Development of a Field-Scale Research Facility to Assess the
Effects of Sea Level Rise on Freshwater
Bottomland Hardwood Forests
Hudson Adams, Riley Garvey, Alyssa Knight, Rachel Mordovancey,
Mattie Rourk, Alexa Schiazza
Clemson University, Clemson, SC
December 1, 2020
Outline
● Introduction
○ Background
○ Rationale
○ Objective(s)
○ Approaches
● Literature Review
● Materials and Methods
● Results
● Recommendations
● Acknowledgements
Introduction
Background
Role of Wetlands
● Wetlands provide many important ecosystem services
○ Improving and protecting water quality
○ Providing fish and wildlife habitats
○ Storing floodwater
● Wetlands are some of the most productive ecosystems
● The overall global wetland value was estimated to be around
47.4 trillion dollars per year
Background
Climate Impact on Wetlands
● Climate change, and the resulting sea level rise, affect the health and
functionality of tidal wetlands.
● Sea level rise causes the inundation and potential displacement of these
areas.
● Such stressors may disassemble the existing ecosystem of the wetland due
to loss of vegetation, loss of habitat, and biogeochemical changes in the
soil.
● Wetlands offer valuable ecosystem services such as erosion control,
bioremediation, and flood protection.
● It is important to be able to predict how these services and ecosystems will
be impacted as sea levels rise.
Background
Wetland Maps
Background
Project Scope
● Freshwater tidal wetlands are wetlands that are influenced by the tides but
do not suffer from saltwater intrusion.
● In the lowlands of South Carolina these are both common and more distant
from the coastline than expected in other areas due to the extremely
gradual elevation changes.
● There are two types of freshwater tidal wetlands, marsh and forest, with
the differences occurring due to the hydroperiod, or the period of time the
wetland is covered by water.
● Ecosystem services can be negatively impacted by environmental/climate
change, therefore it is important to monitor these changes.
Background
Facility Location
● Located in the Santee
Experimental Forest on
the East Branch of the
Cooper River
● Sites are bottomland
hardwood forest
Rationale
● Between a field and a lab facility, a field research facility is needed because
wetlands are so complex that if meaningful data is to be collected, all of the
biogeochemical features would need to be incorporated into a lab research
facility. Thus, a field facility is best in order to more easily bring together
those complex ecosystem functions.
● Wetlands provide many ecosystem services such as improving water quality
and storing flood water. If rising sea level affects the way they currently
function, then they may lose some of these services.
● The models currently used to predict how ecosystem services will be
affected are not useful, as freshwater tidal wetlands have not been
adequately studied.
● The idea for this project is to create a mesocosm to gain critical data by
which to base future models on.
Hypothesis to be tested through the use of the
designed facility:
As sea level rises and
hydroperiods change, these
wetlands will shift in type and
previously nontidal wetlands will
become tidally influenced.
Objectives
Mission
The main objective of this project is to design and model a field scale
research facility to study the impact of climate change on the ecosystem
services provided by wetlands, in particular, to determine the effects of sea
level rise on the hydrologic regime of a freshwater tidal wetland.
Specific Objectives
1. To design impoundment/control water structures and drainage
2. To develop an operational plan
3. To develop a site plan for research site
Client Deliverables
1. Hydrogeomorphic Assessment – this is an integrated assessment of the land
resource data providing a basis for the site selection
a. A detailed analysis of the natural and man-made subcatchments within the
floodplain that could be the mesocosms. This analysis will focus on utilizing
the lidar data to delineate drainage areas and flow paths within the
floodplain.
b. This analysis will consider the current flow paths and hydrologic regimes.
2. Summary on the expected impacts of sea-level rise on the current hydrologic
regime
3. Facility Operational Plan
4. Site Plan
Approaches
Task 1
To determine
a site location
Task 2
To design the
facility
Task 1: To determine a site location
Sub-Tasks:
● To collect hydrological, Lidar, climate, and GIS data for the possible sites.
● To assess references, data, and similar project designs.
● To research sea-level rise modelling done by NOAA or another agency in the
Charleston area.
● To explore water containment and management methods for both options.
● To determine biodiversity of local flora within each option.
● To identify size requirements and necessary site boundaries for both
options.
● To choose an alternative to move forward into design.
Approaches
Site Option 1: Tidally Influenced Sub-Catchment Channel
● Put a weir in “Channel A” to divert
water to “Channel B”
● Put berm at tidally influenced
intersection of “Channel B”
● Use main channel water to flood
“Channel B” area
Site Plan Site Map
Approaches
Site Option 1: Tidally Influenced
Sub-Catchment Channel
A B C
C
A
B
Approaches
Site Option 2: Non-Tidal Controlled Rice Fields
● Retrofit existing berms in rice field
plot
● Install a pump from Nicholson
Creek to the chosen rice field plot
● Construct a weir on the opposite
site of the rice field to let water
escape when necessary
Site Plan Site Map
Approaches
Site Option 2: Non-Tidal
Controlled Rice Fields
A B C
C
A
B
Task 2: To design a facility
Sub-Tasks:
● To evaluate site planning considerations including site access, elevation, and wetland
impact.
● To examine possible methods of passive flow/filling.
● To identify needs to maintain a healthy ecosystem such as water retention rate.
● To determine what additional infrastructure such as water control structures, pipe
networks, pumps, and drainage systems will be required.
● To model hydrologic regimes and design plans by utilizing CAD, HEC-RAS, and SOLIDWORKS.
● To create a design plan draft.
● To develop a final site plan.
● To formulate a facility operations plan by determining how the water control system will
run.
● To assess the cost of the designed field research facility.
Pre-/post-development
modeling and structural
drawings
Developing tidal
regime and
operational plans
CAD site
development
Task Management
Team
We collaborated as a group on all aspects of
the project. To ensure that everything got
done, each group member was assigned a
different task to be in charge of:
● Hudson Adams
○ Structural Drawings using
SolidWorks
● Riley Garvey
○ Pre-development modeling using
HEC-RAS
● Mattie Rourk
○ Operational Plans
○ Literature Review
● Alyssa Knight
○ Developing tidal regime
○ Post-development modeling using
HEC-RAS
● Rachel Mordavancy
○ Site development using CAD
● Alexa Schiazza
○ PowerPoint Format
Ecology Climate
Science
Engineering
TFW research
center
Maximizing use
of existing
infrastructure
Efficiently
capturing and
manipulating
water flows
Diverse
assemblage of
endemic
species
Literature
Review
Literature Review
Site Hydrology
● Most of the soils have high surface runoff and low infiltration
rates.
● Average annual rainfall: 1370 mm
● The peak discharges for the Turkey Creek watershed:
○ 12.0 m3/s--2 year return period
○ 22.9 m3/s--5 year return period
○ 31.5 m3/s--10 year return period
○ 42.9 m3/s--25 year return period
○ 53.2 m3/s--50 year return period
○ 64.2 m3/s--100 year return period
● Vegetation: pine-hardwood forests.
● The area in the watershed lies 2 m-14 m above sea level.
Literature Review
Parameters
● Going forward with the design, the research parameters that the facility will be used
for are:
○ Vegetation response
■ which will monitor changes in vegetation structure, composition, and
productivity including photosynthesis and transpiration
○ Soil response
■ which will monitor changes in soil biogeochemistry such as redox
conditions, greenhouse gas emissions, carbon storage, nutrient cycling,
also soil microbiology
○ Hydrologic response
■ which will monitor changes in hydrology and water quality
Literature Review
Turkey Creek Water Table Data
We will use Turkey Creek
data in order to estimate
Nicholson Creek flows off a
relative size comparison
since they are both type 3
streams
Literature Review
Tidal Information
● High tide and low tide alternate
approximately every 6 hours each day
● Tides shift back about an hour every day
○ Example: 6:30 one day, and 7:30 the
next, etc.
● Estimate timing and inflow and outflow
rates based on Huger Creek tidal data
Literature Review
Sea Level Rise
How high should the water be
raised?
● The relative sea-level rise trend
in Charleston, SC is about 3.32
mm/year based on monthly
mean sea level data spanning
from 1901 to 2019.
● This was determined to be the
equivalent to a 1.09 ft sea level
rise over the span of 100 years.
Literature Review
Sea Level Rise
Literature Review
Mesocosm vs. Large-Scale Experiment
Large Scale Experiment:
● Displayed an increase in
temperature over time.
● An increase in dissolved oxygen
over time.
● Larger scale experiments are
harder to control.
Mesocosm Experiment:
● Became colonized by macrophytes
which caused shading.
○ Lower temperature over time.
● Mesocosms are often more
optimal as they are more
replicable and repeatable.
Both:
● Retain nutrients.
● Showed an increase in pH.
Literature Review
Mesocosm vs. Large-Scale Experiment
How does the complexity
of these two set-ups
compare?
Symbol Key:
Materials
and
Methods
Materials and Methods
Modeling
● To create location and watershed basin maps of the site using ArcGIS
● To measure site hydrologic features, specifically raised water levels, using HEC-RAS
● For site design and plan set development will be created using AutoCAD Civil3D
● To design and model hydraulic structures, such as a weir structure, using SolidWorks
Materials and Methods
Site Needs
● Existing Conditions Evaluation
● Grading Needs (Fill Soils)
● Pump
● Hydraulic Structure: Weir
● Site Access Stair
● Electrical Instrumentation (Beyond Scope of Design)
Results
Results
Site Selection
Channel Rice Field
Results
Site Existing Conditions Utilizing Lidar Data
● Elevation data for the site was acquired from NOAA as a lidar point cloud.
○ Utilized in GIS and HEC-RAS as a DEM
○ Utilized in C3D as a dynamic TIN Surface
Results
Site Existing Conditions Utilizing AutoCAD
Results
Pre-Development Flow Model Utilizing HEC-RAS
● 1-year rain event
● Rice fields are naturally
flooded from large storm
events
○ after 3 hours of this
storm, the average water
depth on the site was 22
cm
● Berms are partially inundated
- creating the need for
increased height and proper
grading
Results
Grading Utilizing AutoCAD
● Utilized C3D’s Feature Lines and Grading Creation Tools
● Created new design surfaces by pasting grading data into the
existing ground surface.
Results
Berm Grading Utilizing C3D
● Due to the deteriorated condition
of the berms, reinforcement and a
raised height is required.
● Berms will be 3’ top width with a
3:1 slope down to the existing
grade.
Results
Post-Development Flow Model Utilizing HEC-RAS
● Simulating 1 foot of sea level
rise
● The pump creates an inflow
to raise the water level to 1 ft
in a 6 hour period to reach
high tide
● The gate opens and releases
water to empty the field over
a 6 hour period to reach low
tide
Results
Site Layout
Utilizing C3D
Results
Spillway Grading Utilizing C3D
● The spillway is
designed to retain
the low tide tide
water level while
the hydraulic weir
will hold the high
tide.
● 3:1 slope down
from berms and
2% down the
spillway through
the berms
Results
Spillway Stabilization
● Major storm events can lead to concentrated
runoff that can erode the spillway.
● Erosion can be prevented using:
○ Protective grass vegetation
○ An appropriately designed rock cover
○ Concrete or other erosion control
matting
● After major storm events, compacted soil
can be placed in the eroded spillway to
restore the normal embankment.
Results
Pump Station Location
● Because the site is
located in the
Nicholson Creek
flood plain, the pump
cannot be placed
within the wetland
area.
● The station will be
located off of
Summerhouse Road
adjacent to
Nicholson Creek
Results
Pump Station Site
Grading Utilizing AutoCAD
● The road grade will be extended by
15’ to provide a 15’ ⨯ 15’ flat surface
in order to place the pump station.
● Graded to the existing ground at 3:1
slope
Results
Cost Assessment-Grading
● A volume comparison surface was created from
the existing and modeled future ground.
● The net fill volume was calculated to be 950.17 yd3
● At an estimated $20 per yd3, the total cost of the
fill soils would be approximately $19,004.
Results
Pipe Alignment Utilizing AutoCAD
● HDPE pressure pipe will
be utilized to pump
water from Nicholson
Creek to the rice field
plot.
Results -Pipe Alignment Profile Utilizing AutoCAD
● In order to avoid the
ecological impact of
burying the pipe, it will
be run over the ground
on stilts supported by
pylons
● Because of the warm
climate of Huger, SC,
temperature related
deflections of the pipe
are of minimal concern.
● The pylons will be
supported with
compacted fill material.
Results
Flow Rate Estimation
● The flow rate was determined using the equation Q = V/t
● The volume was determined to be 64,984.33ft3 based on the area
calculated through CAD modeling and a 1 foot depth with a 3:1 slope on all
sides.
● The time was set to equal 21,600s in order to match a tidal regime of 6
hours.
● The flow rate was found to be 3.01cfs
Results
Pipe and Pump
Sizing
● Hazen Williams head loss
equation
○ 8” Suction Pipe
○ 6” Discharge Pipe
○ Flow rate= 1350 gpm
○ Friction coefficient, C=140
○ Suction Side:
■ 44 LF of pipe.
○ Discharge Side:
■ 351 LF of pipe
● Total friction losses in suction
side=1.42 ft
● Total friction losses in discharge
side=42.9 ft
Increases in friction from the fittings are
accounted for in “Effective Pipeline Length”
or equivalent length of pipe based on the
predetermined K factor for the fitting.
● LE=(K’)(D)
● Project Pipeline includes:
○ 2 - 90° Elbows
○ 1 - 45° Elbow
○ 2 - 15° Elbows
● LE(suction)= 6.75 ft
● LE(discharge)= 28.25 ft
Results
Pump and Pipe Sizing
● Total Dynamic Head (TDH):
○ Equivalent height of the fluid to be pumped.
○ Determined by head loss changes in the pipe.
● Suction Lift TDH=10.42 ft
○ 1.42 ft of friction loss
○ 9 ft of suction head loss
○ Equivalent Length of 51 ft of 8” pipe
● Discharge TDH=36.86 ft
○ 42.9 ft of friction loss
○ -6 ft of head loss (head gain)
○ Equivalent pipe length of 379 LF of 6” pipe
Results
Pump and Pipe Sizing
Results
Pump and Pipe Sizing
● The Net Positive Suction Head
Available (NPSHA) is used to
ensure the pump picked and its
Net Positive Suction Head
Required (NPSHR) is suitable for
the desired flow rate
● Suction Lift Head: 9 ft
● Absolute Pressure: 34 ft
● Vapor Pressure: 1.06 ft
● Friction Loss In Suction Lift: 1.42 ft
● NPSHA=22.52 ft
Results
Pump and Pipe Sizing
● At 1350 GPM and 47 ft TDH, a
Xylem e-XC Suction Split Case
Pump was chosen.
○ 8” Radial Impeller
○ 20 HP Baldor Motor
○ NPSHR = 15.3 ft
Results - Pump and Pipe Sizing
Results
Pump and Pipe Sizing
● Because there is 44 LF of suction
lift, a priming system should be
considered.
● A priming valve would place the
suction line under vacuum and
relocate the lowest point of
pressure to pump.
● This allows water to rise in the
suction line section and maintain a
primed pump.
Results
Cost Assessment-Pump and Piping
● 351 LF of 6” HDPE Pipe
○ $8.50 /LF typically sold in 20’ sections
■ $2984
● 44 LF of 8” HDPE Pressure Pipe
○ $12 /LF typically sold in 20 ft sections
■ $528
● 6” Elbow Fittings (2):
○ $194 /Ea
■ $388
● 8” Elbow Fittings (3):
○ $500 /Ea
■ $1500
● Q-VAC Priming Valve System
■ $50,000
● Xylem Pump with motor and baseplate assembly
○ Includes freight and startup
■ $25,000
● Pump RVSS Control Panel
■ $50,000
Results
Hydraulic Design Utilizing SolidWorks
● Using the equation for
determining the flow rate of
a rectangular contracted weir
the length of the weir was
calculated.
● Q was set to be 3.01cfs as
found solving for the flow
rate
● H was set to be 1 ft to match
with the expected rise in the
water level of the wetland.
● The length was found to be
approximately 1 ft
Results
Hydraulic Design Utilizing SolidWorks
● Design includes a gate on the weir
that is operated by a rack and
pinion system powered by a small
motor
● The gate will be operated on a time
schedule to simulate the coming
and going of the tide each day
● Motor will be mounted on top of
the frame
● A ½ horse power motor is a cheap
and efficient way to operated the
door and should be more than
strong enough to function properly
Results
Rack and Pinion System
● Pros: Easy to design, easy to
maintain
● Cons: If the rack is misaligned
it may damage the entire
gear box, Can be inaccurate if
a higher quality is not bought
and maintained but this is
not an issue for this project.
Results
Cost Assessment-Hydraulic Design
● ½ horsepower motor: ~$100.00
● Rack and Pinion: ~$75.00
● 4 inch square tubing: ~$90.00
● 12x18 1” sheet metal: ~$120.00 x 2
● Weir Structure: ~$2000.00
● Total Cost: ~$2,505
Results
Operational Plan: Facility Use
● Simulated high tide will occur when the water within the rice field reaches a height of 1ft.
● Simulated low tide will occur when the rice field has been completely drained of water (~0ft).
● Low tide and high tide will alternate every 6 hours based on tidal information.
○ Low tide: 9AM, 9PM
○ High tide: 3PM, 3AM
● Water addition will occur immediately following low tide
● Drainage will occur immediately following high tide
● Water will be pumped into the rice field and flow out of the rice field through the weir at the
same rate.
○ Flow Rate: 3.01 cfs
Results
Operational Plan: Maintenance
Rack and Pinion System:
● Maintenance once every 4 weeks
(about once a month)
● Lubricate rack and pinion
Pump:
● Maintenance once every 4 weeks
(about once a month)
● Clean the system
● Check during winter months for
freezing possibility
○ On days when temperature
drops below freezing, do not
turn pump on
Spillway:
● Regularly monitor spillway for
weeds, brush, or obstructions
● Check spillway after major storm
events to repair erosion
Results
Cost Assessment-Labor
Team Members:
Alexa, Alyssa, Hudson, Mattie, Rachel, and Riley
Pre-/post-development
modeling and structural
drawings
Developing tidal
regime and
operational plans
Team
CAD site
development
Task Hours
Meetings 210
PowerPoint 162
Paper 40
Operational Plan 8
Statistics 2
Calculations 6
SolidWorks 12
GIS/AutoCAD 27
HEC-RAS (pre + post) 20
Total ~81 hours / person
Results
Overall Cost Assessment
● Grading: $19,004
● Pump & Piping: $130,900
● Hydraulic Design: $2,505
● Labor:
● Total Cost of Project:
Recommendations
Recommendations
● We recommend implementing site option 2 - non-tidal controlled rice fields
for the research facility, based on the criteria outlined in the results section
as well as field observations
● We recommend using a Xylem e-XC Suction Split Case pump
● We recommend utilizing a gate with a rack and pinion system on the weir
Recommendations
● We recommend modeling the design on EPA-SWMM, instead of HEC-RAS
● We recommend operating the system on a 6 hour tidal schedule
● We recommend servicing the pump and rack and pinion system once a
month
● We recommend turning off the system during freezing temperatures
TFW research
center
Ecology Climate
Science
Engineering
Acknowledgements
Sincerely,
Alexa, Alyssa, Hudson, Mattie,
Rachel, and Riley
Dr. Darnault,
Thank you for guiding us throughout this
project and giving us helpful feedback
on our presentation and paper.
Dr. Xiao,
Thank you for your help throughout the
project process and giving us helpful
feedback about our powerpoint.
Dr. Trettin,
Thank you for giving us the opportunity to
work alongside you to develop a field-scale
research facility to observe the effects
global warming, specifically sea level rise,
has on bottomland hardwood forests. We
hope this project helps you and the USDA
Forestry service devise a plan to
implement in the future.
Julie,
Thank you for showing us around both the
tidally influenced sub-catchment channel,
and the non-tidal controlled rice fields.
This site visit was extremely helpful in the
completion of our project design.
Thank
You!

Weitere ähnliche Inhalte

Was ist angesagt?

Engineered Nanoparticles in Food: Implications for Food Safety and Consumer H...
Engineered Nanoparticles in Food: Implications for Food Safety and Consumer H...Engineered Nanoparticles in Food: Implications for Food Safety and Consumer H...
Engineered Nanoparticles in Food: Implications for Food Safety and Consumer H...Nebraska Water Center
 
Estimation of Groundwater Recharge Using WetSpass and MODFLOW
Estimation of Groundwater Recharge  Using WetSpass and MODFLOWEstimation of Groundwater Recharge  Using WetSpass and MODFLOW
Estimation of Groundwater Recharge Using WetSpass and MODFLOWPutika Ashfar Khoiri
 
Applications of Integrated Surface Water Groundwater Modelling Techniques and...
Applications of Integrated Surface Water Groundwater Modelling Techniques and...Applications of Integrated Surface Water Groundwater Modelling Techniques and...
Applications of Integrated Surface Water Groundwater Modelling Techniques and...Dirk Kassenaar M.Sc. P.Eng.
 
Applications of Integrated Models to Watershed and Sub-Watershed Scale Analys...
Applications of Integrated Models to Watershed and Sub-Watershed Scale Analys...Applications of Integrated Models to Watershed and Sub-Watershed Scale Analys...
Applications of Integrated Models to Watershed and Sub-Watershed Scale Analys...Dirk Kassenaar M.Sc. P.Eng.
 
Reservoir Water Supply Planning for an Uncertain Future
Reservoir Water Supply Planning for an Uncertain FutureReservoir Water Supply Planning for an Uncertain Future
Reservoir Water Supply Planning for an Uncertain FutureDave Campbell
 
Environmental Flows Update, Tony Smith
Environmental Flows Update, Tony SmithEnvironmental Flows Update, Tony Smith
Environmental Flows Update, Tony SmithTWCA
 
Integrated Modelling as a Tool for Assessing Groundwater Sustainability under...
Integrated Modelling as a Tool for Assessing Groundwater Sustainability under...Integrated Modelling as a Tool for Assessing Groundwater Sustainability under...
Integrated Modelling as a Tool for Assessing Groundwater Sustainability under...Dirk Kassenaar M.Sc. P.Eng.
 
Analysis of Low Impact Development (LID) Strategies using Fully-Integrated Fu...
Analysis of Low Impact Development (LID) Strategies using Fully-Integrated Fu...Analysis of Low Impact Development (LID) Strategies using Fully-Integrated Fu...
Analysis of Low Impact Development (LID) Strategies using Fully-Integrated Fu...Dirk Kassenaar M.Sc. P.Eng.
 
Integrated Surface Water and Groundwater Interaction Modelling using GSFLOW
Integrated Surface Water and Groundwater Interaction Modelling using GSFLOWIntegrated Surface Water and Groundwater Interaction Modelling using GSFLOW
Integrated Surface Water and Groundwater Interaction Modelling using GSFLOWDirk Kassenaar M.Sc. P.Eng.
 
Transient Modelling of Groundwater Flow, Application to Tunnel Dewatering
Transient Modelling of Groundwater Flow, Application to Tunnel DewateringTransient Modelling of Groundwater Flow, Application to Tunnel Dewatering
Transient Modelling of Groundwater Flow, Application to Tunnel DewateringDirk Kassenaar M.Sc. P.Eng.
 
A New Methodology for Identifying Ecologically Significant Groundwater Rechar...
A New Methodology for Identifying Ecologically Significant Groundwater Rechar...A New Methodology for Identifying Ecologically Significant Groundwater Rechar...
A New Methodology for Identifying Ecologically Significant Groundwater Rechar...Dirk Kassenaar M.Sc. P.Eng.
 
Environmental flow & Fish passes
Environmental flow & Fish passesEnvironmental flow & Fish passes
Environmental flow & Fish passesSHAHANAS6
 
Lessons Learned From The Everglades Sjr Summit 2010 09 15 Esterson+Landers
Lessons Learned From The Everglades Sjr Summit 2010 09 15 Esterson+LandersLessons Learned From The Everglades Sjr Summit 2010 09 15 Esterson+Landers
Lessons Learned From The Everglades Sjr Summit 2010 09 15 Esterson+LandersKris Esterson
 

Was ist angesagt? (20)

Environmental flows: The concept and applications in India
Environmental flows: The concept and applications in IndiaEnvironmental flows: The concept and applications in India
Environmental flows: The concept and applications in India
 
Engineered Nanoparticles in Food: Implications for Food Safety and Consumer H...
Engineered Nanoparticles in Food: Implications for Food Safety and Consumer H...Engineered Nanoparticles in Food: Implications for Food Safety and Consumer H...
Engineered Nanoparticles in Food: Implications for Food Safety and Consumer H...
 
Estimation of Groundwater Recharge Using WetSpass and MODFLOW
Estimation of Groundwater Recharge  Using WetSpass and MODFLOWEstimation of Groundwater Recharge  Using WetSpass and MODFLOW
Estimation of Groundwater Recharge Using WetSpass and MODFLOW
 
Applications of Integrated Surface Water Groundwater Modelling Techniques and...
Applications of Integrated Surface Water Groundwater Modelling Techniques and...Applications of Integrated Surface Water Groundwater Modelling Techniques and...
Applications of Integrated Surface Water Groundwater Modelling Techniques and...
 
Applications of Integrated Models to Watershed and Sub-Watershed Scale Analys...
Applications of Integrated Models to Watershed and Sub-Watershed Scale Analys...Applications of Integrated Models to Watershed and Sub-Watershed Scale Analys...
Applications of Integrated Models to Watershed and Sub-Watershed Scale Analys...
 
Reservoir Water Supply Planning for an Uncertain Future
Reservoir Water Supply Planning for an Uncertain FutureReservoir Water Supply Planning for an Uncertain Future
Reservoir Water Supply Planning for an Uncertain Future
 
Environmental Flows Update, Tony Smith
Environmental Flows Update, Tony SmithEnvironmental Flows Update, Tony Smith
Environmental Flows Update, Tony Smith
 
Re-thinking recharge
Re-thinking recharge Re-thinking recharge
Re-thinking recharge
 
Integrated Modelling as a Tool for Assessing Groundwater Sustainability under...
Integrated Modelling as a Tool for Assessing Groundwater Sustainability under...Integrated Modelling as a Tool for Assessing Groundwater Sustainability under...
Integrated Modelling as a Tool for Assessing Groundwater Sustainability under...
 
Aquifer Mapping Programme
Aquifer Mapping ProgrammeAquifer Mapping Programme
Aquifer Mapping Programme
 
Analysis of Low Impact Development (LID) Strategies using Fully-Integrated Fu...
Analysis of Low Impact Development (LID) Strategies using Fully-Integrated Fu...Analysis of Low Impact Development (LID) Strategies using Fully-Integrated Fu...
Analysis of Low Impact Development (LID) Strategies using Fully-Integrated Fu...
 
Integrated Surface Water and Groundwater Interaction Modelling using GSFLOW
Integrated Surface Water and Groundwater Interaction Modelling using GSFLOWIntegrated Surface Water and Groundwater Interaction Modelling using GSFLOW
Integrated Surface Water and Groundwater Interaction Modelling using GSFLOW
 
Transient Modelling of Groundwater Flow, Application to Tunnel Dewatering
Transient Modelling of Groundwater Flow, Application to Tunnel DewateringTransient Modelling of Groundwater Flow, Application to Tunnel Dewatering
Transient Modelling of Groundwater Flow, Application to Tunnel Dewatering
 
Assessment of Low Impact Design (LID)
Assessment of Low Impact Design (LID)Assessment of Low Impact Design (LID)
Assessment of Low Impact Design (LID)
 
A New Methodology for Identifying Ecologically Significant Groundwater Rechar...
A New Methodology for Identifying Ecologically Significant Groundwater Rechar...A New Methodology for Identifying Ecologically Significant Groundwater Rechar...
A New Methodology for Identifying Ecologically Significant Groundwater Rechar...
 
Yogyakarta coastal aquifer
Yogyakarta coastal aquiferYogyakarta coastal aquifer
Yogyakarta coastal aquifer
 
final report
final reportfinal report
final report
 
Environmental flow & Fish passes
Environmental flow & Fish passesEnvironmental flow & Fish passes
Environmental flow & Fish passes
 
Online Watershed Analysis Tool
Online Watershed Analysis Tool Online Watershed Analysis Tool
Online Watershed Analysis Tool
 
Lessons Learned From The Everglades Sjr Summit 2010 09 15 Esterson+Landers
Lessons Learned From The Everglades Sjr Summit 2010 09 15 Esterson+LandersLessons Learned From The Everglades Sjr Summit 2010 09 15 Esterson+Landers
Lessons Learned From The Everglades Sjr Summit 2010 09 15 Esterson+Landers
 

Ähnlich wie Presentation final

ARMF 2014 Employment of Proactive Mitigation Strategies in Combination with R...
ARMF 2014 Employment of Proactive Mitigation Strategies in Combination with R...ARMF 2014 Employment of Proactive Mitigation Strategies in Combination with R...
ARMF 2014 Employment of Proactive Mitigation Strategies in Combination with R...Janna Ellis Kepley
 
DSD-INT 2021 Impact of Desalination and Climate Change on Salinity levels in ...
DSD-INT 2021 Impact of Desalination and Climate Change on Salinity levels in ...DSD-INT 2021 Impact of Desalination and Climate Change on Salinity levels in ...
DSD-INT 2021 Impact of Desalination and Climate Change on Salinity levels in ...Deltares
 
Lecture 1-CVS 445.ppt
Lecture 1-CVS 445.pptLecture 1-CVS 445.ppt
Lecture 1-CVS 445.pptLawrence Omai
 
Lecture 1-CVS 445.ppt
Lecture 1-CVS 445.pptLecture 1-CVS 445.ppt
Lecture 1-CVS 445.pptLawrence Omai
 
Modeling the Effects of Land Use Change on Flooding
Modeling the Effects of Land Use Change on FloodingModeling the Effects of Land Use Change on Flooding
Modeling the Effects of Land Use Change on FloodingAdam Nayak
 
2106201_SNEP_SaltPonds-Update.pdf
2106201_SNEP_SaltPonds-Update.pdf2106201_SNEP_SaltPonds-Update.pdf
2106201_SNEP_SaltPonds-Update.pdfEdolatamaFebrinal1
 
ProjetoUrucuia_W2_TroyGilmore_english
ProjetoUrucuia_W2_TroyGilmore_englishProjetoUrucuia_W2_TroyGilmore_english
ProjetoUrucuia_W2_TroyGilmore_englishequipeagroplus
 
DSD-INT 2014 - Delft3D Users Meeting - Integrated Sediment Transport, Wave, a...
DSD-INT 2014 - Delft3D Users Meeting - Integrated Sediment Transport, Wave, a...DSD-INT 2014 - Delft3D Users Meeting - Integrated Sediment Transport, Wave, a...
DSD-INT 2014 - Delft3D Users Meeting - Integrated Sediment Transport, Wave, a...Deltares
 
WATER QUALITY MODELING DR. YANTI
WATER QUALITY MODELING DR. YANTIWATER QUALITY MODELING DR. YANTI
WATER QUALITY MODELING DR. YANTIPebri Nurhayati
 
Capstone Senior Design Final Presentation
Capstone Senior Design Final PresentationCapstone Senior Design Final Presentation
Capstone Senior Design Final PresentationNatalieDell2
 
South Carolina Botanical Garden Detention Pond Implementation and Prairie Res...
South Carolina Botanical Garden Detention Pond Implementation and Prairie Res...South Carolina Botanical Garden Detention Pond Implementation and Prairie Res...
South Carolina Botanical Garden Detention Pond Implementation and Prairie Res...colbycofield
 
South Carolina Botanical Garden Detention Pond Implementation and Prairie Res...
South Carolina Botanical Garden Detention Pond Implementation and Prairie Res...South Carolina Botanical Garden Detention Pond Implementation and Prairie Res...
South Carolina Botanical Garden Detention Pond Implementation and Prairie Res...Jacobsimmons007
 
Senior Design Final Presentation
Senior Design Final PresentationSenior Design Final Presentation
Senior Design Final PresentationKatherine Knight
 
Water resources planning & environmental considerations
Water resources planning & environmental considerationsWater resources planning & environmental considerations
Water resources planning & environmental considerationsAMIE(I) Study Circle
 

Ähnlich wie Presentation final (20)

Capstone
CapstoneCapstone
Capstone
 
ARMF 2014 Employment of Proactive Mitigation Strategies in Combination with R...
ARMF 2014 Employment of Proactive Mitigation Strategies in Combination with R...ARMF 2014 Employment of Proactive Mitigation Strategies in Combination with R...
ARMF 2014 Employment of Proactive Mitigation Strategies in Combination with R...
 
DSD-INT 2021 Impact of Desalination and Climate Change on Salinity levels in ...
DSD-INT 2021 Impact of Desalination and Climate Change on Salinity levels in ...DSD-INT 2021 Impact of Desalination and Climate Change on Salinity levels in ...
DSD-INT 2021 Impact of Desalination and Climate Change on Salinity levels in ...
 
Lecture 1-CVS 445.ppt
Lecture 1-CVS 445.pptLecture 1-CVS 445.ppt
Lecture 1-CVS 445.ppt
 
Lecture 1-CVS 445.ppt
Lecture 1-CVS 445.pptLecture 1-CVS 445.ppt
Lecture 1-CVS 445.ppt
 
Modeling the Effects of Land Use Change on Flooding
Modeling the Effects of Land Use Change on FloodingModeling the Effects of Land Use Change on Flooding
Modeling the Effects of Land Use Change on Flooding
 
2106201_SNEP_SaltPonds-Update.pdf
2106201_SNEP_SaltPonds-Update.pdf2106201_SNEP_SaltPonds-Update.pdf
2106201_SNEP_SaltPonds-Update.pdf
 
McKenzie A - UEI Day 1 - Kochi Jan18
McKenzie A - UEI Day 1 - Kochi Jan18McKenzie A - UEI Day 1 - Kochi Jan18
McKenzie A - UEI Day 1 - Kochi Jan18
 
ProjetoUrucuia_W2_TroyGilmore_english
ProjetoUrucuia_W2_TroyGilmore_englishProjetoUrucuia_W2_TroyGilmore_english
ProjetoUrucuia_W2_TroyGilmore_english
 
DSD-INT 2014 - Delft3D Users Meeting - Integrated Sediment Transport, Wave, a...
DSD-INT 2014 - Delft3D Users Meeting - Integrated Sediment Transport, Wave, a...DSD-INT 2014 - Delft3D Users Meeting - Integrated Sediment Transport, Wave, a...
DSD-INT 2014 - Delft3D Users Meeting - Integrated Sediment Transport, Wave, a...
 
WATER QUALITY MODELING DR. YANTI
WATER QUALITY MODELING DR. YANTIWATER QUALITY MODELING DR. YANTI
WATER QUALITY MODELING DR. YANTI
 
Capstone Senior Design Final Presentation
Capstone Senior Design Final PresentationCapstone Senior Design Final Presentation
Capstone Senior Design Final Presentation
 
South Carolina Botanical Garden Detention Pond Implementation and Prairie Res...
South Carolina Botanical Garden Detention Pond Implementation and Prairie Res...South Carolina Botanical Garden Detention Pond Implementation and Prairie Res...
South Carolina Botanical Garden Detention Pond Implementation and Prairie Res...
 
South Carolina Botanical Garden Detention Pond Implementation and Prairie Res...
South Carolina Botanical Garden Detention Pond Implementation and Prairie Res...South Carolina Botanical Garden Detention Pond Implementation and Prairie Res...
South Carolina Botanical Garden Detention Pond Implementation and Prairie Res...
 
Thesis_MS
Thesis_MSThesis_MS
Thesis_MS
 
Senior Design Final Presentation
Senior Design Final PresentationSenior Design Final Presentation
Senior Design Final Presentation
 
BE 4240 Project.pptx
BE 4240 Project.pptxBE 4240 Project.pptx
BE 4240 Project.pptx
 
Eco eng project ppt
Eco eng project pptEco eng project ppt
Eco eng project ppt
 
Nam Ngiep Hydropower Dam -- Climate Risk Assessment
Nam Ngiep Hydropower Dam -- Climate Risk Assessment Nam Ngiep Hydropower Dam -- Climate Risk Assessment
Nam Ngiep Hydropower Dam -- Climate Risk Assessment
 
Water resources planning & environmental considerations
Water resources planning & environmental considerationsWater resources planning & environmental considerations
Water resources planning & environmental considerations
 

Kürzlich hochgeladen

The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGSIVASHANKAR N
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 

Kürzlich hochgeladen (20)

The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 

Presentation final

  • 1. Development of a Field-Scale Research Facility to Assess the Effects of Sea Level Rise on Freshwater Bottomland Hardwood Forests Hudson Adams, Riley Garvey, Alyssa Knight, Rachel Mordovancey, Mattie Rourk, Alexa Schiazza Clemson University, Clemson, SC December 1, 2020
  • 2. Outline ● Introduction ○ Background ○ Rationale ○ Objective(s) ○ Approaches ● Literature Review ● Materials and Methods ● Results ● Recommendations ● Acknowledgements
  • 4. Background Role of Wetlands ● Wetlands provide many important ecosystem services ○ Improving and protecting water quality ○ Providing fish and wildlife habitats ○ Storing floodwater ● Wetlands are some of the most productive ecosystems ● The overall global wetland value was estimated to be around 47.4 trillion dollars per year
  • 5. Background Climate Impact on Wetlands ● Climate change, and the resulting sea level rise, affect the health and functionality of tidal wetlands. ● Sea level rise causes the inundation and potential displacement of these areas. ● Such stressors may disassemble the existing ecosystem of the wetland due to loss of vegetation, loss of habitat, and biogeochemical changes in the soil. ● Wetlands offer valuable ecosystem services such as erosion control, bioremediation, and flood protection. ● It is important to be able to predict how these services and ecosystems will be impacted as sea levels rise.
  • 7. Background Project Scope ● Freshwater tidal wetlands are wetlands that are influenced by the tides but do not suffer from saltwater intrusion. ● In the lowlands of South Carolina these are both common and more distant from the coastline than expected in other areas due to the extremely gradual elevation changes. ● There are two types of freshwater tidal wetlands, marsh and forest, with the differences occurring due to the hydroperiod, or the period of time the wetland is covered by water. ● Ecosystem services can be negatively impacted by environmental/climate change, therefore it is important to monitor these changes.
  • 8. Background Facility Location ● Located in the Santee Experimental Forest on the East Branch of the Cooper River ● Sites are bottomland hardwood forest
  • 9. Rationale ● Between a field and a lab facility, a field research facility is needed because wetlands are so complex that if meaningful data is to be collected, all of the biogeochemical features would need to be incorporated into a lab research facility. Thus, a field facility is best in order to more easily bring together those complex ecosystem functions. ● Wetlands provide many ecosystem services such as improving water quality and storing flood water. If rising sea level affects the way they currently function, then they may lose some of these services. ● The models currently used to predict how ecosystem services will be affected are not useful, as freshwater tidal wetlands have not been adequately studied. ● The idea for this project is to create a mesocosm to gain critical data by which to base future models on.
  • 10. Hypothesis to be tested through the use of the designed facility: As sea level rises and hydroperiods change, these wetlands will shift in type and previously nontidal wetlands will become tidally influenced.
  • 11. Objectives Mission The main objective of this project is to design and model a field scale research facility to study the impact of climate change on the ecosystem services provided by wetlands, in particular, to determine the effects of sea level rise on the hydrologic regime of a freshwater tidal wetland. Specific Objectives 1. To design impoundment/control water structures and drainage 2. To develop an operational plan 3. To develop a site plan for research site
  • 12. Client Deliverables 1. Hydrogeomorphic Assessment – this is an integrated assessment of the land resource data providing a basis for the site selection a. A detailed analysis of the natural and man-made subcatchments within the floodplain that could be the mesocosms. This analysis will focus on utilizing the lidar data to delineate drainage areas and flow paths within the floodplain. b. This analysis will consider the current flow paths and hydrologic regimes. 2. Summary on the expected impacts of sea-level rise on the current hydrologic regime 3. Facility Operational Plan 4. Site Plan
  • 13. Approaches Task 1 To determine a site location Task 2 To design the facility
  • 14. Task 1: To determine a site location Sub-Tasks: ● To collect hydrological, Lidar, climate, and GIS data for the possible sites. ● To assess references, data, and similar project designs. ● To research sea-level rise modelling done by NOAA or another agency in the Charleston area. ● To explore water containment and management methods for both options. ● To determine biodiversity of local flora within each option. ● To identify size requirements and necessary site boundaries for both options. ● To choose an alternative to move forward into design.
  • 15. Approaches Site Option 1: Tidally Influenced Sub-Catchment Channel ● Put a weir in “Channel A” to divert water to “Channel B” ● Put berm at tidally influenced intersection of “Channel B” ● Use main channel water to flood “Channel B” area Site Plan Site Map
  • 16. Approaches Site Option 1: Tidally Influenced Sub-Catchment Channel A B C C A B
  • 17. Approaches Site Option 2: Non-Tidal Controlled Rice Fields ● Retrofit existing berms in rice field plot ● Install a pump from Nicholson Creek to the chosen rice field plot ● Construct a weir on the opposite site of the rice field to let water escape when necessary Site Plan Site Map
  • 18. Approaches Site Option 2: Non-Tidal Controlled Rice Fields A B C C A B
  • 19. Task 2: To design a facility Sub-Tasks: ● To evaluate site planning considerations including site access, elevation, and wetland impact. ● To examine possible methods of passive flow/filling. ● To identify needs to maintain a healthy ecosystem such as water retention rate. ● To determine what additional infrastructure such as water control structures, pipe networks, pumps, and drainage systems will be required. ● To model hydrologic regimes and design plans by utilizing CAD, HEC-RAS, and SOLIDWORKS. ● To create a design plan draft. ● To develop a final site plan. ● To formulate a facility operations plan by determining how the water control system will run. ● To assess the cost of the designed field research facility.
  • 20. Pre-/post-development modeling and structural drawings Developing tidal regime and operational plans CAD site development Task Management Team We collaborated as a group on all aspects of the project. To ensure that everything got done, each group member was assigned a different task to be in charge of: ● Hudson Adams ○ Structural Drawings using SolidWorks ● Riley Garvey ○ Pre-development modeling using HEC-RAS ● Mattie Rourk ○ Operational Plans ○ Literature Review ● Alyssa Knight ○ Developing tidal regime ○ Post-development modeling using HEC-RAS ● Rachel Mordavancy ○ Site development using CAD ● Alexa Schiazza ○ PowerPoint Format
  • 21. Ecology Climate Science Engineering TFW research center Maximizing use of existing infrastructure Efficiently capturing and manipulating water flows Diverse assemblage of endemic species
  • 23. Literature Review Site Hydrology ● Most of the soils have high surface runoff and low infiltration rates. ● Average annual rainfall: 1370 mm ● The peak discharges for the Turkey Creek watershed: ○ 12.0 m3/s--2 year return period ○ 22.9 m3/s--5 year return period ○ 31.5 m3/s--10 year return period ○ 42.9 m3/s--25 year return period ○ 53.2 m3/s--50 year return period ○ 64.2 m3/s--100 year return period ● Vegetation: pine-hardwood forests. ● The area in the watershed lies 2 m-14 m above sea level.
  • 24. Literature Review Parameters ● Going forward with the design, the research parameters that the facility will be used for are: ○ Vegetation response ■ which will monitor changes in vegetation structure, composition, and productivity including photosynthesis and transpiration ○ Soil response ■ which will monitor changes in soil biogeochemistry such as redox conditions, greenhouse gas emissions, carbon storage, nutrient cycling, also soil microbiology ○ Hydrologic response ■ which will monitor changes in hydrology and water quality
  • 25. Literature Review Turkey Creek Water Table Data We will use Turkey Creek data in order to estimate Nicholson Creek flows off a relative size comparison since they are both type 3 streams
  • 26. Literature Review Tidal Information ● High tide and low tide alternate approximately every 6 hours each day ● Tides shift back about an hour every day ○ Example: 6:30 one day, and 7:30 the next, etc. ● Estimate timing and inflow and outflow rates based on Huger Creek tidal data
  • 27. Literature Review Sea Level Rise How high should the water be raised? ● The relative sea-level rise trend in Charleston, SC is about 3.32 mm/year based on monthly mean sea level data spanning from 1901 to 2019. ● This was determined to be the equivalent to a 1.09 ft sea level rise over the span of 100 years.
  • 29. Literature Review Mesocosm vs. Large-Scale Experiment Large Scale Experiment: ● Displayed an increase in temperature over time. ● An increase in dissolved oxygen over time. ● Larger scale experiments are harder to control. Mesocosm Experiment: ● Became colonized by macrophytes which caused shading. ○ Lower temperature over time. ● Mesocosms are often more optimal as they are more replicable and repeatable. Both: ● Retain nutrients. ● Showed an increase in pH.
  • 30. Literature Review Mesocosm vs. Large-Scale Experiment How does the complexity of these two set-ups compare? Symbol Key:
  • 32. Materials and Methods Modeling ● To create location and watershed basin maps of the site using ArcGIS ● To measure site hydrologic features, specifically raised water levels, using HEC-RAS ● For site design and plan set development will be created using AutoCAD Civil3D ● To design and model hydraulic structures, such as a weir structure, using SolidWorks
  • 33. Materials and Methods Site Needs ● Existing Conditions Evaluation ● Grading Needs (Fill Soils) ● Pump ● Hydraulic Structure: Weir ● Site Access Stair ● Electrical Instrumentation (Beyond Scope of Design)
  • 36. Results Site Existing Conditions Utilizing Lidar Data ● Elevation data for the site was acquired from NOAA as a lidar point cloud. ○ Utilized in GIS and HEC-RAS as a DEM ○ Utilized in C3D as a dynamic TIN Surface
  • 37. Results Site Existing Conditions Utilizing AutoCAD
  • 38. Results Pre-Development Flow Model Utilizing HEC-RAS ● 1-year rain event ● Rice fields are naturally flooded from large storm events ○ after 3 hours of this storm, the average water depth on the site was 22 cm ● Berms are partially inundated - creating the need for increased height and proper grading
  • 39. Results Grading Utilizing AutoCAD ● Utilized C3D’s Feature Lines and Grading Creation Tools ● Created new design surfaces by pasting grading data into the existing ground surface.
  • 40. Results Berm Grading Utilizing C3D ● Due to the deteriorated condition of the berms, reinforcement and a raised height is required. ● Berms will be 3’ top width with a 3:1 slope down to the existing grade.
  • 41. Results Post-Development Flow Model Utilizing HEC-RAS ● Simulating 1 foot of sea level rise ● The pump creates an inflow to raise the water level to 1 ft in a 6 hour period to reach high tide ● The gate opens and releases water to empty the field over a 6 hour period to reach low tide
  • 43. Results Spillway Grading Utilizing C3D ● The spillway is designed to retain the low tide tide water level while the hydraulic weir will hold the high tide. ● 3:1 slope down from berms and 2% down the spillway through the berms
  • 44. Results Spillway Stabilization ● Major storm events can lead to concentrated runoff that can erode the spillway. ● Erosion can be prevented using: ○ Protective grass vegetation ○ An appropriately designed rock cover ○ Concrete or other erosion control matting ● After major storm events, compacted soil can be placed in the eroded spillway to restore the normal embankment.
  • 45. Results Pump Station Location ● Because the site is located in the Nicholson Creek flood plain, the pump cannot be placed within the wetland area. ● The station will be located off of Summerhouse Road adjacent to Nicholson Creek
  • 46. Results Pump Station Site Grading Utilizing AutoCAD ● The road grade will be extended by 15’ to provide a 15’ ⨯ 15’ flat surface in order to place the pump station. ● Graded to the existing ground at 3:1 slope
  • 47. Results Cost Assessment-Grading ● A volume comparison surface was created from the existing and modeled future ground. ● The net fill volume was calculated to be 950.17 yd3 ● At an estimated $20 per yd3, the total cost of the fill soils would be approximately $19,004.
  • 48. Results Pipe Alignment Utilizing AutoCAD ● HDPE pressure pipe will be utilized to pump water from Nicholson Creek to the rice field plot.
  • 49. Results -Pipe Alignment Profile Utilizing AutoCAD ● In order to avoid the ecological impact of burying the pipe, it will be run over the ground on stilts supported by pylons ● Because of the warm climate of Huger, SC, temperature related deflections of the pipe are of minimal concern. ● The pylons will be supported with compacted fill material.
  • 50. Results Flow Rate Estimation ● The flow rate was determined using the equation Q = V/t ● The volume was determined to be 64,984.33ft3 based on the area calculated through CAD modeling and a 1 foot depth with a 3:1 slope on all sides. ● The time was set to equal 21,600s in order to match a tidal regime of 6 hours. ● The flow rate was found to be 3.01cfs
  • 51. Results Pipe and Pump Sizing ● Hazen Williams head loss equation ○ 8” Suction Pipe ○ 6” Discharge Pipe ○ Flow rate= 1350 gpm ○ Friction coefficient, C=140 ○ Suction Side: ■ 44 LF of pipe. ○ Discharge Side: ■ 351 LF of pipe ● Total friction losses in suction side=1.42 ft ● Total friction losses in discharge side=42.9 ft Increases in friction from the fittings are accounted for in “Effective Pipeline Length” or equivalent length of pipe based on the predetermined K factor for the fitting. ● LE=(K’)(D) ● Project Pipeline includes: ○ 2 - 90° Elbows ○ 1 - 45° Elbow ○ 2 - 15° Elbows ● LE(suction)= 6.75 ft ● LE(discharge)= 28.25 ft
  • 52. Results Pump and Pipe Sizing ● Total Dynamic Head (TDH): ○ Equivalent height of the fluid to be pumped. ○ Determined by head loss changes in the pipe. ● Suction Lift TDH=10.42 ft ○ 1.42 ft of friction loss ○ 9 ft of suction head loss ○ Equivalent Length of 51 ft of 8” pipe ● Discharge TDH=36.86 ft ○ 42.9 ft of friction loss ○ -6 ft of head loss (head gain) ○ Equivalent pipe length of 379 LF of 6” pipe
  • 54. Results Pump and Pipe Sizing ● The Net Positive Suction Head Available (NPSHA) is used to ensure the pump picked and its Net Positive Suction Head Required (NPSHR) is suitable for the desired flow rate ● Suction Lift Head: 9 ft ● Absolute Pressure: 34 ft ● Vapor Pressure: 1.06 ft ● Friction Loss In Suction Lift: 1.42 ft ● NPSHA=22.52 ft
  • 55. Results Pump and Pipe Sizing ● At 1350 GPM and 47 ft TDH, a Xylem e-XC Suction Split Case Pump was chosen. ○ 8” Radial Impeller ○ 20 HP Baldor Motor ○ NPSHR = 15.3 ft
  • 56. Results - Pump and Pipe Sizing
  • 57. Results Pump and Pipe Sizing ● Because there is 44 LF of suction lift, a priming system should be considered. ● A priming valve would place the suction line under vacuum and relocate the lowest point of pressure to pump. ● This allows water to rise in the suction line section and maintain a primed pump.
  • 58. Results Cost Assessment-Pump and Piping ● 351 LF of 6” HDPE Pipe ○ $8.50 /LF typically sold in 20’ sections ■ $2984 ● 44 LF of 8” HDPE Pressure Pipe ○ $12 /LF typically sold in 20 ft sections ■ $528 ● 6” Elbow Fittings (2): ○ $194 /Ea ■ $388 ● 8” Elbow Fittings (3): ○ $500 /Ea ■ $1500 ● Q-VAC Priming Valve System ■ $50,000 ● Xylem Pump with motor and baseplate assembly ○ Includes freight and startup ■ $25,000 ● Pump RVSS Control Panel ■ $50,000
  • 59. Results Hydraulic Design Utilizing SolidWorks ● Using the equation for determining the flow rate of a rectangular contracted weir the length of the weir was calculated. ● Q was set to be 3.01cfs as found solving for the flow rate ● H was set to be 1 ft to match with the expected rise in the water level of the wetland. ● The length was found to be approximately 1 ft
  • 60. Results Hydraulic Design Utilizing SolidWorks ● Design includes a gate on the weir that is operated by a rack and pinion system powered by a small motor ● The gate will be operated on a time schedule to simulate the coming and going of the tide each day ● Motor will be mounted on top of the frame ● A ½ horse power motor is a cheap and efficient way to operated the door and should be more than strong enough to function properly
  • 61. Results Rack and Pinion System ● Pros: Easy to design, easy to maintain ● Cons: If the rack is misaligned it may damage the entire gear box, Can be inaccurate if a higher quality is not bought and maintained but this is not an issue for this project.
  • 62. Results Cost Assessment-Hydraulic Design ● ½ horsepower motor: ~$100.00 ● Rack and Pinion: ~$75.00 ● 4 inch square tubing: ~$90.00 ● 12x18 1” sheet metal: ~$120.00 x 2 ● Weir Structure: ~$2000.00 ● Total Cost: ~$2,505
  • 63. Results Operational Plan: Facility Use ● Simulated high tide will occur when the water within the rice field reaches a height of 1ft. ● Simulated low tide will occur when the rice field has been completely drained of water (~0ft). ● Low tide and high tide will alternate every 6 hours based on tidal information. ○ Low tide: 9AM, 9PM ○ High tide: 3PM, 3AM ● Water addition will occur immediately following low tide ● Drainage will occur immediately following high tide ● Water will be pumped into the rice field and flow out of the rice field through the weir at the same rate. ○ Flow Rate: 3.01 cfs
  • 64. Results Operational Plan: Maintenance Rack and Pinion System: ● Maintenance once every 4 weeks (about once a month) ● Lubricate rack and pinion Pump: ● Maintenance once every 4 weeks (about once a month) ● Clean the system ● Check during winter months for freezing possibility ○ On days when temperature drops below freezing, do not turn pump on Spillway: ● Regularly monitor spillway for weeds, brush, or obstructions ● Check spillway after major storm events to repair erosion
  • 65. Results Cost Assessment-Labor Team Members: Alexa, Alyssa, Hudson, Mattie, Rachel, and Riley Pre-/post-development modeling and structural drawings Developing tidal regime and operational plans Team CAD site development Task Hours Meetings 210 PowerPoint 162 Paper 40 Operational Plan 8 Statistics 2 Calculations 6 SolidWorks 12 GIS/AutoCAD 27 HEC-RAS (pre + post) 20 Total ~81 hours / person
  • 66. Results Overall Cost Assessment ● Grading: $19,004 ● Pump & Piping: $130,900 ● Hydraulic Design: $2,505 ● Labor: ● Total Cost of Project:
  • 68. Recommendations ● We recommend implementing site option 2 - non-tidal controlled rice fields for the research facility, based on the criteria outlined in the results section as well as field observations ● We recommend using a Xylem e-XC Suction Split Case pump ● We recommend utilizing a gate with a rack and pinion system on the weir
  • 69. Recommendations ● We recommend modeling the design on EPA-SWMM, instead of HEC-RAS ● We recommend operating the system on a 6 hour tidal schedule ● We recommend servicing the pump and rack and pinion system once a month ● We recommend turning off the system during freezing temperatures
  • 71. Acknowledgements Sincerely, Alexa, Alyssa, Hudson, Mattie, Rachel, and Riley Dr. Darnault, Thank you for guiding us throughout this project and giving us helpful feedback on our presentation and paper. Dr. Xiao, Thank you for your help throughout the project process and giving us helpful feedback about our powerpoint. Dr. Trettin, Thank you for giving us the opportunity to work alongside you to develop a field-scale research facility to observe the effects global warming, specifically sea level rise, has on bottomland hardwood forests. We hope this project helps you and the USDA Forestry service devise a plan to implement in the future. Julie, Thank you for showing us around both the tidally influenced sub-catchment channel, and the non-tidal controlled rice fields. This site visit was extremely helpful in the completion of our project design.

Hinweis der Redaktion

  1. RILEY GOOD AFTERNOON We are only reading (word for word) rationale, objectives, and approaches (esp. tasks). Everything else can be paraphrased “Our Capstone Design is on..” Good Afternoon
  2. RILEY Dar-notes: Don’t deviate from the template he gave us - especially with the outline Introduce critically Just generally follow the template to a T
  3. HUDSON
  4. HUDSON Bring more number/figures into background Another slide about role of wetlands before this Then one about climate change impact on wetlands World map of wetlands, map of SC wetlands Go broader - give more of an outline of the impact of this project and the reason for its conception Put a dollar amount on ecosystem services to show how high their value is Use this to show why this facility will be impactful UPLOAD THE FLIPPIN FILES TO BOX
  5. HUDSON World map of wetlands, map of SC wetlands Go broader - give more of an outline of the impact of this project and the reason for its conception Put a dollar amount on ecosystem services to show how high their value is Use this to show why this facility will be impactful UPLOAD THE FLIPPIN FILES TO BOX
  6. ALYSSA
  7. ALYSSA
  8. ALYSSA
  9. RILEY -Go through this more slowly Too close to bottom
  10. RILEY Show sketch in order to show the impact of sea level rise on the wetland
  11. RILEY
  12. RILEY Don’t include deliverables with objectives→ make its own slide NOt objectives - just deliverables DON’T SAY “JUST” Either have the slide and show all of these things at the end, or don’t include this slide
  13. ALEXA
  14. ALEXA Get rid of “tasks” in the heading - or say “task” and “sub-task” Tasks are what you use to meet the objectives Subtasks under objectives Make title objective 1, and then the tasks Approaches-->big tasks-->small tasks
  15. ALEXA Add channel A and B labels
  16. ALEXA
  17. ALYSSA
  18. ALYSSA “Retrofit” instead of “rehab” because Rachel is an idiot (Suck it Riley) Bring site map onto this slide and show where these pictures are from on the map - do same for channels
  19. ALYSSA Add periods at the end of every sentence Add the word CAD To model/design ___ using cad….
  20. HUDSON Make a circle in organization to make it seem like 1 team
  21. RILEY Add at the end w what we did MAKE CIRCLES and use same font We wanted to create a visual that outlines the different disciplines that are going into this project and how they intersect. The three main disciplines included are ecology, climate science, and engineering. Ecology and climate science intersect when we are ensuring a diverse assemblage of endemic species. Climate science and engineering intersect when we work to efficiently capture and manipulate water flows And engineering and ecology intersect when we are maximizing the use of existing infrastructure. And, of course, all of these intersect with the Tidal Freshwater wetland research facility
  22. MATTIE
  23. MATTIE This map displays the location of our site. The rice fields that we will use lie next to Nicholson Creek. Vegetation-reference Alexa and Alyssa’s slides with pictures showing vegetation
  24. MATTIE Citation- google maps) -Put more information on the rivers - where the wetlands are Dont have the etc. or e.g.--say such as photosynthesis...
  25. MATTIE The largest stream type in this watershed is a type 3 stream, so all of the other waterways in this area flow into it.
  26. MATTIE
  27. MATTIE
  28. MATTIE This animation shows the increase in global temperature over time. The figure at the bottom right shows that as temperatures increase, ice melts and seawater can expand and increase in volume and cause the sea level to rise. This figure in the top right shows how groundwater and marine inundation, or flooding, cause sea level rise. animation https://phys.org/news/2017-03-sea-honolulu-waikiki-vulnerable-groundwater.html
  29. MATTIE This experiment is relevant to our project because it shows what the expected results of our own study would be, although the mesocosm used in this study is on a smaller scale.
  30. MATTIE This figure demonstrates how complex the experiment in a large wetland compares to the mesocosm experiment. The large wetland differs because it factors in wildlife. Add symbol legend
  31. HUDSON
  32. HUDSON Add Logos of software Model hydrological structure, such as a weir Type of GIS maps Measure site hydrological features, specifically raised water leve Hydraulic not hudrologicl
  33. HUDSON We will need to incorporate electrical components and grid tie-ins Factor in cost of off-site dirt
  34. ALYSSA
  35. ALYSSA
  36. RACHEL
  37. RACHEL
  38. RILEY As another part of our pre-development work, we wanted to model the natural water flow prior to any modification, and we decided to use HEC-RAS to accomplish this. For this model, we utilized rain levels associated with a 1-year return period storm to show how the wetland is naturally flooded on a frequent basis. As you can see in this animation, the water easily inundates the rice fields during a one-year storm, filling our site to an average depth of 22 cm after three hours. This depth actually partially covers the berms in water, so We took this to mean that we would need to increase the height of the berms for this project and properly grade them, as Rachel will now discuss. Input, model, and output (including equations)
  39. RACHEL
  40. RACHEL
  41. ALYSSA
  42. RACHEL
  43. RACHEL
  44. MATTIE
  45. RACHEL
  46. RACHEL
  47. Rachel
  48. RACHEL
  49. RACHEL
  50. Hudson
  51. RACHEL To Pump Suction head-9’ 2 fittings Past Pump: Head gain from elevation along pipe=6’ Friction loss in 10” pipe= Friction loss in 8” pipe=9.23 Friction loss in 6” pipe=37.43’ Total elevation change = 3’ Friction in = 1.28’ TDH = 4.28’ Max temp in charleston was 40 C and min temp was
  52. RACHEL
  53. RACHEL
  54. RACHEL Friction loss in 12” pipe for npsh=.155’ 8” pipe=1.11’ 8” npsha=
  55. RACHEL
  56. RACHEL
  57. RACHEL Extends life of pump Prevents cavitation and impeller damage
  58. Alexa
  59. HUDSON
  60. HUDSON
  61. HUDSON
  62. hudson
  63. MATTIE
  64. ALEXA The rack and pinion Hudson discussed… The pump Rachel discussed...
  65. ALEXA Need to add sections for cost assessment and hydraulic calculations
  66. ALEXA Need to add sections for cost assessment and hydraulic calculations
  67. ALEXA
  68. ALEXA
  69. ALYSSA
  70. Riley To conclude this presentation, we wanted to come back around to that venn diagram we showed earlier. As I mentioned, we knew that this project was going to fall within the intersection of climate science, ecology, and engineering. Naturally, our work throughout this project has been strongly associated with these disciplines. A large portion of our literature review was spent researching climate science and sea level rise predictions, and we used this research to develop a hydrologic regime for the facility. Our prior knowledge of ecology was useful for ensuring a diverse assemblage of endemic species in the rice fields. As Alyssa discussed, we put a heavy weight on biodiversity when choosing our site, because the purpose of the research facility is to study the effect of climate change on endemic biodiversity. Lastly, our engineering skills were put to the test with the design of our installations (like the weir and pipe networks), as well as the drawings and modeling of the pre- and post- development landscape in HecRas and AutoCAD.
  71. ALEXA
  72. MATTIE