1. HARESHKUMAR JAYANTILAL PATTANI
Permanent Address:
C-503, Sukan Silver,
Near Swagat Rainforest 2,
Opp. Swami Narayan Dham,
Gandhinagar- koba Highway,
Kudasan 382421, Gandhinagar Gujarat State
Email: hjpattani@yahoo.co.in; hareshpattani67@gmail.com
Mobile : +91-9825551877 ; +91-7567368309
Graduate Engineer professional in operation & Maintenance of Thermal Power plant of
different technologies (pulverized & CFBC boilers) with Experience 26 Years
Skills / Expertise: -
1 Working as Maintenance Engineer in Boiler having a capacity of 3x 210 MW, steam generation of 3 x
690 T/hr pulverized coal fired BHEL make Boiler, ESP and its BOP such as DM plant , Fuel pumps
etc. for Total Plant Capacity 870 Mw as stated above in work experience.
2 Various spares required Procurement & its maintaining to meet the emergency requirements & with a
control inventory to maintain budget as well generation cost.
3 Development & introducing of Local vendors to meet the urgent & Import substitute requirements for
boiler, turbine & balance of plant area spares.
Experience:
As Deputy General Manager ( Mech. Maint.) from 16
th
Jan-2015 to till date…
Working with Adani Power limited Mundra power Plant in Boiler Mechanical Maintenance pressure parts
department. Where I am responsible for ;
• Initiate and manage innovative plant maintenance standards required to remain competitive.
• Cross-train the maintenance employees to handle diverse functions.
• Develop a team-based working environment and cultivate a corporate culture dedicated to
continuous improvement.
• Establish, Develop and maintain positive working relationships with employees, to satisfy
internal and external customers of the station.
• Interface with other departments in supporting plant PLF, Heat Rate, and other important goals.
As Head Maintenance & contracts from Dtd: 1
st
May 2014 to 15
th
Jan 2015.
Worked with M/s Vijay Metal & Engineering Corporation Kalol Gujarat where I am responsible for
Maintenance of entire production unit & monitor and assessment of contracts from outside agency
and dealing with them etc.
As an Asst. General Manger from 4th May 2012 to 30
th
April 2014
1 Raj West Energy Limited,Barmer,Rajasthan Plant –Capacity (8 X 135 MW)
2 Boiler make: DongFang Electric Corporation, China.
3 Specifications: CFBC Boiler of 440 TPH Steam generating capacity at 13.73 Mpa Pressure and 540
deg. C with Reheat at pressure at 2.73 Mpa & 540m Deg C temp.
4 Turbine make: Dong Fang Electric Corporation, china.
5 Type: Extra High Pressure, single Shaft, Double Cylinder, Double Flow, One Intermediate Reheat,
condensed Type.
6 Specifications: Capacity 135 MW, 398.9 TPH steam inlet at 13.24 Mpa and 535 degree centigrade
Major Responsibilities:
2. 1 Day to day maintenance and preventive maintenance of all 8 x135 MW CFBC boilers, pressure–
parts, Boiler–auxiliaries, fuel firing system and dosing system of Boiler – water chemistry , turbine & its
related auxiliaries including balance of plant with cross country pipeline.
2 Maintenances of Cross country pipeline of 185 km long for availability of water requirement of power
plant.
3 Co-ordination with statutory–authority for boiler inspection with boiler– inspector and other
Government authority.
4 Planning and monitoring of maintenance activities during annual-over hauling and capital-overhauling
period for completion in stipulated time frame and without loss in generation.
6 Methodical co-ordination for isolation of the systems and equipment’s to carry out maintenance
so as to enable to complete the beak down as well as preventive maintenance in stipulated narrow
time frame to keep the auxiliaries always available.Day to day observation of running auxiliaries
and equipment’s as a part of performance review and to achieve sustained and proven efficient
work output by implementing predictive & preventive maintenance techniques to execute the works
mentioned above in time and work motion study system.
7 Providing & planning of input budget for various maintenance activities & carried out RM/BM/PM
maintenance as per site requirement.
8 Preparation of annual budget for procurements of spares & maintenance of boiler auxiliaries and
expend in stipulated time frame with a minimum expenditure & inventory.
9 Preparation of budget for maintenance planning & spares procurement for trouble free maintenance
and make inventor availability for spares to minimize the downtime of equipment..
As Deputy Executive Engineer from 8
th
July 2005 to 30
th
April 2012
Gujarat state Electricity corporation ltd; Thermal power station Gandhinagar; having Industrial power plant with
a capacity of 870 MW ( 2x120MW and 3x210MW)with BHEL make pulverized fuel fire boilers.
Major Responsibilities:
(A). Working in Boiler Maintenance of the 2x120Mw & 3 x210 Mw unit. Where I look after the work of …
1 Maintenance of Boiler pressure parts and its related auxiliaries, such as ESP, DM plant Feed water
circuit, Fuel transfer pumps etc and Maintenance of BR-85 (10) R type coal Mill of Alstom Power (I)
Make
2 Conducting of Boiler air leak & air velocity test & Gas distribution tests and studying its &
implementation of its recommendations for improvement of boiler performance & availability.
3 Compliance to the IBR related queries and dealing with the IBR authorities for the IBR related works.
4 Various spares required Procurement & its maintaining to meet the emergency requirements & with a
control inventory to maintain budget as well generation cost.
5 Day to day maintenance and preventive maintenance of all 8 x135 MW CFBC boilers, pressure–
parts, Boiler–auxiliaries, fuel firing system and dosing system of Boiler – water chemistry , turbine & its
related auxiliaries including balance of plant with cross country pipeline..
6 Co-ordination with statutory–authority for boiler inspection with boiler– inspector and other
Government authority.
7 Planning and monitoring of maintenance activities during annual-over hauling and capital-overhauling
period for completion in stipulated time frame and without loss in generation.
8 Methodical co-ordination for isolation of the systems and equipment’s to carry out maintenance
so as to enable to complete the beak down as well as preventive maintenance in stipulated narrow
time frame to keep the auxiliaries always available
9 Day to day observation of running auxiliaries and equipment’s as a part of performance review
and to achieve sustained and proven efficient work output by implementing predictive & preventive
maintenance techniques to execute the works mentioned above in time and work motion study
system.
10 Providing & planning of input budget for various maintenance activities & carried out RM/BM/PM
maintenance as per site requirement.
11 Preparation of annual budget for procurements of spares & maintenance of boiler auxiliaries and
3. expend in stipulated time frame with a minimum expenditure & inventory.
12 Preparations of budget for maintenance planning & spares procurement for trouble free maintenance
and make inventory availability for spares to minimize the downtime of equipment.
13 Development of local vendor against import solutions and Cost saving to build inventory.
(B) Maintenance of BCP-2360 / 77 type coal Mill of Stein France Make for 2x210 Mw unit
1 During my tenure I may responsible for Maintenance of Boiler pressure parts and its related
auxiliaries such as Electrostatic preceptors, DM plant and fuel pumps and its related auxiliaries and
liasioning IBR and Government body for entire groups boiler.
2 At Gandhinagar Power station during my service period of till date I successfully executed the
replacement and repairing job of damaged 210 MW ESP fields and its related spares, structural
beams in the year July- 2006.
3 Also in the year Aug-2008 & Nov-2008, I also successfully executed the replacement Hot Reheater
Zone of 2x 210MW boiler inner loops.
4 I had also co-ordinate for RLA study of boiler with M/s BHEL and as per the RLA reports &
recommendation action plan for 5 years is prepared and execute the work according to that
after getting due approval from IBR authority.
As Junior Engineer from 23
rd
Jan 1993 to 7
th
July 2005 :
Gujarat state Electricity corporation ltd ( elsewhere Known as Gujarat state Electricity Board); Thermal power
station SIKKA Gujarat; having Industrial power plant with a capacity of 240 MW( 2x120MW)with BHEL make
pulverized fuel fire boilers.
Major Responsibilities
1 Working initially for commissioning activity of 120 MW pulverized coal fire boiler unit # 2.
2 Working in operation section for operation of the 120Mw unit II for a period of @ 6 years (to operate
the unit at economical & control way) to produce the power in plant way to timely meet grid system
requirement.
3 Working in Boiler Maintenance of the 120Mw unit. Where I look after the work of …
4 Maintenance of Tube type-BBD-3448 coal Mill of Stein France makes.
5 Effective operation & Maintenance of Ash handling plant of Desien & Indure makes and
maximize the ash disposal by dry ash disposal through silo system.
6 Maintenance of Boiler pressure parts and its related auxiliaries such as Boiler feed pump,
ID/FD/PA fans, Pulverizes etc. and Desin Indure make dry & wet ash plant maintenance.
7 Various spares required Procurement & its maintaining to meet the emergency requirements &
with a control inventory to maintain budget as well generation cost.
8 Preparation of budget for maintenance planning & spares procurement for trouble free
maintenance.
9 Utilization of fly ash in cement plants and other use to reduce the ash disposal burden and
also a member of group level fly ash utilization cell.
10 Compliance to the IBR related queries and dealing with the IBR authorities for the IBR related
works
As Junior Engineer from 6
th
April 1989 to 22
nd
Jan 1993
Gujarat state Electricity corporation ltd (elsewhere Known as Gujarat state Electricity Board); Mangrol
dist Junagadh & Jamnagar City distribution (Discom) area:
4. Major responsibility for Maintenance work of
1 Low-tension distribution line. (415V)
2 High-tension Distribution line (11KV)
3 Maintenances of Distribution Transformer
4 Checking of installation for power theft etc.
Achievements:-
During my service period I complete the following jobs before stipulated time period of job.
1 Re-erection and Recommissioning of damaged boiler of 120Mw Unit No: 2 at Sikka TPS due to
Boilers explosion in year 2004.
2 Recommissioning work of 120 Mw Unit no: 1 Gandhinagar TPS stage-1 Boilers damaged due to
puffing {Explosion} action of Boiler in year 2005.
3 Repairing / Recommissioning of the damaged internals of ESP unit no; 5 at Gandhinagar TPS.
4 At Sikka TPS many Time I saved the machine for out of bar due to the ash handling plant
problem.
5 During the year 2008 Repairing & replacement of new Reheater coils of boiler in unit # 3 & 4
against the existing Reheater Coils through local agencies and by this way GSECL may save
@Rs.1.5 crore.
6 I had previously worked as one of the GSECL Boiler Core group members represents the
Gandhinagar Thermal power station; where the problem related to boilers operation &
maintenance & its related auxiliaries, reduction of Boiler Tube Failure (BTF) and its practices for
reduction in the BTF. By making the continuous efforts at GTPS for boilers having capacity of
210 MW we reduce the BTF of Boiler to only 0-1 number in a year.
7 I also perform work for the liasioning work with Government department, as well as with The
IBR authority.
8 I had also assigned the work for liasioning with IBR authority & Government office for the Boiler
IBR related work for all power station of GSECL.
9 At Raj west power I tried for stabilization of CFBC boiler unit 1 & 2 and also made the correction
in boiler erection problem etc.
10 At Raj west Power four units Commercial operations is completed in 60 days in the month of
Feb-13 to Mar-13.
11 At Adani Power in Air preheater guide bearing dislocation is positioned online and avoid outage
& generation loss of unit for 10-15 days.
Training:-
1 1996. 210 Mw Simulators training at Badarpur New Delhi for operation of the power plant.
2 2000 Steam Generator at BHEL Trichy.
3 2002 Performance and maintenance of Boilers for BHEL Trichy.
4 2003 Ash handling system at Badarpur New Delhi
5 2009 Electro static precipretator at NPTI Nevyeli.
6 I had attended many seminars on Boiler tube failures & its prevention organized by M/s BHEL,
NTPC etc.
Educational Qualification
Technical Qualification:
1 Qualification: B.E. (Electrical
Engineering) University/Institute:
Saurashtra,Rajkot
Year of passing: 1988 (First Division)
2 Qualification: L.L.B (General) Special Subject Labour Laws
University/Institute:
Saurashtra,Rajkot
Year of passing: 1996
3 Qualification: M.I.E (Electrical Engineering)
5. University/Institute: Institue of Engineers
Kolkata Year of passing: 1999
4 Qualification: Boiler 2
nd
class Proficiency Exam (B.O.E.)
University/Institute: Gujarat State
Year of passing: 2006
Academic Qualification: Senior Secondary School
Qualification: Higher Secondary School Examination
University/Institute/Board: Gujarat State Higher secondary Education Board, Gandhinagar
Year of passing: 1984
Percentage: 69.%
Academic Qualification: High School Qualificaton: High School Examination
University/Institute/Board: Gujarat State secondary Education Board, Vadodara
Year of passing: 1982
Percentage: 69.75%
Other Relevant Information
1 Father’s Name: Shri Jayantilal Mainilal Pattani
2 Mother’s Name: Smt. Jyotiben jayantilal Pattani
3 Date of Birth: 12th June 1967
4 Blood Group: O Rh +ve
5 Marital status: Married
6 Passport No.: H-0902746
7 Languages Known: Gujarati, Hindi, English
8 Present Cost to Company: Rs. 28 Lacs / Annum plus perks
9 Expected CTC: Negotiable
10 Joining Time: 60 days
11 Relocation (Yes/No):- Yes
12 Professional References:
a). Shri. N.R Adhvaryu : Deputy Ex. Engineer ( Turbine Maint.) GUJARAT STATE
ELECTRICITY CORPORATION LTD Thermal Power station, Gandhinagar-382041 (
Gujarat) Phone; 09925210301
b) Shri G. C. Joshi : Executive Engineer ( Boiler Maint.) GUJARAT STATE ELECTRICITY
CORPORATION LTD Thermal Power station, Gandhinagar-382041 (Gujarat)
Phone; 09687663056
Computer Awareness:
Microsoft Office Excel & word, Windows, Internet, SAP, and Oracle based ERP,
Yours truly,
(Haresh Pattani)
6. University/Institute: Institue of Engineers
Kolkata Year of passing: 1999
4 Qualification: Boiler 2
nd
class Proficiency Exam (B.O.E.)
University/Institute: Gujarat State
Year of passing: 2006
Academic Qualification: Senior Secondary School
Qualification: Higher Secondary School Examination
University/Institute/Board: Gujarat State Higher secondary Education Board, Gandhinagar
Year of passing: 1984
Percentage: 69.%
Academic Qualification: High School Qualificaton: High School Examination
University/Institute/Board: Gujarat State secondary Education Board, Vadodara
Year of passing: 1982
Percentage: 69.75%
Other Relevant Information
1 Father’s Name: Shri Jayantilal Mainilal Pattani
2 Mother’s Name: Smt. Jyotiben jayantilal Pattani
3 Date of Birth: 12th June 1967
4 Blood Group: O Rh +ve
5 Marital status: Married
6 Passport No.: H-0902746
7 Languages Known: Gujarati, Hindi, English
8 Present Cost to Company: Rs. 28 Lacs / Annum plus perks
9 Expected CTC: Negotiable
10 Joining Time: 60 days
11 Relocation (Yes/No):- Yes
12 Professional References:
a). Shri. N.R Adhvaryu : Deputy Ex. Engineer ( Turbine Maint.) GUJARAT STATE
ELECTRICITY CORPORATION LTD Thermal Power station, Gandhinagar-382041 (
Gujarat) Phone; 09925210301
b) Shri G. C. Joshi : Executive Engineer ( Boiler Maint.) GUJARAT STATE ELECTRICITY
CORPORATION LTD Thermal Power station, Gandhinagar-382041 (Gujarat)
Phone; 09687663056
Computer Awareness:
Microsoft Office Excel & word, Windows, Internet, SAP, and Oracle based ERP,
Yours truly,
(Haresh Pattani)