Testing Process
1. INTRODUCTION
The Testing process ensures that selected work products meet their specified requirements. That
goal is typically attained through formal testing procedures that entail the development of testing
strategy, plans, and cases and the subsequent implementation of actual testing. Defects found in
the testing process are reported, logged and distributed to appropriate entities for resolution and
retesting.
Metrics are generated throughout the process and are used to track progress, which is reported at
various levels to stakeholders as desired. At the end of the process, a report is developed
describing the results of the process and providing an acceptance criteria for product viability for
release to the next project phase, or whether more work is required to get the product to a release
state.
2. PROCESS FLOW DESCRIPTION FOR TESTING
Process flow steps that have separate and distinct UAT components are denoted accordingly.
Conversely, a step that does not specifically call out UAT components is completely applicable
to both systemintegration testing and UAT. The following steps describe the Testing process
flow in more detail:
1. Select the products to be tested.
Product selection is driven during the test planning process. Product selection is based on
requirements and the release schedule that dictates what products must be tested at a
particular time in the project schedule. However, testing may occur on a relatively ad-hoc
basis for an emergency release.
Although the schedule is the major component of product selection, resource and
environment availability are also considered.
Inputs Outputs Procedures Forms/Templates
Unit tested code
For UAT:
products that have
successfully
passed
system/integration
test
Selected products Entrance Criteria Test Plan
Transition/Acceptance
Form
2
2. Determine Integration Sequence
The project schedule determines the integration sequence which is reflected in the Test
Plan(s). The Test Plan is created during the test planning phase and refined as required in
the test preparation phase as detailed test cases are developed. Test case development is
the responsibility of the tester under the direction of the test lead.
Inputs Outputs Procedures Forms/Templates
Project Schedule
Testing Schedule
Integration/Testing
Sequence
(Embedded in
Forms/Templates)
Test Plan
Test Cases
3. Develop Testing and Product Integration Environment
Once the product is selected, the testing environment is developed. This can be
accomplished by utilizing and/or modifying an existing environment, or if necessary,
developing a new environment. If a new environment is required the Test Lead should
complete the Environment Application form to request the environment from the
Environment Management Team/
Inputs Outputs Procedures Forms/Templates
Environment
requirements
Appropriate
environment
(Embedded in
Forms/Templates)
Test Plan
4. Establish Testing and Product Integration Procedures, Policies, and Criteria
The Test Plan describes the scope, approach, and deliverables for verification, validation,
and product integration. Roles and responsibilities are also described. Defect reporting
and management procedures are established.
Test cases are developed using the Test Case Template. This substep requires close
coordination with the Requirements Development process area as test coverage of all
requirements in the selected product is essential for a complete and comprehensive
verification, validation, and product integration. The Requirements Development process
area will also support Requirements traceability which documents proper test case
coverage.
Based on the integration requirements, procedures are developed to ensure proper and
correct integration. Criteria are developed to evaluate if the integration process is
meeting the requirements and the integration schedule.
For UAT: Trainers develop and deliver product-specific training to UAT participants.
UAT test scripts are developed.
Defect recording, tracking and management procedures are put into place in this step, and project
metrics are established
3
The Test plan is developed by the test lead with approval required by Test Management. The
test cases are developed by the actual project testers and approved by the test lead
Inputs Outputs Procedures Forms/Templates
Requirements
For UAT:
Training materials
Test cases
For UAT: Test
scripts
Requirements
Traceability Matrix
Defect Management
Plan
Metrics Strategy
Test Plan
Test Cases
5. Peer Review of Procedures and Policies
Procedures and policiesthat have been developed in the previous steps will undergo the
prescribed Peer Review Process developed by the Quality Assurance (QA) process area.
This process entails the following substeps:
a. Prepare artifacts for peer review
b. Engage in peer review
c. Assimilate peer review results into the artifacts
Inputs Outputs Procedures Forms/Templates
Testing artifacts Peer Reviewed
artifacts
Peer Review Process Peer Review Forms
6. Confirm Readiness of Product Components for Integration
The various components are examined with regard to their readiness for final and
complete integration. This can take the form of a Test Readiness Review. The Test
Readiness review is prepared by the Test Lead and is signed off by the Test Lead prior to
the testing phase commencing.
Inputs Outputs Procedures Forms/Templates
Product
components
Build Report
Product components
verified ready for
integration
(Embedded in
Forms/Templates)
Test Readiness Review
4
7. Assemble Product Components
After integration readiness is confirmed, the various components are assembled
according to the sequence defined in the Test Plan(s).
Inputs Outputs Procedures Forms/Templates
Product
components
Build Report
Product components
assembled for
integration
(Embedded in
Forms/Templates)
Test Plan
8. Test Phase Entrance Criteria Examination
Entrance criteria will be examined to determine if all conditions required for that phase of
testing exist prior to imitation of the actual verification and validation process.
If the criteria are not met, failed criteria are addressed and examined iteratively until all
are met successfully. Entrance and Exit Criteria are developed by the Test Lead for each
project and documented in the test plan.
Inputs Outputs Procedures Forms/Templates
Testing artifacts
and environment
Entrance
determination
(Embedded in
Forms/Templates)
Test Plan
9. Test Readiness Review
A Test Readiness Review is performed. A test readiness review is a test phase-
independent, formalized and documented process wherein all appropriate parties
determine a products “readiness to test”. The end result is a Go/No-go decision to begin
the testing process. The project Test Lead is responsible for conducting the Test
Readiness Review.
Inputs Outputs Procedures Forms/Templates
Testing
components status
Go/No-go decision Test Readiness Review Test Readiness Review
Form
Build Report from CM
10. Perform Testing/Evaluate Assembled Product Components
In this step, the actual verification of the product is conducted. Integration testing is
conducted to evaluate the integrated product. This activity consists of the following
substeps:
5
a. Implement test cases (for UAT: test scripts)
b. Capture, record and implement the test scripts developed in Step 3.
Testers are responsible for executing test cases under the direction of the Test Lead
Inputs Outputs Procedures Forms/Templates
Test Case
For UAT: Test
Scripts
Defects (Embedded in
Forms/Templates)
Test Cases
Defect Reports
Test Metrics Report
Test Scripts
11. Analyze Testing Results
This step is ongoing during testing. Verification results (defects) are assigned to the
proper resources for corrective actions, retested, and either closed or rerouted back to the
appropriate dispositioning entity. Defect metrics are recoded and reported to designated
team members and/or stakeholders. Testers and the project Test Lead are responsible for
conducting Test Result Analysis and the Test Lead is responsible for reporting Defects
and Test Metrics to Test Management and relevant project stakeholders.
Inputs Outputs Procedures Forms/Templates
Defects Defect management
Metrics
Test Reports
(Embedded in
Forms/Templates)
Defect Reports
Test Metrics Report
12. Exit Criteria Examination
After testing is completed and there is a next phase of testing to be implemented, exit
criteria will be examined to determine if all conditions have been met for migration to the
next testing phase.
If the criteria are not met, failed criteria are addressed and examined iteratively until all
are met successfully. The Test Lead is responsible for developing Exit Criteria and
documenting them in the Project Test Plan.
6
Inputs Outputs Procedures Forms/Templates
Testing results Migration decision Testing Phase Entrance
and Exit Criteria and
Test Phase Summary
Report
For UAT: Test Phase
Summary Report
Test Phase Summary
Report
13. Package and Deliver the Product or Product Component
After successful testing/evaluation, the product is packaged appropriately and delivered to
deployment. The Test Lead is responsible for completing the Test Final Report, and
submitting the form to Test Management, and relevant stakeholders for approval.
Inputs Outputs Procedures Forms/Templates
Tested product Packaged product (Embedded in
Forms/Templates)
Test Final Report
14. Process Closure
This last step in the Testing process results in a report that documents the Testing process
(in synopsis), contains a summary of the results of the process and a high-level
description of any risks that remain at verification completion. The Test Lead is
responsible for creating the Test Phase Summary Report and the Test Final Report.
These reports require the approval of test management.
Inputs Outputs Procedures Forms/Templates
Testing results
Testing metrics
Reports
Metrics
(Embedded in
Forms/Templates)
Test Final Report

Weitere ähnliche Inhalte

Andere mochten auch

HealthCare Project Test Case writing guidelines
HealthCare Project Test Case writing guidelinesHealthCare Project Test Case writing guidelines
HealthCare Project Test Case writing guidelines
H2Kinfosys
 
Letters test cases
Letters test casesLetters test cases
Letters test cases
H2Kinfosys
 
Project 2 | Health Care Domain
Project 2 | Health Care DomainProject 2 | Health Care Domain
Project 2 | Health Care Domain
H2kInfosys
 
Online Shopping Cart Business Requirement Dcoument
Online Shopping Cart Business Requirement DcoumentOnline Shopping Cart Business Requirement Dcoument
Online Shopping Cart Business Requirement Dcoument
H2Kinfosys
 
Maximizing your enterprise mobility and mobile testing strategy
Maximizing your enterprise mobility and mobile testing strategyMaximizing your enterprise mobility and mobile testing strategy
Maximizing your enterprise mobility and mobile testing strategy
Perfecto Mobile
 

Andere mochten auch (16)

HealthCare Project Test Case writing guidelines
HealthCare Project Test Case writing guidelinesHealthCare Project Test Case writing guidelines
HealthCare Project Test Case writing guidelines
 
Health Care Project Overview from H2kInfosys LLC
Health Care Project Overview from H2kInfosys LLCHealth Care Project Overview from H2kInfosys LLC
Health Care Project Overview from H2kInfosys LLC
 
Letters test cases
Letters test casesLetters test cases
Letters test cases
 
Project 2 | Health Care Domain
Project 2 | Health Care DomainProject 2 | Health Care Domain
Project 2 | Health Care Domain
 
Claims Test Case | Health Care Domain
Claims Test Case | Health Care DomainClaims Test Case | Health Care Domain
Claims Test Case | Health Care Domain
 
Online Shopping Cart Business Requirement Dcoument
Online Shopping Cart Business Requirement DcoumentOnline Shopping Cart Business Requirement Dcoument
Online Shopping Cart Business Requirement Dcoument
 
Online Banking Business Requirement Document
Online Banking Business Requirement DocumentOnline Banking Business Requirement Document
Online Banking Business Requirement Document
 
Health insurance claim | Health Care Domain
Health insurance claim | Health Care DomainHealth insurance claim | Health Care Domain
Health insurance claim | Health Care Domain
 
Test plan cyclos
Test plan cyclosTest plan cyclos
Test plan cyclos
 
Healthcare industry ppt
Healthcare industry pptHealthcare industry ppt
Healthcare industry ppt
 
Mobile form Validation Rules
Mobile form Validation RulesMobile form Validation Rules
Mobile form Validation Rules
 
Maximizing your enterprise mobility and mobile testing strategy
Maximizing your enterprise mobility and mobile testing strategyMaximizing your enterprise mobility and mobile testing strategy
Maximizing your enterprise mobility and mobile testing strategy
 
Automating the formalization of clinical guidelines using information extraction
Automating the formalization of clinical guidelines using information extractionAutomating the formalization of clinical guidelines using information extraction
Automating the formalization of clinical guidelines using information extraction
 
Healthcare business process partnering for success. ver. 1.3
Healthcare business process partnering for success. ver. 1.3Healthcare business process partnering for success. ver. 1.3
Healthcare business process partnering for success. ver. 1.3
 
2015 Mastering SAP Tech - Enterprise Mobility - Testing Lessons Learned
2015 Mastering SAP Tech - Enterprise Mobility - Testing Lessons Learned2015 Mastering SAP Tech - Enterprise Mobility - Testing Lessons Learned
2015 Mastering SAP Tech - Enterprise Mobility - Testing Lessons Learned
 
Mobile Testing. What to do?
Mobile Testing. What to do?Mobile Testing. What to do?
Mobile Testing. What to do?
 

Ähnlich wie Health Care Project Testing Process

Software-Testing-Chapgdgdgsghshshshshshshs
Software-Testing-ChapgdgdgsghshshshshshshsSoftware-Testing-Chapgdgdgsghshshshshshshs
Software-Testing-Chapgdgdgsghshshshshshshs
shaikbab
 

Ähnlich wie Health Care Project Testing Process (20)

Software-Testing-Chapgdgdgsghshshshshshshs
Software-Testing-ChapgdgdgsghshshshshshshsSoftware-Testing-Chapgdgdgsghshshshshshshs
Software-Testing-Chapgdgdgsghshshshshshshs
 
Pharmaceutical Qualification & Validation
Pharmaceutical Qualification & ValidationPharmaceutical Qualification & Validation
Pharmaceutical Qualification & Validation
 
Prospective Validation NSR.pdf
Prospective Validation NSR.pdfProspective Validation NSR.pdf
Prospective Validation NSR.pdf
 
Introduction to CMMI-DEV v1.3 - Day 3
Introduction to CMMI-DEV v1.3  - Day 3Introduction to CMMI-DEV v1.3  - Day 3
Introduction to CMMI-DEV v1.3 - Day 3
 
Verification process
Verification processVerification process
Verification process
 
Stlc ppt
Stlc pptStlc ppt
Stlc ppt
 
All about testing
All about testingAll about testing
All about testing
 
Test plan
Test planTest plan
Test plan
 
stlc
stlcstlc
stlc
 
Chapter 1 Fundamental of Testing
Chapter 1 Fundamental of TestingChapter 1 Fundamental of Testing
Chapter 1 Fundamental of Testing
 
ISTQB, ISEB Lecture Notes- 2
ISTQB, ISEB Lecture Notes- 2ISTQB, ISEB Lecture Notes- 2
ISTQB, ISEB Lecture Notes- 2
 
stlc
stlcstlc
stlc
 
Software Engineering (Testing Activities, Management, and Automation)
Software Engineering (Testing Activities, Management, and Automation)Software Engineering (Testing Activities, Management, and Automation)
Software Engineering (Testing Activities, Management, and Automation)
 
Process validation
Process validationProcess validation
Process validation
 
Test Life Cycle
Test Life CycleTest Life Cycle
Test Life Cycle
 
Bab i fundamental of testing (yoga)
Bab i fundamental of testing (yoga)Bab i fundamental of testing (yoga)
Bab i fundamental of testing (yoga)
 
QACampus PPT (STLC)
QACampus PPT (STLC)QACampus PPT (STLC)
QACampus PPT (STLC)
 
STLC-ppt-1.pptx
STLC-ppt-1.pptxSTLC-ppt-1.pptx
STLC-ppt-1.pptx
 
Basic concept of process validation
Basic concept of process validation Basic concept of process validation
Basic concept of process validation
 
Tesda css correction
Tesda css correctionTesda css correction
Tesda css correction
 

Mehr von H2Kinfosys

Test Plan Template
Test Plan TemplateTest Plan Template
Test Plan Template
H2Kinfosys
 

Mehr von H2Kinfosys (12)

Python Interview Questions And Answers
Python Interview Questions And AnswersPython Interview Questions And Answers
Python Interview Questions And Answers
 
JIRA Introduction | JIRA Tutorial | Atlassian JIRA Training | H2kinfosys
JIRA Introduction | JIRA Tutorial | Atlassian JIRA Training | H2kinfosysJIRA Introduction | JIRA Tutorial | Atlassian JIRA Training | H2kinfosys
JIRA Introduction | JIRA Tutorial | Atlassian JIRA Training | H2kinfosys
 
Mobile Apps Telecommunication Doc
Mobile Apps Telecommunication DocMobile Apps Telecommunication Doc
Mobile Apps Telecommunication Doc
 
Mobile Apps Testing Tele communication Doc
Mobile Apps Testing Tele communication DocMobile Apps Testing Tele communication Doc
Mobile Apps Testing Tele communication Doc
 
Testcase cyclos excel document
Testcase cyclos excel documentTestcase cyclos excel document
Testcase cyclos excel document
 
Test Plan Template
Test Plan TemplateTest Plan Template
Test Plan Template
 
Test Plan Template
Test Plan TemplateTest Plan Template
Test Plan Template
 
ETL Testing Interview Questions and Answers
ETL Testing Interview Questions and AnswersETL Testing Interview Questions and Answers
ETL Testing Interview Questions and Answers
 
CRM Project - H2Kinfosys
CRM Project - H2KinfosysCRM Project - H2Kinfosys
CRM Project - H2Kinfosys
 
QA Interview Questions With Answers
QA Interview Questions With AnswersQA Interview Questions With Answers
QA Interview Questions With Answers
 
Basic Interview Questions
Basic Interview QuestionsBasic Interview Questions
Basic Interview Questions
 
SDLC software testing
SDLC software testingSDLC software testing
SDLC software testing
 

Kürzlich hochgeladen

Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
AnaAcapella
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
kauryashika82
 

Kürzlich hochgeladen (20)

Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
 
Asian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptxAsian American Pacific Islander Month DDSD 2024.pptx
Asian American Pacific Islander Month DDSD 2024.pptx
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 

Health Care Project Testing Process

  • 1. 1 http://www.h2kinfosys.com| USA: 770 777 1269 | UK: (020) 3371 7615 Testing Process 1. INTRODUCTION The Testing process ensures that selected work products meet their specified requirements. That goal is typically attained through formal testing procedures that entail the development of testing strategy, plans, and cases and the subsequent implementation of actual testing. Defects found in the testing process are reported, logged and distributed to appropriate entities for resolution and retesting. Metrics are generated throughout the process and are used to track progress, which is reported at various levels to stakeholders as desired. At the end of the process, a report is developed describing the results of the process and providing an acceptance criteria for product viability for release to the next project phase, or whether more work is required to get the product to a release state. 2. PROCESS FLOW DESCRIPTION FOR TESTING Process flow steps that have separate and distinct UAT components are denoted accordingly. Conversely, a step that does not specifically call out UAT components is completely applicable to both systemintegration testing and UAT. The following steps describe the Testing process flow in more detail: 1. Select the products to be tested. Product selection is driven during the test planning process. Product selection is based on requirements and the release schedule that dictates what products must be tested at a particular time in the project schedule. However, testing may occur on a relatively ad-hoc basis for an emergency release. Although the schedule is the major component of product selection, resource and environment availability are also considered. Inputs Outputs Procedures Forms/Templates Unit tested code For UAT: products that have successfully passed system/integration test Selected products Entrance Criteria Test Plan Transition/Acceptance Form
  • 2. 2 2. Determine Integration Sequence The project schedule determines the integration sequence which is reflected in the Test Plan(s). The Test Plan is created during the test planning phase and refined as required in the test preparation phase as detailed test cases are developed. Test case development is the responsibility of the tester under the direction of the test lead. Inputs Outputs Procedures Forms/Templates Project Schedule Testing Schedule Integration/Testing Sequence (Embedded in Forms/Templates) Test Plan Test Cases 3. Develop Testing and Product Integration Environment Once the product is selected, the testing environment is developed. This can be accomplished by utilizing and/or modifying an existing environment, or if necessary, developing a new environment. If a new environment is required the Test Lead should complete the Environment Application form to request the environment from the Environment Management Team/ Inputs Outputs Procedures Forms/Templates Environment requirements Appropriate environment (Embedded in Forms/Templates) Test Plan 4. Establish Testing and Product Integration Procedures, Policies, and Criteria The Test Plan describes the scope, approach, and deliverables for verification, validation, and product integration. Roles and responsibilities are also described. Defect reporting and management procedures are established. Test cases are developed using the Test Case Template. This substep requires close coordination with the Requirements Development process area as test coverage of all requirements in the selected product is essential for a complete and comprehensive verification, validation, and product integration. The Requirements Development process area will also support Requirements traceability which documents proper test case coverage. Based on the integration requirements, procedures are developed to ensure proper and correct integration. Criteria are developed to evaluate if the integration process is meeting the requirements and the integration schedule. For UAT: Trainers develop and deliver product-specific training to UAT participants. UAT test scripts are developed. Defect recording, tracking and management procedures are put into place in this step, and project metrics are established
  • 3. 3 The Test plan is developed by the test lead with approval required by Test Management. The test cases are developed by the actual project testers and approved by the test lead Inputs Outputs Procedures Forms/Templates Requirements For UAT: Training materials Test cases For UAT: Test scripts Requirements Traceability Matrix Defect Management Plan Metrics Strategy Test Plan Test Cases 5. Peer Review of Procedures and Policies Procedures and policiesthat have been developed in the previous steps will undergo the prescribed Peer Review Process developed by the Quality Assurance (QA) process area. This process entails the following substeps: a. Prepare artifacts for peer review b. Engage in peer review c. Assimilate peer review results into the artifacts Inputs Outputs Procedures Forms/Templates Testing artifacts Peer Reviewed artifacts Peer Review Process Peer Review Forms 6. Confirm Readiness of Product Components for Integration The various components are examined with regard to their readiness for final and complete integration. This can take the form of a Test Readiness Review. The Test Readiness review is prepared by the Test Lead and is signed off by the Test Lead prior to the testing phase commencing. Inputs Outputs Procedures Forms/Templates Product components Build Report Product components verified ready for integration (Embedded in Forms/Templates) Test Readiness Review
  • 4. 4 7. Assemble Product Components After integration readiness is confirmed, the various components are assembled according to the sequence defined in the Test Plan(s). Inputs Outputs Procedures Forms/Templates Product components Build Report Product components assembled for integration (Embedded in Forms/Templates) Test Plan 8. Test Phase Entrance Criteria Examination Entrance criteria will be examined to determine if all conditions required for that phase of testing exist prior to imitation of the actual verification and validation process. If the criteria are not met, failed criteria are addressed and examined iteratively until all are met successfully. Entrance and Exit Criteria are developed by the Test Lead for each project and documented in the test plan. Inputs Outputs Procedures Forms/Templates Testing artifacts and environment Entrance determination (Embedded in Forms/Templates) Test Plan 9. Test Readiness Review A Test Readiness Review is performed. A test readiness review is a test phase- independent, formalized and documented process wherein all appropriate parties determine a products “readiness to test”. The end result is a Go/No-go decision to begin the testing process. The project Test Lead is responsible for conducting the Test Readiness Review. Inputs Outputs Procedures Forms/Templates Testing components status Go/No-go decision Test Readiness Review Test Readiness Review Form Build Report from CM 10. Perform Testing/Evaluate Assembled Product Components In this step, the actual verification of the product is conducted. Integration testing is conducted to evaluate the integrated product. This activity consists of the following substeps:
  • 5. 5 a. Implement test cases (for UAT: test scripts) b. Capture, record and implement the test scripts developed in Step 3. Testers are responsible for executing test cases under the direction of the Test Lead Inputs Outputs Procedures Forms/Templates Test Case For UAT: Test Scripts Defects (Embedded in Forms/Templates) Test Cases Defect Reports Test Metrics Report Test Scripts 11. Analyze Testing Results This step is ongoing during testing. Verification results (defects) are assigned to the proper resources for corrective actions, retested, and either closed or rerouted back to the appropriate dispositioning entity. Defect metrics are recoded and reported to designated team members and/or stakeholders. Testers and the project Test Lead are responsible for conducting Test Result Analysis and the Test Lead is responsible for reporting Defects and Test Metrics to Test Management and relevant project stakeholders. Inputs Outputs Procedures Forms/Templates Defects Defect management Metrics Test Reports (Embedded in Forms/Templates) Defect Reports Test Metrics Report 12. Exit Criteria Examination After testing is completed and there is a next phase of testing to be implemented, exit criteria will be examined to determine if all conditions have been met for migration to the next testing phase. If the criteria are not met, failed criteria are addressed and examined iteratively until all are met successfully. The Test Lead is responsible for developing Exit Criteria and documenting them in the Project Test Plan.
  • 6. 6 Inputs Outputs Procedures Forms/Templates Testing results Migration decision Testing Phase Entrance and Exit Criteria and Test Phase Summary Report For UAT: Test Phase Summary Report Test Phase Summary Report 13. Package and Deliver the Product or Product Component After successful testing/evaluation, the product is packaged appropriately and delivered to deployment. The Test Lead is responsible for completing the Test Final Report, and submitting the form to Test Management, and relevant stakeholders for approval. Inputs Outputs Procedures Forms/Templates Tested product Packaged product (Embedded in Forms/Templates) Test Final Report 14. Process Closure This last step in the Testing process results in a report that documents the Testing process (in synopsis), contains a summary of the results of the process and a high-level description of any risks that remain at verification completion. The Test Lead is responsible for creating the Test Phase Summary Report and the Test Final Report. These reports require the approval of test management. Inputs Outputs Procedures Forms/Templates Testing results Testing metrics Reports Metrics (Embedded in Forms/Templates) Test Final Report