SlideShare ist ein Scribd-Unternehmen logo
1 von 9
Alternative Railway System 
By Hugo Guimarães 
Mechatronics Engineer 
15/August/2014
Have you ever asked how to take 
advantage of the lost potential of 
the abandoned railways?
Why those railways have beem 
abandoned in the first place? 
• The passengers give up of the trains because: 
– The availability of the service is low 
– The schedules are fixed 
– The time of travel is high due the low speed 
• The rails companies give up of the business 
because: 
– The maintenance cost with infrastructure and trains 
are heavy 
– The energy consumption is high per passengers due 
the low ocupacy tax 
– The costs with workers are high
How to reverse the situation? 
• From the user point of view 
– Increase the availability of the services 
– No Schedule 
– Lower travel time - higher speed 
• From the operator point of view: 
– Reduction of the maintenance costs using lighter 
vehicles 
– Use electric traction rechargeable by solar energy 
– Avoid the use of workers by using automated 
solutions
The Solution is a Individual Rail Vehicle
Individual Rail Vehicle 
• Advantages: 
• 4 passengers capacity vehicle 
• No schedule, always ready to depart 
• Point to point transportation, no middle stops 
• Low vehicle maintenance (electric traction) 
• Low infrastructure maintenance (light vehicles) 
• No power cost (solar energy) 
• Automatic driven (central computer based on GPS 
location) 
• Using the existing rail infrastructure
Terminal A 
Working example 
Middle station Terminal B
3D operation 
http://youtu.be/xgBDESX8a0M
Individual rail vehicle is the “pizza” 
of the mobility

Weitere ähnliche Inhalte

Was ist angesagt?

Presentation-11th ACUUS International Conference
Presentation-11th ACUUS International ConferencePresentation-11th ACUUS International Conference
Presentation-11th ACUUS International Conference
Meliti Pappa
 
Transit Management Poster Template v2 3
Transit Management Poster Template v2 3Transit Management Poster Template v2 3
Transit Management Poster Template v2 3
student
 
Bombardier Transportation - Fast Tracking Rail Vehicle Design
Bombardier Transportation - Fast Tracking Rail Vehicle DesignBombardier Transportation - Fast Tracking Rail Vehicle Design
Bombardier Transportation - Fast Tracking Rail Vehicle Design
Altair ProductDesign
 

Was ist angesagt? (10)

ABB optimised solutions electrification by Jonathan Maher
ABB optimised solutions electrification by Jonathan MaherABB optimised solutions electrification by Jonathan Maher
ABB optimised solutions electrification by Jonathan Maher
 
Presentation-11th ACUUS International Conference
Presentation-11th ACUUS International ConferencePresentation-11th ACUUS International Conference
Presentation-11th ACUUS International Conference
 
Battery Powered and Hybrid Drive Opportunities in Heavy Duty, Large Capacity,...
Battery Powered and Hybrid Drive Opportunities in Heavy Duty, Large Capacity,...Battery Powered and Hybrid Drive Opportunities in Heavy Duty, Large Capacity,...
Battery Powered and Hybrid Drive Opportunities in Heavy Duty, Large Capacity,...
 
Speaker keynote - Interna 2018 - Department of Computer Engineering at Shari...
Speaker keynote - Interna 2018  - Department of Computer Engineering at Shari...Speaker keynote - Interna 2018  - Department of Computer Engineering at Shari...
Speaker keynote - Interna 2018 - Department of Computer Engineering at Shari...
 
"Pony Express" electrification of long haul trucks using tractor swapping
"Pony Express" electrification of long haul trucks using tractor swapping"Pony Express" electrification of long haul trucks using tractor swapping
"Pony Express" electrification of long haul trucks using tractor swapping
 
Bombardier Eco4
Bombardier Eco4Bombardier Eco4
Bombardier Eco4
 
Transit Management Poster Template v2 3
Transit Management Poster Template v2 3Transit Management Poster Template v2 3
Transit Management Poster Template v2 3
 
Modelling the driving behaviour of e-vehicles
Modelling the driving behaviour of e-vehiclesModelling the driving behaviour of e-vehicles
Modelling the driving behaviour of e-vehicles
 
Bombardier Transportation - Fast Tracking Rail Vehicle Design
Bombardier Transportation - Fast Tracking Rail Vehicle DesignBombardier Transportation - Fast Tracking Rail Vehicle Design
Bombardier Transportation - Fast Tracking Rail Vehicle Design
 
Regenerative Braking
Regenerative BrakingRegenerative Braking
Regenerative Braking
 

Ähnlich wie Individual rail transportation

Presentation2
Presentation2Presentation2
Presentation2
Aman Haz
 
PT Modeling in S'pore [Terence Ng]
PT Modeling in S'pore [Terence Ng]PT Modeling in S'pore [Terence Ng]
PT Modeling in S'pore [Terence Ng]
Terence Ng
 
Theme 4 Flexible capacity operations
Theme 4 Flexible capacity operationsTheme 4 Flexible capacity operations
Theme 4 Flexible capacity operations
BRTCoE
 
Transport poster
Transport posterTransport poster
Transport poster
Gordon Best
 

Ähnlich wie Individual rail transportation (20)

UITP training on Bus Procurement
UITP training on Bus ProcurementUITP training on Bus Procurement
UITP training on Bus Procurement
 
Workshop Innovation in Africa - Manifesto for BRT Lite
Workshop Innovation in Africa - Manifesto for BRT LiteWorkshop Innovation in Africa - Manifesto for BRT Lite
Workshop Innovation in Africa - Manifesto for BRT Lite
 
Proposal for redesigning Panadura Bus Terminal- Sri Lanka
Proposal for redesigning Panadura Bus Terminal- Sri LankaProposal for redesigning Panadura Bus Terminal- Sri Lanka
Proposal for redesigning Panadura Bus Terminal- Sri Lanka
 
CONNECTKaro 2015 - Session 10A - BRT - Challenges for Sustainable Transport S...
CONNECTKaro 2015 - Session 10A - BRT - Challenges for Sustainable Transport S...CONNECTKaro 2015 - Session 10A - BRT - Challenges for Sustainable Transport S...
CONNECTKaro 2015 - Session 10A - BRT - Challenges for Sustainable Transport S...
 
Indian railway services
Indian railway servicesIndian railway services
Indian railway services
 
Presentation2
Presentation2Presentation2
Presentation2
 
Unit 4 package 6
Unit 4 package 6Unit 4 package 6
Unit 4 package 6
 
MBTA Electric Multiple Units RFI Update
MBTA Electric Multiple Units RFI UpdateMBTA Electric Multiple Units RFI Update
MBTA Electric Multiple Units RFI Update
 
PT Modeling in S'pore [Terence Ng]
PT Modeling in S'pore [Terence Ng]PT Modeling in S'pore [Terence Ng]
PT Modeling in S'pore [Terence Ng]
 
Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario
Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario
Bus Rapid Transit System (BRTS) - Case Studies in Indian Scenario
 
Capacity management in large projects
Capacity management in large projectsCapacity management in large projects
Capacity management in large projects
 
Sam Linke - Session 3: Airport City Design
Sam Linke - Session 3: Airport City DesignSam Linke - Session 3: Airport City Design
Sam Linke - Session 3: Airport City Design
 
4 bus fleet and infrastructure rli final
4 bus fleet and infrastructure rli final4 bus fleet and infrastructure rli final
4 bus fleet and infrastructure rli final
 
Magnetic Levitating train
Magnetic Levitating trainMagnetic Levitating train
Magnetic Levitating train
 
ICServ2014 Smart Access Vehicle System
ICServ2014 Smart Access Vehicle SystemICServ2014 Smart Access Vehicle System
ICServ2014 Smart Access Vehicle System
 
Theme 4 Flexible capacity operations
Theme 4 Flexible capacity operationsTheme 4 Flexible capacity operations
Theme 4 Flexible capacity operations
 
Bullet train in india
Bullet train in indiaBullet train in india
Bullet train in india
 
The Zuidtangent - Experiences with BRT in the Amsterdam Region
The Zuidtangent - Experiences with BRT in the Amsterdam RegionThe Zuidtangent - Experiences with BRT in the Amsterdam Region
The Zuidtangent - Experiences with BRT in the Amsterdam Region
 
RE-DEVELOPMENT OF HIJLI RAILWAY STATION.pptx
RE-DEVELOPMENT OF HIJLI RAILWAY STATION.pptxRE-DEVELOPMENT OF HIJLI RAILWAY STATION.pptx
RE-DEVELOPMENT OF HIJLI RAILWAY STATION.pptx
 
Transport poster
Transport posterTransport poster
Transport poster
 

Kürzlich hochgeladen

FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377087607
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377087607FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377087607
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377087607
dollysharma2066
 
+971565801893>>Safe and original mtp kit for sale in Dubai>>+971565801893
+971565801893>>Safe and original mtp kit for sale in Dubai>>+971565801893+971565801893>>Safe and original mtp kit for sale in Dubai>>+971565801893
+971565801893>>Safe and original mtp kit for sale in Dubai>>+971565801893
Health
 
Indian Call girl in Dubai 0508644382 Dubai Call girls
Indian Call girl in Dubai 0508644382 Dubai Call girlsIndian Call girl in Dubai 0508644382 Dubai Call girls
Indian Call girl in Dubai 0508644382 Dubai Call girls
Monica Sydney
 
Enabling Business Users to Interpret Data Through Self-Service Analytics (2).pdf
Enabling Business Users to Interpret Data Through Self-Service Analytics (2).pdfEnabling Business Users to Interpret Data Through Self-Service Analytics (2).pdf
Enabling Business Users to Interpret Data Through Self-Service Analytics (2).pdf
Smartinfologiks
 
Jual Obat Aborsi Bojonegoro ( Asli No.1 ) 085657271886 Obat Penggugur Kandung...
Jual Obat Aborsi Bojonegoro ( Asli No.1 ) 085657271886 Obat Penggugur Kandung...Jual Obat Aborsi Bojonegoro ( Asli No.1 ) 085657271886 Obat Penggugur Kandung...
Jual Obat Aborsi Bojonegoro ( Asli No.1 ) 085657271886 Obat Penggugur Kandung...
ZurliaSoop
 

Kürzlich hochgeladen (15)

EV Electric Vehicle Startup Pitch Deck- StartupSprouts.in
EV Electric Vehicle Startup Pitch Deck- StartupSprouts.inEV Electric Vehicle Startup Pitch Deck- StartupSprouts.in
EV Electric Vehicle Startup Pitch Deck- StartupSprouts.in
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377087607
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377087607FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377087607
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377087607
 
EXPERIENCE THE FUTURE OF WORK FOR FUTURE OF BUSINESSES
EXPERIENCE  THE FUTURE OF WORK FOR FUTURE OF BUSINESSESEXPERIENCE  THE FUTURE OF WORK FOR FUTURE OF BUSINESSES
EXPERIENCE THE FUTURE OF WORK FOR FUTURE OF BUSINESSES
 
+971565801893>>Safe and original mtp kit for sale in Dubai>>+971565801893
+971565801893>>Safe and original mtp kit for sale in Dubai>>+971565801893+971565801893>>Safe and original mtp kit for sale in Dubai>>+971565801893
+971565801893>>Safe and original mtp kit for sale in Dubai>>+971565801893
 
CARA BINA PENDAPATAN PASIF HARIAN RM9000 BERMODALKAN RM30 DI TDC
CARA BINA PENDAPATAN PASIF HARIAN RM9000 BERMODALKAN RM30 DI TDCCARA BINA PENDAPATAN PASIF HARIAN RM9000 BERMODALKAN RM30 DI TDC
CARA BINA PENDAPATAN PASIF HARIAN RM9000 BERMODALKAN RM30 DI TDC
 
Famedesired Project portfolio1 . Fullsail
Famedesired Project portfolio1 . FullsailFamedesired Project portfolio1 . Fullsail
Famedesired Project portfolio1 . Fullsail
 
How to structure your pitch - B4i template
How to structure your pitch - B4i templateHow to structure your pitch - B4i template
How to structure your pitch - B4i template
 
Indian Call girl in Dubai 0508644382 Dubai Call girls
Indian Call girl in Dubai 0508644382 Dubai Call girlsIndian Call girl in Dubai 0508644382 Dubai Call girls
Indian Call girl in Dubai 0508644382 Dubai Call girls
 
Enabling Business Users to Interpret Data Through Self-Service Analytics (2).pdf
Enabling Business Users to Interpret Data Through Self-Service Analytics (2).pdfEnabling Business Users to Interpret Data Through Self-Service Analytics (2).pdf
Enabling Business Users to Interpret Data Through Self-Service Analytics (2).pdf
 
How Multicultural Toys Helps in Child Development.pptx
How Multicultural Toys Helps in Child Development.pptxHow Multicultural Toys Helps in Child Development.pptx
How Multicultural Toys Helps in Child Development.pptx
 
Supply Chain Location Decision and Management
Supply Chain Location Decision and ManagementSupply Chain Location Decision and Management
Supply Chain Location Decision and Management
 
Shareholders Agreement Template for Compulsorily Convertible Debt Funding- St...
Shareholders Agreement Template for Compulsorily Convertible Debt Funding- St...Shareholders Agreement Template for Compulsorily Convertible Debt Funding- St...
Shareholders Agreement Template for Compulsorily Convertible Debt Funding- St...
 
JAIPUR CALL GIRLS SERVICE REAL HOT SEXY 👯 CALL GIRLS IN JAIPUR BOOK YOUR DREA...
JAIPUR CALL GIRLS SERVICE REAL HOT SEXY 👯 CALL GIRLS IN JAIPUR BOOK YOUR DREA...JAIPUR CALL GIRLS SERVICE REAL HOT SEXY 👯 CALL GIRLS IN JAIPUR BOOK YOUR DREA...
JAIPUR CALL GIRLS SERVICE REAL HOT SEXY 👯 CALL GIRLS IN JAIPUR BOOK YOUR DREA...
 
Jual Obat Aborsi Bojonegoro ( Asli No.1 ) 085657271886 Obat Penggugur Kandung...
Jual Obat Aborsi Bojonegoro ( Asli No.1 ) 085657271886 Obat Penggugur Kandung...Jual Obat Aborsi Bojonegoro ( Asli No.1 ) 085657271886 Obat Penggugur Kandung...
Jual Obat Aborsi Bojonegoro ( Asli No.1 ) 085657271886 Obat Penggugur Kandung...
 
Dàni Velvet Personal Brand Exploration (1).pptx
Dàni Velvet Personal Brand Exploration (1).pptxDàni Velvet Personal Brand Exploration (1).pptx
Dàni Velvet Personal Brand Exploration (1).pptx
 

Individual rail transportation

  • 1. Alternative Railway System By Hugo Guimarães Mechatronics Engineer 15/August/2014
  • 2. Have you ever asked how to take advantage of the lost potential of the abandoned railways?
  • 3. Why those railways have beem abandoned in the first place? • The passengers give up of the trains because: – The availability of the service is low – The schedules are fixed – The time of travel is high due the low speed • The rails companies give up of the business because: – The maintenance cost with infrastructure and trains are heavy – The energy consumption is high per passengers due the low ocupacy tax – The costs with workers are high
  • 4. How to reverse the situation? • From the user point of view – Increase the availability of the services – No Schedule – Lower travel time - higher speed • From the operator point of view: – Reduction of the maintenance costs using lighter vehicles – Use electric traction rechargeable by solar energy – Avoid the use of workers by using automated solutions
  • 5. The Solution is a Individual Rail Vehicle
  • 6. Individual Rail Vehicle • Advantages: • 4 passengers capacity vehicle • No schedule, always ready to depart • Point to point transportation, no middle stops • Low vehicle maintenance (electric traction) • Low infrastructure maintenance (light vehicles) • No power cost (solar energy) • Automatic driven (central computer based on GPS location) • Using the existing rail infrastructure
  • 7. Terminal A Working example Middle station Terminal B
  • 9. Individual rail vehicle is the “pizza” of the mobility