Roles and Responsibilities in various projects
Project: Tehran West 11.2 Km Sanitary Sewer Transmission Line
Design & Construction, Tehran – Iran
Position: Project Manager
Contract Value: AED US$ 110,000,000
Client: Tehran Sewerage Company
Consultant: LAR Consulting Engineers
The configuration of this project is very similar to that of the Ottawa CSST
tunnel. With a finished inside diameter of 3.00m, it extends for 11.2 Kms to
the proposed Sewerage plant in the south end of the capital city. My project
involvement started in the initial stages; beginning with preparation and
signing of the Joint Venture Agreement with J.V. partners (design consultant
and two contractors) and continued with the preparation of pre-qualification
documents, bidding, and following a successful bid, mobilization and start-
up. Procurement of Tunnel Boring Machine (TBM) from China, purchase
of four locomotives (as part of TBM backup system) from Germany and
purchase of Combi-Segment Lining Panels and Concrete Segment Forms
from Germany followed mobilization. The tunneling is progressing to this
date.
Project: Diftah-Shis Road & Tunnels Project
Sharjah - United Arab Emirates (U.A.E.)
Position: Project Manager
Contract Value: AED 466,000,000 (US$ 127,322,165)
Client: Government of Sharjah, Directorate of Public Works, U. A.E.
Consultant: Halcrow International Partnership, U.K. (now acquired by
CH2M)
My involvement in this project was quite extensive. It ranged from lengthy
contract negotiations with Client and Consultant to project management.
Contract negotiations resulted in securing this job without going through
the tendering process. This process entailed addressing technical issues,
reviewing the general conditions of contract (based on FIDIC), special
provisions, the bill of quantities and agreeing on each item’s price. A
workable time schedule was also mutually agreed upon. After award and
signing of the Contract, I took the role of the project manager; mobilizing
the site, procuring required equipment and personnel and started the job.
Later on, as the regional director, I appointed a new project manager and
both projects and site managers reported to me. My full support was always
extended to the project manager in contract administration and I resolved
contractual issues with Consultant and Client when required.
Project: Wadi Muddiq to Tunnel Road
United Arab Emirates (U.A.E.)
Position: Contract Administrator
Total Contract Value: AED 46,859,228 (US$ 12,803,067)
Client: Government of Sharjah, U.A.E.
Consultant: Halcrow International Partnership, U.K. (now acquired by
CH2M)
After securing a road construction project in Pakistan, this and the
following project (Gillay to Tunnel Road) were our first projects in the
United Arab Emirates (U.A.E.). We had bid on both projects
simultaneously and we were awarded the two projects at the same time. I
was involved with both projects through to completion and handover to
Client.
Project: Gillay to Tunnel Road
United Arab Emirates (U.A.E.)
Position: Contract Administrator
Total Contract Value: AED 23,352,189 (US$ 6,380,379)
Client: Government of Sharjah, U.A.E.
Consultant: Halcrow International Partnership, U.K. (now acquired by
CH2M)
I held the same position as in the above-noted project.
Project: Mountain Road to Al Jais Project (36 Km)
Ras Al Khaimah - United Arab Emirates (U.A.E.)
Position: Project Manager
Contract Value: AED 280,000,000 (US$ 76,000,000)
Client: Government of Ras Al Khainyah, Directorate of Public Works,
U.A.E.
Consultant: Halcrow International Partnership, U.K. (now acquired by
CH2M)
Involved from bidding stage to Award of contract, mobilization, start up
and execution.
Project: Kalba-Lagoon Corniche Road Project- Phases 1 & 2
Kalba - United Arab Emirates (U.A.E.)
Position: Site Manager
Contract Value: AED 46,200,000 (US$ 12,623,000)
Consultant: Halcrow International Partnership, U.K. (now acquired by
CH2M)
Project: Bam & Baravat Cities 56 Km Water Transmission
Pipeline, Pumping Station & Water Treatment Plant Project, Bam –
Kerman Province, Iran
Position: Deputy Project Manager & Head of Technical Committee
Contract Value: US$118,535,314
Client: Kerman Regional Water Authority
Project: Diftah Cloverleaf Interchange
Sharjah - United Arab Emirates (U.A.E.)
Position: Contract Administrator
Contract Value: AED 57,000,000 (US$15,574,000)
Client: Government of Sharjah, U.A.E.
Consultant: Halcrow International Partnership, U.K. (now acquired by
CH2M)
Involved from bidding stage to winning, mobilization, start up and
execution. The Client later suspended this project in mid-construction due
to disputes with adjacent landowners.
Project: Ghalajeh Tunnel & Access Road Project Ilam – Iran
Position: Project Foreign Procurement
Contract Value: US$29,000,000
Client: Ilam Road & Transportation Co.
Project: Tehran International Airport Terminal Building (IKIA)
Tehran – Iran
Position: Member of Technical Committee & in charge of External
Procurement
Total Contract Value: US$34,000,000
Client: Ministry of Transportation
Consultant: ATEC Consulting Engineers
Project: Dubai International City Development
Phases 2 & 3 - Stage 1 - Infrastructure Works
Dubai - United Arab Emirates (U.A.E.)
Position: Contract Administrator
Contract Value: AED 245,000,000 (US$ 66,940,000)
Client: NAKHEEL Development Company, U.A.E.
Project: Surab to Kalat Road Project
Baluchistan – Pakistan
Position: Contract Administrator
Total Contract Value: US$ 30,000,000
Client: National Highway Authority of Pakistan (NHA)
Consultant: Sampak International Consultants – Pakistan
This was the first project secured by General Mechanic Company outside
Iran. I was heavily involved with technical and contractual challenges of the
project.
Project: Asia Highway Project (EPC)
Tehran – Iran
Position: Member of Technical Committee & in charge of External
Procurement
Contract Value: US$130,000,000
Client: Tehran Municipality (Civil & Engineering Organization)
Location: Tehran - Iran
Project: Zanjan-Tabriz Freeway Project (Lot 2A)
East Azarbaijan – Iran
Position: In charge of Supply Contracts for import of toll collection
systems
Contract Value: US$71,300,000
Client: Iran Ministry of Road & Transportation

Weitere ähnliche Inhalte

Was ist angesagt? (20)

Mohamed Hiji C.V_4
Mohamed Hiji C.V_4Mohamed Hiji C.V_4
Mohamed Hiji C.V_4
 
Carrer Profile
Carrer ProfileCarrer Profile
Carrer Profile
 
CV Issam 2
CV Issam 2CV Issam 2
CV Issam 2
 
PACOTECH Parks SOQ
PACOTECH Parks SOQPACOTECH Parks SOQ
PACOTECH Parks SOQ
 
Mohamed sanoussi cv
Mohamed sanoussi cvMohamed sanoussi cv
Mohamed sanoussi cv
 
CV
CVCV
CV
 
CV-SM-Akbari-Feb 2016
CV-SM-Akbari-Feb 2016CV-SM-Akbari-Feb 2016
CV-SM-Akbari-Feb 2016
 
Mechanical_Draftsmen_
Mechanical_Draftsmen_Mechanical_Draftsmen_
Mechanical_Draftsmen_
 
Gagandeepgrover 21 dec 2019
Gagandeepgrover 21 dec 2019Gagandeepgrover 21 dec 2019
Gagandeepgrover 21 dec 2019
 
Detailed Experiance - REV01
Detailed Experiance - REV01Detailed Experiance - REV01
Detailed Experiance - REV01
 
1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)
 
CV - Fakruddin R01
CV - Fakruddin  R01CV - Fakruddin  R01
CV - Fakruddin R01
 
1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)
 
Riyadh Metro Line-6
Riyadh Metro Line-6Riyadh Metro Line-6
Riyadh Metro Line-6
 
Navaneethakrishnan BE .Civil over 8 yrs of exp in Infrastructure projects
Navaneethakrishnan BE .Civil over 8 yrs of exp in Infrastructure projectsNavaneethakrishnan BE .Civil over 8 yrs of exp in Infrastructure projects
Navaneethakrishnan BE .Civil over 8 yrs of exp in Infrastructure projects
 
Samih.CV docx
Samih.CV docxSamih.CV docx
Samih.CV docx
 
CV - Ahmed Mounir
CV - Ahmed MounirCV - Ahmed Mounir
CV - Ahmed Mounir
 
Cv aniruddha
Cv aniruddhaCv aniruddha
Cv aniruddha
 
FRANK SARRISCV282015
FRANK SARRISCV282015FRANK SARRISCV282015
FRANK SARRISCV282015
 
CV PM-KJH
CV PM-KJHCV PM-KJH
CV PM-KJH
 

Andere mochten auch

Report of the Senate finance Committee
Report of the Senate finance CommitteeReport of the Senate finance Committee
Report of the Senate finance Committee
Kristen Lango
 
Resume - Yan Li
Resume - Yan LiResume - Yan Li
Resume - Yan Li
Summer Li
 
Ricardo Artis Final Version(2)
Ricardo Artis Final Version(2)Ricardo Artis Final Version(2)
Ricardo Artis Final Version(2)
DR. RICARDO ARTIS
 
Alan GRAINGER "A cost-benefit analysis tool for planning national zero net la...
Alan GRAINGER "A cost-benefit analysis tool for planning national zero net la...Alan GRAINGER "A cost-benefit analysis tool for planning national zero net la...
Alan GRAINGER "A cost-benefit analysis tool for planning national zero net la...
Global Risk Forum GRFDavos
 
Anchor line 8.24.16
Anchor line 8.24.16Anchor line 8.24.16
Anchor line 8.24.16
Nya Thompson
 

Andere mochten auch (20)

Exposicion de informática
Exposicion de informáticaExposicion de informática
Exposicion de informática
 
Alba run project
Alba run projectAlba run project
Alba run project
 
SKY
SKYSKY
SKY
 
Tarea 1
Tarea 1Tarea 1
Tarea 1
 
Internet servers
Internet serversInternet servers
Internet servers
 
Report of the Senate finance Committee
Report of the Senate finance CommitteeReport of the Senate finance Committee
Report of the Senate finance Committee
 
Exposicion de informática
Exposicion de informáticaExposicion de informática
Exposicion de informática
 
Joshua R
Joshua RJoshua R
Joshua R
 
Cesio 137
Cesio 137Cesio 137
Cesio 137
 
Exposicion de informática
Exposicion de informáticaExposicion de informática
Exposicion de informática
 
Kevin Reason Smith (1)
Kevin Reason Smith (1)Kevin Reason Smith (1)
Kevin Reason Smith (1)
 
Resume - Yan Li
Resume - Yan LiResume - Yan Li
Resume - Yan Li
 
Ricardo Artis Final Version(2)
Ricardo Artis Final Version(2)Ricardo Artis Final Version(2)
Ricardo Artis Final Version(2)
 
revista digital derecho civil
revista digital derecho civilrevista digital derecho civil
revista digital derecho civil
 
Social Developers London April 2013 Intro by Todd Chaffee
Social Developers London April 2013 Intro by Todd ChaffeeSocial Developers London April 2013 Intro by Todd Chaffee
Social Developers London April 2013 Intro by Todd Chaffee
 
Outsourcing – krótkotrwały romans czy długoletni kontrakt?
Outsourcing – krótkotrwały romans czy długoletni kontrakt?Outsourcing – krótkotrwały romans czy długoletni kontrakt?
Outsourcing – krótkotrwały romans czy długoletni kontrakt?
 
Outsourcing a koszty
Outsourcing a kosztyOutsourcing a koszty
Outsourcing a koszty
 
Alan GRAINGER "A cost-benefit analysis tool for planning national zero net la...
Alan GRAINGER "A cost-benefit analysis tool for planning national zero net la...Alan GRAINGER "A cost-benefit analysis tool for planning national zero net la...
Alan GRAINGER "A cost-benefit analysis tool for planning national zero net la...
 
Anchor line 8.24.16
Anchor line 8.24.16Anchor line 8.24.16
Anchor line 8.24.16
 
whispto
whisptowhispto
whispto
 

Ähnlich wie Roles and Responsibilities in various projects

Ähnlich wie Roles and Responsibilities in various projects (20)

CV
CVCV
CV
 
Cv zaki 17.11.2014 dhaka
Cv zaki 17.11.2014 dhakaCv zaki 17.11.2014 dhaka
Cv zaki 17.11.2014 dhaka
 
Giri - CV
Giri - CVGiri - CV
Giri - CV
 
Updated C.V of water & sewerage
Updated  C.V of water & sewerageUpdated  C.V of water & sewerage
Updated C.V of water & sewerage
 
C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)
 
JAMES -CV -
JAMES -CV -JAMES -CV -
JAMES -CV -
 
150809-WSP CV-Mohamed Hassan-General-Short Form
150809-WSP CV-Mohamed Hassan-General-Short Form150809-WSP CV-Mohamed Hassan-General-Short Form
150809-WSP CV-Mohamed Hassan-General-Short Form
 
HITHAM CV
HITHAM CVHITHAM CV
HITHAM CV
 
CV Mahmoud Farid PM
CV Mahmoud Farid PMCV Mahmoud Farid PM
CV Mahmoud Farid PM
 
Annexure - Projects
Annexure - ProjectsAnnexure - Projects
Annexure - Projects
 
Sr Civil Engineer
Sr Civil EngineerSr Civil Engineer
Sr Civil Engineer
 
Revised Resume MSR
Revised Resume MSRRevised Resume MSR
Revised Resume MSR
 
ahmed sakr , CM civil (1)
ahmed sakr , CM civil (1)ahmed sakr , CM civil (1)
ahmed sakr , CM civil (1)
 
Updated CV of Satheeshkumar
Updated CV of SatheeshkumarUpdated CV of Satheeshkumar
Updated CV of Satheeshkumar
 
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
 
amr
amramr
amr
 
Crispan Falcao-2017
Crispan Falcao-2017Crispan Falcao-2017
Crispan Falcao-2017
 
jainco
jaincojainco
jainco
 
CV eldashash
CV eldashashCV eldashash
CV eldashash
 
MCV
MCVMCV
MCV
 

Roles and Responsibilities in various projects

  • 1. Roles and Responsibilities in various projects Project: Tehran West 11.2 Km Sanitary Sewer Transmission Line Design & Construction, Tehran – Iran Position: Project Manager Contract Value: AED US$ 110,000,000 Client: Tehran Sewerage Company Consultant: LAR Consulting Engineers The configuration of this project is very similar to that of the Ottawa CSST tunnel. With a finished inside diameter of 3.00m, it extends for 11.2 Kms to the proposed Sewerage plant in the south end of the capital city. My project involvement started in the initial stages; beginning with preparation and signing of the Joint Venture Agreement with J.V. partners (design consultant and two contractors) and continued with the preparation of pre-qualification documents, bidding, and following a successful bid, mobilization and start- up. Procurement of Tunnel Boring Machine (TBM) from China, purchase of four locomotives (as part of TBM backup system) from Germany and purchase of Combi-Segment Lining Panels and Concrete Segment Forms from Germany followed mobilization. The tunneling is progressing to this date. Project: Diftah-Shis Road & Tunnels Project Sharjah - United Arab Emirates (U.A.E.) Position: Project Manager Contract Value: AED 466,000,000 (US$ 127,322,165) Client: Government of Sharjah, Directorate of Public Works, U. A.E. Consultant: Halcrow International Partnership, U.K. (now acquired by CH2M) My involvement in this project was quite extensive. It ranged from lengthy contract negotiations with Client and Consultant to project management. Contract negotiations resulted in securing this job without going through
  • 2. the tendering process. This process entailed addressing technical issues, reviewing the general conditions of contract (based on FIDIC), special provisions, the bill of quantities and agreeing on each item’s price. A workable time schedule was also mutually agreed upon. After award and signing of the Contract, I took the role of the project manager; mobilizing the site, procuring required equipment and personnel and started the job. Later on, as the regional director, I appointed a new project manager and both projects and site managers reported to me. My full support was always extended to the project manager in contract administration and I resolved contractual issues with Consultant and Client when required. Project: Wadi Muddiq to Tunnel Road United Arab Emirates (U.A.E.) Position: Contract Administrator Total Contract Value: AED 46,859,228 (US$ 12,803,067) Client: Government of Sharjah, U.A.E. Consultant: Halcrow International Partnership, U.K. (now acquired by CH2M) After securing a road construction project in Pakistan, this and the following project (Gillay to Tunnel Road) were our first projects in the United Arab Emirates (U.A.E.). We had bid on both projects simultaneously and we were awarded the two projects at the same time. I was involved with both projects through to completion and handover to Client. Project: Gillay to Tunnel Road United Arab Emirates (U.A.E.) Position: Contract Administrator Total Contract Value: AED 23,352,189 (US$ 6,380,379) Client: Government of Sharjah, U.A.E. Consultant: Halcrow International Partnership, U.K. (now acquired by CH2M) I held the same position as in the above-noted project.
  • 3. Project: Mountain Road to Al Jais Project (36 Km) Ras Al Khaimah - United Arab Emirates (U.A.E.) Position: Project Manager Contract Value: AED 280,000,000 (US$ 76,000,000) Client: Government of Ras Al Khainyah, Directorate of Public Works, U.A.E. Consultant: Halcrow International Partnership, U.K. (now acquired by CH2M) Involved from bidding stage to Award of contract, mobilization, start up and execution. Project: Kalba-Lagoon Corniche Road Project- Phases 1 & 2 Kalba - United Arab Emirates (U.A.E.) Position: Site Manager Contract Value: AED 46,200,000 (US$ 12,623,000) Consultant: Halcrow International Partnership, U.K. (now acquired by CH2M) Project: Bam & Baravat Cities 56 Km Water Transmission Pipeline, Pumping Station & Water Treatment Plant Project, Bam – Kerman Province, Iran Position: Deputy Project Manager & Head of Technical Committee Contract Value: US$118,535,314 Client: Kerman Regional Water Authority
  • 4. Project: Diftah Cloverleaf Interchange Sharjah - United Arab Emirates (U.A.E.) Position: Contract Administrator Contract Value: AED 57,000,000 (US$15,574,000) Client: Government of Sharjah, U.A.E. Consultant: Halcrow International Partnership, U.K. (now acquired by CH2M) Involved from bidding stage to winning, mobilization, start up and execution. The Client later suspended this project in mid-construction due to disputes with adjacent landowners. Project: Ghalajeh Tunnel & Access Road Project Ilam – Iran Position: Project Foreign Procurement Contract Value: US$29,000,000 Client: Ilam Road & Transportation Co. Project: Tehran International Airport Terminal Building (IKIA) Tehran – Iran Position: Member of Technical Committee & in charge of External Procurement Total Contract Value: US$34,000,000 Client: Ministry of Transportation Consultant: ATEC Consulting Engineers
  • 5. Project: Dubai International City Development Phases 2 & 3 - Stage 1 - Infrastructure Works Dubai - United Arab Emirates (U.A.E.) Position: Contract Administrator Contract Value: AED 245,000,000 (US$ 66,940,000) Client: NAKHEEL Development Company, U.A.E. Project: Surab to Kalat Road Project Baluchistan – Pakistan Position: Contract Administrator Total Contract Value: US$ 30,000,000 Client: National Highway Authority of Pakistan (NHA) Consultant: Sampak International Consultants – Pakistan This was the first project secured by General Mechanic Company outside Iran. I was heavily involved with technical and contractual challenges of the project. Project: Asia Highway Project (EPC) Tehran – Iran Position: Member of Technical Committee & in charge of External Procurement Contract Value: US$130,000,000 Client: Tehran Municipality (Civil & Engineering Organization) Location: Tehran - Iran
  • 6. Project: Zanjan-Tabriz Freeway Project (Lot 2A) East Azarbaijan – Iran Position: In charge of Supply Contracts for import of toll collection systems Contract Value: US$71,300,000 Client: Iran Ministry of Road & Transportation