
           5     3 7 4 8 1 2
           6     1 8 3 5
           7     2

          Completion times

           3     8
           4     1 2 3 3 3 4 4 5 5 6 6 6 7 7 8 8 9
           5     1 2 3 4
           6
           7
Answer (a):-   (3) re draw diagram with leafs in numerical order:
          Completion times

           3     8
           4     7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7
           5     3 7 4 8 1 2
           6     1 8 3 5
           7     2

          Completion times

           3     8
           4     1 2 3 3 3 4 4 5 5 6 6 6 7 7 8 8 9
           5     1 2 3 4 7
           6
           7
Answer (a):-   (3) re draw diagram with leafs in numerical order:
          Completion times

           3     8
           4     7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7
           5     3 7 4 8 1 2
           6     1 8 3 5
           7     2

          Completion times

           3     8
           4     1 2 3 3 3 4 4 5 5 6 6 6 7 7 8 8 9
           5     1 2 3 4 7 8
           6
           7
Answer (a):-   (3) re draw diagram with leafs in numerical order:
          Completion times

           3     8
           4     7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7
           5     3 7 4 8 1 2
           6     1 8 3 5
           7     2

          Completion times

           3     8
           4     1 2 3 3 3 4 4 5 5 6 6 6 7 7 8 8 9
           5     1 2 3 4 7 8
           6
           7
Answer (a):-   (3) re draw diagram with leafs in numerical order:
          Completion times

           3     8
           4     7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7
           5     3 7 4 8 1 2
           6     1 8 3 5
           7     2

          Completion times

           3     8
           4     1 2 3 3 3 4 4 5 5 6 6 6 7 7 8 8 9
           5     1 2 3 4 7 8
           6     1
           7
Answer (a):-   (3) re draw diagram with leafs in numerical order:
          Completion times

           3     8
           4     7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7
           5     3 7 4 8 1 2
           6     1 8 3 5
           7     2

          Completion times

           3     8
           4     1 2 3 3 3 4 4 5 5 6 6 6 7 7 8 8 9
           5     1 2 3 4 7 8
           6     1 3
           7
Answer (a):-   (3) re draw diagram with leafs in numerical order:
          Completion times

           3     8
           4     7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7
           5     3 7 4 8 1 2
           6     1 8 3 5
           7     2

          Completion times

           3     8
           4     1 2 3 3 3 4 4 5 5 6 6 6 7 7 8 8 9
           5     1 2 3 4 7 8
           6     1 3 5
           7
Answer (a):-   (3) re draw diagram with leafs in numerical order:
          Completion times

           3     8
           4     7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7
           5     3 7 4 8 1 2
           6     1 8 3 5
           7     2

          Completion times

           3     8
           4     1 2 3 3 3 4 4 5 5 6 6 6 7 7 8 8 9
           5     1 2 3 4 7 8
           6     1 3 5 8
           7
Answer (a):-   (3) re draw diagram with leafs in numerical order:
          Completion times

           3     8
           4     7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7
           5     3 7 4 8 1 2
           6     1 8 3 5
           7     2

          Completion times
                                     4|7 means 47
           3     8
           4     1 2 3 3 3 4 4 5 5 6 6 6 7 7 8 8 9
           5     1 2 3 4 7 8
           6     1 3 5 8
           7     2
Answer (b):-
    Completion times      4|7 means 47

     3      8                                     15th
     4      1 2 3 3 3 4 4 5 5 6 6 6 7 7 8 8 9
     5      1 2 3 4 7 8
     6      1 3 5 8
     7      2

  The median is the middle value: There are 29 values

            29 1                i.e. 15th value
              2                            Median = 47
Answer (b):-
                       Range = Highest - Lowest

               Completion times      4|7 means 47
 Lowest
               3       8
               4       1 2 3 3 3 4 4 5 5 6 6 6 7 7 8 8 9
               5       1 2 3 4 7 8
               6       1 3 5 8
Highest
               7       2



                        Range = 72 – 38 = 34
Thank you

Weitere ähnliche Inhalte

Kürzlich hochgeladen

Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
Joaquim Jorge
 

Kürzlich hochgeladen (20)

Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
Deploy with confidence: VMware Cloud Foundation 5.1 on next gen Dell PowerEdg...
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data DiscoveryTrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
TrustArc Webinar - Unlock the Power of AI-Driven Data Discovery
 

Empfohlen

How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
ThinkNow
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
Kurio // The Social Media Age(ncy)
 

Empfohlen (20)

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPT
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage Engineerings
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 

QC Tools By Mahima Prasad

  • 1.
  • 2. Kaizen is a system in which every employee is encouraged to come up with small improvement suggestions in their area of work on a regular basis  This is a continuous exercise
  • 3. INTRODUCTION:  Masaaki Imai is known as the developer of Kaizen  KAI means 'change' or 'the action to correct'.  ZEN means 'good' “LEAN GURU” AND THE FATHER OF CONTINUOUS IMPROVEMENT (CI)
  • 4. 1. Quality 2. Effort 3. Involvement of all employees 4. Willingness to change 5. Communication
  • 5. 1. Seiko- Tidiness/Proper arrangement 2. Seiton- Orderliness 3. Seiso- Cleanliness 4. Seiketsu- Personal cleanliness 5. Shitsuke- Discipline
  • 6. Identification of materials, equipment and tools, data and information which are necessary or not necessary  Discarding or giving another destination to unnecessary items and providing the necessary space for the necessary items which you require to perform the necessary task
  • 7. It is not only essential to tidy the place but also arrange them in the orderly fashion.  Every equipment or data or anything should be placed in its appropriate and unique place.  It reduces confusion and avoids wastage of time.
  • 8. Apart from a place being tidy and orderly it should be clean.  The shop floor should be free of wastage , oil spills, cotton wastes, etc.  The tools , machines and the entire organization should be free from dirt.  Organization should also identify and eliminate any source of dirt, dust or trash.
  • 9. Maintaining good sanitary conditions and maintaining good personal hygiene.  A person should be clean and his cloths should be clean.  Seiketsu also talks about keeping good sanitary conditions in common places in an organization such as bathrooms, toilets, kitchen, etc.
  • 10. Self discipline is the best disciplining strategy were one doesn’t need an external authority to discipline oneself.  Job discipline is the habit and skill development to perform the job according to standards, to observe company rules and policies at all times, fulfill required, written and other informal specification and requirement in the organization.  This habit of discipline is developed as a result of excursing mental, moral and physical strength.
  • 11. Acceptance quality level is an inspection standard describing the maximum number of defects that could be considered acceptable during the random sampling of an inspection.  The defects found during inspection are sometimes classified into three levels: critical, major and minor.  Critical defects are those that render the product unsafe or hazardous for the end user.  Major defects can result in the product's failure, reducing its marketability, usability or saleability.  Minor defects do not affect the product's marketability or usability, but represent workmanship defects that make the product fall short of defined quality standards.
  • 12. This is a method of cost reduction and productivity improvement.  The employees are working in the organization at different levels.  While on the job they get number of ideas in their mind to do some improvements.  Every improvement yields some gains  To garner these gains suggestion scheme is implemented.
  • 13. 1. Scheme Coordinator 2. Suggestion Scheme Committee 3. The Suggestion Evaluator 4. The Suggestor
  • 14. 1. Appoint suggestion committee and suggestion coordinator . 2. The suggestion committee should create suitable rules to suit the company culture. These rules can be later amended. 3. The form is prepared and got printed 4. Total sincerity and transparency should be displayed 5. Take the membership of (INSSAN INDIAN NATIONAL SUGGESTION SCHEMES ASSOCIATION)
  • 15. Give a subject for each month Motivate employees to think about that subject.  Provide basic data for utilities that company is using.  Give token gift for each given suggestion.  Annual awards for different purposes can be announced
  • 16. Respond to all written suggestions immediately in writing.  High light the suggestions publicly.  Award to be given immediately for best suggestions.  Establish categories for regular awards.  Awarding presentation should be big function.
  • 17. Kaizen are generally a group activity  Suggestion Scheme is an individual activity  Kaizen focuses on pain areas  Suggestion scheme aims at cost reduction  Kaizen is small continuous improvement  Suggestion Scheme can give big benefits  Kaizen motivates employees and suggestion scheme focuses on award for cost reduction
  • 18. A stem and leaf diagram provides a visual summary of your data. This diagram provides a partial sorting of the data and allows you to detect the distributional pattern of the data.
  • 19. Split the data into two pieces, stem and leaf.  Arrange the stems from low to high.  Attach each leaf to the appropriate stem.
  • 20. Question:- 29 students were set a simple task. Their completion times to the nearest second were: 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49 42 58 65 45 44 43 51 45 38 46 44 52 43 47 (a) set these data into a stem and leaf diagram (b) find the median time taken Answer (a):- (1) key: 4|7 means 47 (2) put values into preliminary diagram: Completion times 3 4 stem 5 leaf 6 7
  • 21. Question:- 29 students were set a simple task. Their completion times to the nearest second were: 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49 42 58 65 45 44 43 51 45 38 46 44 52 43 47 (a) set these data into a stem and leaf diagram (b) find the median Answer (a):- (1) key: 4|7 means 47 (2) put values into preliminary diagram: Completion times 3 4 7 5 6 7
  • 22. Question:- 29 students were set a simple task. Their completion times to the nearest second were: 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49 42 58 65 45 44 43 51 45 38 46 44 52 43 47 (a) set these data into a stem and leaf diagram (b) find the median Answer (a):- (1) key: 4|7 means 47 (2) put values into preliminary diagram: Completion times 3 4 7 5 6 1 7
  • 23. Question:- 29 students were set a simple task. Their completion times to the nearest second were: 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49 42 58 65 45 44 43 51 45 38 46 44 52 43 47 (a) set these data into a stem and leaf diagram (b) find the median Answer (a):- (1) key: 4|7 means 47 (2) put values into preliminary diagram: Completion times 3 4 7 5 3 6 1 7
  • 24. Question:- 29 students were set a simple task. Their completion times to the nearest second were: 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49 42 58 65 45 44 43 51 45 38 46 44 52 43 47 (a) set these data into a stem and leaf diagram (b) find the median Answer (a):- (1) key: 4|7 means 47 (2) put values into preliminary diagram: Completion times 3 4 7 3 5 3 6 1 7
  • 25. Question:- 29 students were set a simple task. Their completion times to the nearest second were: 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49 42 58 65 45 44 43 51 45 38 46 44 52 43 47 (a) set these data into a stem and leaf diagram (b) find the median Answer (a):- (1) key: 4|7 means 47 (2) put values into preliminary diagram: Completion times 3 4 7 3 6 5 3 6 1 7
  • 26. Question:- 29 students were set a simple task. Their completion times to the nearest second were: 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49 42 58 65 45 44 43 51 45 38 46 44 52 43 47 (a) set these data into a stem and leaf diagram (b) find the median Answer (a):- (1) key: 4|7 means 47 (2) put values into preliminary diagram: Completion times 3 4 7 3 6 6 5 3 6 1 7
  • 27. Question:- 29 students were set a simple task. Their completion times to the nearest second were: 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49 42 58 65 45 44 43 51 45 38 46 44 52 43 47 (a) set these data into a stem and leaf diagram (b) find the median Answer (a):- (1) key: 4|7 means 47 (2) put values into preliminary diagram: Completion times 3 4 7 3 6 6 5 3 6 1 8 7
  • 28. Question:- 29 students were set a simple task. Their completion times to the nearest second were: 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49 42 58 65 45 44 43 51 45 38 46 44 52 43 47 (a) set these data into a stem and leaf diagram (b) find the median Answer (a):- (1) key: 4|7 means 47 (2) put values into preliminary diagram: Completion times 3 4 7 3 6 6 8 5 3 6 1 8 7
  • 29. Question:- 29 students were set a simple task. Their completion times to the nearest second were: 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49 42 58 65 45 44 43 51 45 38 46 44 52 43 47 (a) set these data into a stem and leaf diagram (b) find the median Answer (a):- (1) key: 4|7 means 47 (2) put values into preliminary diagram: Completion times 3 4 7 3 6 6 8 5 3 6 1 8 7 2
  • 30. Question:- 29 students were set a simple task. Their completion times to the nearest second were: 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49 42 58 65 45 44 43 51 45 38 46 44 52 43 47 (a) set these data into a stem and leaf diagram (b) find the median Answer (a):- (1) key: 4|7 means 47 (2) put values into preliminary diagram: Completion times 3 4 7 3 6 6 8 5 3 7 6 1 8 7 2
  • 31. Question:- 29 students were set a simple task. Their completion times to the nearest second were: 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49 42 58 65 45 44 43 51 45 38 46 44 52 43 47 (a) set these data into a stem and leaf diagram (b) find the median Answer (a):- (1) key: 4|7 means 47 (2) put values into preliminary diagram: Completion times 3 4 7 3 6 6 8 8 1 9 5 3 7 4 6 1 8 3 7 2
  • 32. Question:- 29 students were set a simple task. Their completion times to the nearest second were: 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49 42 58 65 45 44 43 51 45 38 46 44 52 43 47 (a) set these data into a stem and leaf diagram (b) find the median Answer (a):- (1) key: 4|7 means 47 (2) put values into preliminary diagram: Completion times 3 4 7 3 6 6 8 8 1 9 2 5 3 7 4 6 1 8 3 7 2
  • 33. Question:- 29 students were set a simple task. Their completion times to the nearest second were: 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49 42 58 65 45 44 43 51 45 38 46 44 52 43 47 (a) set these data into a stem and leaf diagram (b) find the median Answer (a):- (1) key: 4|7 means 47 (2) put values into preliminary diagram: Completion times 3 4 7 3 6 6 8 8 1 9 2 5 3 7 4 8 6 1 8 3 7 2
  • 34. Question:- 29 students were set a simple task. Their completion times to the nearest second were: 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49 42 58 65 45 44 43 51 45 38 46 44 52 43 47 (a) set these data into a stem and leaf diagram (b) find the median Answer (a):- (1) key: 4|7 means 47 (2) put values into preliminary diagram: Completion times 3 4 7 3 6 6 8 8 1 9 2 5 3 7 4 8 6 1 8 3 5 7 2
  • 35. Question:- 29 students were set a simple task. Their completion times to the nearest second were: 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49 42 58 65 45 44 43 51 45 38 46 44 52 43 47 (a) set these data into a stem and leaf diagram (b) find the median Answer (a):- (1) key: 4|7 means 47 (2) put values into preliminary diagram: Completion times 3 4 7 3 6 6 8 8 1 9 2 5 5 3 7 4 8 6 1 8 3 5 7 2
  • 36. Question:- 29 students were set a simple task. Their completion times to the nearest second were: 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49 42 58 65 45 44 43 51 45 38 46 44 52 43 47 (a) set these data into a stem and leaf diagram (b) find the median, quartiles and inter-quartile range Answer (a):- (1) key: 4|7 means 47 (2) put values into preliminary diagram: Completion times 3 4 7 3 6 6 8 8 1 9 2 5 4 5 3 7 4 8 6 1 8 3 5 7 2
  • 37. Question:- 29 students were set a simple task. Their completion times to the nearest second were: 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49 42 58 65 45 44 43 51 45 38 46 44 52 43 47 (a) set these data into a stem and leaf diagram (b) find the median Answer (a):- (1) key: 4|7 means 47 (2) put values into preliminary diagram: Completion times 3 4 7 3 6 6 8 8 1 9 2 5 4 3 5 3 7 4 8 6 1 8 3 5 7 2
  • 38. Question:- 29 students were set a simple task. Their completion times to the nearest second were: 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49 42 58 65 45 44 43 51 45 38 46 44 52 43 47 (a) set these data into a stem and leaf diagram (b) find the median Answer (a):- (1) key: 4|7 means 47 (2) put values into preliminary diagram: Completion times 3 4 7 3 6 6 8 8 1 9 2 5 4 3 5 3 7 4 8 1 6 1 8 3 5 7 2
  • 39. Question:- 29 students were set a simple task. Their completion times to the nearest second were: 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49 42 58 65 45 44 43 51 45 38 46 44 52 43 47 (a) set these data into a stem and leaf diagram (b) find the median Answer (a):- (1) key: 4|7 means 47 (2) put values into preliminary diagram: Completion times 3 4 7 3 6 6 8 8 1 9 2 5 4 3 5 5 3 7 4 8 1 6 1 8 3 5 7 2
  • 40. Question:- 29 students were set a simple task. Their completion times to the nearest second were: 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49 42 58 65 45 44 43 51 45 38 46 44 52 43 47 (a) set these data into a stem and leaf diagram (b) find the median Answer (a):- (1) key: 4|7 means 47 (2) put values into preliminary diagram: Completion times 3 8 4 7 3 6 6 8 8 1 9 2 5 4 3 5 5 3 7 4 8 1 6 1 8 3 5 7 2
  • 41. Question:- 29 students were set a simple task. Their completion times to the nearest second were: 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49 42 58 65 45 44 43 51 45 38 46 44 52 43 47 (a) set these data into a stem and leaf diagram (b) find the median Answer (a):- (1) key: 4|7 means 47 (2) put values into preliminary diagram: Completion times 3 8 4 7 3 6 6 8 8 1 9 2 5 4 3 5 6 5 3 7 4 8 1 6 1 8 3 5 7 2
  • 42. Question:- 29 students were set a simple task. Their completion times to the nearest second were: 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49 42 58 65 45 44 43 51 45 38 46 44 52 43 47 (a) set these data into a stem and leaf diagram (b) find the median Answer (a):- (1) key: 4|7 means 47 (2) put values into preliminary diagram: Completion times 3 8 4 7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 5 3 7 4 8 1 6 1 8 3 5 7 2
  • 43. Question:- 29 students were set a simple task. Their completion times to the nearest second were: 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49 42 58 65 45 44 43 51 45 38 46 44 52 43 47 (a) set these data into a stem and leaf diagram (b) find the median Answer (a):- (1) key: 4|7 means 47 (2) put values into preliminary diagram: Completion times 3 8 4 7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 5 3 7 4 8 1 2 6 1 8 3 5 7 2
  • 44. Question:- 29 students were set a simple task. Their completion times to the nearest second were: 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49 42 58 65 45 44 43 51 45 38 46 44 52 43 47 (a) set these data into a stem and leaf diagram (b) find the median Answer (a):- (1) key: 4|7 means 47 (2) put values into preliminary diagram: Completion times 3 8 4 7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 5 3 7 4 8 1 2 6 1 8 3 5 7 2
  • 45. Question:- 29 students were set a simple task. Their completion times to the nearest second were: 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49 42 58 65 45 44 43 51 45 38 46 44 52 43 47 (a) set these data into a stem and leaf diagram (b) find the median Answer (a):- (1) key: 4|7 means 47 (2) put values into preliminary diagram: Completion times 3 8 4 7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7 5 3 7 4 8 1 2 6 1 8 3 5 7 2
  • 46. Question:- 29 students were set a simple task. Their completion times to the nearest second were: 47 61 53 43 46 46 68 48 72 57 48 54 41 63 49 42 58 65 45 44 43 51 45 38 46 44 52 43 47 (a) set these data into a stem and leaf diagram (b) find the median Answer (a):- (1) key: 4|7 means 47 (2) put values into preliminary diagram: Completion times 3 8 4 7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7 5 3 7 4 8 1 2 6 1 8 3 5 7 2 (3) re draw diagram with leafs in numerical order:
  • 47. Answer (a):- (3) re draw diagram with leafs in numerical order: Completion times 3 8 4 7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7 5 3 7 4 8 1 2 6 1 8 3 5 7 2 Completion times 3 4 5 6 7
  • 48. Answer (a):- (3) re draw diagram with leafs in numerical order: Completion times 3 8 4 7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7 5 3 7 4 8 1 2 6 1 8 3 5 7 2 Completion times 3 8 4 5 6 7
  • 49. Answer (a):- (3) re draw diagram with leafs in numerical order: Completion times 3 8 4 7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7 5 3 7 4 8 1 2 6 1 8 3 5 7 2 Completion times 3 8 4 1 5 6 7
  • 50. Answer (a):- (3) re draw diagram with leafs in numerical order: Completion times 3 8 4 7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7 5 3 7 4 8 1 2 6 1 8 3 5 7 2 Completion times 3 8 4 1 2 5 6 7
  • 51. Answer (a):- (3) re draw diagram with leafs in numerical order: Completion times 3 8 4 7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7 5 3 7 4 8 1 2 6 1 8 3 5 7 2 Completion times 3 8 4 1 2 3 5 6 7
  • 52. Answer (a):- (3) re draw diagram with leafs in numerical order: Completion times 3 8 4 7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7 5 3 7 4 8 1 2 6 1 8 3 5 7 2 Completion times 3 8 4 1 2 3 3 5 6 7
  • 53. Answer (a):- (3) re draw diagram with leafs in numerical order: Completion times 3 8 4 7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7 5 3 7 4 8 1 2 6 1 8 3 5 7 2 Completion times 3 8 4 1 2 3 3 3 5 6 7
  • 54. Answer (a):- (3) re draw diagram with leafs in numerical order: Completion times 3 8 4 7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7 5 3 7 4 8 1 2 6 1 8 3 5 7 2 Completion times 3 8 4 1 2 3 3 3 4 5 6 7
  • 55. Answer (a):- (3) re draw diagram with leafs in numerical order: Completion times 3 8 4 7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7 5 3 7 4 8 1 2 6 1 8 3 5 7 2 Completion times 3 8 4 1 2 3 3 3 4 4 5 6 7
  • 56. Answer (a):- (3) re draw diagram with leafs in numerical order: Completion times 3 8 4 7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7 5 3 7 4 8 1 2 6 1 8 3 5 7 2 Completion times 3 8 4 1 2 3 3 3 4 4 5 5 6 7
  • 57. Answer (a):- (3) re draw diagram with leafs in numerical order: Completion times 3 8 4 7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7 5 3 7 4 8 1 2 6 1 8 3 5 7 2 Completion times 3 8 4 1 2 3 3 3 4 4 5 5 5 6 7
  • 58. Answer (a):- (3) re draw diagram with leafs in numerical order: Completion times 3 8 4 7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7 5 3 7 4 8 1 2 6 1 8 3 5 7 2 Completion times 3 8 4 1 2 3 3 3 4 4 5 5 6 5 6 7
  • 59. Answer (a):- (3) re draw diagram with leafs in numerical order: Completion times 3 8 4 7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7 5 3 7 4 8 1 2 6 1 8 3 5 7 2 Completion times 3 8 4 1 2 3 3 3 4 4 5 5 6 6 5 6 7
  • 60. Answer (a):- (3) re draw diagram with leafs in numerical order: Completion times 3 8 4 7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7 5 3 7 4 8 1 2 6 1 8 3 5 7 2 Completion times 3 8 4 1 2 3 3 3 4 4 5 5 6 6 6 5 6 7
  • 61. Answer (a):- (3) re draw diagram with leafs in numerical order: Completion times 3 8 4 7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7 5 3 7 4 8 1 2 6 1 8 3 5 7 2 Completion times 3 8 4 1 2 3 3 3 4 4 5 5 6 6 6 7 5 6 7
  • 62. Answer (a):- (3) re draw diagram with leafs in numerical order: Completion times 3 8 4 7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7 5 3 7 4 8 1 2 6 1 8 3 5 7 2 Completion times 3 8 4 1 2 3 3 3 4 4 5 5 6 6 6 7 7 5 6 7
  • 63. Answer (a):- (3) re draw diagram with leafs in numerical order: Completion times 3 8 4 7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7 5 3 7 4 8 1 2 6 1 8 3 5 7 2 Completion times 3 8 4 1 2 3 3 3 4 4 5 5 6 6 6 7 7 8 5 6 7
  • 64. Answer (a):- (3) re draw diagram with leafs in numerical order: Completion times 3 8 4 7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7 5 3 7 4 8 1 2 6 1 8 3 5 7 2 Completion times 3 8 4 1 2 3 3 3 4 4 5 5 6 6 6 7 7 8 8 5 6 7
  • 65. Answer (a):- (3) re draw diagram with leafs in numerical order: Completion times 3 8 4 7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7 5 3 7 4 8 1 2 6 1 8 3 5 7 2 Completion times 3 8 4 1 2 3 3 3 4 4 5 5 6 6 6 7 7 8 8 9 5 6 7
  • 66. Answer (a):- (3) re draw diagram with leafs in numerical order: Completion times 3 8 4 7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7 5 3 7 4 8 1 2 6 1 8 3 5 7 2 Completion times 3 8 4 1 2 3 3 3 4 4 5 5 6 6 6 7 7 8 8 9 5 1 6 7
  • 67. Answer (a):- (3) re draw diagram with leafs in numerical order: Completion times 3 8 4 7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7 5 3 7 4 8 1 2 6 1 8 3 5 7 2 Completion times 3 8 4 1 2 3 3 3 4 4 5 5 6 6 6 7 7 8 8 9 5 1 2 6 7
  • 68. Answer (a):- (3) re draw diagram with leafs in numerical order: Completion times 3 8 4 7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7 5 3 7 4 8 1 2 6 1 8 3 5 7 2 Completion times 3 8 4 1 2 3 3 3 4 4 5 5 6 6 6 7 7 8 8 9 5 1 2 3 6 7
  • 69. Answer (a):- (3) re draw diagram with leafs in numerical order: Completion times 3 8 4 7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7 5 3 7 4 8 1 2 6 1 8 3 5 7 2 Completion times 3 8 4 1 2 3 3 3 4 4 5 5 6 6 6 7 7 8 8 9 5 1 2 3 4 6 7
  • 70. Answer (a):- (3) re draw diagram with leafs in numerical order: Completion times 3 8 4 7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7 5 3 7 4 8 1 2 6 1 8 3 5 7 2 Completion times 3 8 4 1 2 3 3 3 4 4 5 5 6 6 6 7 7 8 8 9 5 1 2 3 4 7 6 7
  • 71. Answer (a):- (3) re draw diagram with leafs in numerical order: Completion times 3 8 4 7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7 5 3 7 4 8 1 2 6 1 8 3 5 7 2 Completion times 3 8 4 1 2 3 3 3 4 4 5 5 6 6 6 7 7 8 8 9 5 1 2 3 4 7 8 6 7
  • 72. Answer (a):- (3) re draw diagram with leafs in numerical order: Completion times 3 8 4 7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7 5 3 7 4 8 1 2 6 1 8 3 5 7 2 Completion times 3 8 4 1 2 3 3 3 4 4 5 5 6 6 6 7 7 8 8 9 5 1 2 3 4 7 8 6 7
  • 73. Answer (a):- (3) re draw diagram with leafs in numerical order: Completion times 3 8 4 7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7 5 3 7 4 8 1 2 6 1 8 3 5 7 2 Completion times 3 8 4 1 2 3 3 3 4 4 5 5 6 6 6 7 7 8 8 9 5 1 2 3 4 7 8 6 1 7
  • 74. Answer (a):- (3) re draw diagram with leafs in numerical order: Completion times 3 8 4 7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7 5 3 7 4 8 1 2 6 1 8 3 5 7 2 Completion times 3 8 4 1 2 3 3 3 4 4 5 5 6 6 6 7 7 8 8 9 5 1 2 3 4 7 8 6 1 3 7
  • 75. Answer (a):- (3) re draw diagram with leafs in numerical order: Completion times 3 8 4 7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7 5 3 7 4 8 1 2 6 1 8 3 5 7 2 Completion times 3 8 4 1 2 3 3 3 4 4 5 5 6 6 6 7 7 8 8 9 5 1 2 3 4 7 8 6 1 3 5 7
  • 76. Answer (a):- (3) re draw diagram with leafs in numerical order: Completion times 3 8 4 7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7 5 3 7 4 8 1 2 6 1 8 3 5 7 2 Completion times 3 8 4 1 2 3 3 3 4 4 5 5 6 6 6 7 7 8 8 9 5 1 2 3 4 7 8 6 1 3 5 8 7
  • 77. Answer (a):- (3) re draw diagram with leafs in numerical order: Completion times 3 8 4 7 3 6 6 8 8 1 9 2 5 4 3 5 6 4 3 7 5 3 7 4 8 1 2 6 1 8 3 5 7 2 Completion times 4|7 means 47 3 8 4 1 2 3 3 3 4 4 5 5 6 6 6 7 7 8 8 9 5 1 2 3 4 7 8 6 1 3 5 8 7 2
  • 78. Answer (b):- Completion times 4|7 means 47 3 8 15th 4 1 2 3 3 3 4 4 5 5 6 6 6 7 7 8 8 9 5 1 2 3 4 7 8 6 1 3 5 8 7 2 The median is the middle value: There are 29 values 29 1 i.e. 15th value 2 Median = 47
  • 79. Answer (b):- Range = Highest - Lowest Completion times 4|7 means 47 Lowest 3 8 4 1 2 3 3 3 4 4 5 5 6 6 6 7 7 8 8 9 5 1 2 3 4 7 8 6 1 3 5 8 Highest 7 2 Range = 72 – 38 = 34