SlideShare ist ein Scribd-Unternehmen logo
1 von 37
© 2013 IBM Corporation
Planning and
Scheduling in Maximo:
Best Practices and
Coming Enhancements
James Cooper, European Technical Leader
[ Copenhagen, 28th May ]
1
1
Please note
IBM’s statements regarding its plans, directions, and intent are subject to change or
withdrawal without notice at IBM’s sole discretion.
Information regarding potential future products is intended to outline our general product
direction and it should not be relied on in making a purchasing decision.
The information mentioned regarding potential future products is not a commitment, promise,
or legal obligation to deliver any material, code or functionality. Information about potential
future products may not be incorporated into any contract. The development, release, and
timing of any future features or functionality described for our products remains at our sole
discretion.
Performance is based on measurements and projections using standard IBM benchmarks in
a controlled environment. The actual throughput or performance that any user will experience
will vary depending upon many factors, including considerations such as the amount of
multiprogramming in the user’s job stream, the I/O configuration, the storage configuration,
and the workload processed. Therefore, no assurance can be given that an individual user
will achieve results similar to those stated here.
2
2
What is Maximo Scheduler?
A set of Maximo applications where users can:
 Schedule work orders, tasks and PM forecasts graphically
 Assign labor/crew to work orders and tasks
 Dispatch crew to work locations to perform work
3
3
What is Maximo Scheduler?
Maximo
Maximo Scheduler
Is installed when
Maximo 7.x is
installed (richer
functions on
7.5.x)
Enabled by the
Scheduler license key
Scheduler is an
add-on product
to Maximo
4
4
History - Scheduler 7.1 & 7.1.1
Gantt View to visualize work orders and tasks
- Drag & drop work orders & tasks
- Manage dependencies
- Perform CPM
- View resource load and availability
Work Orders
- Date constraints
- Task dependencies
Scheduler 7.1
Gantt View to visualize PM forecasts
- View and manage future PMs and Work Orders
- View resource load and availability for both future PMs
and Work Orders
Work Orders
- Bulk Reschedule
- Assignment Manager tab in Work Order application
Scheduler 7.1.1
5
5
Current Version - What makes up Scheduler 7.5.1 ?
Investing in the natural evolution of our current products in a direction desired by
our customers
Enhancements to Scheduler
•Graphical Assignment/Dispatching
•Provision of standard Work Order actions
•Additional Resources
•Assets/Locations
•Labor
•Tools
•Materials
•Schedule Compliance
Enhancements to Maximo
•Service Addresses
•Public Map UI Control
•Crews
Maximo Everyplace role based templates
6
Scheduler Application Screen Shot
7
7
 It is also a means to view labor availability (vacation, overtime, previous
assignments etc..) and make labor assignments
 It is a Dispatching application where the location of Crews and Labor,
and the progress of work can all be monitored
 It is Maximo Everyplace templates
designed to make the job of the field
technician all that much easier
Scheduler is now not just a planning & scheduling
tool !
Scheduler – Revised Approach to Work Mgmt.
8
8
Target users..
• Defines and adjusts labor/crew availability along with resource leveling
• Capacity Planning
• Assigns work orders to resources
• Continuously optimizes the schedule as the operational environment changes
• Sequence and route work assignments based on geography
Scheduler/Planner
• Monitor field resources and work order progress and status
• Monitor the location of field resources compared to open orders
• Enter status and complete work orders on behalf of technicians who
don't have mobile devices
• Sequence and route ongoing work assignments based on geography and
optimization
Dispatcher
• Supervisor approves and assigns work on mobile devices
• Receive work orders in the field and provide real time status updates to
dispatch
• Complete, edit and approve work orders on mobile devices along with
viewing work on a map with optimal driving directions
• Notify dispatch of potentially dangerous situations, incomplete work
Field Technician
9
9
Scheduler
• Create Schedule
• Forecast Work, Resource Demand / Availability
Graphical
Assignment
• Make Assignments
• View availability (incl. breaks, vacation), Validate Craft/Skill,
Dispatching
• Assigned Routes visible &editable in a map
• Assign new work based on crew proximity
Communication
• Field tech can view assigned route & work
• Update work status & progress
Work Management hand off
10
1
Functionality & Use Cases by Role
11
1
Planners & Schedulers
12
1
The ability to show Target, Scheduled and Actual Dates on the Gantt
chart
 Allows Planners & Schedulers to get a view of how work is
progressing, and the affect of the progress on related work
Scheduler Compliance
13
1
Asset & Location Availability
14
1
Other Resource Availability tab shows:
 Maintenance/Operational/Calendar availability of Asset and Location
 Material Availability for planned materials
 Shows required quantity vs available quantity
 Green bar shows materials are available, red bar shows materials are unavailable
 Planners & Schedulers know when not to schedule work based on material
availability
Material Availability
15
1
Work Order Actions
• Allow status changes on
multiple work orders/tasks
Additional Toolbar Buttons
• Zoom to Week
• Go To Day
• Constrain horizontal scrolling to
the date range containing work
• Filter resources based on
selected work orders
• Show/Hide Compliance
• Full Screen
Additional Actions
16
1
Calculate costs within schedule by week, month and year
 Illustrate Committed and Saved Estimated Labor, Materials, Services
and Tools, as well as Actual Labor, Materials, Service and Tools
 Allows budget adherence
Schedule Cost
17
1
Shop Floor Resource Planners
18
1
New application aimed at the process of assigning work to people
– Similar UI to Scheduler Gantt view for consistency
– Helps the Planner & Scheduler see non work time for a resource, as well as assignments made by other
Foremen beyond the bounds of their schedule… eliminates duplicate labor assignments
Graphical Assignment
19
1
Graphical Assignment
20
2
Allows the Foreman to:
 Split Work According to Shifts, might be used if extending duration of the
assignment across an end of shift
 Split Work, once split can drag second assignment to add a time gap
 Split Work into Three Records, creates two additional assignments
 Create Assignment
 Delete Assignment
Making an Assignment
21
2
Dispatchers
22
2
Graphical Assignment – Dispatch View
 Create Street-Level Routes for your mobile field workforce to view work on the Dispatch View tab in Graphical
Assignment.
Calendar View Map View
23
2
Graphical Assignment – Dispatch Calendar View
Grey Line - Calendar Breaks – set
up in Calendar Application
Light Grey Area – labor/crew
Availability – set up in Gantt View –
Modify Person/Crew availability
Assignments with Travel
Time
Filter Button – Highlight the Resources you
want to focus on and click Filter button – only
those resource will show in the list.
24
2
Graphical Assignment – Dispatch Map View
Work Symbology –
show markers based
on Route, Status,
Priority and Work
Type.
Unassigned WOs – show
Unassigned WOs on the map
based on Work List Query.
Nearby Labor and Crews–
show resources geo-location
on the map.
25
2
Field Technicians
26
2
Maximo Everyplace Work List
27
2
Everyplace Map View Section – Street Level Route
Street-level Route with
assigned Work Orders
for the Labor or Crew.
28
2
Everyplace Work Order Labor Bookings
 Start and Stop Timers
– Start Timer allows you to automatically
set work order to INPRG.
– If a member of a Crew is logged in will
create a labor transaction for each
member of the crew.
– Each transaction is still editable after
the fact until WO is set to Complete.
– Stop Timer allows you to set WO
Status to Complete.
29
2
Next Release - Optimization
30
3
Why Scheduler Optimization?
Planner / Scheduler
manually creates an
optimal schedule
Manually leverage the
benefits of Scheduler 7.5.1
Supervisor manually performs
assignments for all work orders
and tasks within the schedule
Manually leverages the benefits of
Graphical Assignments appl. in
Scheduler 7.5.1
Dispatcher monitors current and
incoming work & assigns based on
many org specific criteria. Manually
adjusts resource schedules
affected by new assignments
Manually manages a dynamic
Resource and Crew schedule in the
Dispatching appl. in Scheduler 7.5.1
• Quicker schedule creation
• Greater schedule accuracy
and compliance.
• Reduction in Services
required to supplement
resources.
Benefits
Schedule automatically created
Capacity planning and resource
leveling models based on
asset/location availability, resource
constraints
Labor and/or Crews
automatically assigned to
schedules
Assignment optimization model
uses Craft, Skill and Crew Type
and vacation data to optimally
assign Resources or Crews
Incoming work automatically assigned
to Labor or Crews based on
organizational priorities
Uses Dynamic Scheduling optimization
model to accommodate incoming work
respecting organizational priorities to
optimize routes, assignments, and
productivity
• Major efficiency gain by freeing
the Dispatcher from having to
shuffle resource routes to
accommodate incoming work.
• Optimizes work and travel time
to maximize productivity.
Current Approach
Scheduler 7.5.1
Streamlines the entire work management process!
• Huge efficiency gains by
eliminating routine repetitive
assignment action.
• Allows Supervisor to adjust
the assignments rather than
make them.
Our intent
with a new approach
Scheduler V.x
31
3
Our Intent with Scheduler Optimization Models…
Capacity Planning
Adjusts craft, skill and crew type availability to
execute as best as possible the work as required
(overutilization and underutilization periods are
possible). Gaps are identified.
Resource Levelling
Work orders are scheduled within their allowed time
window to minimize overutilization and
underutilization.
Craft, skill and crew type availability
Craft, skill and crew type availability
(1) Long/Medium Term Planning
(2) Medium/Short Term Planning
Resource
Assignment
Scheduled work orders
Specific workers are assigned to the activities to fulfil
the craft or crew type requirement.
Dynamic Work
Scheduling
Dynamically assign emergency work orders to
labor/crews and reassign/reschedule affected work
orders.
Named resources availability with
specific craft, skill set, crew type and
location.
Specific resources with required craft,
skill set, crew type for a given geographic
location.
(3) Short Term Planning
(4) Short Term Planning
Emergent work orders
32
3
Base enhancement - Highlighted Edited Records
Work rows will be highlighted when the work order has been edited
Right-click action available to commit only selected rows that have been
edited.
33
3
Optimization Processing Options
A resource leveling scenario allows foreground or background processing
a cron for timing the run on a recurring basis
various user inputs based on the type of criteria for the problem being resolved
34
3
Compare Schedules
The new Compare View lets the planner see the differences between any 2 scenarios
including the current schedule
Red indicates a difference in a work order's schedule dates
A previous/next button scrolls through the differences. A filter button filters the view to just
the differences
35
3
36
Divider Slide

Weitere ähnliche Inhalte

Was ist angesagt?

Classifications in IBM Maximo Asset Management
Classifications in IBM Maximo Asset ManagementClassifications in IBM Maximo Asset Management
Classifications in IBM Maximo Asset ManagementRobert Zientara
 
Asset Management for Rail,Metro and Monorail
Asset Management for Rail,Metro and MonorailAsset Management for Rail,Metro and Monorail
Asset Management for Rail,Metro and MonorailPravir Kumar Dwivedi
 
IBM Maximo for Utilities
IBM Maximo for UtilitiesIBM Maximo for Utilities
IBM Maximo for UtilitiesVincent Kwon
 
Failure Codes in IBM Maximo Asset Management
Failure Codes in IBM Maximo Asset ManagementFailure Codes in IBM Maximo Asset Management
Failure Codes in IBM Maximo Asset ManagementRobert Zientara
 
Maximo training - Getting Started
Maximo training - Getting StartedMaximo training - Getting Started
Maximo training - Getting StartedBruno Portaluri
 
IBM Roadmap Maximo 2018
IBM Roadmap Maximo 2018IBM Roadmap Maximo 2018
IBM Roadmap Maximo 2018FMMUG
 
Maximo Training - Introduction
Maximo Training - IntroductionMaximo Training - Introduction
Maximo Training - IntroductionBruno Portaluri
 
Using IBM MAXIMO Safety Plans
Using IBM MAXIMO Safety PlansUsing IBM MAXIMO Safety Plans
Using IBM MAXIMO Safety PlansDuane Aritonang
 
Meters in IBM Maximo Asset Management
Meters in IBM Maximo Asset ManagementMeters in IBM Maximo Asset Management
Meters in IBM Maximo Asset ManagementRobert Zientara
 
Generic Maximo Business Processes
Generic Maximo Business ProcessesGeneric Maximo Business Processes
Generic Maximo Business ProcessesMisha Jain
 
IBM Maximo Asset Management solutions for the oil and gas industry
IBM Maximo Asset Management solutions for the oil and gas industryIBM Maximo Asset Management solutions for the oil and gas industry
IBM Maximo Asset Management solutions for the oil and gas industryIBM Chemical Petroleum
 
Maximo and a roadmap for your IoT journey
Maximo and a roadmap for your IoT journeyMaximo and a roadmap for your IoT journey
Maximo and a roadmap for your IoT journeyHelen Fisher
 
Maximo Training - Asset Management
Maximo Training - Asset ManagementMaximo Training - Asset Management
Maximo Training - Asset ManagementBruno Portaluri
 
Create a new work order in Ibm Maximo
Create a new work order in Ibm MaximoCreate a new work order in Ibm Maximo
Create a new work order in Ibm MaximoTony Bertram
 
Maximo Training - Work Management
Maximo Training - Work ManagementMaximo Training - Work Management
Maximo Training - Work ManagementBruno Portaluri
 
IBM Maximo - Prorate services to add loaded costs to items in inventory
IBM Maximo - Prorate services to add loaded costs to items in inventoryIBM Maximo - Prorate services to add loaded costs to items in inventory
IBM Maximo - Prorate services to add loaded costs to items in inventoryCyrus Sorab
 

Was ist angesagt? (20)

Classifications in IBM Maximo Asset Management
Classifications in IBM Maximo Asset ManagementClassifications in IBM Maximo Asset Management
Classifications in IBM Maximo Asset Management
 
Asset Management for Rail,Metro and Monorail
Asset Management for Rail,Metro and MonorailAsset Management for Rail,Metro and Monorail
Asset Management for Rail,Metro and Monorail
 
IBM Maximo for Utilities
IBM Maximo for UtilitiesIBM Maximo for Utilities
IBM Maximo for Utilities
 
Failure Codes in IBM Maximo Asset Management
Failure Codes in IBM Maximo Asset ManagementFailure Codes in IBM Maximo Asset Management
Failure Codes in IBM Maximo Asset Management
 
Maximo training - Getting Started
Maximo training - Getting StartedMaximo training - Getting Started
Maximo training - Getting Started
 
Why upgrade to maximo v7.6
Why upgrade to maximo v7.6Why upgrade to maximo v7.6
Why upgrade to maximo v7.6
 
Maximo Field Service Management
Maximo Field Service ManagementMaximo Field Service Management
Maximo Field Service Management
 
Maximo 7.6 Features
Maximo 7.6 Features Maximo 7.6 Features
Maximo 7.6 Features
 
Maximo 7.6.0.8
Maximo 7.6.0.8Maximo 7.6.0.8
Maximo 7.6.0.8
 
IBM Roadmap Maximo 2018
IBM Roadmap Maximo 2018IBM Roadmap Maximo 2018
IBM Roadmap Maximo 2018
 
Maximo Training - Introduction
Maximo Training - IntroductionMaximo Training - Introduction
Maximo Training - Introduction
 
Using IBM MAXIMO Safety Plans
Using IBM MAXIMO Safety PlansUsing IBM MAXIMO Safety Plans
Using IBM MAXIMO Safety Plans
 
Meters in IBM Maximo Asset Management
Meters in IBM Maximo Asset ManagementMeters in IBM Maximo Asset Management
Meters in IBM Maximo Asset Management
 
Generic Maximo Business Processes
Generic Maximo Business ProcessesGeneric Maximo Business Processes
Generic Maximo Business Processes
 
IBM Maximo Asset Management solutions for the oil and gas industry
IBM Maximo Asset Management solutions for the oil and gas industryIBM Maximo Asset Management solutions for the oil and gas industry
IBM Maximo Asset Management solutions for the oil and gas industry
 
Maximo and a roadmap for your IoT journey
Maximo and a roadmap for your IoT journeyMaximo and a roadmap for your IoT journey
Maximo and a roadmap for your IoT journey
 
Maximo Training - Asset Management
Maximo Training - Asset ManagementMaximo Training - Asset Management
Maximo Training - Asset Management
 
Create a new work order in Ibm Maximo
Create a new work order in Ibm MaximoCreate a new work order in Ibm Maximo
Create a new work order in Ibm Maximo
 
Maximo Training - Work Management
Maximo Training - Work ManagementMaximo Training - Work Management
Maximo Training - Work Management
 
IBM Maximo - Prorate services to add loaded costs to items in inventory
IBM Maximo - Prorate services to add loaded costs to items in inventoryIBM Maximo - Prorate services to add loaded costs to items in inventory
IBM Maximo - Prorate services to add loaded costs to items in inventory
 

Andere mochten auch

IBM Maximo Product Roadmap 2016
IBM Maximo Product Roadmap 2016IBM Maximo Product Roadmap 2016
IBM Maximo Product Roadmap 2016Helen Fisher
 
Attachments in IBM Maximo Asset Management
Attachments in IBM Maximo Asset ManagementAttachments in IBM Maximo Asset Management
Attachments in IBM Maximo Asset ManagementRobert Zientara
 
Maximo Oil and Gas and HSE 7.6.1 roadmap
Maximo Oil and Gas and HSE 7.6.1 roadmapMaximo Oil and Gas and HSE 7.6.1 roadmap
Maximo Oil and Gas and HSE 7.6.1 roadmapHelen Fisher
 
A01 - Defining the Asset Hierarchy and Structure (MCU)
A01 - Defining the Asset Hierarchy and Structure (MCU)A01 - Defining the Asset Hierarchy and Structure (MCU)
A01 - Defining the Asset Hierarchy and Structure (MCU)Maintenance Connection
 
Bulletin board in IBM Maximo Asset Management
Bulletin board in IBM Maximo Asset ManagementBulletin board in IBM Maximo Asset Management
Bulletin board in IBM Maximo Asset ManagementRobert Zientara
 
Understanding Hierarchical Asset Structures in CMMS
Understanding Hierarchical Asset Structures in CMMSUnderstanding Hierarchical Asset Structures in CMMS
Understanding Hierarchical Asset Structures in CMMSeMaint Enterprises
 
Domains in IBM Maximo Asset Management
Domains in IBM Maximo Asset ManagementDomains in IBM Maximo Asset Management
Domains in IBM Maximo Asset ManagementRobert Zientara
 
Mobile Communication Strategy
Mobile Communication StrategyMobile Communication Strategy
Mobile Communication StrategyVoalte
 
Alarm management slide_share_14
Alarm management slide_share_14Alarm management slide_share_14
Alarm management slide_share_14Voalte
 
Future of Power: Håndtering af nye teknologier - Kim Escherich
Future of Power: Håndtering af nye teknologier - Kim EscherichFuture of Power: Håndtering af nye teknologier - Kim Escherich
Future of Power: Håndtering af nye teknologier - Kim EscherichIBM Danmark
 

Andere mochten auch (12)

IBM Maximo Product Roadmap 2016
IBM Maximo Product Roadmap 2016IBM Maximo Product Roadmap 2016
IBM Maximo Product Roadmap 2016
 
Agile Delivery
Agile DeliveryAgile Delivery
Agile Delivery
 
Attachments in IBM Maximo Asset Management
Attachments in IBM Maximo Asset ManagementAttachments in IBM Maximo Asset Management
Attachments in IBM Maximo Asset Management
 
Maximo Oil and Gas and HSE 7.6.1 roadmap
Maximo Oil and Gas and HSE 7.6.1 roadmapMaximo Oil and Gas and HSE 7.6.1 roadmap
Maximo Oil and Gas and HSE 7.6.1 roadmap
 
A01 - Defining the Asset Hierarchy and Structure (MCU)
A01 - Defining the Asset Hierarchy and Structure (MCU)A01 - Defining the Asset Hierarchy and Structure (MCU)
A01 - Defining the Asset Hierarchy and Structure (MCU)
 
Scheduling Priority in Maximo
Scheduling Priority in Maximo Scheduling Priority in Maximo
Scheduling Priority in Maximo
 
Bulletin board in IBM Maximo Asset Management
Bulletin board in IBM Maximo Asset ManagementBulletin board in IBM Maximo Asset Management
Bulletin board in IBM Maximo Asset Management
 
Understanding Hierarchical Asset Structures in CMMS
Understanding Hierarchical Asset Structures in CMMSUnderstanding Hierarchical Asset Structures in CMMS
Understanding Hierarchical Asset Structures in CMMS
 
Domains in IBM Maximo Asset Management
Domains in IBM Maximo Asset ManagementDomains in IBM Maximo Asset Management
Domains in IBM Maximo Asset Management
 
Mobile Communication Strategy
Mobile Communication StrategyMobile Communication Strategy
Mobile Communication Strategy
 
Alarm management slide_share_14
Alarm management slide_share_14Alarm management slide_share_14
Alarm management slide_share_14
 
Future of Power: Håndtering af nye teknologier - Kim Escherich
Future of Power: Håndtering af nye teknologier - Kim EscherichFuture of Power: Håndtering af nye teknologier - Kim Escherich
Future of Power: Håndtering af nye teknologier - Kim Escherich
 

Ähnlich wie Planning and Scheduling in Maximo: Best Practices and Coming Enhancements

MS Project Integration: Tips, Tricks and What's New for You
MS Project Integration: Tips, Tricks and What's New for YouMS Project Integration: Tips, Tricks and What's New for You
MS Project Integration: Tips, Tricks and What's New for YouCA Technologies
 
Maximo Scheduler 751 Workshop Pedro Solfa Sep 2012
Maximo Scheduler 751 Workshop Pedro Solfa Sep 2012Maximo Scheduler 751 Workshop Pedro Solfa Sep 2012
Maximo Scheduler 751 Workshop Pedro Solfa Sep 2012alipaiva
 
4.3.2013 Tool Demo - Traditional Development RTC Planning In Context Collabor...
4.3.2013 Tool Demo - Traditional Development RTC Planning In Context Collabor...4.3.2013 Tool Demo - Traditional Development RTC Planning In Context Collabor...
4.3.2013 Tool Demo - Traditional Development RTC Planning In Context Collabor...IBM Rational
 
Project management
Project managementProject management
Project managementervinod
 
Financial Services Webinar Updated Products Pt. 2 (January 18, 2017)
Financial Services Webinar Updated Products Pt. 2 (January 18, 2017)Financial Services Webinar Updated Products Pt. 2 (January 18, 2017)
Financial Services Webinar Updated Products Pt. 2 (January 18, 2017)Salesforce Partners
 
IBM Rational Team Concert at Landmap
IBM Rational Team Concert at LandmapIBM Rational Team Concert at Landmap
IBM Rational Team Concert at LandmapBharti Gupta
 
Software Engineering (Project Scheduling)
Software Engineering (Project Scheduling)Software Engineering (Project Scheduling)
Software Engineering (Project Scheduling)ShudipPal
 
Lessons Learned - Schedule Updating And Maintenance Using Primavera™
Lessons Learned - Schedule Updating And Maintenance Using Primavera™Lessons Learned - Schedule Updating And Maintenance Using Primavera™
Lessons Learned - Schedule Updating And Maintenance Using Primavera™Charlie Jackson
 
DescriptionThe Aires Corporation is highly desirous of implementi.docx
DescriptionThe Aires Corporation is highly desirous of implementi.docxDescriptionThe Aires Corporation is highly desirous of implementi.docx
DescriptionThe Aires Corporation is highly desirous of implementi.docxcarolinef5
 
DescriptionThe Aires Corporation is highly desirous of implementi.docx
DescriptionThe Aires Corporation is highly desirous of implementi.docxDescriptionThe Aires Corporation is highly desirous of implementi.docx
DescriptionThe Aires Corporation is highly desirous of implementi.docxdonaldp2
 
Pagerinkite užsakymų įvykdymą laiku naudodami šiuolaikinius gamybos planavimo...
Pagerinkite užsakymų įvykdymą laiku naudodami šiuolaikinius gamybos planavimo...Pagerinkite užsakymų įvykdymą laiku naudodami šiuolaikinius gamybos planavimo...
Pagerinkite užsakymų įvykdymą laiku naudodami šiuolaikinius gamybos planavimo...Columbus Lietuva
 
Paranda ettevõtte tulemusi targa tootmise planeerimise ja operatiivjuhtimisega
Paranda ettevõtte tulemusi targa tootmise planeerimise ja operatiivjuhtimisegaParanda ettevõtte tulemusi targa tootmise planeerimise ja operatiivjuhtimisega
Paranda ettevõtte tulemusi targa tootmise planeerimise ja operatiivjuhtimisegaColumbus Eesti AS
 
Control techniques
Control techniquesControl techniques
Control techniquesAdnan Shakir
 
Project Share Feature List - MS Project Services
Project Share Feature List - MS Project ServicesProject Share Feature List - MS Project Services
Project Share Feature List - MS Project Servicesmahyars
 
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARETIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWAREKHUSHBU SHAH
 
Network diagrams
Network diagramsNetwork diagrams
Network diagramsLii Van
 
160155061 project-monitoring-control
160155061 project-monitoring-control160155061 project-monitoring-control
160155061 project-monitoring-controleidalin95
 

Ähnlich wie Planning and Scheduling in Maximo: Best Practices and Coming Enhancements (20)

MS Project Integration: Tips, Tricks and What's New for You
MS Project Integration: Tips, Tricks and What's New for YouMS Project Integration: Tips, Tricks and What's New for You
MS Project Integration: Tips, Tricks and What's New for You
 
Maximo Scheduler 751 Workshop Pedro Solfa Sep 2012
Maximo Scheduler 751 Workshop Pedro Solfa Sep 2012Maximo Scheduler 751 Workshop Pedro Solfa Sep 2012
Maximo Scheduler 751 Workshop Pedro Solfa Sep 2012
 
4.3.2013 Tool Demo - Traditional Development RTC Planning In Context Collabor...
4.3.2013 Tool Demo - Traditional Development RTC Planning In Context Collabor...4.3.2013 Tool Demo - Traditional Development RTC Planning In Context Collabor...
4.3.2013 Tool Demo - Traditional Development RTC Planning In Context Collabor...
 
Project management
Project managementProject management
Project management
 
Financial Services Webinar Updated Products Pt. 2 (January 18, 2017)
Financial Services Webinar Updated Products Pt. 2 (January 18, 2017)Financial Services Webinar Updated Products Pt. 2 (January 18, 2017)
Financial Services Webinar Updated Products Pt. 2 (January 18, 2017)
 
IBM Rational Team Concert at Landmap
IBM Rational Team Concert at LandmapIBM Rational Team Concert at Landmap
IBM Rational Team Concert at Landmap
 
Software Engineering (Project Scheduling)
Software Engineering (Project Scheduling)Software Engineering (Project Scheduling)
Software Engineering (Project Scheduling)
 
Lessons Learned - Schedule Updating And Maintenance Using Primavera™
Lessons Learned - Schedule Updating And Maintenance Using Primavera™Lessons Learned - Schedule Updating And Maintenance Using Primavera™
Lessons Learned - Schedule Updating And Maintenance Using Primavera™
 
DescriptionThe Aires Corporation is highly desirous of implementi.docx
DescriptionThe Aires Corporation is highly desirous of implementi.docxDescriptionThe Aires Corporation is highly desirous of implementi.docx
DescriptionThe Aires Corporation is highly desirous of implementi.docx
 
DescriptionThe Aires Corporation is highly desirous of implementi.docx
DescriptionThe Aires Corporation is highly desirous of implementi.docxDescriptionThe Aires Corporation is highly desirous of implementi.docx
DescriptionThe Aires Corporation is highly desirous of implementi.docx
 
ACH 216 Lecture 08 (Scheduling)
ACH 216 Lecture 08 (Scheduling)ACH 216 Lecture 08 (Scheduling)
ACH 216 Lecture 08 (Scheduling)
 
Pagerinkite užsakymų įvykdymą laiku naudodami šiuolaikinius gamybos planavimo...
Pagerinkite užsakymų įvykdymą laiku naudodami šiuolaikinius gamybos planavimo...Pagerinkite užsakymų įvykdymą laiku naudodami šiuolaikinius gamybos planavimo...
Pagerinkite užsakymų įvykdymą laiku naudodami šiuolaikinius gamybos planavimo...
 
Paranda ettevõtte tulemusi targa tootmise planeerimise ja operatiivjuhtimisega
Paranda ettevõtte tulemusi targa tootmise planeerimise ja operatiivjuhtimisegaParanda ettevõtte tulemusi targa tootmise planeerimise ja operatiivjuhtimisega
Paranda ettevõtte tulemusi targa tootmise planeerimise ja operatiivjuhtimisega
 
062613 Rufran's Primavera Scheduling Tips & Tricks 01-13
062613 Rufran's Primavera Scheduling Tips & Tricks 01-13062613 Rufran's Primavera Scheduling Tips & Tricks 01-13
062613 Rufran's Primavera Scheduling Tips & Tricks 01-13
 
Control techniques
Control techniquesControl techniques
Control techniques
 
Project Share Feature List - MS Project Services
Project Share Feature List - MS Project ServicesProject Share Feature List - MS Project Services
Project Share Feature List - MS Project Services
 
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARETIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
 
Network diagrams
Network diagramsNetwork diagrams
Network diagrams
 
Field staf job scheduling software
Field staf job scheduling softwareField staf job scheduling software
Field staf job scheduling software
 
160155061 project-monitoring-control
160155061 project-monitoring-control160155061 project-monitoring-control
160155061 project-monitoring-control
 

Mehr von IBM Danmark

DevOps, Development and Operations, Tina McGinley
DevOps, Development and Operations, Tina McGinleyDevOps, Development and Operations, Tina McGinley
DevOps, Development and Operations, Tina McGinleyIBM Danmark
 
Velkomst, Universitetssporet 2013, Pia Rønhøj
Velkomst, Universitetssporet 2013, Pia RønhøjVelkomst, Universitetssporet 2013, Pia Rønhøj
Velkomst, Universitetssporet 2013, Pia RønhøjIBM Danmark
 
Smarter Commerce, Salg og Marketing, Thomas Steglich-Andersen
Smarter Commerce, Salg og Marketing, Thomas Steglich-AndersenSmarter Commerce, Salg og Marketing, Thomas Steglich-Andersen
Smarter Commerce, Salg og Marketing, Thomas Steglich-AndersenIBM Danmark
 
Mobile, Philip Nyborg
Mobile, Philip NyborgMobile, Philip Nyborg
Mobile, Philip NyborgIBM Danmark
 
IT innovation, Kim Escherich
IT innovation, Kim EscherichIT innovation, Kim Escherich
IT innovation, Kim EscherichIBM Danmark
 
Echo.IT, Stefan K. Madsen
Echo.IT, Stefan K. MadsenEcho.IT, Stefan K. Madsen
Echo.IT, Stefan K. MadsenIBM Danmark
 
Big Data & Analytics, Peter Jönsson
Big Data & Analytics, Peter JönssonBig Data & Analytics, Peter Jönsson
Big Data & Analytics, Peter JönssonIBM Danmark
 
Social Business, Alice Bayer
Social Business, Alice BayerSocial Business, Alice Bayer
Social Business, Alice BayerIBM Danmark
 
Numascale Product IBM
Numascale Product IBMNumascale Product IBM
Numascale Product IBMIBM Danmark
 
Intel HPC Update
Intel HPC UpdateIntel HPC Update
Intel HPC UpdateIBM Danmark
 
IBM general parallel file system - introduction
IBM general parallel file system - introductionIBM general parallel file system - introduction
IBM general parallel file system - introductionIBM Danmark
 
NeXtScale HPC seminar
NeXtScale HPC seminarNeXtScale HPC seminar
NeXtScale HPC seminarIBM Danmark
 
Future of Power: PowerLinux - Jan Kristian Nielsen
Future of Power: PowerLinux - Jan Kristian NielsenFuture of Power: PowerLinux - Jan Kristian Nielsen
Future of Power: PowerLinux - Jan Kristian NielsenIBM Danmark
 
Future of Power: Power Strategy and Offerings for Denmark - Steve Sibley
Future of Power: Power Strategy and Offerings for Denmark - Steve SibleyFuture of Power: Power Strategy and Offerings for Denmark - Steve Sibley
Future of Power: Power Strategy and Offerings for Denmark - Steve SibleyIBM Danmark
 
Future of Power: Big Data - Søren Ravn
Future of Power: Big Data - Søren RavnFuture of Power: Big Data - Søren Ravn
Future of Power: Big Data - Søren RavnIBM Danmark
 
Future of Power: IBM PureFlex - Kim Mortensen
Future of Power: IBM PureFlex - Kim MortensenFuture of Power: IBM PureFlex - Kim Mortensen
Future of Power: IBM PureFlex - Kim MortensenIBM Danmark
 
Future of Power: IBM Trends & Directions - Erik Rex
Future of Power: IBM Trends & Directions - Erik RexFuture of Power: IBM Trends & Directions - Erik Rex
Future of Power: IBM Trends & Directions - Erik RexIBM Danmark
 
Future of Power - Lars Mikkelgaard-Jensen
Future of Power - Lars Mikkelgaard-JensenFuture of Power - Lars Mikkelgaard-Jensen
Future of Power - Lars Mikkelgaard-JensenIBM Danmark
 
Future of Power: IBM Power - Lars Johanneson
Future of Power: IBM Power - Lars JohannesonFuture of Power: IBM Power - Lars Johanneson
Future of Power: IBM Power - Lars JohannesonIBM Danmark
 

Mehr von IBM Danmark (20)

DevOps, Development and Operations, Tina McGinley
DevOps, Development and Operations, Tina McGinleyDevOps, Development and Operations, Tina McGinley
DevOps, Development and Operations, Tina McGinley
 
Velkomst, Universitetssporet 2013, Pia Rønhøj
Velkomst, Universitetssporet 2013, Pia RønhøjVelkomst, Universitetssporet 2013, Pia Rønhøj
Velkomst, Universitetssporet 2013, Pia Rønhøj
 
Smarter Commerce, Salg og Marketing, Thomas Steglich-Andersen
Smarter Commerce, Salg og Marketing, Thomas Steglich-AndersenSmarter Commerce, Salg og Marketing, Thomas Steglich-Andersen
Smarter Commerce, Salg og Marketing, Thomas Steglich-Andersen
 
Mobile, Philip Nyborg
Mobile, Philip NyborgMobile, Philip Nyborg
Mobile, Philip Nyborg
 
IT innovation, Kim Escherich
IT innovation, Kim EscherichIT innovation, Kim Escherich
IT innovation, Kim Escherich
 
Echo.IT, Stefan K. Madsen
Echo.IT, Stefan K. MadsenEcho.IT, Stefan K. Madsen
Echo.IT, Stefan K. Madsen
 
Big Data & Analytics, Peter Jönsson
Big Data & Analytics, Peter JönssonBig Data & Analytics, Peter Jönsson
Big Data & Analytics, Peter Jönsson
 
Social Business, Alice Bayer
Social Business, Alice BayerSocial Business, Alice Bayer
Social Business, Alice Bayer
 
Numascale Product IBM
Numascale Product IBMNumascale Product IBM
Numascale Product IBM
 
Mellanox IBM
Mellanox IBMMellanox IBM
Mellanox IBM
 
Intel HPC Update
Intel HPC UpdateIntel HPC Update
Intel HPC Update
 
IBM general parallel file system - introduction
IBM general parallel file system - introductionIBM general parallel file system - introduction
IBM general parallel file system - introduction
 
NeXtScale HPC seminar
NeXtScale HPC seminarNeXtScale HPC seminar
NeXtScale HPC seminar
 
Future of Power: PowerLinux - Jan Kristian Nielsen
Future of Power: PowerLinux - Jan Kristian NielsenFuture of Power: PowerLinux - Jan Kristian Nielsen
Future of Power: PowerLinux - Jan Kristian Nielsen
 
Future of Power: Power Strategy and Offerings for Denmark - Steve Sibley
Future of Power: Power Strategy and Offerings for Denmark - Steve SibleyFuture of Power: Power Strategy and Offerings for Denmark - Steve Sibley
Future of Power: Power Strategy and Offerings for Denmark - Steve Sibley
 
Future of Power: Big Data - Søren Ravn
Future of Power: Big Data - Søren RavnFuture of Power: Big Data - Søren Ravn
Future of Power: Big Data - Søren Ravn
 
Future of Power: IBM PureFlex - Kim Mortensen
Future of Power: IBM PureFlex - Kim MortensenFuture of Power: IBM PureFlex - Kim Mortensen
Future of Power: IBM PureFlex - Kim Mortensen
 
Future of Power: IBM Trends & Directions - Erik Rex
Future of Power: IBM Trends & Directions - Erik RexFuture of Power: IBM Trends & Directions - Erik Rex
Future of Power: IBM Trends & Directions - Erik Rex
 
Future of Power - Lars Mikkelgaard-Jensen
Future of Power - Lars Mikkelgaard-JensenFuture of Power - Lars Mikkelgaard-Jensen
Future of Power - Lars Mikkelgaard-Jensen
 
Future of Power: IBM Power - Lars Johanneson
Future of Power: IBM Power - Lars JohannesonFuture of Power: IBM Power - Lars Johanneson
Future of Power: IBM Power - Lars Johanneson
 

Kürzlich hochgeladen

IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?XfilesPro
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsMemoori
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAndikSusilo4
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Paola De la Torre
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 

Kürzlich hochgeladen (20)

IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & Application
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 

Planning and Scheduling in Maximo: Best Practices and Coming Enhancements

  • 1. © 2013 IBM Corporation Planning and Scheduling in Maximo: Best Practices and Coming Enhancements James Cooper, European Technical Leader [ Copenhagen, 28th May ]
  • 2. 1 1 Please note IBM’s statements regarding its plans, directions, and intent are subject to change or withdrawal without notice at IBM’s sole discretion. Information regarding potential future products is intended to outline our general product direction and it should not be relied on in making a purchasing decision. The information mentioned regarding potential future products is not a commitment, promise, or legal obligation to deliver any material, code or functionality. Information about potential future products may not be incorporated into any contract. The development, release, and timing of any future features or functionality described for our products remains at our sole discretion. Performance is based on measurements and projections using standard IBM benchmarks in a controlled environment. The actual throughput or performance that any user will experience will vary depending upon many factors, including considerations such as the amount of multiprogramming in the user’s job stream, the I/O configuration, the storage configuration, and the workload processed. Therefore, no assurance can be given that an individual user will achieve results similar to those stated here.
  • 3. 2 2 What is Maximo Scheduler? A set of Maximo applications where users can:  Schedule work orders, tasks and PM forecasts graphically  Assign labor/crew to work orders and tasks  Dispatch crew to work locations to perform work
  • 4. 3 3 What is Maximo Scheduler? Maximo Maximo Scheduler Is installed when Maximo 7.x is installed (richer functions on 7.5.x) Enabled by the Scheduler license key Scheduler is an add-on product to Maximo
  • 5. 4 4 History - Scheduler 7.1 & 7.1.1 Gantt View to visualize work orders and tasks - Drag & drop work orders & tasks - Manage dependencies - Perform CPM - View resource load and availability Work Orders - Date constraints - Task dependencies Scheduler 7.1 Gantt View to visualize PM forecasts - View and manage future PMs and Work Orders - View resource load and availability for both future PMs and Work Orders Work Orders - Bulk Reschedule - Assignment Manager tab in Work Order application Scheduler 7.1.1
  • 6. 5 5 Current Version - What makes up Scheduler 7.5.1 ? Investing in the natural evolution of our current products in a direction desired by our customers Enhancements to Scheduler •Graphical Assignment/Dispatching •Provision of standard Work Order actions •Additional Resources •Assets/Locations •Labor •Tools •Materials •Schedule Compliance Enhancements to Maximo •Service Addresses •Public Map UI Control •Crews Maximo Everyplace role based templates
  • 8. 7 7  It is also a means to view labor availability (vacation, overtime, previous assignments etc..) and make labor assignments  It is a Dispatching application where the location of Crews and Labor, and the progress of work can all be monitored  It is Maximo Everyplace templates designed to make the job of the field technician all that much easier Scheduler is now not just a planning & scheduling tool ! Scheduler – Revised Approach to Work Mgmt.
  • 9. 8 8 Target users.. • Defines and adjusts labor/crew availability along with resource leveling • Capacity Planning • Assigns work orders to resources • Continuously optimizes the schedule as the operational environment changes • Sequence and route work assignments based on geography Scheduler/Planner • Monitor field resources and work order progress and status • Monitor the location of field resources compared to open orders • Enter status and complete work orders on behalf of technicians who don't have mobile devices • Sequence and route ongoing work assignments based on geography and optimization Dispatcher • Supervisor approves and assigns work on mobile devices • Receive work orders in the field and provide real time status updates to dispatch • Complete, edit and approve work orders on mobile devices along with viewing work on a map with optimal driving directions • Notify dispatch of potentially dangerous situations, incomplete work Field Technician
  • 10. 9 9 Scheduler • Create Schedule • Forecast Work, Resource Demand / Availability Graphical Assignment • Make Assignments • View availability (incl. breaks, vacation), Validate Craft/Skill, Dispatching • Assigned Routes visible &editable in a map • Assign new work based on crew proximity Communication • Field tech can view assigned route & work • Update work status & progress Work Management hand off
  • 11. 10 1 Functionality & Use Cases by Role
  • 13. 12 1 The ability to show Target, Scheduled and Actual Dates on the Gantt chart  Allows Planners & Schedulers to get a view of how work is progressing, and the affect of the progress on related work Scheduler Compliance
  • 14. 13 1 Asset & Location Availability
  • 15. 14 1 Other Resource Availability tab shows:  Maintenance/Operational/Calendar availability of Asset and Location  Material Availability for planned materials  Shows required quantity vs available quantity  Green bar shows materials are available, red bar shows materials are unavailable  Planners & Schedulers know when not to schedule work based on material availability Material Availability
  • 16. 15 1 Work Order Actions • Allow status changes on multiple work orders/tasks Additional Toolbar Buttons • Zoom to Week • Go To Day • Constrain horizontal scrolling to the date range containing work • Filter resources based on selected work orders • Show/Hide Compliance • Full Screen Additional Actions
  • 17. 16 1 Calculate costs within schedule by week, month and year  Illustrate Committed and Saved Estimated Labor, Materials, Services and Tools, as well as Actual Labor, Materials, Service and Tools  Allows budget adherence Schedule Cost
  • 19. 18 1 New application aimed at the process of assigning work to people – Similar UI to Scheduler Gantt view for consistency – Helps the Planner & Scheduler see non work time for a resource, as well as assignments made by other Foremen beyond the bounds of their schedule… eliminates duplicate labor assignments Graphical Assignment
  • 21. 20 2 Allows the Foreman to:  Split Work According to Shifts, might be used if extending duration of the assignment across an end of shift  Split Work, once split can drag second assignment to add a time gap  Split Work into Three Records, creates two additional assignments  Create Assignment  Delete Assignment Making an Assignment
  • 23. 22 2 Graphical Assignment – Dispatch View  Create Street-Level Routes for your mobile field workforce to view work on the Dispatch View tab in Graphical Assignment. Calendar View Map View
  • 24. 23 2 Graphical Assignment – Dispatch Calendar View Grey Line - Calendar Breaks – set up in Calendar Application Light Grey Area – labor/crew Availability – set up in Gantt View – Modify Person/Crew availability Assignments with Travel Time Filter Button – Highlight the Resources you want to focus on and click Filter button – only those resource will show in the list.
  • 25. 24 2 Graphical Assignment – Dispatch Map View Work Symbology – show markers based on Route, Status, Priority and Work Type. Unassigned WOs – show Unassigned WOs on the map based on Work List Query. Nearby Labor and Crews– show resources geo-location on the map.
  • 28. 27 2 Everyplace Map View Section – Street Level Route Street-level Route with assigned Work Orders for the Labor or Crew.
  • 29. 28 2 Everyplace Work Order Labor Bookings  Start and Stop Timers – Start Timer allows you to automatically set work order to INPRG. – If a member of a Crew is logged in will create a labor transaction for each member of the crew. – Each transaction is still editable after the fact until WO is set to Complete. – Stop Timer allows you to set WO Status to Complete.
  • 30. 29 2 Next Release - Optimization
  • 31. 30 3 Why Scheduler Optimization? Planner / Scheduler manually creates an optimal schedule Manually leverage the benefits of Scheduler 7.5.1 Supervisor manually performs assignments for all work orders and tasks within the schedule Manually leverages the benefits of Graphical Assignments appl. in Scheduler 7.5.1 Dispatcher monitors current and incoming work & assigns based on many org specific criteria. Manually adjusts resource schedules affected by new assignments Manually manages a dynamic Resource and Crew schedule in the Dispatching appl. in Scheduler 7.5.1 • Quicker schedule creation • Greater schedule accuracy and compliance. • Reduction in Services required to supplement resources. Benefits Schedule automatically created Capacity planning and resource leveling models based on asset/location availability, resource constraints Labor and/or Crews automatically assigned to schedules Assignment optimization model uses Craft, Skill and Crew Type and vacation data to optimally assign Resources or Crews Incoming work automatically assigned to Labor or Crews based on organizational priorities Uses Dynamic Scheduling optimization model to accommodate incoming work respecting organizational priorities to optimize routes, assignments, and productivity • Major efficiency gain by freeing the Dispatcher from having to shuffle resource routes to accommodate incoming work. • Optimizes work and travel time to maximize productivity. Current Approach Scheduler 7.5.1 Streamlines the entire work management process! • Huge efficiency gains by eliminating routine repetitive assignment action. • Allows Supervisor to adjust the assignments rather than make them. Our intent with a new approach Scheduler V.x
  • 32. 31 3 Our Intent with Scheduler Optimization Models… Capacity Planning Adjusts craft, skill and crew type availability to execute as best as possible the work as required (overutilization and underutilization periods are possible). Gaps are identified. Resource Levelling Work orders are scheduled within their allowed time window to minimize overutilization and underutilization. Craft, skill and crew type availability Craft, skill and crew type availability (1) Long/Medium Term Planning (2) Medium/Short Term Planning Resource Assignment Scheduled work orders Specific workers are assigned to the activities to fulfil the craft or crew type requirement. Dynamic Work Scheduling Dynamically assign emergency work orders to labor/crews and reassign/reschedule affected work orders. Named resources availability with specific craft, skill set, crew type and location. Specific resources with required craft, skill set, crew type for a given geographic location. (3) Short Term Planning (4) Short Term Planning Emergent work orders
  • 33. 32 3 Base enhancement - Highlighted Edited Records Work rows will be highlighted when the work order has been edited Right-click action available to commit only selected rows that have been edited.
  • 34. 33 3 Optimization Processing Options A resource leveling scenario allows foreground or background processing a cron for timing the run on a recurring basis various user inputs based on the type of criteria for the problem being resolved
  • 35. 34 3 Compare Schedules The new Compare View lets the planner see the differences between any 2 scenarios including the current schedule Red indicates a difference in a work order's schedule dates A previous/next button scrolls through the differences. A filter button filters the view to just the differences
  • 36. 35 3