2. MAN Diesel & Turbo
„Engineering the Future – since 1758.“
Carsten B. Poulsen
Methodology Research Engineer
Marine Low Speed, Research & Development
3. Product Range
by Strategic Business Unit
Engines & Marine Turbomachinery Power Plants After Sales
Systems
4. Areas of Activity
MAN Diesel & Turbo in World Trade
World Trade fleet is 53.000 vessels
50% is powered by MAN Diesel & Turbo Engines!
Challenge: •Better fuel economy
•Reduced maintenance
•Remote management
•Reduced crew
•Improved reliability
•Environment compliance
<
9. The Change Process tool support
Rational Change (Change Request)
Rational Change
(Work Package)
Rational DOORS
(Specfications)
Rational Synergy
(Artefacts)
10. Achievements
•Single Change Req. repository
•Better collaboration
•Improved perspective
•Continuous development
•SFC still to be determined
11. Gained Experiences
Processes?
All events are
managed equally by There is no workflow related
the process distinction between enhancements
and defects
The Process
determines important
activities Synergy Task concept rules
Initial phase Analysis phase Resolution phase Verification phase
Even important 1. Document the change
proposal or defect in a CR
2. Analyse the impact of
implementing the CR
Implement the selection of
CRs as scheduled
6. Verify the implementation
of the CRs
activities may be
formal or informal 3. Accept or reject the CR 7. Close the CRs
Development process
Investigation
Distinguish between Assignment phase Feasibility
Requirements specification
4. Schedule selected CRs for Functional design
Processes and Workflows
a defined release
Architectural design
Implementation design
Implementation
Keep workflows as simple as
Integration
5. Review the selection of
scheduled CRs with relevant
Testing
stakeholders
Releasing
possible