1. GRANT GREEN – CV
OFFSHORE EMPLOYMENT- RIGGING
SUPERVISOR / DECK FOREMAN
Identity Number: 6901275020082
Passport number: 459060408 / Expiry Date-2016
M00049079 / Expiry Date-2021
CONTACT INFORMATION
Name: Grant Walter Green
Address: 363 Manning Road
Durban
Kwazulu Natal
South Africa
4001
Cell Phone: +27832659422
Email: grantwgreen@hotmail.com
PERSONAL INFORMATION
Date of Birth: 27 January 1969
Place of Birth: Port Shepstone, South Africa
Citizenship: South African
Visa Status: Nil
CERTIFICATION AQUIRED
OPITO BOSIET including HUET, Fire Fighting & First Aid, done at Falck Safety Services, Dubai ,UAE.
Escape System Training in accordance with OLF Guidelines, done at RGIT, Aberdeen.
UK Medical certificate, done at Workmed, Durban, South Africa
OPITO approved Banksman and Slinging Operations, done at Onsite Training Centre, Aberdeen.
OPITO approved Rigging and Lifting Operations, done at Onsite Training Centre, Aberdeen.
ConocoPhillips level 2 permit to work induction.
Working at Heights certificate done at AquaTerra, Aberdeen.
Personal Safety & Social Responsibilities with Personal Survival Techniques, done at Unicorn, Durban, South Africa.
Yellow Fever.
A SELF-MOTIVATED, ADAPTABLE AND HARD-WORKING INDIVIDUAL
With extensive experience in the Oil & Gas industry (offshore), who always strives to achieve a high standard of quality
workmanship in every task.
OFFSHORE VESSELS and PLATFORMS
Work included all types of rigging for deployment subsea, experience in use of chianblocks, lever hoists, turfors and all other
general rigging equipment. Also included use of small cranes and winches, as well as general maintenance, good house keeping
and communications.
RIGGING AND HEAVY LIFTING
Various types of heavy and intermediate lifts such as machinery, implements, engines, gearboxes and housings with the aid of
chain blocks, pulleys, slings, shackles and chains. Many heavy lifts of various offshore equipment, rigid and flexible spools.
2. EXPERIENCE:
POSITION: Deck Foreman
LOCATION: Angola, West Africa
INSTALATION: Girassol FPSO, Technip
DURATION: 04/2015 - Present
JOB DISCRIPTION: Demobbing of heavy lift winches and CPU’s. General rigging and lifting.
POSITION: Deck Foreman
LOCATION: Angola, West Africa
INSTALATION: Topaz Faye, Supply Vessel, Technip
DURATION: 12/2014 – 01/2015
JOB DISCRIPTION- Supply and Standby vessel to the Deep Pioneer with regards to Pipe Laying and Subsea construction.
POSITION: Assistant Deck Foreman
LOCATION: Nigeria, West Africa
INSTALATION: Normand Pacific, OCV, CEONA
DURATION: 09/2014 – 11/2014
JOB DISCRIPTION- Retrieval and redeployment of umbilicals and flow- lines using VLS and RDS system. Dismantling and
reconnecting of midline connections. ROV support.
POSITION: Deck Foreman
LOCATION: Equatorial Guinea, West Africa
INSTALATION: Bourbon Peridot, OCV, Amerada Hess.
DURATION: 06/2012 – 25/2/14
JOB DISCRIPTION: The deployment of Flexible and Ridged Jumpers, Xmas Trees, Mud Mats, Metrology Compats, Hydrate
Remediation Skids, Ridged Jumper Chop Saw, PEP Tool, Pipe Pulling Skid and various ROV support and Subsea Rigging.
POSITION: Rigging Supervisor
LOCATION: Congo and Gabon, West Africa
INSTALATION: Normand Installer, OCV and various Platforms, SBM.
DURATION: 01/2012 – 02/2012
JOB DISCRIPTION: High Voltage and Optic Fibre cable laying from Platform to Platform for power and communication
purposes. Process was done with the use of The Normand Installer OCV and ROV support.
POSITION: Rigging Supervisor
LOCATION: Congo, West Africa
INSTALATION: FDPSO, Azurite, Murphy
DURATION: 07/2011 – 09/2011
JOB DISCRIPTION: Deployment of MPP pump. ROV support. Removal of ROV equipment and control room by means of air
tuggers and skids to bring within range of crane for back loading. All general rigging and lifting procedures.
POSITION: Rigging Supervisor
LOCATION: Ghana, West Africa
INSTALATION: Skandi Aker, Construction Vessel, Technip.
DURATION: 10/2010 – 01/2011
JOB DISCRIPTION: Installation of Subsea Yolks, Tie-backs, ROV support, hose transfers to FPSO for H2S pressure testing
and Billy Pugh personnel transfers.
POSITION: Rigging Supervisor
LOCATION: Ghana, West Africa
INSTALATION: FPSO, Kwame Nkrumah, Technip
DURATION: 07/2010 – 10/2010
JOB DISCRIPTION: Installation of 9 Umbilical Risers and 2 Water Injection Risers on Turret System. Heavy lifts involved
with use of 980 ton Hydraulic Winch. Tools used – Hydraulic Flange Pullers, Air Hoists, Air Winches and various Air and
Hydraulic hand held tools. Flange bolt tensioning with use of Hydratight equipment. Lift Plans, Permit to Work Procedures and
Tool Box Talks were all conducted by myself for working parties involved and Engineers.
POSITION: Rigger
LOCATION: North Sea, United Kingdom
INSTALATION: Oil Rig, Buzzard, Nexen
DURATION: 03/2010 – 06/2010
JOB DISCRIPTION: Hook-Up of PS Platform. Valve change over’s, Spool replacements and all general Rigging and Lifting.
Materials Handler.
POSITION: Rigger
LOCATION: North Sea, United Kingdom
INSTALATION: Oil Rig, Beryl Alpha, ExxonMobil
DURATION: 11/2009 – 02/2010
JOB DISCRIPTION: Destruct and Construct of Derrick Support Beams, Walkways, Spools and Pipe support brackets.
Construction of Flare Stack Walkways, replacement of Spool Clamps and Support Beams.
POSITION: Rigger
3. LOCATION: North Sea, United Kingdom
INSTALATION: Gas Platform, Viking Bravo, ConocoPhillips
DURATION: 05/2009 – 09/2009
JOB DISCRIPTION: Riser Installation and Riser Protection Frame to Subsea. Banksman for Riser Installation. Destruct of
decommissioned Spools and Valves. Pre rigging of Riser Clamps for Divers. Lowering of Clamps to Divers with assistance of
Air Winch and transfer onto Dive Support Vessel crane for further lowering to Subsea. Reverse effect of lifting of old Clamps
from Subsea to Platform lay down area. Platform Shut Down, replacement of various Spools ranging from 20 inch to 60 inch.
Work Leader and Permit Holder on the above mentioned tasks.
POSITION: Rigger
LOCATION: North Sea, United Kingdom
INSTALATION: FPSO, Anasuria, Shell
DURATION: 04/2009- 05/2009
JOB DISCRIPTION: Heavy lifts consisting of diesel purification pumps, diesel engine fire pump overall (CAT 3412 engine)
and Air Compressor Motors.
POSITION: Rigger
LOCATION: North Sea, United Kingdom
INSTALATION: Gas Platform, Loggs, ConocoPhillips
DURATION: 02/2009 – 03/2009
JOB DISCRIPTION: Installation of Gas Riser to sea level. Replacement of gas meter valves.
POSITION: Rigger
LOCATION: North Sea, United Kingdom
INSTALATION: Oil Rig, Gannet Alpha, Shell
DURATION: 12/2008 – 01/2009
JOB DISCRIPTION: Destruct of deluge system. Use of air tools, impact wrench, sengar saws, spitznar saws and hammer drills.
Heavy lifts a very confined spaces.
POSITION: Rigger
LOCATION: North Sea, United Kingdom
INSTALATION: Oil Rig, Ninian Central, Canadian Natural Resources
DURATION: 10/2008 – 11/2008
JOB DISCRIPTION: Replacement of safety valves, general rigging and lifting. Placement of certain hot and cold equipment for
further tasks.
POSITION: Rigger
LOCATION: North Sea, United Kingdom
INSTALATION: Oil Rig, Gannet Alpha, Shell
DURATION: 08/2008 – 09/2008
JOB DISCRIPTION: Shut Down, replacement of release valves, constant springs, constant load
supports, spools (piping), pipe work supports and the destruct and construct of spools.