SlideShare ist ein Scribd-Unternehmen logo
1 von 5
Downloaden Sie, um offline zu lesen
Curriculum Vitae
Sist endret: 21.03.2016
Personalia
Herman Edano ♂
Halvorstraen 18
4077 Hundvåg, Norge
Nasjonalitet: Filippinene
Sivilstand: Gift
Antall barn: 4
Fødselsdag: 23.10.1960
E-postadresse: herman_edano@yahoo.com
Privattelefon: 40635859
Mobiltelefon: 47 40635859
Gyldig arbeidstillatelse: Ja
Utdanning
06.1979 - 03.1984 B.S.C.E (Bachelor of Science in Civil Engineering), Manuel S. Enverga University Foundation – Lucen, Philippines
( Annet - Bachelorgrad )
Stillinger
05.2014 - 07.2015 Senior Structural PDMS Designer, Cofely Fabricom - Kanalsletta 3, Forus, Stavanger, Norway ( Bransje:Energi /
Olje, Fagfelt:Bygg / Anlegg / VVS, Rolle:Prosjektarbeid )
Assigned to Structural and Marine and report to the department manager for the assigned task:
Responsible for updating As-Built PDMS 3D model and PDMS drawing as per the redline mark-up and comments from
construction for Helihangar SFB project.
Familiarization of Statoil cad requirements like TR2231 and TR2381 – PDMS 3D model and LCI requirements.
Create a data file through DB Listing and snap shot of the specially design structure and equipment from PDMS 3D
model.
01.2014 - 04.2014 Senior Structural PDMS Designer, Cofely Fabricom - Kanalsletta 3, Forus, Stavanger, Norway ( Bransje:Energi /
Olje, Fagfelt:Bygg / Anlegg / VVS, Rolle:Prosjektarbeid )
Project: Engineering and Design for Permanent Plug and Abandonment for Heimdal PP&A Interphase Project
Client: Archer/Statoil
Responsible for the layout on PDMS 3D model and producing PDMS drawing for a variety of mechanical equipment
support on modules M50 and M55 areas.
11.2013 - 12.2013 Senior Structural PDMS Designer, Cofely Fabricom - Kanalsletta 3, Forus, Stavanger, Norway ( Bransje:Energi /
Olje, Fagfelt:Bygg / Anlegg / VVS, Rolle:Prosjektarbeid )
Assigned to Structural and Marine and report to the department manager for the assigned task:
Responsible for updating of Structural drawing standards based on the current Norsok and Statoil regulations.
Check and coordinate to the Engineer regarding comments mark up on PDMS drawing.
Check drawing to Norsok regulation about material, design fabrication and installation for steel and aluminum
structures.
Upload the final drawing to Fabricom Management System (FMS) through ProArc.
08.2013 - 10.2013 Senior Structural PDMS Designer, Cofely Fabricom - Kanalsletta 3 Forus, Stavanger ( Bransje:Energi / Olje,
Fagfelt:Bygg / Anlegg / VVS, Rolle:Prosjektarbeid )
Project: Demolition of the exhaust tower for the Valhall oil platform.
Client: BP
Responsible for the layout through PDMS 3D model and producing drawing of the securing clamps to be used for the
demolition of the exhaust tower.
Coordinate to the area lead engineer for the important design parameters needed to finalize and focus on the right
objective.
Filled out the engineering and design checklist prior for submission to the checkers.
Update the comments marked up on the drawing and clarifies other issues to the checker.
Upload the final drawing to ProArc.
06.2012 - 07.2013 Senior Structural PDMS Designer, Fabricom GDF Suez - Skogstøstraen 25, Tasta, Stavanger, Norway (
Bransje:Energi / Olje, Fagfelt:Bygg / Anlegg / VVS, Rolle:Prosjektarbeid )
Project: Engineering and Design for the construction of Helihangar in Statfjord B (SFB).
Client: Statoil
• Responsible for updating PDMS model and drawing to As-Built status, based on the redline mark up from fabrication,
construction and installation.
• Responsible for preliminary layout through PDMS 3D model for aluminum Infill for the east wall.
• Responsible for checking the cutting sketches of section profiles and plates, extracted from PDMS 3D model.
• Prepare the final copy of drawing for signing and filling out the checklist form, prior for uploading to ProArc.
06.2011 - 06.2012 Senior Structural PDMS Designer, Fabricom - Stavanger Norway ( Bransje:Energi / Olje, Fagfelt:Bygg / Anlegg /
VVS, Rolle:Prosjektarbeid )
Project: Stjerne Topside Modification on Oseberg Sør
Client: Staoil
Create layout foundation of the pull - in winch, piping penetration, stair and handrail demolition on 3D PDMS model
Provide MicroStation drawing for the foundation of SCPU cabinet on the Instrument/Telecom room.
Generate MTO report, and coordinate with other disciplines regarding the design that might affect the structures.
Perform checking using True View, Cloud works and site photos to visually check and familiarity on the actual site
condition.
11.2008 - 12.2010 Structural Designer, IKM/Aker Solutions - Bøuy Stavanger Norway ( Bransje:Energi / Olje, Fagfelt:Bygg / Anlegg
/ VVS, Rolle:Prosjektarbeid )
Project: Kashagan Hook - Up Development - Engineering and Design for the hook up and offshore installation of the
remaining structural steel on the north of the Caspian Sea.
Client: Agip/KCO
Produce MicroStation drawing of steel for hook-up to the existing steel structures.
Produce MTO, BOM and work sequence for the installation of structural steel on offshore
Prepare and review checklist for IROA (incidents risk offshore assessment).
Coordinate with other discipline for other information relevant to the work scope.
Check the structure for clashes and obstruction with other structures by visual walk through on 3D model using SPR
(smart plant review).
Register electronically the final drawing and documents on Time, IMIS, and ProArc.
06.2008 - 10.2008 Structural Designer, CB&I/ABB - No. 2 Ayer Rajah, Crescent 139935, Singapore ( Bransje:Energi / Olje,
Fagfelt:Bygg / Anlegg / VVS, Rolle:Prosjektarbeid )
Project: Engineering and design for the conversion of Tanker Mt. Freeway to FPSO.
CLient: Tanker Pacific Incorporated - Jurong Shipyard, Singapore.
Conduct verification of structural steel design for modification and offshore installation.
Coordinate between engineering department and construction about discrepancies that might affect the design
integrity of the structures.
Prepare PDMS 3D modeling and produce drawing for access platforms and walkways.
11.2007 - 06.2008 Senior Structural Designer, CB&I/ABB - No. 2 Ayer Rajah Crescent 139935, Singapore ( Bransje:Energi / Olje,
Fagfelt:Bygg / Anlegg / VVS, Rolle:Prosjektarbeid )
Project: Engineering and Design for the construction and rehabilitation of facilities of Ethylene Cracker Complex for
Mono - Ethylene Glycol plant for Shell ECC.
Client: Shell Eastern Petroleum - Pulau Ular, Singapore.
Produce modification drawing for concrete piping trenches using PDMS modeling and drafting.
Produce MTO report and estimates other miscellaneous structural steel.
Prepare the final copy of drawing for signing and filing out the checklist form, prior for uploading to ProArc.
07.2007 - 11.2007 Senior Structural Designer, ABB Lummus Global - No. 2 Ayer Rajah Crescent 139935, Singapore (
Bransje:Energi / Olje, Fagfelt:Bygg / Anlegg / VVS, Rolle:Prosjektarbeid )
Project: Engineering and Design for the construction of FPSO for Azurite Field Development - Congo West Africa
Client: Prosafe Offshore - Singapore
Produce detail drawing on topside module for central pipe rack M71 to M74, aft crane interphase module F96 and on
forward interphase module F95.
Layout main support frame for equipment platform using PDMS 3D modeling and extract to produce drawing.
Perform clash check report to identity structures with clashes to other structures.
04.2007 - 07.2007 Senior Structural Designer, Fluor Daniel Incorporated Philippines - Alabang, Manila ( Bransje:Energi / Olje,
Fagfelt:Bygg / Anlegg / VVS, Rolle:Prosjektarbeid )
Project: Engineering and Design for Tasnee PP Expansion - Including Existing Polypropylene Plant, upgrade of the
Polymerization unit and Extraction unit. Upgrades of the Line 1 of the Polymerization Reactor. Construction of new
Recovery unit, construction of the new TEAL (Triethylene Aluminum) building and construction of the new
Substation building.
Client: Fluor B.V., Haarlem, Netherlands
Layout in 3D model using PDS/Framework Plus of underground pipes and electrical trenches on the new TEAL
building.
Layout in 3D model of the access platforms and walkways and various pipes and electrical support.
Extract frozen views on 3D to create 2D views and attached to the MicroStation title block.
Run interference detection process (IDP) clash check report on the 3D model. Investigate by visual walk through
using SPR.
Coordinate to the concern discipline regarding clashes of structures.
09.2006 - 03.2007 Senior Structural Designer (Assistant Lead), Fluor Daniel Incorporated Philippines - Alabang, Manila (
Bransje:Energi / Olje, Fagfelt:Bygg / Anlegg / VVS, Rolle:Prosjektarbeid )
Project: Engineering and Design for Habshan Gas Complex Expansion
Client: Fluor B.V., Netherlands
Engineering and design of concrete foundation for horizontal vessel, sump pumps, storage tanks and it's reinforced
concrete wall for liquid containment.
Engineering and design of steel structures for equipment support and access walkways.
Assist the project supervisor on delegating work assignments for the team members.
Conduct monitoring and expediting activities for weekly progress report.
Checking 3D model and 2D drawing deliverables for steel structures and bar bending for reinforced concrete
foundations.
Attend weekly teleconference with Fluor Camberly office for the the discussion of unresolved regarding engineering
and design issues.
Layout structures on 3D model using Framework and produce 2D drawing using MicroStation.
02.2005 - 09.2006 Senior Structural Designer, Flour Daniel Incorporated Philippines - Alabang, Manila ( Bransje:Energi / Olje,
Fagfelt:Bygg / Anlegg / VVS, Rolle:Prosjektarbeid )
Project: Engineering for DOW/PIC OL2K - Shuaiba Industrial Area, South Kuwait
Client: Flour Haarlem, Netherlands
Layout a multi - level steel pipe rack, reinforced concrete foundation for equipment and various steel support in 3D
model using PDS/Framework Plus
Create frozen views extracted from 3D model and attach to title block on MicroStation to produce 2D drawing.
Generate MTO for bar bending schedules and showing it on detail drawing.
Generate SDNF (Steel Detailer Neutral File) report.
Conduct self - checking and fill out the checklist.
Conduct visual check for clashing incident of structures to other structures on 3D model using SPR.
09.2004 - 02.2005 Senior Structural Designer, Fluor Daniel Incorporated Philippines - Alabang, Manila, Philippines (
Bransje:Energi / Olje, Fagfelt:Bygg / Anlegg / VVS, Rolle:Prosjektarbeid )
Project: Enfield Area Development - Engineering and design for the construction of FPSO (Floating Production,
Storage and Offloading) ship.
Client: Woodside
Layout piping and electrical support on 3D model environment using PDS/Framework Plus.
Extract to create frozen views and attached on the title block to produce drawing through MicroStation.
Generate IDP clash report and identity and check on the SPR.
Generate MTO report.
12.2003 - 09.2004 Senior Structural Designer, Fluor Daniel Incorporated, Philippines - Alabang, Manila ( Bransje:Energi / Olje,
Fagfelt:Bygg / Anlegg / VVS, Rolle:Prosjektarbeid )
Project: TCO Tenghizchevroil - Onshore project for north eastern shore on Caspian Sea.
Client: Tenghizchevroil Chevroil
Develop knowledge and understanding of company legislative requirements and procedures to meet the level of
competence.
Layout steel pipe rack on 3D model on SGP facilities using PDS/Framework plus.
Produce 2D drawing using MicroStation.
05.2003 - 12.2003 Structural Detailer/Checker, Universal Steel Detailing Company - Aurora Blvd., Manila, Philippines (
Bransje:Bygg / Anlegg / VVS, Fagfelt:Bygg / Anlegg / VVS, Rolle:Prosjektarbeid )
Project: Various USA Project
Client: Allied and Peirene Iron Works
Checking of structural drawings like anchor bolts setting plan, erection and general arrangement drawings.
Verify and check 2D drawing against the 3D model on SDS/2 cad program software.
Check structural steel MTO.
Observe if the drawing complies with the statutory and regulatory requirements by the project.
05.2002 - 12.2002 Senior Structural Designer, Flour Daniel Incorporated Philippines - Alabang, Manila ( Bransje:Energi / Olje,
Fagfelt:Bygg / Anlegg / VVS, Rolle:Prosjektarbeid )
Project: United Olefins
Client: Jubail United Petrochemical Company (JUPC).
Produce 2D drawing on MicroStation for concrete modification of the sump pit structure.
Incorporate comments of the checker on the drawing.
Check the 3D model through Smart Pant view, to check clashing of the structures.
Coordinate and collaborate with the team members to generate solutions for the clashes of the structure.
06.2001 - 04.2002 Structural Detailer/Checker, Eichleay Pacific Incorporated - Libis Quezon City, Manila, Philippines (
Bransje:Energi / Olje, Fagfelt:Bygg / Anlegg / VVS, Rolle:Prosjektarbeid )
Project: Engineering support for Calpine Ontenlaunee Energy Center -580 megawatt coal fired power plant in
Pennsylvania, USA.
Client: Calpine Corporation.
Prepare and checking of structural fabrication drawing and implement project procedure and specification.
Implement and guide the delailer to use the assigned checklist to reduce mistakes.
Track all the priority items and it's necessary requirement prior to it's submission to the clients for review.
Provide inputs to the supervisor regarding status of drawing deliverables.
08.1999 - 06.2001 Structural Steel Detailer, NG Dumlao Enterprises ( Bransje:Bygg / Anlegg / VVS, Fagfelt:Bygg / Anlegg / VVS,
Rolle:Prosjektarbeid )
Project: Engineering support for the construction of various Pre - Engineered System in the USA.
Client: Rigid Building System - USA
Produce a detailed drawing of a Pre - Engineered System for general arrangement drawings and anchor bolt setting
plans.
Generate MTO of structural and architectural materials like fasteners, water sealants, trimmings and flashing.
Initiate self checking and review the checklist to minimize mistakes.
Revised and incorporate comments by the checker on the drawings.
Compile the hard copy of the finish drawings in it's allocated folders.
07.1997 - 05.1999 Structural Project Engineer, NKK Philippines ( Bransje:Transport / Distribusjon, Fagfelt:Bygg / Anlegg / VVS,
Rolle:Prosjektarbeid )
Project: Construction of Ninoy Aquino International Airport Terminal 2 (NAIA II)
Client: ADP /JAC Consortium
Conduct dimensional and welding inspection of fabricated steel structures from the fabrication yard of the vendors steel
supplier to insure the integrity of the project requirements and specifications prior for delivery to construction site and
installation.
Generate progress report on the status of the priority items and submit to the project supervisor.
Attend construction meeting to clients and vendor supplier to discuss the weekly activity and address other work
related problems affecting structural activities.
Wetness and evaluate Welder's pre - qualification testing and submit a recommendation report to the supervisor for
approval.
05.1997 - 07.1997 Construction Site Engineer, BF Metal Corporation ( Bransje:IT, Fagfelt:Bygg / Anlegg / VVS, Rolle:Prosjektarbeid
)
Project: Modifications of facilities for Intel Corporations
Client: Intel Corporations - General Trias, Cavite Philippines
Modification of facilities for Intel Corporation - General Trias Cavite, Philippines
Supervision for the installation of fabricated structural steel coming to construction site from our fabrication shop in
Cainta Rizal.
Verify and check the delivery of the fabricated steel if it conforms to the latest general requirements of the clients.
Conduct progress report to submit to clients project engineer.
Attend construction meeting and discuss issues and concern like proper access of the material and equipments to
facilitate installation of structural steel.
Prepare installation procedures and submit to clients project engineer to secure work permit.
01.1996 - 01.1997 Welding Inspector, Trusty Engineering and Construction ( Bransje:Energi / Olje, Fagfelt:Bygg / Anlegg / VVS,
Rolle:Prosjektarbeid )
Project: TPC - 2/BL - 1 - Pulau Ayer Merbau, Singapore
Client: Sumitomo Heavy Industries / Polyolefin Company Private Limited
Conduct surveys of fabricated piping materials on yard to identify and nominated priority items for daily radiographic
testing conducted by the vendor testing company.
Assist Setsco inspector on wetnessing the welder's pre - qualification testing on each welding process for SMAW and
GTAW.
Observe and evaluate the overall weld quality according to the project requirements.
Makes daily welding report prior for submission to Sumotomo QC Supervisor for approval.
Conduct visual inspection of welds to check sub - surface defects that is beyond the acceptable tolerance level required
by the project.
Attend construction meeting to clarify issues and discuss alternative solutions on problem that may arise during
fabrication and installation.
05.1989 - 10.1995 Quality Control (QC)/NDT/Welding Inspector, Grandspan Development Corporation ( Bransje:Annen industri,
Fagfelt:Prosjektledelse, Rolle:Prosjektarbeid )
Assigned in the fabrication shop to check the overall quality of the ongoing and outgoing structural steel prior to
delivery to its respective clients.
Ensure that company and project standards, procedures and specifications are maintained and followed throughout the
fabrication process.
Wetness and assess the welder's performance on pre-qualification testing.
Conduct Non-Destructive testing like Ultrasonic Testing (UT), Dye Penetrant Testing (DPT) and Magnetic Particles
Testing (MPT) on the completed welds.
Conduct dimensional inspection of structural items on every fabrication stages, such as during fit-up stage, after full
welding stages and assembly stages.
Insure that the latest drawing revision are used to incorporate the latest changes possible.
Conduct visual weld inspection to check the sub-surface weld defects, weld size measured using welding gauges, to
insure that it is within the acceptable criteria of the project requirements.
Write the remarks or comments and recommend a method to repair any fabrication error found on the request for
inspection sheet in a more complete and easy to understand word. Coordinate to the supervisor and foreman to explain
the fabrication deviation and the recommended to rectify such deviation.
Raise a Non-Conformance Report (NCR) on constantly repeated on any fabrication deviation. Close it when the it been
rectified and QC accepted.
Observe the safety and house keeping of the workplaces as often as necessary.
Attend production meeting to discuss the outstanding NCR. Highlight other concern regarding personnel safety and
overall quality of workmanship.
Conduct inspections on other fabrication stages such as finishing stages, sandblasting stages, packing and loading
stages on transportation truck.
Used Dry Film Thickness gauges to check the paint thickness are acceptable according to project standard and
specification.
Received incoming materials from the steel supplier and check its overall quality, check description and verify it to the
packing list.
Check if there are laminar defects especially on steel plates. Conduct
Lamination check using UT and DPT.
Ensure proper handling and storages of the materials are within the specified procedures.
01.1989 - 04.1989 Assistant Construction Surveyor, Lucena Industrial Corporation ( Bransje:Stat, Fagfelt:Bygg / Anlegg / VVS,
Rolle:Prosjektarbeid )
Client: Department of Public Works and Highway, First Engineering District.
Assigned to assist the Geodetic Engineer and the team on preparing route survey for the construction of 90 km road
connecting Calauag Quezon and Sipocot Camarines Sur, Philippines.
Perform leveling and measurement using theodolite survey instrument.
Acts as rodman and help clear bushes to clear obstacles that interfere with the line of sight of the surveyor through
survey instruments.
01.1987 - 07.1987 Cadet Civil Engineer, Department of Public Works and Highway ( Bransje:Stat, Fagfelt:Bygg / Anlegg / VVS,
Rolle:Prosjektarbeid )
Project: Construction/Modification of Public School Buildings, National Roads and Baranggay Roads.
Client: Philippine Government
Assist the district engineer for the supervision of the construction and modification of baranggay roads and school
building located in the town of Real, Infanta, Burdeos and Panukulan Quezon.
Språk
Fillipinsk Muntlig: Meget godt. Skriftlig: Meget godt
Engelsk Muntlig: Godt. Skriftlig: Godt
WebCruiter

Weitere ähnliche Inhalte

Was ist angesagt?

Was ist angesagt? (20)

Cv vinaya
Cv vinayaCv vinaya
Cv vinaya
 
Piping engineer cv
Piping engineer cvPiping engineer cv
Piping engineer cv
 
Szczesniak Projects portofolio_DEC_15
Szczesniak Projects portofolio_DEC_15Szczesniak Projects portofolio_DEC_15
Szczesniak Projects portofolio_DEC_15
 
Robin dargavel consutant mechanical - facilities engineer
Robin dargavel   consutant mechanical - facilities engineerRobin dargavel   consutant mechanical - facilities engineer
Robin dargavel consutant mechanical - facilities engineer
 
My CV
My CVMy CV
My CV
 
Rajib Ali CV (Final)
Rajib Ali CV (Final)Rajib Ali CV (Final)
Rajib Ali CV (Final)
 
ARafer Resume
ARafer ResumeARafer Resume
ARafer Resume
 
CV & Letters.Branescu Gavril Viorel
CV & Letters.Branescu Gavril ViorelCV & Letters.Branescu Gavril Viorel
CV & Letters.Branescu Gavril Viorel
 
Resume for Pipeline Designer
Resume for Pipeline DesignerResume for Pipeline Designer
Resume for Pipeline Designer
 
Bill ure cv 31 08-16
Bill ure cv 31 08-16Bill ure cv 31 08-16
Bill ure cv 31 08-16
 
CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016
 
DE LANGE - CV
DE LANGE - CVDE LANGE - CV
DE LANGE - CV
 
BJD Curriculum Vitae Oct 2016.doc-10
BJD Curriculum Vitae Oct 2016.doc-10BJD Curriculum Vitae Oct 2016.doc-10
BJD Curriculum Vitae Oct 2016.doc-10
 
My cv
My cvMy cv
My cv
 
PMC 1.1- 22jul16
PMC 1.1- 22jul16PMC 1.1- 22jul16
PMC 1.1- 22jul16
 
Resume - Raveendra S
Resume - Raveendra SResume - Raveendra S
Resume - Raveendra S
 
Resume_Pintu Darji_Piping Engr.
Resume_Pintu Darji_Piping Engr.Resume_Pintu Darji_Piping Engr.
Resume_Pintu Darji_Piping Engr.
 
RESUME Updated - with photo
RESUME Updated - with photoRESUME Updated - with photo
RESUME Updated - with photo
 
CV-Priono_Update
CV-Priono_UpdateCV-Priono_Update
CV-Priono_Update
 
Patrick Asiedu - Employment CV3
Patrick Asiedu - Employment CV3Patrick Asiedu - Employment CV3
Patrick Asiedu - Employment CV3
 

Andere mochten auch

Oglašavanje na Gmailu
Oglašavanje na GmailuOglašavanje na Gmailu
Oglašavanje na GmailuVice Božić
 
採訪技巧
採訪技巧採訪技巧
採訪技巧luvhsuan
 
Webinar sulle valutazioni - 23 maggio 2016
Webinar sulle valutazioni - 23 maggio 2016Webinar sulle valutazioni - 23 maggio 2016
Webinar sulle valutazioni - 23 maggio 2016Orlando Selenu
 
What is at Stake When a Worker is Misclassifed?
What is at Stake When a Worker is Misclassifed?What is at Stake When a Worker is Misclassifed?
What is at Stake When a Worker is Misclassifed?lruzicka
 
Исследование корпоративные медиа 2016
Исследование корпоративные медиа 2016Исследование корпоративные медиа 2016
Исследование корпоративные медиа 2016Leonid Khomeriki
 
TargetSummit Moscow Meetup - Indiline Sergey Sharov.
TargetSummit Moscow Meetup - Indiline Sergey Sharov. TargetSummit Moscow Meetup - Indiline Sergey Sharov.
TargetSummit Moscow Meetup - Indiline Sergey Sharov. TargetSummit
 
Introduction to linguistics
Introduction to linguisticsIntroduction to linguistics
Introduction to linguisticsRedzh Chriscel
 
Intro. to Linguistics_4 The History of Linguistics
Intro. to Linguistics_4 The History of LinguisticsIntro. to Linguistics_4 The History of Linguistics
Intro. to Linguistics_4 The History of LinguisticsEdi Brata
 
White feces disease in shrimp
White feces disease in shrimpWhite feces disease in shrimp
White feces disease in shrimpYong Thong Poh
 

Andere mochten auch (16)

ECOaudit USA
ECOaudit USAECOaudit USA
ECOaudit USA
 
Maritza Oviedo
Maritza OviedoMaritza Oviedo
Maritza Oviedo
 
original Cv 1
original Cv 1original Cv 1
original Cv 1
 
Oglašavanje na Gmailu
Oglašavanje na GmailuOglašavanje na Gmailu
Oglašavanje na Gmailu
 
採訪技巧
採訪技巧採訪技巧
採訪技巧
 
Webinar sulle valutazioni - 23 maggio 2016
Webinar sulle valutazioni - 23 maggio 2016Webinar sulle valutazioni - 23 maggio 2016
Webinar sulle valutazioni - 23 maggio 2016
 
What is at Stake When a Worker is Misclassifed?
What is at Stake When a Worker is Misclassifed?What is at Stake When a Worker is Misclassifed?
What is at Stake When a Worker is Misclassifed?
 
Smart
SmartSmart
Smart
 
ADDIE Bethy Baño
ADDIE Bethy BañoADDIE Bethy Baño
ADDIE Bethy Baño
 
GUL37_100_BAH_To_See
GUL37_100_BAH_To_SeeGUL37_100_BAH_To_See
GUL37_100_BAH_To_See
 
Исследование корпоративные медиа 2016
Исследование корпоративные медиа 2016Исследование корпоративные медиа 2016
Исследование корпоративные медиа 2016
 
LOLA™ by Sonora Labs
LOLA™ by Sonora LabsLOLA™ by Sonora Labs
LOLA™ by Sonora Labs
 
TargetSummit Moscow Meetup - Indiline Sergey Sharov.
TargetSummit Moscow Meetup - Indiline Sergey Sharov. TargetSummit Moscow Meetup - Indiline Sergey Sharov.
TargetSummit Moscow Meetup - Indiline Sergey Sharov.
 
Introduction to linguistics
Introduction to linguisticsIntroduction to linguistics
Introduction to linguistics
 
Intro. to Linguistics_4 The History of Linguistics
Intro. to Linguistics_4 The History of LinguisticsIntro. to Linguistics_4 The History of Linguistics
Intro. to Linguistics_4 The History of Linguistics
 
White feces disease in shrimp
White feces disease in shrimpWhite feces disease in shrimp
White feces disease in shrimp
 

Ähnlich wie WebCruiter (20)

Mvcv v10
Mvcv v10Mvcv v10
Mvcv v10
 
Behnam Nikouei resume
Behnam Nikouei resumeBehnam Nikouei resume
Behnam Nikouei resume
 
HeikkiläCV201602
HeikkiläCV201602HeikkiläCV201602
HeikkiläCV201602
 
SM CV2016
SM CV2016SM CV2016
SM CV2016
 
GMcnicol CV
GMcnicol CVGMcnicol CV
GMcnicol CV
 
EZBonavente CV_ Civil & Structural Engineer
EZBonavente CV_ Civil & Structural EngineerEZBonavente CV_ Civil & Structural Engineer
EZBonavente CV_ Civil & Structural Engineer
 
Amitava_resume
Amitava_resumeAmitava_resume
Amitava_resume
 
GK_cv_2015_Mar
GK_cv_2015_MarGK_cv_2015_Mar
GK_cv_2015_Mar
 
Tyron Muller Curriculum Vitae
Tyron Muller Curriculum VitaeTyron Muller Curriculum Vitae
Tyron Muller Curriculum Vitae
 
DML CV 17
DML CV 17DML CV 17
DML CV 17
 
CV CBK 2015 N
CV CBK 2015 NCV CBK 2015 N
CV CBK 2015 N
 
SMA CV2016-1
SMA CV2016-1SMA CV2016-1
SMA CV2016-1
 
CV QUANPH - FEB 2019
CV QUANPH - FEB 2019CV QUANPH - FEB 2019
CV QUANPH - FEB 2019
 
Sudarsang electrical designer
Sudarsang electrical designerSudarsang electrical designer
Sudarsang electrical designer
 
Nitin_Technical
Nitin_TechnicalNitin_Technical
Nitin_Technical
 
Ian_Rowell_Resume_June_2015
Ian_Rowell_Resume_June_2015Ian_Rowell_Resume_June_2015
Ian_Rowell_Resume_June_2015
 
(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)(Ahmed Kamal Mohamed)
(Ahmed Kamal Mohamed)
 
Craig Sharples - CV - Stonus Ltd
Craig Sharples - CV - Stonus LtdCraig Sharples - CV - Stonus Ltd
Craig Sharples - CV - Stonus Ltd
 
Lawrence CV på English 2
Lawrence CV på English 2Lawrence CV på English 2
Lawrence CV på English 2
 
Resume_Mallanagouda Patil
Resume_Mallanagouda PatilResume_Mallanagouda Patil
Resume_Mallanagouda Patil
 

WebCruiter

  • 1. Curriculum Vitae Sist endret: 21.03.2016 Personalia Herman Edano ♂ Halvorstraen 18 4077 Hundvåg, Norge Nasjonalitet: Filippinene Sivilstand: Gift Antall barn: 4 Fødselsdag: 23.10.1960 E-postadresse: herman_edano@yahoo.com Privattelefon: 40635859 Mobiltelefon: 47 40635859 Gyldig arbeidstillatelse: Ja Utdanning 06.1979 - 03.1984 B.S.C.E (Bachelor of Science in Civil Engineering), Manuel S. Enverga University Foundation – Lucen, Philippines ( Annet - Bachelorgrad ) Stillinger 05.2014 - 07.2015 Senior Structural PDMS Designer, Cofely Fabricom - Kanalsletta 3, Forus, Stavanger, Norway ( Bransje:Energi / Olje, Fagfelt:Bygg / Anlegg / VVS, Rolle:Prosjektarbeid ) Assigned to Structural and Marine and report to the department manager for the assigned task: Responsible for updating As-Built PDMS 3D model and PDMS drawing as per the redline mark-up and comments from construction for Helihangar SFB project. Familiarization of Statoil cad requirements like TR2231 and TR2381 – PDMS 3D model and LCI requirements. Create a data file through DB Listing and snap shot of the specially design structure and equipment from PDMS 3D model. 01.2014 - 04.2014 Senior Structural PDMS Designer, Cofely Fabricom - Kanalsletta 3, Forus, Stavanger, Norway ( Bransje:Energi / Olje, Fagfelt:Bygg / Anlegg / VVS, Rolle:Prosjektarbeid ) Project: Engineering and Design for Permanent Plug and Abandonment for Heimdal PP&A Interphase Project Client: Archer/Statoil Responsible for the layout on PDMS 3D model and producing PDMS drawing for a variety of mechanical equipment support on modules M50 and M55 areas. 11.2013 - 12.2013 Senior Structural PDMS Designer, Cofely Fabricom - Kanalsletta 3, Forus, Stavanger, Norway ( Bransje:Energi / Olje, Fagfelt:Bygg / Anlegg / VVS, Rolle:Prosjektarbeid ) Assigned to Structural and Marine and report to the department manager for the assigned task: Responsible for updating of Structural drawing standards based on the current Norsok and Statoil regulations. Check and coordinate to the Engineer regarding comments mark up on PDMS drawing. Check drawing to Norsok regulation about material, design fabrication and installation for steel and aluminum structures. Upload the final drawing to Fabricom Management System (FMS) through ProArc. 08.2013 - 10.2013 Senior Structural PDMS Designer, Cofely Fabricom - Kanalsletta 3 Forus, Stavanger ( Bransje:Energi / Olje, Fagfelt:Bygg / Anlegg / VVS, Rolle:Prosjektarbeid ) Project: Demolition of the exhaust tower for the Valhall oil platform. Client: BP Responsible for the layout through PDMS 3D model and producing drawing of the securing clamps to be used for the demolition of the exhaust tower. Coordinate to the area lead engineer for the important design parameters needed to finalize and focus on the right objective. Filled out the engineering and design checklist prior for submission to the checkers. Update the comments marked up on the drawing and clarifies other issues to the checker. Upload the final drawing to ProArc. 06.2012 - 07.2013 Senior Structural PDMS Designer, Fabricom GDF Suez - Skogstøstraen 25, Tasta, Stavanger, Norway ( Bransje:Energi / Olje, Fagfelt:Bygg / Anlegg / VVS, Rolle:Prosjektarbeid ) Project: Engineering and Design for the construction of Helihangar in Statfjord B (SFB). Client: Statoil • Responsible for updating PDMS model and drawing to As-Built status, based on the redline mark up from fabrication, construction and installation. • Responsible for preliminary layout through PDMS 3D model for aluminum Infill for the east wall. • Responsible for checking the cutting sketches of section profiles and plates, extracted from PDMS 3D model. • Prepare the final copy of drawing for signing and filling out the checklist form, prior for uploading to ProArc. 06.2011 - 06.2012 Senior Structural PDMS Designer, Fabricom - Stavanger Norway ( Bransje:Energi / Olje, Fagfelt:Bygg / Anlegg / VVS, Rolle:Prosjektarbeid ) Project: Stjerne Topside Modification on Oseberg Sør Client: Staoil Create layout foundation of the pull - in winch, piping penetration, stair and handrail demolition on 3D PDMS model Provide MicroStation drawing for the foundation of SCPU cabinet on the Instrument/Telecom room. Generate MTO report, and coordinate with other disciplines regarding the design that might affect the structures. Perform checking using True View, Cloud works and site photos to visually check and familiarity on the actual site condition.
  • 2. 11.2008 - 12.2010 Structural Designer, IKM/Aker Solutions - Bøuy Stavanger Norway ( Bransje:Energi / Olje, Fagfelt:Bygg / Anlegg / VVS, Rolle:Prosjektarbeid ) Project: Kashagan Hook - Up Development - Engineering and Design for the hook up and offshore installation of the remaining structural steel on the north of the Caspian Sea. Client: Agip/KCO Produce MicroStation drawing of steel for hook-up to the existing steel structures. Produce MTO, BOM and work sequence for the installation of structural steel on offshore Prepare and review checklist for IROA (incidents risk offshore assessment). Coordinate with other discipline for other information relevant to the work scope. Check the structure for clashes and obstruction with other structures by visual walk through on 3D model using SPR (smart plant review). Register electronically the final drawing and documents on Time, IMIS, and ProArc. 06.2008 - 10.2008 Structural Designer, CB&I/ABB - No. 2 Ayer Rajah, Crescent 139935, Singapore ( Bransje:Energi / Olje, Fagfelt:Bygg / Anlegg / VVS, Rolle:Prosjektarbeid ) Project: Engineering and design for the conversion of Tanker Mt. Freeway to FPSO. CLient: Tanker Pacific Incorporated - Jurong Shipyard, Singapore. Conduct verification of structural steel design for modification and offshore installation. Coordinate between engineering department and construction about discrepancies that might affect the design integrity of the structures. Prepare PDMS 3D modeling and produce drawing for access platforms and walkways. 11.2007 - 06.2008 Senior Structural Designer, CB&I/ABB - No. 2 Ayer Rajah Crescent 139935, Singapore ( Bransje:Energi / Olje, Fagfelt:Bygg / Anlegg / VVS, Rolle:Prosjektarbeid ) Project: Engineering and Design for the construction and rehabilitation of facilities of Ethylene Cracker Complex for Mono - Ethylene Glycol plant for Shell ECC. Client: Shell Eastern Petroleum - Pulau Ular, Singapore. Produce modification drawing for concrete piping trenches using PDMS modeling and drafting. Produce MTO report and estimates other miscellaneous structural steel. Prepare the final copy of drawing for signing and filing out the checklist form, prior for uploading to ProArc. 07.2007 - 11.2007 Senior Structural Designer, ABB Lummus Global - No. 2 Ayer Rajah Crescent 139935, Singapore ( Bransje:Energi / Olje, Fagfelt:Bygg / Anlegg / VVS, Rolle:Prosjektarbeid ) Project: Engineering and Design for the construction of FPSO for Azurite Field Development - Congo West Africa Client: Prosafe Offshore - Singapore Produce detail drawing on topside module for central pipe rack M71 to M74, aft crane interphase module F96 and on forward interphase module F95. Layout main support frame for equipment platform using PDMS 3D modeling and extract to produce drawing. Perform clash check report to identity structures with clashes to other structures. 04.2007 - 07.2007 Senior Structural Designer, Fluor Daniel Incorporated Philippines - Alabang, Manila ( Bransje:Energi / Olje, Fagfelt:Bygg / Anlegg / VVS, Rolle:Prosjektarbeid ) Project: Engineering and Design for Tasnee PP Expansion - Including Existing Polypropylene Plant, upgrade of the Polymerization unit and Extraction unit. Upgrades of the Line 1 of the Polymerization Reactor. Construction of new Recovery unit, construction of the new TEAL (Triethylene Aluminum) building and construction of the new Substation building. Client: Fluor B.V., Haarlem, Netherlands Layout in 3D model using PDS/Framework Plus of underground pipes and electrical trenches on the new TEAL building. Layout in 3D model of the access platforms and walkways and various pipes and electrical support. Extract frozen views on 3D to create 2D views and attached to the MicroStation title block. Run interference detection process (IDP) clash check report on the 3D model. Investigate by visual walk through using SPR. Coordinate to the concern discipline regarding clashes of structures. 09.2006 - 03.2007 Senior Structural Designer (Assistant Lead), Fluor Daniel Incorporated Philippines - Alabang, Manila ( Bransje:Energi / Olje, Fagfelt:Bygg / Anlegg / VVS, Rolle:Prosjektarbeid ) Project: Engineering and Design for Habshan Gas Complex Expansion Client: Fluor B.V., Netherlands Engineering and design of concrete foundation for horizontal vessel, sump pumps, storage tanks and it's reinforced concrete wall for liquid containment. Engineering and design of steel structures for equipment support and access walkways. Assist the project supervisor on delegating work assignments for the team members. Conduct monitoring and expediting activities for weekly progress report. Checking 3D model and 2D drawing deliverables for steel structures and bar bending for reinforced concrete foundations. Attend weekly teleconference with Fluor Camberly office for the the discussion of unresolved regarding engineering and design issues. Layout structures on 3D model using Framework and produce 2D drawing using MicroStation. 02.2005 - 09.2006 Senior Structural Designer, Flour Daniel Incorporated Philippines - Alabang, Manila ( Bransje:Energi / Olje, Fagfelt:Bygg / Anlegg / VVS, Rolle:Prosjektarbeid ) Project: Engineering for DOW/PIC OL2K - Shuaiba Industrial Area, South Kuwait Client: Flour Haarlem, Netherlands Layout a multi - level steel pipe rack, reinforced concrete foundation for equipment and various steel support in 3D model using PDS/Framework Plus Create frozen views extracted from 3D model and attach to title block on MicroStation to produce 2D drawing. Generate MTO for bar bending schedules and showing it on detail drawing.
  • 3. Generate SDNF (Steel Detailer Neutral File) report. Conduct self - checking and fill out the checklist. Conduct visual check for clashing incident of structures to other structures on 3D model using SPR. 09.2004 - 02.2005 Senior Structural Designer, Fluor Daniel Incorporated Philippines - Alabang, Manila, Philippines ( Bransje:Energi / Olje, Fagfelt:Bygg / Anlegg / VVS, Rolle:Prosjektarbeid ) Project: Enfield Area Development - Engineering and design for the construction of FPSO (Floating Production, Storage and Offloading) ship. Client: Woodside Layout piping and electrical support on 3D model environment using PDS/Framework Plus. Extract to create frozen views and attached on the title block to produce drawing through MicroStation. Generate IDP clash report and identity and check on the SPR. Generate MTO report. 12.2003 - 09.2004 Senior Structural Designer, Fluor Daniel Incorporated, Philippines - Alabang, Manila ( Bransje:Energi / Olje, Fagfelt:Bygg / Anlegg / VVS, Rolle:Prosjektarbeid ) Project: TCO Tenghizchevroil - Onshore project for north eastern shore on Caspian Sea. Client: Tenghizchevroil Chevroil Develop knowledge and understanding of company legislative requirements and procedures to meet the level of competence. Layout steel pipe rack on 3D model on SGP facilities using PDS/Framework plus. Produce 2D drawing using MicroStation. 05.2003 - 12.2003 Structural Detailer/Checker, Universal Steel Detailing Company - Aurora Blvd., Manila, Philippines ( Bransje:Bygg / Anlegg / VVS, Fagfelt:Bygg / Anlegg / VVS, Rolle:Prosjektarbeid ) Project: Various USA Project Client: Allied and Peirene Iron Works Checking of structural drawings like anchor bolts setting plan, erection and general arrangement drawings. Verify and check 2D drawing against the 3D model on SDS/2 cad program software. Check structural steel MTO. Observe if the drawing complies with the statutory and regulatory requirements by the project. 05.2002 - 12.2002 Senior Structural Designer, Flour Daniel Incorporated Philippines - Alabang, Manila ( Bransje:Energi / Olje, Fagfelt:Bygg / Anlegg / VVS, Rolle:Prosjektarbeid ) Project: United Olefins Client: Jubail United Petrochemical Company (JUPC). Produce 2D drawing on MicroStation for concrete modification of the sump pit structure. Incorporate comments of the checker on the drawing. Check the 3D model through Smart Pant view, to check clashing of the structures. Coordinate and collaborate with the team members to generate solutions for the clashes of the structure. 06.2001 - 04.2002 Structural Detailer/Checker, Eichleay Pacific Incorporated - Libis Quezon City, Manila, Philippines ( Bransje:Energi / Olje, Fagfelt:Bygg / Anlegg / VVS, Rolle:Prosjektarbeid ) Project: Engineering support for Calpine Ontenlaunee Energy Center -580 megawatt coal fired power plant in Pennsylvania, USA. Client: Calpine Corporation. Prepare and checking of structural fabrication drawing and implement project procedure and specification. Implement and guide the delailer to use the assigned checklist to reduce mistakes. Track all the priority items and it's necessary requirement prior to it's submission to the clients for review. Provide inputs to the supervisor regarding status of drawing deliverables. 08.1999 - 06.2001 Structural Steel Detailer, NG Dumlao Enterprises ( Bransje:Bygg / Anlegg / VVS, Fagfelt:Bygg / Anlegg / VVS, Rolle:Prosjektarbeid ) Project: Engineering support for the construction of various Pre - Engineered System in the USA. Client: Rigid Building System - USA Produce a detailed drawing of a Pre - Engineered System for general arrangement drawings and anchor bolt setting plans. Generate MTO of structural and architectural materials like fasteners, water sealants, trimmings and flashing. Initiate self checking and review the checklist to minimize mistakes. Revised and incorporate comments by the checker on the drawings. Compile the hard copy of the finish drawings in it's allocated folders. 07.1997 - 05.1999 Structural Project Engineer, NKK Philippines ( Bransje:Transport / Distribusjon, Fagfelt:Bygg / Anlegg / VVS, Rolle:Prosjektarbeid ) Project: Construction of Ninoy Aquino International Airport Terminal 2 (NAIA II) Client: ADP /JAC Consortium Conduct dimensional and welding inspection of fabricated steel structures from the fabrication yard of the vendors steel supplier to insure the integrity of the project requirements and specifications prior for delivery to construction site and installation. Generate progress report on the status of the priority items and submit to the project supervisor. Attend construction meeting to clients and vendor supplier to discuss the weekly activity and address other work related problems affecting structural activities. Wetness and evaluate Welder's pre - qualification testing and submit a recommendation report to the supervisor for approval. 05.1997 - 07.1997 Construction Site Engineer, BF Metal Corporation ( Bransje:IT, Fagfelt:Bygg / Anlegg / VVS, Rolle:Prosjektarbeid ) Project: Modifications of facilities for Intel Corporations Client: Intel Corporations - General Trias, Cavite Philippines Modification of facilities for Intel Corporation - General Trias Cavite, Philippines
  • 4. Supervision for the installation of fabricated structural steel coming to construction site from our fabrication shop in Cainta Rizal. Verify and check the delivery of the fabricated steel if it conforms to the latest general requirements of the clients. Conduct progress report to submit to clients project engineer. Attend construction meeting and discuss issues and concern like proper access of the material and equipments to facilitate installation of structural steel. Prepare installation procedures and submit to clients project engineer to secure work permit. 01.1996 - 01.1997 Welding Inspector, Trusty Engineering and Construction ( Bransje:Energi / Olje, Fagfelt:Bygg / Anlegg / VVS, Rolle:Prosjektarbeid ) Project: TPC - 2/BL - 1 - Pulau Ayer Merbau, Singapore Client: Sumitomo Heavy Industries / Polyolefin Company Private Limited Conduct surveys of fabricated piping materials on yard to identify and nominated priority items for daily radiographic testing conducted by the vendor testing company. Assist Setsco inspector on wetnessing the welder's pre - qualification testing on each welding process for SMAW and GTAW. Observe and evaluate the overall weld quality according to the project requirements. Makes daily welding report prior for submission to Sumotomo QC Supervisor for approval. Conduct visual inspection of welds to check sub - surface defects that is beyond the acceptable tolerance level required by the project. Attend construction meeting to clarify issues and discuss alternative solutions on problem that may arise during fabrication and installation. 05.1989 - 10.1995 Quality Control (QC)/NDT/Welding Inspector, Grandspan Development Corporation ( Bransje:Annen industri, Fagfelt:Prosjektledelse, Rolle:Prosjektarbeid ) Assigned in the fabrication shop to check the overall quality of the ongoing and outgoing structural steel prior to delivery to its respective clients. Ensure that company and project standards, procedures and specifications are maintained and followed throughout the fabrication process. Wetness and assess the welder's performance on pre-qualification testing. Conduct Non-Destructive testing like Ultrasonic Testing (UT), Dye Penetrant Testing (DPT) and Magnetic Particles Testing (MPT) on the completed welds. Conduct dimensional inspection of structural items on every fabrication stages, such as during fit-up stage, after full welding stages and assembly stages. Insure that the latest drawing revision are used to incorporate the latest changes possible. Conduct visual weld inspection to check the sub-surface weld defects, weld size measured using welding gauges, to insure that it is within the acceptable criteria of the project requirements. Write the remarks or comments and recommend a method to repair any fabrication error found on the request for inspection sheet in a more complete and easy to understand word. Coordinate to the supervisor and foreman to explain the fabrication deviation and the recommended to rectify such deviation. Raise a Non-Conformance Report (NCR) on constantly repeated on any fabrication deviation. Close it when the it been rectified and QC accepted. Observe the safety and house keeping of the workplaces as often as necessary. Attend production meeting to discuss the outstanding NCR. Highlight other concern regarding personnel safety and overall quality of workmanship. Conduct inspections on other fabrication stages such as finishing stages, sandblasting stages, packing and loading stages on transportation truck. Used Dry Film Thickness gauges to check the paint thickness are acceptable according to project standard and specification. Received incoming materials from the steel supplier and check its overall quality, check description and verify it to the packing list. Check if there are laminar defects especially on steel plates. Conduct Lamination check using UT and DPT. Ensure proper handling and storages of the materials are within the specified procedures. 01.1989 - 04.1989 Assistant Construction Surveyor, Lucena Industrial Corporation ( Bransje:Stat, Fagfelt:Bygg / Anlegg / VVS, Rolle:Prosjektarbeid ) Client: Department of Public Works and Highway, First Engineering District. Assigned to assist the Geodetic Engineer and the team on preparing route survey for the construction of 90 km road connecting Calauag Quezon and Sipocot Camarines Sur, Philippines. Perform leveling and measurement using theodolite survey instrument. Acts as rodman and help clear bushes to clear obstacles that interfere with the line of sight of the surveyor through survey instruments. 01.1987 - 07.1987 Cadet Civil Engineer, Department of Public Works and Highway ( Bransje:Stat, Fagfelt:Bygg / Anlegg / VVS, Rolle:Prosjektarbeid ) Project: Construction/Modification of Public School Buildings, National Roads and Baranggay Roads. Client: Philippine Government Assist the district engineer for the supervision of the construction and modification of baranggay roads and school building located in the town of Real, Infanta, Burdeos and Panukulan Quezon. Språk Fillipinsk Muntlig: Meget godt. Skriftlig: Meget godt Engelsk Muntlig: Godt. Skriftlig: Godt