Hugo Vermeulen is a Class 2 50m air diver and skipper with experience in a variety of projects. He has worked on jobs like quayside construction, oil spill cleanup, underwater inspections of ships and structures. Hugo is hardworking, easy to get along with, and wants to succeed in his career. He is seeking future work opportunities and believes he will be an asset to any team.
1. HUGO VERMEULEN
CLASS 2 AIR DIVER & SKIPPER
PROFESSIONAL DIVER
Hi my name is Hugo Vermeulen.I am a class 2 50m air diver and
skipper. I have good experience in a wide variety of different
projects.
Please consider my CV for future work. I would please like to be part
of your team. I am an extremely hard worker who wants to succeed
and do well in my career. I will most definitely be an asset to your
team and the project. I am an easy personto get along with and I
work well with a team.
Below is my CV, thank you for taking the time to considerme.
Kind Regards
Hugo Vermeulen
2. CLASS II AIR DIVER & SKIPPER
HUGO VERMEULEN
PERSONAL INFORMATION:
Address: SOUTH AFRICA
KZN
DURBAN, Umhlanga
Prestondale
3 Woodlands Close
Contact Number: +27834721156
Email: hugovermeulen@yahoo.com
Nationality: SOUTH AFRICAN.
Nearest Airport: King Shaka International, Durban, South Africa
Identification No.: 9301085187089
Passport No.: A00427921 Expires: 01/10/2019
Yellow fever vaccination: Valid until 18/10/2023
Dive Medical: Valid until 07/02/2015
Education: Senior Certificate @ Pietermaritzburg College.
DIVING & ALLIED QUALIFICATIONS:
HSE part 1 South African Commercial Diver Class II 50 Metre.
IASST Offshore Survival Certificate: valid till 29/05/2017.
IASST HUET & fire fighting. Valid till 29/05/2017.
SAMSA Category C Day Skippers Ticket.
WORK EXPERIENCE:
COMPANY TAG DIVING SERVICES
COUNTRY SOUTH AFRICA
POSITION DIVER/skipper
DATE 21/09/2014-present
PROJECT/JOB
SCOPE
Quayside Construction
Brocco and gas cut 220, 1m x 600mm,
squares in an old quay side sheet pile 20mm
steel wall to drive support piles from new sheet
pile wall through the holes cut out in the old
sheet pile wall and into backfilled quay.
Weld pad eyes to new King piles in water to
hold 16tone koffer dam. welds tested to 36
tones.
Moving and positioning barges.
CLIENT STEFANNUTI STOCKS
3. COMPANY TAG DIVING SERVICES
COUNTRY SOUTH AFRICA
POSITION DIVER/skipper
DATE 11/0406/2014-21/09/2014
PROJECT/JOB
SCOPE
Quayside Construction
BUILDING A EVEN ROCK SLOPE IN DURBAN
HARBOR TO INSTALL TWO SAND BYPASS
PIPES LINES. FLOAT 13T CONCRETE COLLARS
INTO PLACE AND THEN DROP THEM IN PLACE
ON THE PREPARED SEA BED. FLOAT PIPE
LINES IN PIECE BY PIECE WITH LIFT BAGS
AND CONNECTING THE PIPES.
CLIENT GROUP 5 STRUCTURED INGENUITY
COMPANY TAG DIVING SERVICES
COUNTRY SOUTH AFRICA
POSITION DIVER/skipper
DATE 05/04/2014-27/04/2014
PROJECT/JOB
SCOPE
OIL CLEAN UP.
CLEAN A OIL SPILL IN THE HARBOR. CLEAN
OIL OFF OF SHIPS AND IN AND UNDER QUAE
SIDES OF HARBOR.
CLEANED THE SHIPS USING WATER JETTING
AND CUP BRUSHES ON HYDRAULIC
GRINDERS. CONTAMINATED DIVING
CLIENT Engen
COMPANY TAG DIVING SERVICES
COUNTRY South Africa
POSITION DIVER/skipper
DATE 15/11/2013-1/04/2014
PROJECT/JOB
SCOPE
Quayside Construction
REINFORCE SEA BED UNDER QUAY SIDE IN
DURBAN HARBOR. FIX ROCK PROFILE,
REMOVE STEAL, LAYING GROUT BAGS TO
EVEN OUT ROCK SLOPE, ROCK DRILLING TO
REMOVE BIG ROCKS, LIFT BAGS,SLINGS AND
80MM STEEL PINS WERE USED TO RIG THE
ROCKS UP SND MOVE THEM.
CLIENT STEFANNUTI Stocks
COMPANY TAG DIVING SERVICES
COUNTRY SOUTH AFRICA
POSITION DIVER
DATE 11/11/2013 - 03/12/2013
VESSEL SEDCO 702 Oil Rig
PROJECT/JOB
SCOPE
INSPECT PONTOONS, SEA CHESTS,
HYDROPHONES, ANODES AND 8 THRUSTERS
OF RIG SEDCO 702. CUT OLD ANODES OFF
AND WELDED NEW ANODES ON,
PHOTOGRAPHIC SURVEYS, VIDEO & SOUND
SURVEYS, WERE DONE. CLEANING OF
THRUSTERS AND SEA CHEST. INSTALLING
AND REMOVING OF BLANKS ON SEA CHESTS
AND HYDROPHONES. OIL&GAS & UWILD
CLIENT DCD Marine
4. TAG DIVING SERVICES
COUNTRY SOUTH AFRICA
POSITION DIVER
DATE 06/11/2013
COMPANY TAG DIVING SERVICES
COUNTRY SOUTH AFRICA
POSITION DIVER
DATE 22/10/2013
VESSEL SUBTECH RUBBER DUCK
JOB SCOPE INSPECT THE “SMART” SHIP WRECK,
DETERMINE WHERE THE SHIP SPLIT AND
LOCATE STRESS AND SERIOUS DAMAGED
AREAS OF THE SHIP, INSIDE AND OUTSIDE OF
SHIP. DETERMINE WHETHER OR NOT IT IS
SAFE FOR OTHER DIVERS TO WORK SAFELY
INSIDE WRECK FOR SALVAGE PURPOSES.
VIDEO AND AUDIO SURVEYS WERE DONE BY
ME.
CLIENT TITAN SALVAGE
COMPANY TAG DIVING SERVICES
COUNTRY SOUTH AFRICA
POSITION DIVER
DATE 19/10/2013
VESSEL TAG DIVING RUBBER DUCK
JOB SCOPE JET PROBE WITH 6M LONG JET PROBE
AROUND THE “SMART SHIP WRECK” TO
DETERMINE WHAT THE OCEAN BED WAS LIKE
AROUND THE SHIP. CLAY, SAND OR ROCK.
MAKE SURE IT IS SAFE FOR JACKUP BARGE TO
POSITION ITSELF NEXT TO THE WRECK.
CLIENT TITAN SALVAGE
COMPANY TAG DIVING SERVICES
COUNTRY SOUTH AFRICA
POSITION DIVER
DATE 12/10/2013
VESSEL SUPERLIGHT
JOB SCOPE ATTEMPT TO LOCATE AND RETRIEVE A SHIPS
ANCHOR, ANCHORE WAS DEEPER THAN 50M
AND JOB WAS STOPPED.
CLIENT SHIPPING AGENCY
COMPANY TAG DIVING SERVICES
COUNTRY SOUTH AFRICA
POSITION DIVER
DATE 26/09/2013 – 05/11/2013
JOB SCOPE POSITION 2t SAND BAGS NEXT PIERS FOR
SURPPORT AND TO STOP SCOURING
COMPANY TAG DIVING SERVICES
COUNTRY SOUTH AFRICA
POSITION DIVER/SKIPPER
DATE 02/09/2013 - 05/09/2013
5. PROJECT/JOB
SCOPE
INSTALLING AND REMOVING BLANKS/ KOFFER
DAMS IN 0 VIZ ON VALVES INSIDE THE “WAGANS
DRIFT” DAM WALL FOR VALVE CHANGE OUTS AND
REFURBISHMENT.
CLIENT DEPARTMENT OF WATER AFFAIRS.
COMPANY TAG DIVING SERVICES
COUNTRY SOUTH AFRICA
POSITION DIVER
DATE 27/01/2013 – 01/08/2013
PROJECT/JOB
SCOPE
INSTALLING AND REMOVING BLANKS ON HYDRO
STATION WATER PUMPS IN A DAM. VALVE CHANGE
OUTS.
CLIENT WATER AFFAIRS
COMPANY TAG DIVING SERVICES
COUNTRY SOUTH AFRICA
POSITION DIVER
DATE 19/07/2013 - 26/08/2013
PROJECT/JOB
SCOPE
Quayside Construction
REMOVING 62t REINFORCMENT STEEL FROM
UNDER QUAY IN DURBAN HARBOR. BROCCO
CUTTING I-BEAMS.
CLIENT STAFANNUTI
COMPANY AQUA-TECH DIVING
COUNTRY SOUTH AFRICA
POSITION FREELANCE DIVER
DATE 08/07/2013
PROJECT/JOB
SCOPE
PHOTOGRAPHIC SURVEY ON FISHING TRAWLER.
GENERAL HULL INSPECTION, PROP INSPECTION
AND BOW THRUSTER INSPECTION.
COMPANY WALVIS BAY DIVING SERVICES
COUNTRY NAMIBIA
POSITION DIVER/SKIPPER
DATE 25/06/2013
PROJECT/JOB
SCOPE
PROP POLISH USING HYDROLIC GRINDER ON
CABLE LAYING VESSEL.
COMPANY WALVIS BAY DIVING SERVICES
COUNTRY NAMIBIA
POSITION DIVER/SKIPPER
DATE 21/06/2013
PROJECT/JOB
SCOPE
GENERAL HULL INSPECTION ON DIMOND VESSEL.
COMPANY WALVIS BAY DIVING SERVICES
COUNTRY NAMIBIA
POSITION DIVER/SKIPPER
DATE 18/06/2013
PROJECT/JOB
SCOPE
DRILLIND ISPECTION PORTS ON THRUSTER OF
FISHING TRAWLER AND WELDED PORTS CLOSED
AGAIN.
COMPANY WALVIS BAY DIVING SERVICES
COUNTRY NAMIBIA
POSITION DIVER/SKIPPER
6. DATE 17/06/2013
PROJECT/JOB
SCOPE
CLEANED BARNICLES AND DEBRE OFF SHIPS HULL
WUTH WATER JET.
COMPANY WALVIS BAY DIVING SERVICES
COUNTRY NAMIBIA
POSITION DIVER/SKIPPER
DATE 14/06/2013
PROJECT/JOB
SCOPE
PROP INSPECTION ON A SHIP, TAKE BLADE
MESSUREMENTS TO DETERMIN HOW MUCH THE
PROP HAS BEEN DAMAGED.
COMPANY WALVIS BAY DIVING SERVICES
COUNTRY NAMIBIA
POSITION DIVER/SKIPPER
DATE 11/06/2013
PROJECT/JOB
SCOPE
INSPECT SEAMS AND WATERPROOFING OF THE
ELISENHEIN RESERVOIR. LOCATE LEAKS AND DO
PHOTOGRAPHIC SURVEY.
COMPANY WALVIS BAY DIVING SERVICES
COUNTRY NAMIBIA
POSITION DIVER/SKIPPER
DATE 04/06/2013
PROJECT/JOB
SCOPE
PROP INSPECTION AND GENERAL HULL INSPECTION
ON SHIP.
REFERENCES:
Dirk Van Der Heever(Supervisor) - +27 78666 7054
Nic Endemann (Sat diver) +27 828021684
Riaan Erasmus ( Supervisor) +27 732493975
Chris Stemmet (Supervisor) +27 795005340