STAGE
SEATING FOR
>150
PEOPLE
MENS
WOMENS
BACKSTAGERECEPTION
HEADS
OFFICE
STORAGE
STORAGE
COUNSEL
ROOM
OFFICE
CHANGE
ROOM
CHANGE
ROOM
TEA
lock up
cupboards
door with
security gate
door with
security gate
sliding steel
+
wood door
timber
screen
sliding steel
+
wood door
ICIC
IC IC IC
FFL1 +0454
FFL2 +1049
FFL3 +1304
NGL 1 0000
SOF1 +3186
SOF2 +3684
+3964
+4400
MAX +5882
FFL1 +0454
FFL2 +1049
FFL3 +1304
SOF1 +3186
SOF2 +3684
NGL2 + 0851 NGL2 + 0851
+ 4109
+5422
MAX +5882
NGL 1 0000 NGL 1 -0107
-0900 -0900-0786
50X75 STEEL ANGLE FRAME WITH
SMOOTH PLANED TIMBER DECKING FOR
STAGE FINISH
150 SMOOTH FLOATED RC FLOOR SLAB
ON DPC ON 150 LAYERS OF COMPACTED
FILL
0.5mm IBR CHROMADEK @ 15° ON ALUBUBBLE INSULATION
FIXED TO 125x65x20x2 STEEL LIP CHANNEL FIXED WITH 2 x M12
BOLTS TO STEEL CLEATS WELDED @ EQUAL CENTERS NOT
EXCEEDING 1800 TO 160 IPE AA TRUSSES @ 5000 CS
CHROMADEK IBR ROOF SHEETING
SCREWED TO 75x50 TIMBER PURLINS
NAILED @ MAX 1200 CS TO 114x38
TIMBER TRUSSES @ 800CS ON 228x38
TIMBER BEAMS
100 Ø
STEEL
COLUMN
230
FACEBRICK
WALL
INTERNAL
SURFACE OF
STAGE WALLS TO
BE PLASTEREDSECURE STEEL + TIMBER SHELVING
SECURE
STEEL +
TIMBER
SHELVING
SUSPENDED GYPSUM CEILING FIXED
TO U.SIDE OF TRUSSES WITH
ALU./STEEL HANGERS + RAILS
IPE 160 STEEL
COLUMNS ON
800x800x900
RC FOOTING




115 INTERNAL WALL
ON THICKENED SLAB
CONC TOPPED FACEBRICK
PIERS ENCLOSING STEEL
COLUMN @ BASE
STD STEEL DOOR
FRAME FITTED WITH
HARDWOOD DOOR
AND STEEL SECURITY
GATE
CUSTOM STEEL AND
TIMBER SLIDING DOOR
FOR STAGE ACCESS
1 1 0 P V C W A S T E
WATER LINE LINKING
I N T O E X I S T I N G
W A S T E W A T E R
S Y S T E M
85 SMOOTH POLISHED RC FLOOR SLAB
ON DPC ON 150 LAYERS OF COMPACTED
FILL
A A
NC11F NE1 NE1 NE1 NE1NG4 NG7
NC11F NC1 NE1 NE1 NE1NG4 NG7
NC11FNC11F
85 RC
WALKWAY WITH
THICKENED
EDGE
38 TIMBER
GABLE CLOSER








COMPACTED SOILCRETE
MIX TO MIN THICKNESS
400
800x800x500 CONCRETE
PAD FOUNDATION
GUSSET PLATE MOUNTED
TO THREADBAR CAST IN
CONCRETE
IPE 180 AA
COLUMN @ 5000
CS
NGL


IPE 160 AA
8 x M18 BOLTS
CHROMADEK IBR SHEETS
ALUBUBBLE INSULATION
125x65x20x2 LIP CHANNEL
PURLINS BOLTED TO STEEL
CLEAT WELDED TO TRUSS @
EQUAL CS


6 9 0 X 2 3 0 C O N C R E T E S T R I P
FOUNDATION REINFORCED WITH 4
Y12 BARS @ CENTRES TO SUIT
W I T H R 10 S T I R R U PS @ 3 0 0
C E N T R E S
85 THICK 1:3:6 SMOOTH
FLOATED CONCRETE SLAB
O N 2 0 0 M I C R O N D P C
1 4 m p a C O N C R E T E
B RI CK S TO GR OUN D
LEVEL + FLOOR LEVEL
A S S H O W N
7 mpa FACEBRICK
USED EXTERNALLY
7 mpa PLASTERED CONCRETE
BRICK USED INTERNALLY
100 WELL COMPACTED
CALCRETE BASE LAYER


150 G5 COMPACTED TO 98% MOD AASHTO
150 G5 COMPACTED TO 95% MOD AASHTO
150 RIPPED + RECOMPACTED TO 93% MOD AASHTO
10 mpaCONC BRICK USED
B E L O W N G L
85 THICK 1:3:6 SMOOTH FLOATED CONCRETE SLAB
R E I N F O R C E D W I T H W E L D M E S H T O S U I T
O N 2 0 0 M I C R O N D P C
THICKENED TO 150 BELOW 115 NON LOAD BEARING WALL
150 G5 COMPACTED TO 98% MOD AASHTO
7 mpa PLASTERED CONCRETE
BRICK USED INTERNALLY


150 G5 COMPACTED TO 95% MOD AASHTO
150 RIPPED + RECOMPACTED TO 93% MOD AASHTO
DATE: PROJECT: DRAWING: SCALE:
DRAWN BY:CLIENT:
PLOT: SIGNED:
APPROVAL SET 001
PLAN
SECTION
ELEVATIONS
DETAILS
1:100 1:200
G HNOKA YA BOTSHELO SCHOOL
CLIENT ADDRESS:
APRIL 2015
2967, PLATEAU, KASANEP.O. BOX 30
KASANE
NOKA YA BOTSHELO
SCHOOL HALL
INTERNAL LAYOUT
SUBMITTED:REVISIONS
PAGE #:
NYB/MHI/02/01
A1L
DRAWING NUMBER:
/
existing
football
field
existing
netball
court
existing
swimming
pool
existing
tennis
court
existing
classroom
block
existing
preschool
complex
existing
admin
block
EXISTING ASSEMBLY HALL
ROOF STRUCTURE
TO FUTURE WUC CONNECTION
MAIN
GATE
SERVICE
+EXIT
GATE
existing
office
15m
ROAD
TO
KASANE
CBD
TO UPPER
ROAD A33

9
staff
parking
24
proposed
parking
33
proposed
parking
existing
parking
area to
be moved
PROPOSED
WASTE
AREA
WASTE
AREA
existing
conservancy
tanks
future
classroom
future
classroom
future
classroom
future
classroom
future
classroom
future
classroomfuture
classroom
future
toilets
future
offices
future
library
future
staff
house
future
staff
house
future
staff
house
future
staff
house
future
lunch
area
class
class
ablutions
loading
loading
loading
open play
area
LOCATION PLAN
1:5000
DATE: PROJECT: DRAWING: SCALE:
DRAWN BY:CLIENT:
PLOT: SIGNED:
APPROVAL SET 001
SITE PLAN
LOCATION PLAN
1:500 1:5000
G HNOKA YA BOTSHELO SCHOOL
CLIENT ADDRESS:
APRIL 2015
2967, PLATEAU, KASANEP.O. BOX 30
KASANE
NOKA YA BOTSHELO
SCHOOL HALL
INTERNAL LAYOUT
SUBMITTED:REVISIONS
PAGE #:
NYB/MHI/01/01
A1L
DRAWING NUMBER:
/
AREAS
SITE AREA = 45011 sqm
PROPOSED BUILDING AREA = 386.6 sqm
EXISTING BUILDING AREA = 821 sqm
TOTAL = 1207 sqm
COVERAGE = 2.68 %
PARKING
25 EXISTING
55 PROPOSED
80 TOTAL ( 3 DISABLED )
FAP FIRE ASSEMBLY POINT
FIRE EXTINGUISHER
PROPOSED FUTURE DEVELOPMENTS

Weitere ähnliche Inhalte

Was ist angesagt?

3 Baobabs Lodge As Built
3 Baobabs Lodge As Built3 Baobabs Lodge As Built
3 Baobabs Lodge As BuiltGrant Hepburn
 
Mark Thornton Portfolio
Mark Thornton PortfolioMark Thornton Portfolio
Mark Thornton PortfolioMark Thornton
 
St Angela's College General Arrangment Drawings
St Angela's College General Arrangment DrawingsSt Angela's College General Arrangment Drawings
St Angela's College General Arrangment DrawingsJonathan Flanagan
 
Alidi House Proposal
Alidi House ProposalAlidi House Proposal
Alidi House ProposalGrant Hepburn
 
Pavilion FS[1] (TO SEND)
Pavilion FS[1] (TO SEND)Pavilion FS[1] (TO SEND)
Pavilion FS[1] (TO SEND)Jose Guirola
 
1050_25_SMALL_METER_HOUSE
1050_25_SMALL_METER_HOUSE1050_25_SMALL_METER_HOUSE
1050_25_SMALL_METER_HOUSERichard Worrall
 
Centre for the Creative Arts and Media (CCAM) | GMIT General Arrangment Drawings
Centre for the Creative Arts and Media (CCAM) | GMIT General Arrangment DrawingsCentre for the Creative Arts and Media (CCAM) | GMIT General Arrangment Drawings
Centre for the Creative Arts and Media (CCAM) | GMIT General Arrangment DrawingsJonathan Flanagan
 
Architectural design and drafting sample, residential house design, NSW, Aust...
Architectural design and drafting sample, residential house design, NSW, Aust...Architectural design and drafting sample, residential house design, NSW, Aust...
Architectural design and drafting sample, residential house design, NSW, Aust...AlexeyRyabchenko
 
Final year Revit project
Final year Revit projectFinal year Revit project
Final year Revit projectMark Thornton
 
Platinum Premier | 3/4 BHK Furnished Flats in Ghaziabad
Platinum Premier | 3/4 BHK Furnished Flats in GhaziabadPlatinum Premier | 3/4 BHK Furnished Flats in Ghaziabad
Platinum Premier | 3/4 BHK Furnished Flats in GhaziabadRamprastha Group
 
House Harripersad Submission
House Harripersad SubmissionHouse Harripersad Submission
House Harripersad SubmissionYolanda Sewpersad
 
House Plan For Robert Ledwaba
House Plan For Robert LedwabaHouse Plan For Robert Ledwaba
House Plan For Robert LedwabaJan Malesela
 
Municipal Hays-SECTION-ELEVATIONS-A3 (2)
Municipal Hays-SECTION-ELEVATIONS-A3 (2)Municipal Hays-SECTION-ELEVATIONS-A3 (2)
Municipal Hays-SECTION-ELEVATIONS-A3 (2)David Dinsdale
 
Plano Caja Acustica 18s kit18
Plano Caja Acustica 18s kit18Plano Caja Acustica 18s kit18
Plano Caja Acustica 18s kit18Alexander Segnini
 

Was ist angesagt? (18)

Mj ranasignhe final
Mj ranasignhe finalMj ranasignhe final
Mj ranasignhe final
 
3 Baobabs Lodge As Built
3 Baobabs Lodge As Built3 Baobabs Lodge As Built
3 Baobabs Lodge As Built
 
Mark Thornton Portfolio
Mark Thornton PortfolioMark Thornton Portfolio
Mark Thornton Portfolio
 
St Angela's College General Arrangment Drawings
St Angela's College General Arrangment DrawingsSt Angela's College General Arrangment Drawings
St Angela's College General Arrangment Drawings
 
Lot 280 Bogdanich way
Lot 280 Bogdanich wayLot 280 Bogdanich way
Lot 280 Bogdanich way
 
Alidi House Proposal
Alidi House ProposalAlidi House Proposal
Alidi House Proposal
 
Pavilion FS[1] (TO SEND)
Pavilion FS[1] (TO SEND)Pavilion FS[1] (TO SEND)
Pavilion FS[1] (TO SEND)
 
Goldcoast housing
Goldcoast housingGoldcoast housing
Goldcoast housing
 
Lot12A Ardeen st
Lot12A Ardeen stLot12A Ardeen st
Lot12A Ardeen st
 
1050_25_SMALL_METER_HOUSE
1050_25_SMALL_METER_HOUSE1050_25_SMALL_METER_HOUSE
1050_25_SMALL_METER_HOUSE
 
Centre for the Creative Arts and Media (CCAM) | GMIT General Arrangment Drawings
Centre for the Creative Arts and Media (CCAM) | GMIT General Arrangment DrawingsCentre for the Creative Arts and Media (CCAM) | GMIT General Arrangment Drawings
Centre for the Creative Arts and Media (CCAM) | GMIT General Arrangment Drawings
 
Architectural design and drafting sample, residential house design, NSW, Aust...
Architectural design and drafting sample, residential house design, NSW, Aust...Architectural design and drafting sample, residential house design, NSW, Aust...
Architectural design and drafting sample, residential house design, NSW, Aust...
 
Final year Revit project
Final year Revit projectFinal year Revit project
Final year Revit project
 
Platinum Premier | 3/4 BHK Furnished Flats in Ghaziabad
Platinum Premier | 3/4 BHK Furnished Flats in GhaziabadPlatinum Premier | 3/4 BHK Furnished Flats in Ghaziabad
Platinum Premier | 3/4 BHK Furnished Flats in Ghaziabad
 
House Harripersad Submission
House Harripersad SubmissionHouse Harripersad Submission
House Harripersad Submission
 
House Plan For Robert Ledwaba
House Plan For Robert LedwabaHouse Plan For Robert Ledwaba
House Plan For Robert Ledwaba
 
Municipal Hays-SECTION-ELEVATIONS-A3 (2)
Municipal Hays-SECTION-ELEVATIONS-A3 (2)Municipal Hays-SECTION-ELEVATIONS-A3 (2)
Municipal Hays-SECTION-ELEVATIONS-A3 (2)
 
Plano Caja Acustica 18s kit18
Plano Caja Acustica 18s kit18Plano Caja Acustica 18s kit18
Plano Caja Acustica 18s kit18
 

Ähnlich wie Chobe River College School Hall + Master Site Plan

Red Reedbuck Bush Lodge
Red Reedbuck Bush LodgeRed Reedbuck Bush Lodge
Red Reedbuck Bush LodgeGrant Hepburn
 
Kalahari Safaris Operations Base
Kalahari Safaris Operations BaseKalahari Safaris Operations Base
Kalahari Safaris Operations BaseGrant Hepburn
 
Medialine Holdings Multi Family Residential
Medialine Holdings Multi Family ResidentialMedialine Holdings Multi Family Residential
Medialine Holdings Multi Family ResidentialGrant Hepburn
 
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction Drawing
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction DrawingBUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction Drawing
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction DrawingAngeline KH
 
PORTFOLIO - HAZEL GUNDRAN
PORTFOLIO - HAZEL GUNDRANPORTFOLIO - HAZEL GUNDRAN
PORTFOLIO - HAZEL GUNDRANHazel Gundran
 
Thebe River Safaris Room Addition 2014
Thebe River Safaris Room Addition 2014Thebe River Safaris Room Addition 2014
Thebe River Safaris Room Addition 2014Grant Hepburn
 
Build Something That Lasts
Build Something That LastsBuild Something That Lasts
Build Something That Lastslharback
 
MARA - Design Development Portfolio
MARA - Design Development PortfolioMARA - Design Development Portfolio
MARA - Design Development PortfolioChinh Phan Duc
 
Hampton hotels architecture
Hampton hotels architectureHampton hotels architecture
Hampton hotels architecturePavan Modh
 
Logic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson HouseLogic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson HouseGrant Hepburn
 
Metso Neles T5 Series Top Entry Rotary Ball Valves
Metso Neles T5 Series Top Entry Rotary Ball ValvesMetso Neles T5 Series Top Entry Rotary Ball Valves
Metso Neles T5 Series Top Entry Rotary Ball ValvesMead O'Brien, Inc.
 
Caracal Biodiversity Centre Staff Village + Site
Caracal Biodiversity Centre Staff Village + SiteCaracal Biodiversity Centre Staff Village + Site
Caracal Biodiversity Centre Staff Village + SiteGrant Hepburn
 
African Crossroads Missions Residential Extension
African Crossroads Missions Residential ExtensionAfrican Crossroads Missions Residential Extension
African Crossroads Missions Residential ExtensionGrant Hepburn
 
Whitefriars Presentation 2 A1
Whitefriars Presentation 2 A1Whitefriars Presentation 2 A1
Whitefriars Presentation 2 A1Vincent Doherty
 

Ähnlich wie Chobe River College School Hall + Master Site Plan (20)

Red Reedbuck Bush Lodge
Red Reedbuck Bush LodgeRed Reedbuck Bush Lodge
Red Reedbuck Bush Lodge
 
Kalahari Safaris Operations Base
Kalahari Safaris Operations BaseKalahari Safaris Operations Base
Kalahari Safaris Operations Base
 
Blair House
Blair HouseBlair House
Blair House
 
Medialine Holdings Multi Family Residential
Medialine Holdings Multi Family ResidentialMedialine Holdings Multi Family Residential
Medialine Holdings Multi Family Residential
 
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction Drawing
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction DrawingBUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction Drawing
BUILDING TECHNOLOGY 2: Project 2- Working Drawing- Construction Drawing
 
Africa Avantu Lodge
Africa Avantu LodgeAfrica Avantu Lodge
Africa Avantu Lodge
 
PORTFOLIO - HAZEL GUNDRAN
PORTFOLIO - HAZEL GUNDRANPORTFOLIO - HAZEL GUNDRAN
PORTFOLIO - HAZEL GUNDRAN
 
Thebe River Safaris Room Addition 2014
Thebe River Safaris Room Addition 2014Thebe River Safaris Room Addition 2014
Thebe River Safaris Room Addition 2014
 
Build Something That Lasts
Build Something That LastsBuild Something That Lasts
Build Something That Lasts
 
MARA - Design Development Portfolio
MARA - Design Development PortfolioMARA - Design Development Portfolio
MARA - Design Development Portfolio
 
ERDENEBAT 374-3
ERDENEBAT 374-3ERDENEBAT 374-3
ERDENEBAT 374-3
 
Hampton hotels architecture
Hampton hotels architectureHampton hotels architecture
Hampton hotels architecture
 
Logic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson HouseLogic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson House
 
8 months work
8 months work8 months work
8 months work
 
Metso Neles T5 Series Top Entry Rotary Ball Valves
Metso Neles T5 Series Top Entry Rotary Ball ValvesMetso Neles T5 Series Top Entry Rotary Ball Valves
Metso Neles T5 Series Top Entry Rotary Ball Valves
 
Caracal Biodiversity Centre Staff Village + Site
Caracal Biodiversity Centre Staff Village + SiteCaracal Biodiversity Centre Staff Village + Site
Caracal Biodiversity Centre Staff Village + Site
 
African Crossroads Missions Residential Extension
African Crossroads Missions Residential ExtensionAfrican Crossroads Missions Residential Extension
African Crossroads Missions Residential Extension
 
Whitefriars Presentation 2 A1
Whitefriars Presentation 2 A1Whitefriars Presentation 2 A1
Whitefriars Presentation 2 A1
 
Ktrimbee A-4
Ktrimbee A-4Ktrimbee A-4
Ktrimbee A-4
 
Ktrimbee A-4
Ktrimbee A-4Ktrimbee A-4
Ktrimbee A-4
 

Chobe River College School Hall + Master Site Plan

  • 1. STAGE SEATING FOR >150 PEOPLE MENS WOMENS BACKSTAGERECEPTION HEADS OFFICE STORAGE STORAGE COUNSEL ROOM OFFICE CHANGE ROOM CHANGE ROOM TEA lock up cupboards door with security gate door with security gate sliding steel + wood door timber screen sliding steel + wood door ICIC IC IC IC FFL1 +0454 FFL2 +1049 FFL3 +1304 NGL 1 0000 SOF1 +3186 SOF2 +3684 +3964 +4400 MAX +5882 FFL1 +0454 FFL2 +1049 FFL3 +1304 SOF1 +3186 SOF2 +3684 NGL2 + 0851 NGL2 + 0851 + 4109 +5422 MAX +5882 NGL 1 0000 NGL 1 -0107 -0900 -0900-0786 50X75 STEEL ANGLE FRAME WITH SMOOTH PLANED TIMBER DECKING FOR STAGE FINISH 150 SMOOTH FLOATED RC FLOOR SLAB ON DPC ON 150 LAYERS OF COMPACTED FILL 0.5mm IBR CHROMADEK @ 15° ON ALUBUBBLE INSULATION FIXED TO 125x65x20x2 STEEL LIP CHANNEL FIXED WITH 2 x M12 BOLTS TO STEEL CLEATS WELDED @ EQUAL CENTERS NOT EXCEEDING 1800 TO 160 IPE AA TRUSSES @ 5000 CS CHROMADEK IBR ROOF SHEETING SCREWED TO 75x50 TIMBER PURLINS NAILED @ MAX 1200 CS TO 114x38 TIMBER TRUSSES @ 800CS ON 228x38 TIMBER BEAMS 100 Ø STEEL COLUMN 230 FACEBRICK WALL INTERNAL SURFACE OF STAGE WALLS TO BE PLASTEREDSECURE STEEL + TIMBER SHELVING SECURE STEEL + TIMBER SHELVING SUSPENDED GYPSUM CEILING FIXED TO U.SIDE OF TRUSSES WITH ALU./STEEL HANGERS + RAILS IPE 160 STEEL COLUMNS ON 800x800x900 RC FOOTING     115 INTERNAL WALL ON THICKENED SLAB CONC TOPPED FACEBRICK PIERS ENCLOSING STEEL COLUMN @ BASE STD STEEL DOOR FRAME FITTED WITH HARDWOOD DOOR AND STEEL SECURITY GATE CUSTOM STEEL AND TIMBER SLIDING DOOR FOR STAGE ACCESS 1 1 0 P V C W A S T E WATER LINE LINKING I N T O E X I S T I N G W A S T E W A T E R S Y S T E M 85 SMOOTH POLISHED RC FLOOR SLAB ON DPC ON 150 LAYERS OF COMPACTED FILL A A NC11F NE1 NE1 NE1 NE1NG4 NG7 NC11F NC1 NE1 NE1 NE1NG4 NG7 NC11FNC11F 85 RC WALKWAY WITH THICKENED EDGE 38 TIMBER GABLE CLOSER         COMPACTED SOILCRETE MIX TO MIN THICKNESS 400 800x800x500 CONCRETE PAD FOUNDATION GUSSET PLATE MOUNTED TO THREADBAR CAST IN CONCRETE IPE 180 AA COLUMN @ 5000 CS NGL   IPE 160 AA 8 x M18 BOLTS CHROMADEK IBR SHEETS ALUBUBBLE INSULATION 125x65x20x2 LIP CHANNEL PURLINS BOLTED TO STEEL CLEAT WELDED TO TRUSS @ EQUAL CS   6 9 0 X 2 3 0 C O N C R E T E S T R I P FOUNDATION REINFORCED WITH 4 Y12 BARS @ CENTRES TO SUIT W I T H R 10 S T I R R U PS @ 3 0 0 C E N T R E S 85 THICK 1:3:6 SMOOTH FLOATED CONCRETE SLAB O N 2 0 0 M I C R O N D P C 1 4 m p a C O N C R E T E B RI CK S TO GR OUN D LEVEL + FLOOR LEVEL A S S H O W N 7 mpa FACEBRICK USED EXTERNALLY 7 mpa PLASTERED CONCRETE BRICK USED INTERNALLY 100 WELL COMPACTED CALCRETE BASE LAYER   150 G5 COMPACTED TO 98% MOD AASHTO 150 G5 COMPACTED TO 95% MOD AASHTO 150 RIPPED + RECOMPACTED TO 93% MOD AASHTO 10 mpaCONC BRICK USED B E L O W N G L 85 THICK 1:3:6 SMOOTH FLOATED CONCRETE SLAB R E I N F O R C E D W I T H W E L D M E S H T O S U I T O N 2 0 0 M I C R O N D P C THICKENED TO 150 BELOW 115 NON LOAD BEARING WALL 150 G5 COMPACTED TO 98% MOD AASHTO 7 mpa PLASTERED CONCRETE BRICK USED INTERNALLY   150 G5 COMPACTED TO 95% MOD AASHTO 150 RIPPED + RECOMPACTED TO 93% MOD AASHTO DATE: PROJECT: DRAWING: SCALE: DRAWN BY:CLIENT: PLOT: SIGNED: APPROVAL SET 001 PLAN SECTION ELEVATIONS DETAILS 1:100 1:200 G HNOKA YA BOTSHELO SCHOOL CLIENT ADDRESS: APRIL 2015 2967, PLATEAU, KASANEP.O. BOX 30 KASANE NOKA YA BOTSHELO SCHOOL HALL INTERNAL LAYOUT SUBMITTED:REVISIONS PAGE #: NYB/MHI/02/01 A1L DRAWING NUMBER: /
  • 2. existing football field existing netball court existing swimming pool existing tennis court existing classroom block existing preschool complex existing admin block EXISTING ASSEMBLY HALL ROOF STRUCTURE TO FUTURE WUC CONNECTION MAIN GATE SERVICE +EXIT GATE existing office 15m ROAD TO KASANE CBD TO UPPER ROAD A33  9 staff parking 24 proposed parking 33 proposed parking existing parking area to be moved PROPOSED WASTE AREA WASTE AREA existing conservancy tanks future classroom future classroom future classroom future classroom future classroom future classroomfuture classroom future toilets future offices future library future staff house future staff house future staff house future staff house future lunch area class class ablutions loading loading loading open play area LOCATION PLAN 1:5000 DATE: PROJECT: DRAWING: SCALE: DRAWN BY:CLIENT: PLOT: SIGNED: APPROVAL SET 001 SITE PLAN LOCATION PLAN 1:500 1:5000 G HNOKA YA BOTSHELO SCHOOL CLIENT ADDRESS: APRIL 2015 2967, PLATEAU, KASANEP.O. BOX 30 KASANE NOKA YA BOTSHELO SCHOOL HALL INTERNAL LAYOUT SUBMITTED:REVISIONS PAGE #: NYB/MHI/01/01 A1L DRAWING NUMBER: / AREAS SITE AREA = 45011 sqm PROPOSED BUILDING AREA = 386.6 sqm EXISTING BUILDING AREA = 821 sqm TOTAL = 1207 sqm COVERAGE = 2.68 % PARKING 25 EXISTING 55 PROPOSED 80 TOTAL ( 3 DISABLED ) FAP FIRE ASSEMBLY POINT FIRE EXTINGUISHER PROPOSED FUTURE DEVELOPMENTS