SlideShare ist ein Scribd-Unternehmen logo
1 von 5
Downloaden Sie, um offline zu lesen
International Journal of Environmental & Agriculture Research (IJOEAR) ISSN:[2454-1850] [Vol-3, Issue-1, January- 2017]
Page | 136
Example of management of water resources for agricultural
irrigation
Carla Caroça
PhP in Geology, specializing in Hydrogeology by University of Lisbon, Science Faculty, Lisbon, Portugal
Abstract— Water is a natural resource vital to life, economic development and social welfare. The National Water Plan
resulting from the transposition of the Water Framework Directive, has as an objective: benefit the existing irrigated, with
the aim of making more efficient use of water, in particular, with regard to reducing losses, storage, transport and
distribution of water, its application in soil and the rationalization of consumption. [1]. Portugal, in Aveiro, between Nazaré
and Alcobaça council, has an area with a simple irrigation system for irrigation, called Cela hydro-agricultural profit.
Keywords— irrigation, water, agriculture, Portugal, management.
I. INTRODUCTION
Agriculture is one of the essential activities for the production of food and for the economic and social development of rural
communities. The demand for irrigation water throughout the year, in quantity and quality, leads to the need for the
construction of hydraulic structures with the objective of extracting and distributing water from the water resources to the
cultivated areas. [2]
Portugal has as its environmental objective the socio-economic and environmental sustainability of water resources. One of
the examples of the Water Resources Management Plan (PGRH), implemented in Portugal, is Cela Agricultural Instigation
Work, which in Law-Decree number 86/2002 of April 6, from chapter XX – Concession, article 102nd
, passed to write Cela
Hidro-agricultural Profit, instead of Hidro-agricultural Instigation. This work, begun in 1940, continues to this day.
II. LOCATION
The Cela Hidro-agricultural Profit is located in the Famalicão Valley, covering part of the Alcobaça river and the alluvial
lowlands of the basin bounded by the Pescaria and Bárrio mountains, in the parish of Famalicão of the municipality of
Nazaré (104 ha) and in the parishes Cela and Bárrio in the municipality of Alcobaça (377 ha), in the district of Leiria,
making a total area of 481ha. (Fig. 1)
The area where the Hydro-agricultural Profit is located corresponds to an alluvial plain basically constituted by holocenic
formations composed of sediments transported by the waters and deposited in the basin, of very low dimensions and
physiographically very flat. The terrain measures vary between 0 and 6 m. [3]
The most representative crops installed in the Cela Profit in recent years are horticulture, orchards and other crops with little
representation. The average distribution of the crops is 65% of horticultural, 20% of orchard and 15% of other crops, being
the one that consumes more water the horticultural ones. [4]
International Journal of Environmental & Agriculture Research (IJOEAR) ISSN:[2454-1850] [Vol-3, Issue-1, January- 2017]
Page | 137
FIGURE 1 – CELA HYDRO-AGRICULTURAL PROFIT LOCATION. (VÁRZEA DA NAZARÉ IS THE AREA
OCCUPIED BY THE OLD PEDERNEIRA LAGOON THAT SETTLED FROM THE 18TH CENTURY, AND IS FILLED
WITH ALLUVIAL SEDIMENTS OF THE QUATERNARY.)
III. CELA HYDRO-AGRICULTURAL PROFIT
Hydro-agricultural works, using the definition of a work of hydroagricultural Instigation Work, are works of «use of public
water for irrigation, watering or sealing, drainage and defense of land for agricultural purposes, adaptation to irrigated land
benefited, irrigation improvement and the appropriate agrarian structuring» (Law-Decree number 269/82 of July 10). At the
International Journal of Environmental & Agriculture Research (IJOEAR) ISSN:[2454-1850] [Vol-3, Issue-1, January- 2017]
Page | 138
moment it is defined as being «the set of hydro-agricultural infrastructure and its equipment, areas that were acquired and
expropriated for its implantation, as well as other real estate identified in the respective regulation» (article 2nd
, paragraph a,
of Decree number 1473/2007 of 15 November).
The area of Cela Hydro-agriculture Profit consists of the following infrastructures:
 Cela movable dam (photo 1, station 1 in Fig. 1),
 Distributor channel of the Alcobaça River or main channel,
 Flood Waist Valve, also referred to as the Flood Defense Collector (around the perimeter of hydro-agricultural Profit),
 North and south elevated irrigation channels (also known as northern and southern collectors) (parallel to the flood
defense collector and within the perimeter of the hydro-agricultural profit),
 Small beam dam (deactivate),
 Irrigation and drainage system integrating channels and irrigation ditch,
 Drainage elevation station (in this there are two buoys to measure the piezometer level, which is not registered due to
lack of personnel and/or funding to allocate to the programmer a printer). (station 6 in Fig. 1).
The water intake of the Alcobaça river is made by means of a nozzle with a rectangular section equipped with an automatic
damper provided by an electric automatism controlled by a mobile phone, [5], installed in the reservoir at Km 4, [4], without
the need for pumping. The entrance is protected by a fixed metal grille, without cleaning grills. [5]. The maximum discharge
at the outlet of the dam, according to the Association of Beneficiaries of Cela is variable according to the current of the river,
hence it is difficult to estimate the cubic meters per hour. This flow will feed the main channel, Paúl da Cela, and at the end
the surplus returns to the river Alcobaça. Along this route, the main channel is subdivided firstly by two irrigation channels,
the north and the south. From these, there are several channels for patch of ground irrigation.
After watering, drain excess water in the patch of ground to avoid flooding. For this purpose, the elevation station located
near the VCI of Nazaré (photo 5, station 6 in Fig. 1) is used to remove the water from the site with a maximum discharge
(project horizon) of 0,222m3
/s to the Alcobaça. [4]
The management of the Cela Hydro-agricultural Profit was delivered to the Cela Beneficiaries Association based on a
concession contract for the 'private use of the public water domain' for a period of 20 years, 'under the terms of article 69st
of
Law number 58/2005 of December 29, and in article 35st
of Decree-Law number 226-A/2007 of May 31’, made between
Administração de Recursos Hídricos (ARH) Tejo IP and the Direcção Geral da Agricultura e Desenvolvimento Rural
(DGADR), in 2011.
Therefore, the Association has to fulfill certain obligations, such as:
 Maintain in perfect operation the infrastructures and the estates assigned to the concession;
 Facilitate water consumption for new users;
 Respect the precautionary measures of the competent authorities in flood periods;
 Informing any changes to the state of water captation that prevents its use in Agência Portuguesa do Ambiente (APA),
I.P.;
 Comply with the provisions of article 78st
of Decree-Law number 226-A/2007 of May 31 regarding the final
destination of materials resulting from the cleaning of irrigation channels;
 Know and apply up-to-date national and international standards;
 Inform about changes in the type of crops and the fertilization system and phytopharmaceuticals used;
 To elaborate, define and present emergency prevention and mitigation measures in the face of various possible
accidents in watering and in hydraulic infrastructures;
International Journal of Environmental & Agriculture Research (IJOEAR) ISSN:[2454-1850] [Vol-3, Issue-1, January- 2017]
Page | 139
 Develop a monitoring plan about water resource used, fertilizers products and phytopharmaceuticals, and the patch of
ground to be irrigated. [4]
In addition, the Cela Beneficiaries Association is subject to water resources tax, water utility tariffs and program contracts
related to water resources management. [2]
IV. DISCUSSION
The Association initiated the payment of the water resources tax in 2010, but disagrees with this rate. Claiming that the use
of water is done by closing a gate in the Alcobaça river bed and proceeding to its distribution by trenches and by cement
aerial channels. It considers that the calculation formula in the law does not apply to the situation of this irrigation system
based on gravity, without pressure, and there being no alternative to this payment suggested the existence of three counters.
One at the water entrance of the Alcobaça river and the other two at the exits of the north channel and the south channel, in
the discharges to the flood defense collector. The difference between the outlet value for the flood defense collector and the
value of the water intake in the perimeter would give an approximate value of the discharge consumed, taking into account
that not all water is used, since there are loss of around 30%, due to the occurrence of infiltrations and evaporations along the
course.
The Continent Rural Development Program 2014-2020, version 1, dated 28 October 1983, prepared by the Sea and
Agricultural Ministry in the politics planning Cabinet, includes Cela Hydro-agricultural Profit in the Priority Intervention of
'Sub-Action 2 – Improvement of the existing irrigation efficiency'. To 'improve and update the existing hydro-agriculture
utilization in order to reduce losses in water transport and distribution, to promote storage reinforcement and more efficient
techniques in conjunction with more energy-efficient solutions and the introduction of new technologies'. According to this
program, the modernization of older profits will have an impact on productivity and water management, introducing water
and energy savings, and investment in this area should focus in particular on:
 Introduction of water conduction and distribution systems leading to the reduction of unused water fractions;
 Modernization and automation of equipment already installed;
 Rehabilitation of installed infrastructures in order to improve the efficiency of their management and exploration,
reducing water losses;
 Promotion and installation of new technologies, namely in water and irrigation management, such as automation,
telemanagement, remote monitoring and geographic information systems and water quality monitoring.
The introduction of more efficient water supply and distribution systems presupposes the minimization of impacts on the
environment, preservation of the water lines and natural values present, water monitoring, landscape integration and water
management, as inseparable from the sustainability of public irrigation. Likewise, the modernization of water pumping and
energy production equipment associated with the management of hydro-agricultural profits aims at increasing the energy
efficiency of these profits, with consequent environmental gains, in particular in terms of reducing consumption of fossil
fuels and reduction of greenhouse gas emissions. [6]
V. CONCLUSION
The Water Law (Law number 58/2005, of 29 December, altered for Law-decree number 130/2012 of 22 June) and the Water
Framework Directive (WFD) (transposed Directive 2000/60/EC of the European Parliament and of the Council of 23
October) do not mention hydro-agricultural works, but rather, hydraulic infrastructures. Hydraulic infrastructures are 'works
or assemblies of works, installations or equipment installed on a fixed basis in beds or banks intended to allow the use of
water for the purposes of the general interest' (article 4st
, paragraph ee, Law-decree number 1301/2012 of 22 June). They
require the expropriation of small patch of ground for the placement of primary and secondary pipelines, lift stations, dams,
reservoirs and other hydraulic infrastructures. (Example: Cova da Beira Hydraulic Infrastructures). [7]. These are more
expensive works than the works of hydro-agricultural Profit. As the Water Law and the WFD did not repeal Law-decree
number 269/82 of 10 July, nor its alterations, this "remains as the set of standards and reference principles for hydro-
agricultural profits and areas benefited" [8], changed to Law-decree number 86/2002 of April 6, and this one, in turn, was
changed to Law-decree number 169/2005 of September 26. [2]
International Journal of Environmental & Agriculture Research (IJOEAR) ISSN:[2454-1850] [Vol-3, Issue-1, January- 2017]
Page | 140
The author considers the "hydro-agricultural profit works" (Law-decree number 86/2002 of 6 April, based on article 102nd
)
useful and which should be considered in agricultural activities as current practices, not only for better irrigation efficiency
and production of agricultural products, but also for the management and preservation of water resources throughout the
year. However, if other entities responsible for water resources (Agência Portuguesa do Ambiente, IP and Autarquias) do not
comply with the requirements of the legislation on the preservation of the environment and the quality of water for human
consumption and irrigation, such as: non-control on the introduction of wastewater into water lines and soil and the lack of
cleaning and reprofiling of water lines, agricultural production is impaired.
Good planning and management of water resources is achieved when the various public and private entities, professionals,
researchers and students work together and/or share informations.
ACKNOWLEDGEMENTS
The author is grateful to the Science & Technology Foundation (FCT) for the support given through the granting of a PhD
Scholarship (SFRH/BD/70957/2010), to the President Carlos Malhó of the Cela Beneficiaries Association for the
photographs and the information provided. And also, to the representatives of the Water Resources Admnistration (ARH)
Associations, now Environmental Portuguese Agence (APA) and to all who contributed to the elaboration of this work.
REFERENCES
[1] MAOTDR, “PEASAR – Plano Estratégico de Abastecimento de Água e de Saneamento de Águas Residuais 2007 – 2013, S.I.”,
Longoalcance Production, Gestão de Imagem e Comunicação, Lda, 1st
ed., Gráfica Maiadouro, Maia, 2007,pp.172
[2] Caroça, C., “Plano de Gestão de Recursos Hídricos na Várzea da Nazaré - Obra de Fomento Hidroagrícola em Paúl da Cela”.Final
Written Work in the scope of the Post-Graduate Water Law Course of the Institute of Political Juridical Sciences of the Faculty of
Law of the University of Lisbon, Lisbon, 2012e
, 31 p.; (http://www.icjp.pt/sites/default/files/papers/carla_caroca.pdf);
[3] COBA, “Projecto de Execução da Reabilitação e Modernização da Rede de Rega e Açudes de Derivação do Aproveitamento
Hidroagrícola de Cela”, Volume 2 – Rede de Rega e Sistema de Automatização e Controlo. Tomo 2.1 – Memória Descritiva e
Justificativa. (Rev01-28/03/2005), [Lisboa?], Ministry of Agriculture, Fisheries and Forestry, Institute of Rural Development and
Hydraulics Rehabilitation and Modernization of Irrigation Network and Dam of Derivation of Cela Hydro-agricultural Profit , 2005,
pp.167
[4] CONTRATO DE CONCESSÃO ARHT/0021.11/T/C.CA.S, Concession Agreement regarding the use of water resources for the
abstraction of surface water intended for irrigation in the hydroelectric exploitation of Cela, [Lisbon?], 2011, pp.78
[5] DOCUMENT PROVIDED BY THE ASSOCIATION, on “Technical Characterization of the Cela Hydro-agricultural Profit”,
undated.
[6] GPP, “Programa do Desenvolvimento Rural Continente 2014-2020”, Decision C (2014) 9896 of 12 December 2014; Ministry of
Agriculture and the Sea, Office of Planning, Policies and General Administration, Lisbon, Portugal, 2014, 415p.;
(https://www.portugal2020.pt/Portal2020/Media/Default/Docs/Programas%20Operacionais/VERSOES%20CONSULTA/PDR%2020
20_integral.pdf; 20/01/2017)
[7] Mota, A.C., Santos, A. M., “Aproveitamento Hidroagrícola da Cova da Beira – Eficiência como garantia de futuro”, APRH
Technical Conferences, The Engineering of Hydro-agricultural Profits: current and future challenges, Lisbon, 2011, 16p.;
(http://sir.dgadr.pt/conteudos/jornadas_aph/apresentacoes/s1/10.pdf; 08/10/2014)
[8] Folque, A., “Recursos Hídricos e Ordenamento do Território: o regime jurídico das Obras de Fomento Hidroagrícola”, Notes from
the 14th session of the Water Law course at the Institute of Legal and Political Sciences, University of Lisbon, 2012, p. 25.

Weitere ähnliche Inhalte

Was ist angesagt?

South Carolina Botanical Garden Detention Pond Implementation and Prairie Res...
South Carolina Botanical Garden Detention Pond Implementation and Prairie Res...South Carolina Botanical Garden Detention Pond Implementation and Prairie Res...
South Carolina Botanical Garden Detention Pond Implementation and Prairie Res...
colbycofield
 
1-4_Presentation bav conference may 2012
1-4_Presentation bav conference may 20121-4_Presentation bav conference may 2012
1-4_Presentation bav conference may 2012
YWPBulgaria
 
Integrated watershed managment
Integrated watershed managmentIntegrated watershed managment
Integrated watershed managment
Janak Shah
 
Guidelines for Santee Water Efficient Landscape
Guidelines for Santee Water Efficient LandscapeGuidelines for Santee Water Efficient Landscape
Guidelines for Santee Water Efficient Landscape
Fujita64g
 
Xiaolan Zhang - Hai River Basin Presentation
Xiaolan Zhang - Hai River Basin PresentationXiaolan Zhang - Hai River Basin Presentation
Xiaolan Zhang - Hai River Basin Presentation
Iwl Pcu
 
Marcopper Boac River Update
Marcopper Boac River UpdateMarcopper Boac River Update
Marcopper Boac River Update
Ronald Recidoro
 
Overview of water panning in queensland, kaylene power
Overview of water panning in queensland, kaylene powerOverview of water panning in queensland, kaylene power
Overview of water panning in queensland, kaylene power
International WaterCentre
 

Was ist angesagt? (20)

Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)
 
Dams introduction
Dams  introductionDams  introduction
Dams introduction
 
South Carolina Botanical Garden Detention Pond Implementation and Prairie Res...
South Carolina Botanical Garden Detention Pond Implementation and Prairie Res...South Carolina Botanical Garden Detention Pond Implementation and Prairie Res...
South Carolina Botanical Garden Detention Pond Implementation and Prairie Res...
 
South Carolina Botanical Garden Detention Pond Implementation and Prairie Res...
South Carolina Botanical Garden Detention Pond Implementation and Prairie Res...South Carolina Botanical Garden Detention Pond Implementation and Prairie Res...
South Carolina Botanical Garden Detention Pond Implementation and Prairie Res...
 
Capstone Senior Design Final Presentation
Capstone Senior Design Final PresentationCapstone Senior Design Final Presentation
Capstone Senior Design Final Presentation
 
Watershed management and development
Watershed management and developmentWatershed management and development
Watershed management and development
 
1-4_Presentation bav conference may 2012
1-4_Presentation bav conference may 20121-4_Presentation bav conference may 2012
1-4_Presentation bav conference may 2012
 
Integrated watershed managment
Integrated watershed managmentIntegrated watershed managment
Integrated watershed managment
 
Kanaha Pond Wildlife Sanctuary - Wetland in Jeopardy - Water Restoration and ...
Kanaha Pond Wildlife Sanctuary - Wetland in Jeopardy - Water Restoration and ...Kanaha Pond Wildlife Sanctuary - Wetland in Jeopardy - Water Restoration and ...
Kanaha Pond Wildlife Sanctuary - Wetland in Jeopardy - Water Restoration and ...
 
Guidelines for Santee Water Efficient Landscape
Guidelines for Santee Water Efficient LandscapeGuidelines for Santee Water Efficient Landscape
Guidelines for Santee Water Efficient Landscape
 
T7: SUSTAINABLE WATERSHED MANAGEMENT: AN ESSENTIAL COMPONENT OF INTEGRATED ...
T7: SUSTAINABLE  WATERSHED MANAGEMENT: AN ESSENTIAL COMPONENT  OF INTEGRATED ...T7: SUSTAINABLE  WATERSHED MANAGEMENT: AN ESSENTIAL COMPONENT  OF INTEGRATED ...
T7: SUSTAINABLE WATERSHED MANAGEMENT: AN ESSENTIAL COMPONENT OF INTEGRATED ...
 
Mr.Singh IEWP @ Workshop on River Basin Management Planning and Governance,14...
Mr.Singh IEWP @ Workshop on River Basin Management Planning and Governance,14...Mr.Singh IEWP @ Workshop on River Basin Management Planning and Governance,14...
Mr.Singh IEWP @ Workshop on River Basin Management Planning and Governance,14...
 
Urban watershed management
Urban watershed managementUrban watershed management
Urban watershed management
 
Xiaolan Zhang - Hai River Basin Presentation
Xiaolan Zhang - Hai River Basin PresentationXiaolan Zhang - Hai River Basin Presentation
Xiaolan Zhang - Hai River Basin Presentation
 
Irrigation Management for Sustainable Crop Production  
Irrigation Management for Sustainable Crop Production  Irrigation Management for Sustainable Crop Production  
Irrigation Management for Sustainable Crop Production  
 
Underground Injection Well Overview, Lorrie Council
Underground Injection Well Overview, Lorrie CouncilUnderground Injection Well Overview, Lorrie Council
Underground Injection Well Overview, Lorrie Council
 
Watershed management
Watershed managementWatershed management
Watershed management
 
WATERSHED MANAGEMENT
WATERSHED MANAGEMENTWATERSHED MANAGEMENT
WATERSHED MANAGEMENT
 
Marcopper Boac River Update
Marcopper Boac River UpdateMarcopper Boac River Update
Marcopper Boac River Update
 
Overview of water panning in queensland, kaylene power
Overview of water panning in queensland, kaylene powerOverview of water panning in queensland, kaylene power
Overview of water panning in queensland, kaylene power
 

Andere mochten auch

Lance Bankston Accounting Resume
Lance Bankston Accounting ResumeLance Bankston Accounting Resume
Lance Bankston Accounting Resume
Lance Bankston
 
Equilibrio Orcamentario Gastar Menos Do Que Se Ganha Dica6
Equilibrio Orcamentario Gastar Menos Do Que Se Ganha Dica6Equilibrio Orcamentario Gastar Menos Do Que Se Ganha Dica6
Equilibrio Orcamentario Gastar Menos Do Que Se Ganha Dica6
myfreecomm
 
Safety Management Systems (SMS) Fundamentals: Framework Guidance
Safety Management Systems (SMS) Fundamentals: Framework GuidanceSafety Management Systems (SMS) Fundamentals: Framework Guidance
Safety Management Systems (SMS) Fundamentals: Framework Guidance
FAA Safety Team Central Florida
 

Andere mochten auch (20)

Скачать новейшые программы на вормикс
Скачать новейшые программы на вормиксСкачать новейшые программы на вормикс
Скачать новейшые программы на вормикс
 
co:op-READ-Convention Marburg - Katrin Marx-Jaskulski
co:op-READ-Convention Marburg - Katrin Marx-Jaskulskico:op-READ-Convention Marburg - Katrin Marx-Jaskulski
co:op-READ-Convention Marburg - Katrin Marx-Jaskulski
 
Sales Training Seminar: CEO Sales Strategy Seminar
Sales Training Seminar: CEO Sales Strategy Seminar Sales Training Seminar: CEO Sales Strategy Seminar
Sales Training Seminar: CEO Sales Strategy Seminar
 
co:op-READ-Convention Marburg - Milena Dobreva
co:op-READ-Convention Marburg - Milena Dobrevaco:op-READ-Convention Marburg - Milena Dobreva
co:op-READ-Convention Marburg - Milena Dobreva
 
Секреты и коды для вормикса
Секреты и коды для вормиксаСекреты и коды для вормикса
Секреты и коды для вормикса
 
Lance Bankston Accounting Resume
Lance Bankston Accounting ResumeLance Bankston Accounting Resume
Lance Bankston Accounting Resume
 
Equilibrio Orcamentario Gastar Menos Do Que Se Ganha Dica6
Equilibrio Orcamentario Gastar Menos Do Que Se Ganha Dica6Equilibrio Orcamentario Gastar Menos Do Que Se Ganha Dica6
Equilibrio Orcamentario Gastar Menos Do Que Se Ganha Dica6
 
Баг рубин в вормиксе
Баг рубин в вормиксеБаг рубин в вормиксе
Баг рубин в вормиксе
 
Definitions of quality
Definitions of qualityDefinitions of quality
Definitions of quality
 
Modelagem de Negócios Inovadores - Back-End do Modelo de Negócios
Modelagem de Negócios Inovadores - Back-End do Modelo de NegóciosModelagem de Negócios Inovadores - Back-End do Modelo de Negócios
Modelagem de Negócios Inovadores - Back-End do Modelo de Negócios
 
Jussi Nuorteva - Power of Open Data in Archives
Jussi Nuorteva - Power of Open Data in Archives Jussi Nuorteva - Power of Open Data in Archives
Jussi Nuorteva - Power of Open Data in Archives
 
Parcel management system - Proposal
Parcel management system - ProposalParcel management system - Proposal
Parcel management system - Proposal
 
E-commerce Packaging and Shipping
E-commerce Packaging and ShippingE-commerce Packaging and Shipping
E-commerce Packaging and Shipping
 
Pabellón de Siemens
Pabellón de SiemensPabellón de Siemens
Pabellón de Siemens
 
Parcel management system - presentation
Parcel management system - presentationParcel management system - presentation
Parcel management system - presentation
 
Armand vallin feigenbaum (control total de calidad) (1)
Armand vallin feigenbaum (control total de calidad) (1)Armand vallin feigenbaum (control total de calidad) (1)
Armand vallin feigenbaum (control total de calidad) (1)
 
Safety Management Systems (SMS) Fundamentals: Framework Guidance
Safety Management Systems (SMS) Fundamentals: Framework GuidanceSafety Management Systems (SMS) Fundamentals: Framework Guidance
Safety Management Systems (SMS) Fundamentals: Framework Guidance
 
Lean Six Sigma Mistake-Proofing Process Training Module
Lean Six Sigma Mistake-Proofing Process Training ModuleLean Six Sigma Mistake-Proofing Process Training Module
Lean Six Sigma Mistake-Proofing Process Training Module
 
Safety Risk Management Example
Safety Risk Management ExampleSafety Risk Management Example
Safety Risk Management Example
 
Courier Management System By Mukesh
Courier Management System By MukeshCourier Management System By Mukesh
Courier Management System By Mukesh
 

Ähnlich wie Example of management of water resources for agricultural irrigation

CONSERVATION OF WATER IN AGRICULTURE AND INDUSTRIAL SECTORS - 2003
CONSERVATION OF WATER IN AGRICULTURE AND INDUSTRIAL SECTORS - 2003CONSERVATION OF WATER IN AGRICULTURE AND INDUSTRIAL SECTORS - 2003
CONSERVATION OF WATER IN AGRICULTURE AND INDUSTRIAL SECTORS - 2003
IWRS Society
 
Implementation of ecosystem approach for improving wetlands management in kaz...
Implementation of ecosystem approach for improving wetlands management in kaz...Implementation of ecosystem approach for improving wetlands management in kaz...
Implementation of ecosystem approach for improving wetlands management in kaz...
Nurgul Alipinova
 
ranjith_major_project_2333.pptx
ranjith_major_project_2333.pptxranjith_major_project_2333.pptx
ranjith_major_project_2333.pptx
19TK1132
 
T10 karuppan sakadevan on land and water management in near east and north a...
T10 karuppan sakadevan  on land and water management in near east and north a...T10 karuppan sakadevan  on land and water management in near east and north a...
T10 karuppan sakadevan on land and water management in near east and north a...
NENAwaterscarcity
 
Ses 3 wg2_molinos_econ_distrissueslowerebro
Ses 3 wg2_molinos_econ_distrissueslowerebroSes 3 wg2_molinos_econ_distrissueslowerebro
Ses 3 wg2_molinos_econ_distrissueslowerebro
Volkmar Hartje
 
Abengoa-FB Side Event – Emilio Custodio, UPC, 14th January, 2015 UN Water Con...
Abengoa-FB Side Event – Emilio Custodio, UPC, 14th January, 2015 UN Water Con...Abengoa-FB Side Event – Emilio Custodio, UPC, 14th January, 2015 UN Water Con...
Abengoa-FB Side Event – Emilio Custodio, UPC, 14th January, 2015 UN Water Con...
water-decade
 

Ähnlich wie Example of management of water resources for agricultural irrigation (20)

CONSERVATION OF WATER IN AGRICULTURE AND INDUSTRIAL SECTORS - 2003
CONSERVATION OF WATER IN AGRICULTURE AND INDUSTRIAL SECTORS - 2003CONSERVATION OF WATER IN AGRICULTURE AND INDUSTRIAL SECTORS - 2003
CONSERVATION OF WATER IN AGRICULTURE AND INDUSTRIAL SECTORS - 2003
 
Conservation of water in agriculture and industrial sectors
Conservation of water in agriculture and industrial sectorsConservation of water in agriculture and industrial sectors
Conservation of water in agriculture and industrial sectors
 
IRJET- A Review on Sustainable Development of Rainwater Harvesting System in ...
IRJET- A Review on Sustainable Development of Rainwater Harvesting System in ...IRJET- A Review on Sustainable Development of Rainwater Harvesting System in ...
IRJET- A Review on Sustainable Development of Rainwater Harvesting System in ...
 
Mr. Carlos Benitez Sanz IEWP @ Workshop on Water allocation, water economics ...
Mr. Carlos Benitez Sanz IEWP @ Workshop on Water allocation, water economics ...Mr. Carlos Benitez Sanz IEWP @ Workshop on Water allocation, water economics ...
Mr. Carlos Benitez Sanz IEWP @ Workshop on Water allocation, water economics ...
 
Achievements of the NWSAS Aquifer project (Latrech)
Achievements of the NWSAS Aquifer project (Latrech)Achievements of the NWSAS Aquifer project (Latrech)
Achievements of the NWSAS Aquifer project (Latrech)
 
Implementation of ecosystem approach for improving wetlands management in kaz...
Implementation of ecosystem approach for improving wetlands management in kaz...Implementation of ecosystem approach for improving wetlands management in kaz...
Implementation of ecosystem approach for improving wetlands management in kaz...
 
Water Resources Management in Brantas River Basin
Water Resources Management in Brantas River BasinWater Resources Management in Brantas River Basin
Water Resources Management in Brantas River Basin
 
ranjith_major_project_2333.pptx
ranjith_major_project_2333.pptxranjith_major_project_2333.pptx
ranjith_major_project_2333.pptx
 
T10 karuppan sakadevan on land and water management in near east and north a...
T10 karuppan sakadevan  on land and water management in near east and north a...T10 karuppan sakadevan  on land and water management in near east and north a...
T10 karuppan sakadevan on land and water management in near east and north a...
 
26 nov16 irrigation_water_use_efficiency
26 nov16 irrigation_water_use_efficiency26 nov16 irrigation_water_use_efficiency
26 nov16 irrigation_water_use_efficiency
 
Ses 3 wg2_molinos_econ_distrissueslowerebro
Ses 3 wg2_molinos_econ_distrissueslowerebroSes 3 wg2_molinos_econ_distrissueslowerebro
Ses 3 wg2_molinos_econ_distrissueslowerebro
 
Science and Technology Inputs for Powai Lake.ppt
Science and Technology Inputs for Powai Lake.pptScience and Technology Inputs for Powai Lake.ppt
Science and Technology Inputs for Powai Lake.ppt
 
Irrigation scheduling practice at Tana Bales Sugar project by Hunda Tolina
Irrigation scheduling practice  at Tana Bales Sugar project by Hunda TolinaIrrigation scheduling practice  at Tana Bales Sugar project by Hunda Tolina
Irrigation scheduling practice at Tana Bales Sugar project by Hunda Tolina
 
Dnieper River Basin in Belarus - Factsheet (EN)
Dnieper River Basin in Belarus - Factsheet (EN)Dnieper River Basin in Belarus - Factsheet (EN)
Dnieper River Basin in Belarus - Factsheet (EN)
 
Evaluation of the Wastewater Quality Improvement by The Channel Located Downs...
Evaluation of the Wastewater Quality Improvement by The Channel Located Downs...Evaluation of the Wastewater Quality Improvement by The Channel Located Downs...
Evaluation of the Wastewater Quality Improvement by The Channel Located Downs...
 
Water harvesting – a solution to drought & falling level of ground water ...
Water harvesting – a solution to drought & falling level of ground water ...Water harvesting – a solution to drought & falling level of ground water ...
Water harvesting – a solution to drought & falling level of ground water ...
 
TUUL SELBE RIVER IMPROVEMENT
TUUL SELBE RIVER IMPROVEMENT TUUL SELBE RIVER IMPROVEMENT
TUUL SELBE RIVER IMPROVEMENT
 
Abengoa-FB Side Event – Emilio Custodio, UPC, 14th January, 2015 UN Water Con...
Abengoa-FB Side Event – Emilio Custodio, UPC, 14th January, 2015 UN Water Con...Abengoa-FB Side Event – Emilio Custodio, UPC, 14th January, 2015 UN Water Con...
Abengoa-FB Side Event – Emilio Custodio, UPC, 14th January, 2015 UN Water Con...
 
WD management.pptx
WD management.pptxWD management.pptx
WD management.pptx
 
GBF 2015, April 16th, Presentation of Mr. Volker Frobarth
GBF 2015, April 16th, Presentation of Mr. Volker FrobarthGBF 2015, April 16th, Presentation of Mr. Volker Frobarth
GBF 2015, April 16th, Presentation of Mr. Volker Frobarth
 

Kürzlich hochgeladen

Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Anamikakaur10
 

Kürzlich hochgeladen (20)

RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING  SYSTEMS- IGBC, GRIHA, LEED--.pptxRATING  SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
 
Enhancing forest data transparency for climate action
Enhancing forest data transparency for climate actionEnhancing forest data transparency for climate action
Enhancing forest data transparency for climate action
 
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
 
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
 
Green Marketing
Green MarketingGreen Marketing
Green Marketing
 
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
 
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verifiedSector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
Sector 18, Noida Call girls :8448380779 Model Escorts | 100% verified
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024
 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting Day
 
Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.
 
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
 
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
VVIP Pune Call Girls Moshi WhatSapp Number 8005736733 With Elite Staff And Re...
 
CSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -ENCSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -EN
 
(Anamika) VIP Call Girls Jammu Call Now 8617697112 Jammu Escorts 24x7
(Anamika) VIP Call Girls Jammu Call Now 8617697112 Jammu Escorts 24x7(Anamika) VIP Call Girls Jammu Call Now 8617697112 Jammu Escorts 24x7
(Anamika) VIP Call Girls Jammu Call Now 8617697112 Jammu Escorts 24x7
 
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
 
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
 
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
 
Cheap Call Girls in Dubai %(+971524965298 )# Dubai Call Girl Service By Rus...
Cheap Call Girls  in Dubai %(+971524965298 )#  Dubai Call Girl Service By Rus...Cheap Call Girls  in Dubai %(+971524965298 )#  Dubai Call Girl Service By Rus...
Cheap Call Girls in Dubai %(+971524965298 )# Dubai Call Girl Service By Rus...
 
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
VIP Model Call Girls Charholi Budruk ( Pune ) Call ON 8005736733 Starting Fro...
 
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
 

Example of management of water resources for agricultural irrigation

  • 1. International Journal of Environmental & Agriculture Research (IJOEAR) ISSN:[2454-1850] [Vol-3, Issue-1, January- 2017] Page | 136 Example of management of water resources for agricultural irrigation Carla Caroça PhP in Geology, specializing in Hydrogeology by University of Lisbon, Science Faculty, Lisbon, Portugal Abstract— Water is a natural resource vital to life, economic development and social welfare. The National Water Plan resulting from the transposition of the Water Framework Directive, has as an objective: benefit the existing irrigated, with the aim of making more efficient use of water, in particular, with regard to reducing losses, storage, transport and distribution of water, its application in soil and the rationalization of consumption. [1]. Portugal, in Aveiro, between Nazaré and Alcobaça council, has an area with a simple irrigation system for irrigation, called Cela hydro-agricultural profit. Keywords— irrigation, water, agriculture, Portugal, management. I. INTRODUCTION Agriculture is one of the essential activities for the production of food and for the economic and social development of rural communities. The demand for irrigation water throughout the year, in quantity and quality, leads to the need for the construction of hydraulic structures with the objective of extracting and distributing water from the water resources to the cultivated areas. [2] Portugal has as its environmental objective the socio-economic and environmental sustainability of water resources. One of the examples of the Water Resources Management Plan (PGRH), implemented in Portugal, is Cela Agricultural Instigation Work, which in Law-Decree number 86/2002 of April 6, from chapter XX – Concession, article 102nd , passed to write Cela Hidro-agricultural Profit, instead of Hidro-agricultural Instigation. This work, begun in 1940, continues to this day. II. LOCATION The Cela Hidro-agricultural Profit is located in the Famalicão Valley, covering part of the Alcobaça river and the alluvial lowlands of the basin bounded by the Pescaria and Bárrio mountains, in the parish of Famalicão of the municipality of Nazaré (104 ha) and in the parishes Cela and Bárrio in the municipality of Alcobaça (377 ha), in the district of Leiria, making a total area of 481ha. (Fig. 1) The area where the Hydro-agricultural Profit is located corresponds to an alluvial plain basically constituted by holocenic formations composed of sediments transported by the waters and deposited in the basin, of very low dimensions and physiographically very flat. The terrain measures vary between 0 and 6 m. [3] The most representative crops installed in the Cela Profit in recent years are horticulture, orchards and other crops with little representation. The average distribution of the crops is 65% of horticultural, 20% of orchard and 15% of other crops, being the one that consumes more water the horticultural ones. [4]
  • 2. International Journal of Environmental & Agriculture Research (IJOEAR) ISSN:[2454-1850] [Vol-3, Issue-1, January- 2017] Page | 137 FIGURE 1 – CELA HYDRO-AGRICULTURAL PROFIT LOCATION. (VÁRZEA DA NAZARÉ IS THE AREA OCCUPIED BY THE OLD PEDERNEIRA LAGOON THAT SETTLED FROM THE 18TH CENTURY, AND IS FILLED WITH ALLUVIAL SEDIMENTS OF THE QUATERNARY.) III. CELA HYDRO-AGRICULTURAL PROFIT Hydro-agricultural works, using the definition of a work of hydroagricultural Instigation Work, are works of «use of public water for irrigation, watering or sealing, drainage and defense of land for agricultural purposes, adaptation to irrigated land benefited, irrigation improvement and the appropriate agrarian structuring» (Law-Decree number 269/82 of July 10). At the
  • 3. International Journal of Environmental & Agriculture Research (IJOEAR) ISSN:[2454-1850] [Vol-3, Issue-1, January- 2017] Page | 138 moment it is defined as being «the set of hydro-agricultural infrastructure and its equipment, areas that were acquired and expropriated for its implantation, as well as other real estate identified in the respective regulation» (article 2nd , paragraph a, of Decree number 1473/2007 of 15 November). The area of Cela Hydro-agriculture Profit consists of the following infrastructures:  Cela movable dam (photo 1, station 1 in Fig. 1),  Distributor channel of the Alcobaça River or main channel,  Flood Waist Valve, also referred to as the Flood Defense Collector (around the perimeter of hydro-agricultural Profit),  North and south elevated irrigation channels (also known as northern and southern collectors) (parallel to the flood defense collector and within the perimeter of the hydro-agricultural profit),  Small beam dam (deactivate),  Irrigation and drainage system integrating channels and irrigation ditch,  Drainage elevation station (in this there are two buoys to measure the piezometer level, which is not registered due to lack of personnel and/or funding to allocate to the programmer a printer). (station 6 in Fig. 1). The water intake of the Alcobaça river is made by means of a nozzle with a rectangular section equipped with an automatic damper provided by an electric automatism controlled by a mobile phone, [5], installed in the reservoir at Km 4, [4], without the need for pumping. The entrance is protected by a fixed metal grille, without cleaning grills. [5]. The maximum discharge at the outlet of the dam, according to the Association of Beneficiaries of Cela is variable according to the current of the river, hence it is difficult to estimate the cubic meters per hour. This flow will feed the main channel, Paúl da Cela, and at the end the surplus returns to the river Alcobaça. Along this route, the main channel is subdivided firstly by two irrigation channels, the north and the south. From these, there are several channels for patch of ground irrigation. After watering, drain excess water in the patch of ground to avoid flooding. For this purpose, the elevation station located near the VCI of Nazaré (photo 5, station 6 in Fig. 1) is used to remove the water from the site with a maximum discharge (project horizon) of 0,222m3 /s to the Alcobaça. [4] The management of the Cela Hydro-agricultural Profit was delivered to the Cela Beneficiaries Association based on a concession contract for the 'private use of the public water domain' for a period of 20 years, 'under the terms of article 69st of Law number 58/2005 of December 29, and in article 35st of Decree-Law number 226-A/2007 of May 31’, made between Administração de Recursos Hídricos (ARH) Tejo IP and the Direcção Geral da Agricultura e Desenvolvimento Rural (DGADR), in 2011. Therefore, the Association has to fulfill certain obligations, such as:  Maintain in perfect operation the infrastructures and the estates assigned to the concession;  Facilitate water consumption for new users;  Respect the precautionary measures of the competent authorities in flood periods;  Informing any changes to the state of water captation that prevents its use in Agência Portuguesa do Ambiente (APA), I.P.;  Comply with the provisions of article 78st of Decree-Law number 226-A/2007 of May 31 regarding the final destination of materials resulting from the cleaning of irrigation channels;  Know and apply up-to-date national and international standards;  Inform about changes in the type of crops and the fertilization system and phytopharmaceuticals used;  To elaborate, define and present emergency prevention and mitigation measures in the face of various possible accidents in watering and in hydraulic infrastructures;
  • 4. International Journal of Environmental & Agriculture Research (IJOEAR) ISSN:[2454-1850] [Vol-3, Issue-1, January- 2017] Page | 139  Develop a monitoring plan about water resource used, fertilizers products and phytopharmaceuticals, and the patch of ground to be irrigated. [4] In addition, the Cela Beneficiaries Association is subject to water resources tax, water utility tariffs and program contracts related to water resources management. [2] IV. DISCUSSION The Association initiated the payment of the water resources tax in 2010, but disagrees with this rate. Claiming that the use of water is done by closing a gate in the Alcobaça river bed and proceeding to its distribution by trenches and by cement aerial channels. It considers that the calculation formula in the law does not apply to the situation of this irrigation system based on gravity, without pressure, and there being no alternative to this payment suggested the existence of three counters. One at the water entrance of the Alcobaça river and the other two at the exits of the north channel and the south channel, in the discharges to the flood defense collector. The difference between the outlet value for the flood defense collector and the value of the water intake in the perimeter would give an approximate value of the discharge consumed, taking into account that not all water is used, since there are loss of around 30%, due to the occurrence of infiltrations and evaporations along the course. The Continent Rural Development Program 2014-2020, version 1, dated 28 October 1983, prepared by the Sea and Agricultural Ministry in the politics planning Cabinet, includes Cela Hydro-agricultural Profit in the Priority Intervention of 'Sub-Action 2 – Improvement of the existing irrigation efficiency'. To 'improve and update the existing hydro-agriculture utilization in order to reduce losses in water transport and distribution, to promote storage reinforcement and more efficient techniques in conjunction with more energy-efficient solutions and the introduction of new technologies'. According to this program, the modernization of older profits will have an impact on productivity and water management, introducing water and energy savings, and investment in this area should focus in particular on:  Introduction of water conduction and distribution systems leading to the reduction of unused water fractions;  Modernization and automation of equipment already installed;  Rehabilitation of installed infrastructures in order to improve the efficiency of their management and exploration, reducing water losses;  Promotion and installation of new technologies, namely in water and irrigation management, such as automation, telemanagement, remote monitoring and geographic information systems and water quality monitoring. The introduction of more efficient water supply and distribution systems presupposes the minimization of impacts on the environment, preservation of the water lines and natural values present, water monitoring, landscape integration and water management, as inseparable from the sustainability of public irrigation. Likewise, the modernization of water pumping and energy production equipment associated with the management of hydro-agricultural profits aims at increasing the energy efficiency of these profits, with consequent environmental gains, in particular in terms of reducing consumption of fossil fuels and reduction of greenhouse gas emissions. [6] V. CONCLUSION The Water Law (Law number 58/2005, of 29 December, altered for Law-decree number 130/2012 of 22 June) and the Water Framework Directive (WFD) (transposed Directive 2000/60/EC of the European Parliament and of the Council of 23 October) do not mention hydro-agricultural works, but rather, hydraulic infrastructures. Hydraulic infrastructures are 'works or assemblies of works, installations or equipment installed on a fixed basis in beds or banks intended to allow the use of water for the purposes of the general interest' (article 4st , paragraph ee, Law-decree number 1301/2012 of 22 June). They require the expropriation of small patch of ground for the placement of primary and secondary pipelines, lift stations, dams, reservoirs and other hydraulic infrastructures. (Example: Cova da Beira Hydraulic Infrastructures). [7]. These are more expensive works than the works of hydro-agricultural Profit. As the Water Law and the WFD did not repeal Law-decree number 269/82 of 10 July, nor its alterations, this "remains as the set of standards and reference principles for hydro- agricultural profits and areas benefited" [8], changed to Law-decree number 86/2002 of April 6, and this one, in turn, was changed to Law-decree number 169/2005 of September 26. [2]
  • 5. International Journal of Environmental & Agriculture Research (IJOEAR) ISSN:[2454-1850] [Vol-3, Issue-1, January- 2017] Page | 140 The author considers the "hydro-agricultural profit works" (Law-decree number 86/2002 of 6 April, based on article 102nd ) useful and which should be considered in agricultural activities as current practices, not only for better irrigation efficiency and production of agricultural products, but also for the management and preservation of water resources throughout the year. However, if other entities responsible for water resources (Agência Portuguesa do Ambiente, IP and Autarquias) do not comply with the requirements of the legislation on the preservation of the environment and the quality of water for human consumption and irrigation, such as: non-control on the introduction of wastewater into water lines and soil and the lack of cleaning and reprofiling of water lines, agricultural production is impaired. Good planning and management of water resources is achieved when the various public and private entities, professionals, researchers and students work together and/or share informations. ACKNOWLEDGEMENTS The author is grateful to the Science & Technology Foundation (FCT) for the support given through the granting of a PhD Scholarship (SFRH/BD/70957/2010), to the President Carlos Malhó of the Cela Beneficiaries Association for the photographs and the information provided. And also, to the representatives of the Water Resources Admnistration (ARH) Associations, now Environmental Portuguese Agence (APA) and to all who contributed to the elaboration of this work. REFERENCES [1] MAOTDR, “PEASAR – Plano Estratégico de Abastecimento de Água e de Saneamento de Águas Residuais 2007 – 2013, S.I.”, Longoalcance Production, Gestão de Imagem e Comunicação, Lda, 1st ed., Gráfica Maiadouro, Maia, 2007,pp.172 [2] Caroça, C., “Plano de Gestão de Recursos Hídricos na Várzea da Nazaré - Obra de Fomento Hidroagrícola em Paúl da Cela”.Final Written Work in the scope of the Post-Graduate Water Law Course of the Institute of Political Juridical Sciences of the Faculty of Law of the University of Lisbon, Lisbon, 2012e , 31 p.; (http://www.icjp.pt/sites/default/files/papers/carla_caroca.pdf); [3] COBA, “Projecto de Execução da Reabilitação e Modernização da Rede de Rega e Açudes de Derivação do Aproveitamento Hidroagrícola de Cela”, Volume 2 – Rede de Rega e Sistema de Automatização e Controlo. Tomo 2.1 – Memória Descritiva e Justificativa. (Rev01-28/03/2005), [Lisboa?], Ministry of Agriculture, Fisheries and Forestry, Institute of Rural Development and Hydraulics Rehabilitation and Modernization of Irrigation Network and Dam of Derivation of Cela Hydro-agricultural Profit , 2005, pp.167 [4] CONTRATO DE CONCESSÃO ARHT/0021.11/T/C.CA.S, Concession Agreement regarding the use of water resources for the abstraction of surface water intended for irrigation in the hydroelectric exploitation of Cela, [Lisbon?], 2011, pp.78 [5] DOCUMENT PROVIDED BY THE ASSOCIATION, on “Technical Characterization of the Cela Hydro-agricultural Profit”, undated. [6] GPP, “Programa do Desenvolvimento Rural Continente 2014-2020”, Decision C (2014) 9896 of 12 December 2014; Ministry of Agriculture and the Sea, Office of Planning, Policies and General Administration, Lisbon, Portugal, 2014, 415p.; (https://www.portugal2020.pt/Portal2020/Media/Default/Docs/Programas%20Operacionais/VERSOES%20CONSULTA/PDR%2020 20_integral.pdf; 20/01/2017) [7] Mota, A.C., Santos, A. M., “Aproveitamento Hidroagrícola da Cova da Beira – Eficiência como garantia de futuro”, APRH Technical Conferences, The Engineering of Hydro-agricultural Profits: current and future challenges, Lisbon, 2011, 16p.; (http://sir.dgadr.pt/conteudos/jornadas_aph/apresentacoes/s1/10.pdf; 08/10/2014) [8] Folque, A., “Recursos Hídricos e Ordenamento do Território: o regime jurídico das Obras de Fomento Hidroagrícola”, Notes from the 14th session of the Water Law course at the Institute of Legal and Political Sciences, University of Lisbon, 2012, p. 25.