CONTENTS:
 SUBST
A
TIONS
 BUSBAR
 TRANSFORMER
CURRENTTRANSFORMER
POTENTIALTRANSFORMER
DISTRUBUTIONTRANSFORMER
 INSULA
TORS
 PROTECTIVERELA
Y
 CIRCUITBREAKER
 CAP
ACITORBANK
 METERING AND
INDICATING
INSTRUMENT
 LIGHTENING
ARRESTORS
 LINE ISOLATOR
 SINGLELINEDIAGRAM
 SUBSTATION
A Station is a subsidiary station of an electricity generation,
transmission,& distribution system where voltage is transformed
to high to low or the reverse using transformers.
A substation generally have switching, protection, &
control equipment & one or more transformers.
 CONSTRUCTIONAL FEATURESOF 33/11KV
SHIRBHA
VISANGOLA,
In this substation the power is coming from two lines
namely
440V SHIRBHAVI
 33/11 KV Yard
 BUS BAR
 A Bus bar is a conducting bar that
carries heavy currents to supply
several electric circuits.
 Bus bar is made from ‘Cu’ and ‘Al’.
TYPES OF BUS BAR-
 Main Bus Bar
 Auxiliary Bus Bar
 One Bus Bar is Main Bus Bar
and another is Auxiliary Bus
Bar.
 TRANSFORMER
 A Transformer is a static device that transfers Electrical energy
from one Electrical circuit to another Electrical circuit by means of
a common Magnetic Circuit.
TRANSFORMER USED IN GSS
 DISTRIBUTION X-MER
 C.T.
 P.T.
ding
)
 DISTRUBUTIONTRANSFORMER
 To step-down the voltage and
transfer power from one A.C
voltage to another A.C Voltage at
same frequency.
MAIN P
AR
TS
OFPOWER
TRANSFORMER-
Winding(H.V winding , I.V winding)
Core
 Tap changer
Conservator Tank
 Buchholz Relay
 Dehydrating Breather
Oil Temperature Indicator
 CURRENT TRANSFORMER
 Current Transformer:- A C.Tis
used to step down current
for measurement, control
and protection.
 Current Transformer is an
instrument transformer used
to protection & Metering of
high values of current.
 POTENTIAL TRANSFORMER
 Potential Transformer:- Potential Transformer are Instrument
Transformer. A P.T is used to step down voltage for
measurement, control and protection.
 INSULATORS
 transmission lines, In order to
avoid current leakage to the Earth,
 through the supporting structure
provide to the
conductor of overhead
insulators are used.
 PROTECTIVE RELAYS
 A protective relay is a device
that detects the fault and
initiates the operation of the
C.B. to isolate the defective
element from the rest of the
system
 The relay detects the abnormal
condition in the electrical circuit
by constantly measuring the
electrical quantities, which are
different under normal and fault
conditions.
 There are several metering and indicating Instrument (e.g.
Ammeters, Voltmeters, energy meter, etc.) installed in a
Substation to maintain which over the circuit quantities.
 The instrument transformers are invariably used with them
for satisfactory operation.
 Metering and Indicating Instruments
 CIRCUIT BREAKER
 A Circuit Breaker is an automatically or
manually operated electrical switch
designed to protect an electrical circuit
from damage caused by overload
or short circuit.
TYPES OF CIRCUIT BREAKER-
which is used in 33/11kv substation
 oil circuit breaker
 Capacitor banks are used to
improve the quality of the
electrical supply and the
efficient operation of the
power system.
 Studies show that a flat
voltage profile on the
system can significantly
reduce line losses.
 CAPACITOR BANK
 ISOLATING SWITCH
 In Sub-Station, it is often
desired to disconnect a part of
the system for general
maintenance and repairs. This
is accomplished by an
isolating switch or isolator
 isolator Switches are operate
only when the line is which
they are connected carry no
load.
 LIGHTENING ARRESTORS
 Lightening arrestors with earth
switch lightening arrestors after
the current transformer are used
so as to protect it from
lightening i.e. from high
voltage entering into it.
 This lightening arrestor has an
earth switch, which can directly
earth the lightening.
 lightening. The arrestor works
at 30° to 45° angel of the
lightening making a cone
 LINE ISOLATOR
 The line isolators are used to isolate
the high voltage flow through the
line into the bus. This isolator
prevents the instruments to get
damaged
 It also allows the only need of
voltage and rest is earthed by itself
 Insulators are used in electrical
equipment to support and separate
electrical conductors without
allowing current through
themselves.
 Single line diagram
Thankyou

Weitere ähnliche Inhalte

Ähnlich wie pptravi-191011011024 (1).pdf

Sharavati receiving station
Sharavati  receiving stationSharavati  receiving station
Sharavati receiving stationH.C.Naveen Kumar
 
DISTRIBUTION SYSTEM OPERATION AND CONTROL
DISTRIBUTION SYSTEM OPERATION AND CONTROLDISTRIBUTION SYSTEM OPERATION AND CONTROL
DISTRIBUTION SYSTEM OPERATION AND CONTROLyohannes feleke
 
Summer Tranning priyanshu tiwari by aditya.pptx
Summer Tranning priyanshu tiwari by aditya.pptxSummer Tranning priyanshu tiwari by aditya.pptx
Summer Tranning priyanshu tiwari by aditya.pptxAdityaRaj873503
 
Substation equipment and its function 2
Substation equipment and its function 2Substation equipment and its function 2
Substation equipment and its function 2Zulfiqar Mangrio
 
132 kv g.s.s chambal jaipur
132 kv g.s.s chambal jaipur132 kv g.s.s chambal jaipur
132 kv g.s.s chambal jaipurmonga786
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentationKamal Mittal
 
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptxRajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptxsohaib268827
 
Power Corporation ppt
Power Corporation pptPower Corporation ppt
Power Corporation pptKamal Tiwari
 
Summer_Tranning_satihs[1].pptx
Summer_Tranning_satihs[1].pptxSummer_Tranning_satihs[1].pptx
Summer_Tranning_satihs[1].pptxAdityaRaj873503
 
Ppt on 400 kv gss raiser Bikaner- Yatendra Parashar
Ppt on 400 kv gss raiser Bikaner- Yatendra ParasharPpt on 400 kv gss raiser Bikaner- Yatendra Parashar
Ppt on 400 kv gss raiser Bikaner- Yatendra ParasharYatendra Parashar
 
Powergrid Corporation India Limited industrial training
Powergrid Corporation India Limited industrial trainingPowergrid Corporation India Limited industrial training
Powergrid Corporation India Limited industrial trainingAkriti Gupta
 
powergrid presentation
powergrid presentationpowergrid presentation
powergrid presentationAkriti Gupta
 
UPPCL,33/11KV H.A.L SUBSTATION,INDIRANAGAR(LUCKNOW)
UPPCL,33/11KV H.A.L SUBSTATION,INDIRANAGAR(LUCKNOW)UPPCL,33/11KV H.A.L SUBSTATION,INDIRANAGAR(LUCKNOW)
UPPCL,33/11KV H.A.L SUBSTATION,INDIRANAGAR(LUCKNOW)Sogendra Rajput
 
PPT on 220 kV G.S.S, Sitapura Jaipur by Ashish Bairwa
PPT on 220 kV G.S.S, Sitapura Jaipur by Ashish BairwaPPT on 220 kV G.S.S, Sitapura Jaipur by Ashish Bairwa
PPT on 220 kV G.S.S, Sitapura Jaipur by Ashish BairwaAshish Bairwa
 
Load Distribution
Load DistributionLoad Distribution
Load DistributionArpit Gupta
 
220 kV GSS Mansarovar Jaipur (RVPNL) Training PPT SM54
220 kV GSS Mansarovar Jaipur (RVPNL) Training PPT SM54220 kV GSS Mansarovar Jaipur (RVPNL) Training PPT SM54
220 kV GSS Mansarovar Jaipur (RVPNL) Training PPT SM54Subhash Mahla
 
Ppt on 132 kv gss by ashok khoja
Ppt on  132 kv gss  by ashok khojaPpt on  132 kv gss  by ashok khoja
Ppt on 132 kv gss by ashok khojaASHOK KHOJA
 

Ähnlich wie pptravi-191011011024 (1).pdf (20)

Sharavati receiving station
Sharavati  receiving stationSharavati  receiving station
Sharavati receiving station
 
DISTRIBUTION SYSTEM OPERATION AND CONTROL
DISTRIBUTION SYSTEM OPERATION AND CONTROLDISTRIBUTION SYSTEM OPERATION AND CONTROL
DISTRIBUTION SYSTEM OPERATION AND CONTROL
 
Summer Tranning priyanshu tiwari by aditya.pptx
Summer Tranning priyanshu tiwari by aditya.pptxSummer Tranning priyanshu tiwari by aditya.pptx
Summer Tranning priyanshu tiwari by aditya.pptx
 
Substation equipment and its function 2
Substation equipment and its function 2Substation equipment and its function 2
Substation equipment and its function 2
 
132 kv g.s.s chambal jaipur
132 kv g.s.s chambal jaipur132 kv g.s.s chambal jaipur
132 kv g.s.s chambal jaipur
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentation
 
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptxRajasthan Rajya Vidyut Prasaran Nigam.pptx
Rajasthan Rajya Vidyut Prasaran Nigam.pptx
 
Gss ppt by kanhaiya
Gss ppt  by kanhaiyaGss ppt  by kanhaiya
Gss ppt by kanhaiya
 
Power Corporation ppt
Power Corporation pptPower Corporation ppt
Power Corporation ppt
 
Summer_Tranning_satihs[1].pptx
Summer_Tranning_satihs[1].pptxSummer_Tranning_satihs[1].pptx
Summer_Tranning_satihs[1].pptx
 
Ppt on 400 kv gss raiser Bikaner- Yatendra Parashar
Ppt on 400 kv gss raiser Bikaner- Yatendra ParasharPpt on 400 kv gss raiser Bikaner- Yatendra Parashar
Ppt on 400 kv gss raiser Bikaner- Yatendra Parashar
 
Powergrid Corporation India Limited industrial training
Powergrid Corporation India Limited industrial trainingPowergrid Corporation India Limited industrial training
Powergrid Corporation India Limited industrial training
 
powergrid presentation
powergrid presentationpowergrid presentation
powergrid presentation
 
UPPCL,33/11KV H.A.L SUBSTATION,INDIRANAGAR(LUCKNOW)
UPPCL,33/11KV H.A.L SUBSTATION,INDIRANAGAR(LUCKNOW)UPPCL,33/11KV H.A.L SUBSTATION,INDIRANAGAR(LUCKNOW)
UPPCL,33/11KV H.A.L SUBSTATION,INDIRANAGAR(LUCKNOW)
 
Industrial training
Industrial trainingIndustrial training
Industrial training
 
PPT on 220 kV G.S.S, Sitapura Jaipur by Ashish Bairwa
PPT on 220 kV G.S.S, Sitapura Jaipur by Ashish BairwaPPT on 220 kV G.S.S, Sitapura Jaipur by Ashish Bairwa
PPT on 220 kV G.S.S, Sitapura Jaipur by Ashish Bairwa
 
Load Distribution
Load DistributionLoad Distribution
Load Distribution
 
summer internship
summer internshipsummer internship
summer internship
 
220 kV GSS Mansarovar Jaipur (RVPNL) Training PPT SM54
220 kV GSS Mansarovar Jaipur (RVPNL) Training PPT SM54220 kV GSS Mansarovar Jaipur (RVPNL) Training PPT SM54
220 kV GSS Mansarovar Jaipur (RVPNL) Training PPT SM54
 
Ppt on 132 kv gss by ashok khoja
Ppt on  132 kv gss  by ashok khojaPpt on  132 kv gss  by ashok khoja
Ppt on 132 kv gss by ashok khoja
 

Kürzlich hochgeladen

1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...fonyou31
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfAyushMahapatra5
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room servicediscovermytutordmt
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...PsychoTech Services
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 

Kürzlich hochgeladen (20)

1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room service
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 

pptravi-191011011024 (1).pdf

  • 1. A PRESENTATION ON SUMMER TRAINING FROM SHIRBHAVI, SANGOLA 33/11 KV SUB-STATION PRESENTED BY: PHADTARE RAVI DATTATRYA ROLL NO.- 21 SUBMITTED TO : MR.PATIL J. B ( PROF. EE DEPT)
  • 2. CONTENTS:  SUBST A TIONS  BUSBAR  TRANSFORMER CURRENTTRANSFORMER POTENTIALTRANSFORMER DISTRUBUTIONTRANSFORMER  INSULA TORS  PROTECTIVERELA Y  CIRCUITBREAKER  CAP ACITORBANK  METERING AND INDICATING INSTRUMENT  LIGHTENING ARRESTORS  LINE ISOLATOR  SINGLELINEDIAGRAM
  • 3.  SUBSTATION A Station is a subsidiary station of an electricity generation, transmission,& distribution system where voltage is transformed to high to low or the reverse using transformers. A substation generally have switching, protection, & control equipment & one or more transformers.  CONSTRUCTIONAL FEATURESOF 33/11KV SHIRBHA VISANGOLA, In this substation the power is coming from two lines namely 440V SHIRBHAVI
  • 5.  BUS BAR  A Bus bar is a conducting bar that carries heavy currents to supply several electric circuits.  Bus bar is made from ‘Cu’ and ‘Al’. TYPES OF BUS BAR-  Main Bus Bar  Auxiliary Bus Bar  One Bus Bar is Main Bus Bar and another is Auxiliary Bus Bar.
  • 6.  TRANSFORMER  A Transformer is a static device that transfers Electrical energy from one Electrical circuit to another Electrical circuit by means of a common Magnetic Circuit. TRANSFORMER USED IN GSS  DISTRIBUTION X-MER  C.T.  P.T.
  • 7. ding )  DISTRUBUTIONTRANSFORMER  To step-down the voltage and transfer power from one A.C voltage to another A.C Voltage at same frequency. MAIN P AR TS OFPOWER TRANSFORMER- Winding(H.V winding , I.V winding) Core  Tap changer Conservator Tank  Buchholz Relay  Dehydrating Breather Oil Temperature Indicator
  • 8.  CURRENT TRANSFORMER  Current Transformer:- A C.Tis used to step down current for measurement, control and protection.  Current Transformer is an instrument transformer used to protection & Metering of high values of current.
  • 9.  POTENTIAL TRANSFORMER  Potential Transformer:- Potential Transformer are Instrument Transformer. A P.T is used to step down voltage for measurement, control and protection.
  • 10.  INSULATORS  transmission lines, In order to avoid current leakage to the Earth,  through the supporting structure provide to the conductor of overhead insulators are used.
  • 11.  PROTECTIVE RELAYS  A protective relay is a device that detects the fault and initiates the operation of the C.B. to isolate the defective element from the rest of the system  The relay detects the abnormal condition in the electrical circuit by constantly measuring the electrical quantities, which are different under normal and fault conditions.
  • 12.  There are several metering and indicating Instrument (e.g. Ammeters, Voltmeters, energy meter, etc.) installed in a Substation to maintain which over the circuit quantities.  The instrument transformers are invariably used with them for satisfactory operation.  Metering and Indicating Instruments
  • 13.  CIRCUIT BREAKER  A Circuit Breaker is an automatically or manually operated electrical switch designed to protect an electrical circuit from damage caused by overload or short circuit. TYPES OF CIRCUIT BREAKER- which is used in 33/11kv substation  oil circuit breaker
  • 14.  Capacitor banks are used to improve the quality of the electrical supply and the efficient operation of the power system.  Studies show that a flat voltage profile on the system can significantly reduce line losses.  CAPACITOR BANK
  • 15.  ISOLATING SWITCH  In Sub-Station, it is often desired to disconnect a part of the system for general maintenance and repairs. This is accomplished by an isolating switch or isolator  isolator Switches are operate only when the line is which they are connected carry no load.
  • 16.  LIGHTENING ARRESTORS  Lightening arrestors with earth switch lightening arrestors after the current transformer are used so as to protect it from lightening i.e. from high voltage entering into it.  This lightening arrestor has an earth switch, which can directly earth the lightening.  lightening. The arrestor works at 30° to 45° angel of the lightening making a cone
  • 17.  LINE ISOLATOR  The line isolators are used to isolate the high voltage flow through the line into the bus. This isolator prevents the instruments to get damaged  It also allows the only need of voltage and rest is earthed by itself  Insulators are used in electrical equipment to support and separate electrical conductors without allowing current through themselves.
  • 18.  Single line diagram