SlideShare ist ein Scribd-Unternehmen logo
1 von 7
LOMA LINDA UNIVERSITY
CLINICAL LABS REMODEL
CONTRACTOR
Serfass and Company
SIZE
2,200 sq.ft.
PROJECT BUDGET
1.3 million
SCHEDULE
6 Months
Completed as scheduled in
September
OWNER REFERENCE
Kent Chow Financial Officer
School of Allied Health
Professions
ARCHITECT REFERENCE
Brad Glassick HMC
Architects
Located in the historical Nichol Hall of the
Loma Linda University Campus. This 1.3
million remodel included but was not limited
to renovations to upgrade and restore the
finishes and furnishings in the Clinical Sciences
Classroom, giving it new lighting, work
benches and an overall contemporary
aesthetic .
Challenges :
• Layout
• Flow
• Utilities
• Technology
• Casework
“Despite these challenges, he has demonstrated
leadership through problem solving and conflict
resolution and effective communication.” Kent
Chow
LOMA LINDA UNIVERSITY
SHEPARDSON STREET OVERFLOW PARKING AND SOCCER FIELD
CONTRACTOR
Tilden Coil
SIZE
340,000 sq.ft.
PROJECT BUDGET
3.6 million
SCHEDULE
7 months
Completed as scheduled
January
OWNER REFERENCE
Donald Sease
Director LLU Drayson Center
ARCHITECT REFERENCE
Ken Scofield
Onyx Architects
Develop LLUAHSC Overflow Parking
(563 spaces) with lighting, fence,
landscape and security systems (card
controlled gate, security cameras, etc.).
Develop soccer field expansion for
Drayson Center with artificial turf and
sprinkler pressurization pumps and a new
restroom building.
Challenges:
• Layout
• Permits & Requirements
• Lighting
• Drainage
LOMA LINDA UNIVERSITY
NICHOL HALL KITCHEN
CONTRACTOR
Capstone Inc.
SIZE
1,420 sq.ft.
PROJECT BUDGET
1.3 million
SCHEDULE
6 months
Completed as scheduled
September
OWNER REFERENCE
Kent Chow Financial Officer
School of Allied Health
Professions
ARCHITECT REFERENCE
Brad Glassick HMC
Architects
Located in the historical Nichol Hall of the
Loma Linda University Campus. This 1.3
million remodel included but was not limited
to renovations to upgrade and restore the
finishes and furnishings in the space and give
this kitchen a clean and elegant look.
Challenges:
• Layout
• Permits & Requirements
• Flexibility
• Structural
• HVAC & Exhaust
“The project was full of surprises and it was
managed as if they had never occurred.“ Chef
Corey Gheen SAHP
LOMA LINDA UNIVERSITY
LLUAHSC SERVICES BUILDING 101 – MOVE MANAGEMENT
MOVE CONTRACTOR
Tangram Interiors
People
600
PROJECT BUDGET
½ million
SCHEDULE
4 months
Completed on scheduled
May
OWNER REFERENCE
Kevin Fischer
Executive Director LLU Real
Estate Management
ARCHITECT REFERENCE
Troy Aday
Aday Architects
Move 600 people from various locations on
the Loma Linda University campus to the
newly constructed LLUAHSC Services
Building 101. Coo
Challenges:
• Scheduling
• Limited down time
• Coordination with
active construction
• IT , IS, and Desktop
coordination
• Space planning
LOMA LINDA UNIVERSITY
EVANS HALL AMPHITHEATER
CONTRACTOR
Capstone Inc.
SIZE
1,100 sq.ft.
PROJECT BUDGET
446,00
SCHEDULE
4 months
Completed as scheduled
December
OWNER REFERENCE
Kent Chow Financial Officer
School of Allied Health
Professions
ARCHITECT REFERENCE
Troy Aday
Aday Architects
Renovate the amphitheater in Evans Hall to
provide larger table tops and accessible
desk spaces using new fixed amphitheater
seating. New high efficiency lighting, carpet
and audiovisual for teaching.
Challenges:
• Layout
• Framing Risers
• Schedule
LOMA LINDA UNIVERSITY
EVANS HALL TENANT IMPROVEMENT – PHYSICIAN ASSISTANT
CONTRACTOR
Capstone Inc.
SIZE
1,100 sq.ft.
PROJECT BUDGET
446,00
SCHEDULE
4 months
Completed as scheduled
December
OWNER REFERENCE
Kent Chow Financial Officer
School of Allied Health
Professions
ARCHITECT REFERENCE
Troy Aday
Aday Architects
Renovate level 2 of Evans Hall for the
relocation of the Physician’s Assistant
program. Scope included move
management,
Challenges:
• Layout
• Schedule
• Asbestos/Lead Abatement
• Schedule
• Changes
LOMA LINDA UNIVERSITY
LINDSAY HALL KITCHEN
CONTRACTOR
Serfass and Company
SIZE
2,200 sq.ft.
PROJECT BUDGET
1.3 million
SCHEDULE
6 Months
Completed December
OWNER REFERENCE
Lynette Bates
ARCHITECT REFERENCE
Alfredo E. Neyra Architect
The Lindsay Hall Female dormitory
kitchen remodel the existing Kitchen
and expand it to provide room for all
the Health Department-required
kitchen facilities and equipment.
Challenges :
• Layout
• Permits & Requirements
• Flow
• Utilities
• Casework

Weitere ähnliche Inhalte

Andere mochten auch

Ciências biológica citologia
Ciências  biológica   citologiaCiências  biológica   citologia
Ciências biológica citologiaKarina Rayne
 
Ley municipal que aumenta faltas sancionables contra los choferes de La Paz
Ley municipal que aumenta faltas sancionables contra los choferes de La PazLey municipal que aumenta faltas sancionables contra los choferes de La Paz
Ley municipal que aumenta faltas sancionables contra los choferes de La PazErbol Digital
 
Proxecto Miguel de Cervantes de Carlos García Guerra
Proxecto Miguel de Cervantes de Carlos García GuerraProxecto Miguel de Cervantes de Carlos García Guerra
Proxecto Miguel de Cervantes de Carlos García GuerraCarmela Garcia
 
Wes Ogden Resume Atlanta
Wes Ogden Resume AtlantaWes Ogden Resume Atlanta
Wes Ogden Resume AtlantaWes Ogden
 
Sesion de aprendizaje de ciencia y ambiente de primaria sara ccesa007
Sesion de aprendizaje de ciencia y ambiente de primaria sara ccesa007Sesion de aprendizaje de ciencia y ambiente de primaria sara ccesa007
Sesion de aprendizaje de ciencia y ambiente de primaria sara ccesa007Demetrio Ccesa Rayme
 

Andere mochten auch (7)

Ciências biológica citologia
Ciências  biológica   citologiaCiências  biológica   citologia
Ciências biológica citologia
 
Ley municipal que aumenta faltas sancionables contra los choferes de La Paz
Ley municipal que aumenta faltas sancionables contra los choferes de La PazLey municipal que aumenta faltas sancionables contra los choferes de La Paz
Ley municipal que aumenta faltas sancionables contra los choferes de La Paz
 
Proxecto Miguel de Cervantes de Carlos García Guerra
Proxecto Miguel de Cervantes de Carlos García GuerraProxecto Miguel de Cervantes de Carlos García Guerra
Proxecto Miguel de Cervantes de Carlos García Guerra
 
Wes Ogden Resume Atlanta
Wes Ogden Resume AtlantaWes Ogden Resume Atlanta
Wes Ogden Resume Atlanta
 
Brunilda
BrunildaBrunilda
Brunilda
 
Sesion de aprendizaje de ciencia y ambiente de primaria sara ccesa007
Sesion de aprendizaje de ciencia y ambiente de primaria sara ccesa007Sesion de aprendizaje de ciencia y ambiente de primaria sara ccesa007
Sesion de aprendizaje de ciencia y ambiente de primaria sara ccesa007
 
20160203150052031
2016020315005203120160203150052031
20160203150052031
 

Ähnlich wie Portfolio - GH

Lon Dunaway Resume
Lon Dunaway ResumeLon Dunaway Resume
Lon Dunaway ResumeLon Dunaway
 
Past Apex Projects
Past Apex ProjectsPast Apex Projects
Past Apex Projectsdbwdvideos
 
Lewis & Hickey - Education
Lewis & Hickey - EducationLewis & Hickey - Education
Lewis & Hickey - EducationTim Hall
 
B11-Adapting+Richards+Medical+Research+Building.pdf
B11-Adapting+Richards+Medical+Research+Building.pdfB11-Adapting+Richards+Medical+Research+Building.pdf
B11-Adapting+Richards+Medical+Research+Building.pdfReemKhalil28
 
COTE Top Ten: Intelligent Design for a Restorative Future
COTE Top Ten: Intelligent Design for a Restorative FutureCOTE Top Ten: Intelligent Design for a Restorative Future
COTE Top Ten: Intelligent Design for a Restorative Futurejuliekannai
 
DJC Top Projects 2015 - Breathe Building Project Description - Final
DJC Top Projects 2015 - Breathe Building Project Description - FinalDJC Top Projects 2015 - Breathe Building Project Description - Final
DJC Top Projects 2015 - Breathe Building Project Description - FinalChris Humphries
 
Renee m thomas resume
Renee m thomas resumeRenee m thomas resume
Renee m thomas resumeRenee Thomas
 
Australian Catholic University Package A
Australian Catholic University Package AAustralian Catholic University Package A
Australian Catholic University Package AOd Solutions
 
RFP_Final Submission (1)
RFP_Final Submission (1)RFP_Final Submission (1)
RFP_Final Submission (1)Hrishikesh Tupe
 
Final portfolio michael voit 140130
Final portfolio michael voit 140130Final portfolio michael voit 140130
Final portfolio michael voit 140130voit1
 
Spa capability statement 2020
Spa capability statement 2020Spa capability statement 2020
Spa capability statement 2020Krishna Rao
 
2016 Harry H. Mellon Awards in Job Order Contracting | Gordian
2016 Harry H. Mellon Awards in Job Order Contracting | Gordian2016 Harry H. Mellon Awards in Job Order Contracting | Gordian
2016 Harry H. Mellon Awards in Job Order Contracting | GordianGordian
 
LA Commercial Project Experience 052412
LA Commercial Project Experience 052412LA Commercial Project Experience 052412
LA Commercial Project Experience 052412lundinarchitects
 

Ähnlich wie Portfolio - GH (20)

A+ work
A+ workA+ work
A+ work
 
Resume Kenneth Johnson
Resume Kenneth JohnsonResume Kenneth Johnson
Resume Kenneth Johnson
 
Lon Dunaway Resume
Lon Dunaway ResumeLon Dunaway Resume
Lon Dunaway Resume
 
140709 july 9th meeting
140709 july 9th meeting140709 july 9th meeting
140709 july 9th meeting
 
Past Apex Projects
Past Apex ProjectsPast Apex Projects
Past Apex Projects
 
Lewis & Hickey - Education
Lewis & Hickey - EducationLewis & Hickey - Education
Lewis & Hickey - Education
 
B11-Adapting+Richards+Medical+Research+Building.pdf
B11-Adapting+Richards+Medical+Research+Building.pdfB11-Adapting+Richards+Medical+Research+Building.pdf
B11-Adapting+Richards+Medical+Research+Building.pdf
 
COTE Top Ten: Intelligent Design for a Restorative Future
COTE Top Ten: Intelligent Design for a Restorative FutureCOTE Top Ten: Intelligent Design for a Restorative Future
COTE Top Ten: Intelligent Design for a Restorative Future
 
DJC Top Projects 2015 - Breathe Building Project Description - Final
DJC Top Projects 2015 - Breathe Building Project Description - FinalDJC Top Projects 2015 - Breathe Building Project Description - Final
DJC Top Projects 2015 - Breathe Building Project Description - Final
 
Renee m thomas resume
Renee m thomas resumeRenee m thomas resume
Renee m thomas resume
 
CRESAAlbanyINTRO
CRESAAlbanyINTROCRESAAlbanyINTRO
CRESAAlbanyINTRO
 
Australian Catholic University Package A
Australian Catholic University Package AAustralian Catholic University Package A
Australian Catholic University Package A
 
RFP_Final Submission (1)
RFP_Final Submission (1)RFP_Final Submission (1)
RFP_Final Submission (1)
 
Final portfolio michael voit 140130
Final portfolio michael voit 140130Final portfolio michael voit 140130
Final portfolio michael voit 140130
 
St Mark's Center for Innovation
St Mark's Center for InnovationSt Mark's Center for Innovation
St Mark's Center for Innovation
 
Spa capability statement 2020
Spa capability statement 2020Spa capability statement 2020
Spa capability statement 2020
 
Binder2
Binder2Binder2
Binder2
 
2016 Harry H. Mellon Awards in Job Order Contracting | Gordian
2016 Harry H. Mellon Awards in Job Order Contracting | Gordian2016 Harry H. Mellon Awards in Job Order Contracting | Gordian
2016 Harry H. Mellon Awards in Job Order Contracting | Gordian
 
Open House Forum
Open House ForumOpen House Forum
Open House Forum
 
LA Commercial Project Experience 052412
LA Commercial Project Experience 052412LA Commercial Project Experience 052412
LA Commercial Project Experience 052412
 

Portfolio - GH

  • 1. LOMA LINDA UNIVERSITY CLINICAL LABS REMODEL CONTRACTOR Serfass and Company SIZE 2,200 sq.ft. PROJECT BUDGET 1.3 million SCHEDULE 6 Months Completed as scheduled in September OWNER REFERENCE Kent Chow Financial Officer School of Allied Health Professions ARCHITECT REFERENCE Brad Glassick HMC Architects Located in the historical Nichol Hall of the Loma Linda University Campus. This 1.3 million remodel included but was not limited to renovations to upgrade and restore the finishes and furnishings in the Clinical Sciences Classroom, giving it new lighting, work benches and an overall contemporary aesthetic . Challenges : • Layout • Flow • Utilities • Technology • Casework “Despite these challenges, he has demonstrated leadership through problem solving and conflict resolution and effective communication.” Kent Chow
  • 2. LOMA LINDA UNIVERSITY SHEPARDSON STREET OVERFLOW PARKING AND SOCCER FIELD CONTRACTOR Tilden Coil SIZE 340,000 sq.ft. PROJECT BUDGET 3.6 million SCHEDULE 7 months Completed as scheduled January OWNER REFERENCE Donald Sease Director LLU Drayson Center ARCHITECT REFERENCE Ken Scofield Onyx Architects Develop LLUAHSC Overflow Parking (563 spaces) with lighting, fence, landscape and security systems (card controlled gate, security cameras, etc.). Develop soccer field expansion for Drayson Center with artificial turf and sprinkler pressurization pumps and a new restroom building. Challenges: • Layout • Permits & Requirements • Lighting • Drainage
  • 3. LOMA LINDA UNIVERSITY NICHOL HALL KITCHEN CONTRACTOR Capstone Inc. SIZE 1,420 sq.ft. PROJECT BUDGET 1.3 million SCHEDULE 6 months Completed as scheduled September OWNER REFERENCE Kent Chow Financial Officer School of Allied Health Professions ARCHITECT REFERENCE Brad Glassick HMC Architects Located in the historical Nichol Hall of the Loma Linda University Campus. This 1.3 million remodel included but was not limited to renovations to upgrade and restore the finishes and furnishings in the space and give this kitchen a clean and elegant look. Challenges: • Layout • Permits & Requirements • Flexibility • Structural • HVAC & Exhaust “The project was full of surprises and it was managed as if they had never occurred.“ Chef Corey Gheen SAHP
  • 4. LOMA LINDA UNIVERSITY LLUAHSC SERVICES BUILDING 101 – MOVE MANAGEMENT MOVE CONTRACTOR Tangram Interiors People 600 PROJECT BUDGET ½ million SCHEDULE 4 months Completed on scheduled May OWNER REFERENCE Kevin Fischer Executive Director LLU Real Estate Management ARCHITECT REFERENCE Troy Aday Aday Architects Move 600 people from various locations on the Loma Linda University campus to the newly constructed LLUAHSC Services Building 101. Coo Challenges: • Scheduling • Limited down time • Coordination with active construction • IT , IS, and Desktop coordination • Space planning
  • 5. LOMA LINDA UNIVERSITY EVANS HALL AMPHITHEATER CONTRACTOR Capstone Inc. SIZE 1,100 sq.ft. PROJECT BUDGET 446,00 SCHEDULE 4 months Completed as scheduled December OWNER REFERENCE Kent Chow Financial Officer School of Allied Health Professions ARCHITECT REFERENCE Troy Aday Aday Architects Renovate the amphitheater in Evans Hall to provide larger table tops and accessible desk spaces using new fixed amphitheater seating. New high efficiency lighting, carpet and audiovisual for teaching. Challenges: • Layout • Framing Risers • Schedule
  • 6. LOMA LINDA UNIVERSITY EVANS HALL TENANT IMPROVEMENT – PHYSICIAN ASSISTANT CONTRACTOR Capstone Inc. SIZE 1,100 sq.ft. PROJECT BUDGET 446,00 SCHEDULE 4 months Completed as scheduled December OWNER REFERENCE Kent Chow Financial Officer School of Allied Health Professions ARCHITECT REFERENCE Troy Aday Aday Architects Renovate level 2 of Evans Hall for the relocation of the Physician’s Assistant program. Scope included move management, Challenges: • Layout • Schedule • Asbestos/Lead Abatement • Schedule • Changes
  • 7. LOMA LINDA UNIVERSITY LINDSAY HALL KITCHEN CONTRACTOR Serfass and Company SIZE 2,200 sq.ft. PROJECT BUDGET 1.3 million SCHEDULE 6 Months Completed December OWNER REFERENCE Lynette Bates ARCHITECT REFERENCE Alfredo E. Neyra Architect The Lindsay Hall Female dormitory kitchen remodel the existing Kitchen and expand it to provide room for all the Health Department-required kitchen facilities and equipment. Challenges : • Layout • Permits & Requirements • Flow • Utilities • Casework