Roof Hatch Safety Rail Assessment Form
Project Name Project Address
I. HATCH INFORMATION
II. VISUAL ORIENTATION
Hatch Manufacturer:
Bilco
Babcock-Davis
Dur-Red
Elmdor
Lane-Aire
Milcor
Nystrom
Other:
Hatch Construction:
Steel Aluminum
Hatch Condition:
New Hatch - Model #
Existing Hatch (Please attach pictures)
If installing on an existing hatch, is the hatch
able to withstand the 200 lbs. of force required
by OSHA standards:
Yes (Current hatch is in good working order)
No (Hatch will need replacement)
Other Observations:
III. AGREEMENT
The SafePro™ Roof Hatch Assessment Form is required for all orders. A separate form is required for each hatch. All rails are made to specifications
and measurements defined above, guaranteed to fit your roof hatch properly if the form is completed correctly. If SafePro™ is found to be in error
when manufacturing your rail, SafePro™ will replace or fix the problem at no cost. If you make an error in defining the correct measurements on this
form, SafePro™ will remake the rail at your cost. For this reason, SafePro™ recommends you indicate your measurements correctly on this form. By
signing this form, you acknowledge and agree to all of the above terms and conditions.
Name, Title Company
Signature Date
”
”
Mark:
1. Place an X on the L to identify ladder
2. Gate hinge with “G”
3. Side A and B measurements
4. Ladder Height for RiskPro: ____ft.
5. Draw an arrow to show how to exit hatch
Tips:
* Measure just above the drip edge
where rail will mount
* Always hinge gate to open towards
roof edge
*For stairs rail hinge is typically on
hatch hinge side
* View measuring video on Youtube:
http://youtu.be/TaGxF4OTyF0
Choose Roof Hatch Rail Finishing:
Galvanized Yellow Powder Coating
Custom Color:
A
B
L L
L

Weitere ähnliche Inhalte

Ähnlich wie RHA Update3

2007 Porsche Cayman Service Repair Manual
2007 Porsche Cayman Service Repair Manual2007 Porsche Cayman Service Repair Manual
2007 Porsche Cayman Service Repair Manualjkmsmmkem8u
 
Karl Dean's Resume
Karl Dean's ResumeKarl Dean's Resume
Karl Dean's ResumeKARL DEAN
 
Stress Analysis in District Cooling Projects
Stress Analysis in District Cooling ProjectsStress Analysis in District Cooling Projects
Stress Analysis in District Cooling ProjectsAmer Abdul Aziz
 
05120 steel & structure
05120 steel & structure05120 steel & structure
05120 steel & structureVinay Yadav
 
Bridge code aashto aws d1.5
Bridge code aashto aws d1.5Bridge code aashto aws d1.5
Bridge code aashto aws d1.5James Gray
 
Precast Concrete Specifications.doc
Precast Concrete Specifications.docPrecast Concrete Specifications.doc
Precast Concrete Specifications.docAbdallah437436
 

Ähnlich wie RHA Update3 (10)

2007 Porsche Cayman Service Repair Manual
2007 Porsche Cayman Service Repair Manual2007 Porsche Cayman Service Repair Manual
2007 Porsche Cayman Service Repair Manual
 
Karl Dean's Resume
Karl Dean's ResumeKarl Dean's Resume
Karl Dean's Resume
 
Brochure eb 2017
Brochure eb 2017Brochure eb 2017
Brochure eb 2017
 
Stress Analysis in District Cooling Projects
Stress Analysis in District Cooling ProjectsStress Analysis in District Cooling Projects
Stress Analysis in District Cooling Projects
 
05120 steel & structure
05120 steel & structure05120 steel & structure
05120 steel & structure
 
Bridge code aashto aws d1.5
Bridge code aashto aws d1.5Bridge code aashto aws d1.5
Bridge code aashto aws d1.5
 
Field Service: Problem Resolution - Feb. 2010
Field Service: Problem Resolution - Feb. 2010Field Service: Problem Resolution - Feb. 2010
Field Service: Problem Resolution - Feb. 2010
 
Pipe Support Field Examples & Case Studies
Pipe Support Field Examples & Case StudiesPipe Support Field Examples & Case Studies
Pipe Support Field Examples & Case Studies
 
Portofolio 2016
Portofolio 2016Portofolio 2016
Portofolio 2016
 
Precast Concrete Specifications.doc
Precast Concrete Specifications.docPrecast Concrete Specifications.doc
Precast Concrete Specifications.doc
 

RHA Update3

  • 1. Roof Hatch Safety Rail Assessment Form Project Name Project Address I. HATCH INFORMATION II. VISUAL ORIENTATION Hatch Manufacturer: Bilco Babcock-Davis Dur-Red Elmdor Lane-Aire Milcor Nystrom Other: Hatch Construction: Steel Aluminum Hatch Condition: New Hatch - Model # Existing Hatch (Please attach pictures) If installing on an existing hatch, is the hatch able to withstand the 200 lbs. of force required by OSHA standards: Yes (Current hatch is in good working order) No (Hatch will need replacement) Other Observations: III. AGREEMENT The SafePro™ Roof Hatch Assessment Form is required for all orders. A separate form is required for each hatch. All rails are made to specifications and measurements defined above, guaranteed to fit your roof hatch properly if the form is completed correctly. If SafePro™ is found to be in error when manufacturing your rail, SafePro™ will replace or fix the problem at no cost. If you make an error in defining the correct measurements on this form, SafePro™ will remake the rail at your cost. For this reason, SafePro™ recommends you indicate your measurements correctly on this form. By signing this form, you acknowledge and agree to all of the above terms and conditions. Name, Title Company Signature Date ” ” Mark: 1. Place an X on the L to identify ladder 2. Gate hinge with “G” 3. Side A and B measurements 4. Ladder Height for RiskPro: ____ft. 5. Draw an arrow to show how to exit hatch Tips: * Measure just above the drip edge where rail will mount * Always hinge gate to open towards roof edge *For stairs rail hinge is typically on hatch hinge side * View measuring video on Youtube: http://youtu.be/TaGxF4OTyF0 Choose Roof Hatch Rail Finishing: Galvanized Yellow Powder Coating Custom Color: A B L L L