Logistical impact
of
Additive Manufacturing
on
after-sales service supply chains
A Quick scan at JLG Ground Support
Stijn Verputten, TU/e
Table of contents
1. JLG Industries
2. Ranking method
3. Promising parts
JLG Industries
• JLG is a $3 Billion global Company
• Part of $9 Billion Oshkosh Corporation
• Distributer of access equipment
• Work platforms
• Tele-handlers
• JLG Ground Support
• Aftermarket
• Operating all around the world
• Project done in Maasmechelen, Belgium
Benefits of Additive Manufacturing
Benefits1 for JLG Ground Support
• Simpler supply chain
• Shorter lead times  Lower inventories
• Small production batches
Company goal: Reduce inventory while maintaining a fill rate of 98%
Company goal in combination with AM benefits
• In our project we investigate how we can use AM to meet this goal
• We need to know which parts are eligible and what criteria they must meet
[1] Holmström, J., Partanen, J., Tuomi, J., & Walter, M. (2010). Rapid manufacturing in the spare parts supply chain: alternative approaches
to capacity deployment. Journal of Manufacturing Technology Management,21(6), 687-697.
Ranking method
• We follow Knofius’ framework as conducted at Fokker and
Royal Netherlands Army
• Ranking method made in 3 phases
Data Filtering
Spare Part
attributes
assortment
Data Scoring
Overall
Score
Phase 1 Phase 2 Phase 3 Result
Data Filtering
• Start with 74 882 parts
• Go/No-Go attributes
• Data unavailability
• 803 promising parts
ID Field Restriction Remaining parts
1 All parts JLG Ground
Support
74,882 parts
2 Superseded/obsolete =’(Blanks)’ 71,805 parts
3 Buy level =’buy level’ 17,064 parts
4 Sales 2007/2016
Yes/No
=’Yes’ 5,284 parts
5 Std price > 20€ 2,600 parts
6 Commodity code Min {irrelevant
keywords}
883 parts
7 Printable Material
type
Min {irrelevant
keywords}
868 parts
8 Total Size printable =1 853 parts
9 Printable Weight < 22 pounds 803 parts
Spare part attributes
• Determine spare part attributes
• Demand
• Lead time
• Cost
• Batch size/sales
• Inventory Turnover Rate(ITR)
Spare part attribute weight
19%
22%
19%
18%
22%
Demand Leadtime Batchsize
ITR Cost
• Analytical Hierarchy Process
• 5 Decision makers
• Pair-wise comparison
Data scoring
• All candidate parts receive a score from ‘0’ to ‘1’ for every
spare part attribute
• Normalize scores based on extreme values
• Linear scoring:
• Lead time
• Batch size/sale
• ITR
• Logarithmic scoring:
• cost
• Other scoring:
• Demand
Final results
Very promising parts:
• Parts with score >0.6
• 122 parts
0
50
100
150
200
250
0-0.1 0.1-0.2 0.2-0.3 0.3-0.4 0.4-0.5 0.5-0.6 0.6-0.7 0.7-0.8
1
34
88
177
220
161
89
33
Numberofparts
total scores
Total scores
Promising parts
• Manual check for the 50 best parts
• 4 parts are selected in collaboration with the
company.
• Based on: - Suitability to manufacture with AM
- Favorable for AM
- Kind of part
Stop, Lift cylinder
Specification:
• Material: Metal
• Size:
• Weight: 0,700 kg
• Lead time: 25 days
• Cost: € 30,63
• Demand: 2 a year
• Batch size/sales:12.50
• ITR: 0.08
0,190
0,0490,190
0,174
0,02
6
Total score:
0.629301
Score demand
score leadtime
score batchsize
score ITR
score Cost
Mount, Rear window latch
Specification:
• Material: A36 Steel
• Size: 52 mm
• Weight: 0,067 kg
• Lead time: 77 days
• Cost: € 34,04
• Demand: 1 a year
• Batch size/sales:1
• ITR: 0,14
Pin, Kingpin (1001130160)
Specification:
• Material: Metal (4150101).
• Size: 150 mm
• Weight: 0,400 kg
• Lead time: 59 days
• Cost: € 95,36
• Demand: 2 a year
• Batch size/sales:0,5
• ITR: 0,15
Valve, Heater water
Specification:
• Material: Metal
• Size: 106,0 mm
• Weight: 0,450 kg
• Lead time: 81 days
• Cost: € 106,41
• Demand: 0 a year
• Batch size/sales:1
• ITR: 0
Future steps
• Next steps with these parts are, with Westerweel’s model:
• Determine minimum Quality of the AM parts
• Determine maximum cost of the AM parts
• To determine definit Go/No-go for the selected parts
Conclusion
Questions?
Pin, Axle Pivot
Specification:
• Material: Metal (4150101)
• Size: 222,5 mm
• Lead time: 79 days
• Cost: € 21,72
• Demand: 2 a year
• Batch size/sales:5
• ITR: 1
Valve, Fly boom
Specification:
• Material:
• Size: 153,7 mm
• Lead time: 59 days
• Cost: € 150,60
• Demand: 0 a year
• Batch size/sales:5
• ITR: 0
Valve, Counterbalance
Specification:
• Material: Metal (4150421)
• Size: 134,8 mm
• Lead time: 111 days
• Cost: € 73,34
• Demand: 1 a year
• Batch size/sales:1
• ITR: 0,5

Weitere ähnliche Inhalte

Andere mochten auch

150616 Quickscan Thales (Antoine Katgert)
150616 Quickscan Thales (Antoine Katgert)150616 Quickscan Thales (Antoine Katgert)
150616 Quickscan Thales (Antoine Katgert)SINTAS
 
150616 Quickscan Royal Netherlands Army (Gino Balistreri)
150616 Quickscan Royal Netherlands Army (Gino Balistreri)150616 Quickscan Royal Netherlands Army (Gino Balistreri)
150616 Quickscan Royal Netherlands Army (Gino Balistreri)SINTAS
 
150616 Quickscan Fokker Services (Casper Sterkman)
150616 Quickscan Fokker Services (Casper Sterkman)150616 Quickscan Fokker Services (Casper Sterkman)
150616 Quickscan Fokker Services (Casper Sterkman)SINTAS
 
150616 Metal Additive Manufacturing on existing products (Paula Guedes Martin...
150616 Metal Additive Manufacturing on existing products (Paula Guedes Martin...150616 Metal Additive Manufacturing on existing products (Paula Guedes Martin...
150616 Metal Additive Manufacturing on existing products (Paula Guedes Martin...SINTAS
 
150616 Progress Update WP2 (Bram Westerweel)
150616 Progress Update WP2 (Bram Westerweel)150616 Progress Update WP2 (Bram Westerweel)
150616 Progress Update WP2 (Bram Westerweel)SINTAS
 
150616 Progress Update WP3 (Nils Knofius)
150616 Progress Update WP3 (Nils Knofius)150616 Progress Update WP3 (Nils Knofius)
150616 Progress Update WP3 (Nils Knofius)SINTAS
 
150616 Project Progress Update (Matthieu van der Heijden)
150616 Project Progress Update (Matthieu van der Heijden)150616 Project Progress Update (Matthieu van der Heijden)
150616 Project Progress Update (Matthieu van der Heijden)SINTAS
 
160615 Progress Update WP2 (Bram Westerweel)
160615 Progress Update WP2 (Bram Westerweel)160615 Progress Update WP2 (Bram Westerweel)
160615 Progress Update WP2 (Bram Westerweel)SINTAS
 
CSCMP 2014 3D Printing for the Rest of Us
CSCMP 2014 3D Printing for the Rest of UsCSCMP 2014 3D Printing for the Rest of Us
CSCMP 2014 3D Printing for the Rest of UsEdElsbury
 
Connected digital additive manufacturing competition briefing
Connected digital additive manufacturing competition briefingConnected digital additive manufacturing competition briefing
Connected digital additive manufacturing competition briefingInnovate UK
 
141118 Additive Manufacturing in the spare part supply chain (Bouke Wullms)
141118 Additive Manufacturing in the spare part supply chain (Bouke Wullms)141118 Additive Manufacturing in the spare part supply chain (Bouke Wullms)
141118 Additive Manufacturing in the spare part supply chain (Bouke Wullms)SINTAS
 
Aerospace Supply Chain & Raw Material Outlook
Aerospace Supply Chain & Raw Material OutlookAerospace Supply Chain & Raw Material Outlook
Aerospace Supply Chain & Raw Material OutlookICF
 
3-D Printing vs. The Supply Chain - 2016 edition, EN - TNO Robbert Janssen
3-D Printing vs. The Supply Chain - 2016 edition, EN - TNO Robbert Janssen3-D Printing vs. The Supply Chain - 2016 edition, EN - TNO Robbert Janssen
3-D Printing vs. The Supply Chain - 2016 edition, EN - TNO Robbert JanssenRobbert Janssen
 
Confident Group Project Althena
Confident Group Project AlthenaConfident Group Project Althena
Confident Group Project AlthenaConfident Group
 
3 D Printing / Additive Manufacturing
3 D Printing / Additive Manufacturing3 D Printing / Additive Manufacturing
3 D Printing / Additive ManufacturingRishabh Sardana
 
3D Printing - A 2014 Horizonwatching Trend Summary Report
3D Printing - A 2014 Horizonwatching Trend Summary Report3D Printing - A 2014 Horizonwatching Trend Summary Report
3D Printing - A 2014 Horizonwatching Trend Summary ReportBill Chamberlin
 

Andere mochten auch (18)

150616 Quickscan Thales (Antoine Katgert)
150616 Quickscan Thales (Antoine Katgert)150616 Quickscan Thales (Antoine Katgert)
150616 Quickscan Thales (Antoine Katgert)
 
150616 Quickscan Royal Netherlands Army (Gino Balistreri)
150616 Quickscan Royal Netherlands Army (Gino Balistreri)150616 Quickscan Royal Netherlands Army (Gino Balistreri)
150616 Quickscan Royal Netherlands Army (Gino Balistreri)
 
150616 Quickscan Fokker Services (Casper Sterkman)
150616 Quickscan Fokker Services (Casper Sterkman)150616 Quickscan Fokker Services (Casper Sterkman)
150616 Quickscan Fokker Services (Casper Sterkman)
 
150616 Metal Additive Manufacturing on existing products (Paula Guedes Martin...
150616 Metal Additive Manufacturing on existing products (Paula Guedes Martin...150616 Metal Additive Manufacturing on existing products (Paula Guedes Martin...
150616 Metal Additive Manufacturing on existing products (Paula Guedes Martin...
 
150616 Progress Update WP2 (Bram Westerweel)
150616 Progress Update WP2 (Bram Westerweel)150616 Progress Update WP2 (Bram Westerweel)
150616 Progress Update WP2 (Bram Westerweel)
 
150616 Progress Update WP3 (Nils Knofius)
150616 Progress Update WP3 (Nils Knofius)150616 Progress Update WP3 (Nils Knofius)
150616 Progress Update WP3 (Nils Knofius)
 
150616 Project Progress Update (Matthieu van der Heijden)
150616 Project Progress Update (Matthieu van der Heijden)150616 Project Progress Update (Matthieu van der Heijden)
150616 Project Progress Update (Matthieu van der Heijden)
 
160615 Progress Update WP2 (Bram Westerweel)
160615 Progress Update WP2 (Bram Westerweel)160615 Progress Update WP2 (Bram Westerweel)
160615 Progress Update WP2 (Bram Westerweel)
 
CSCMP 2014 3D Printing for the Rest of Us
CSCMP 2014 3D Printing for the Rest of UsCSCMP 2014 3D Printing for the Rest of Us
CSCMP 2014 3D Printing for the Rest of Us
 
ADDITIVE MANUFACTURING: ALSTOM REX
ADDITIVE MANUFACTURING: ALSTOM REXADDITIVE MANUFACTURING: ALSTOM REX
ADDITIVE MANUFACTURING: ALSTOM REX
 
Connected digital additive manufacturing competition briefing
Connected digital additive manufacturing competition briefingConnected digital additive manufacturing competition briefing
Connected digital additive manufacturing competition briefing
 
141118 Additive Manufacturing in the spare part supply chain (Bouke Wullms)
141118 Additive Manufacturing in the spare part supply chain (Bouke Wullms)141118 Additive Manufacturing in the spare part supply chain (Bouke Wullms)
141118 Additive Manufacturing in the spare part supply chain (Bouke Wullms)
 
Aerospace Supply Chain & Raw Material Outlook
Aerospace Supply Chain & Raw Material OutlookAerospace Supply Chain & Raw Material Outlook
Aerospace Supply Chain & Raw Material Outlook
 
3-D Printing vs. The Supply Chain - 2016 edition, EN - TNO Robbert Janssen
3-D Printing vs. The Supply Chain - 2016 edition, EN - TNO Robbert Janssen3-D Printing vs. The Supply Chain - 2016 edition, EN - TNO Robbert Janssen
3-D Printing vs. The Supply Chain - 2016 edition, EN - TNO Robbert Janssen
 
The future of 3D printing
The future of 3D printingThe future of 3D printing
The future of 3D printing
 
Confident Group Project Althena
Confident Group Project AlthenaConfident Group Project Althena
Confident Group Project Althena
 
3 D Printing / Additive Manufacturing
3 D Printing / Additive Manufacturing3 D Printing / Additive Manufacturing
3 D Printing / Additive Manufacturing
 
3D Printing - A 2014 Horizonwatching Trend Summary Report
3D Printing - A 2014 Horizonwatching Trend Summary Report3D Printing - A 2014 Horizonwatching Trend Summary Report
3D Printing - A 2014 Horizonwatching Trend Summary Report
 

Ähnlich wie 160615 Quickscan JLG (Stijn Verputten)

180926 UT-FS - Identifying Business Cases for 3D Printing in Service Logistics
180926 UT-FS - Identifying Business Cases for 3D Printing in Service Logistics180926 UT-FS - Identifying Business Cases for 3D Printing in Service Logistics
180926 UT-FS - Identifying Business Cases for 3D Printing in Service LogisticsSINTAS
 
YSX TECH Presentation
YSX TECH PresentationYSX TECH Presentation
YSX TECH PresentationJolin Huang
 
Giacomo Squintani, PTC presenation at Spare Parts 2013
Giacomo Squintani, PTC presenation at Spare Parts 2013Giacomo Squintani, PTC presenation at Spare Parts 2013
Giacomo Squintani, PTC presenation at Spare Parts 2013Copperberg
 
Company Presentation 2015
Company Presentation 2015Company Presentation 2015
Company Presentation 2015Mach Cao Xuan
 
Tasman 3DPrinters presentation - Avalon Airshow 2015
Tasman 3DPrinters presentation - Avalon Airshow 2015Tasman 3DPrinters presentation - Avalon Airshow 2015
Tasman 3DPrinters presentation - Avalon Airshow 2015Grange Products
 
Gearing up for Volume Manufacturing
Gearing up for Volume ManufacturingGearing up for Volume Manufacturing
Gearing up for Volume ManufacturingOmer Kilic
 
Term Project presentation Robotic Gripper design project - Copy.pptx
Term Project presentation Robotic Gripper design project - Copy.pptxTerm Project presentation Robotic Gripper design project - Copy.pptx
Term Project presentation Robotic Gripper design project - Copy.pptxravilearnsonline
 
Generating significant savings through China sourcing
Generating significant savings through China sourcingGenerating significant savings through China sourcing
Generating significant savings through China sourcingJohn William
 
Vendor Selection for Manufacturing Companies
Vendor Selection for Manufacturing Companies Vendor Selection for Manufacturing Companies
Vendor Selection for Manufacturing Companies Melody Ucros
 
COMIT Community Day Spring 2019 - Cement & Beyond
COMIT Community Day Spring 2019 - Cement & BeyondCOMIT Community Day Spring 2019 - Cement & Beyond
COMIT Community Day Spring 2019 - Cement & BeyondComit Projects Ltd
 
Ashok Iron Work Jai Hind Plant Internship Report, Belagavi
Ashok Iron Work Jai Hind Plant Internship Report, BelagaviAshok Iron Work Jai Hind Plant Internship Report, Belagavi
Ashok Iron Work Jai Hind Plant Internship Report, BelagaviAbhishek Turamandi
 
Sheet Metal Part Costing
Sheet Metal Part CostingSheet Metal Part Costing
Sheet Metal Part Costingsidhant68
 
Maximizing Profit of Steel Production by Integrated Optimisation Technology
Maximizing Profit of Steel Production by Integrated Optimisation TechnologyMaximizing Profit of Steel Production by Integrated Optimisation Technology
Maximizing Profit of Steel Production by Integrated Optimisation TechnologyN-SIDE
 
LESSON-7_Businesses-and-the-Costs-of-Production.pptx
LESSON-7_Businesses-and-the-Costs-of-Production.pptxLESSON-7_Businesses-and-the-Costs-of-Production.pptx
LESSON-7_Businesses-and-the-Costs-of-Production.pptxmarkmerino3
 
Corporate presentation 2014
Corporate presentation 2014Corporate presentation 2014
Corporate presentation 2014bmacforever
 
REFRIGERATOR INDUSTRY
REFRIGERATOR INDUSTRYREFRIGERATOR INDUSTRY
REFRIGERATOR INDUSTRYMitashi
 
Supply chain design and operation
Supply chain design and operationSupply chain design and operation
Supply chain design and operationAngelainBay
 
Paolo Gallibci, Electrolux presentation at Spare Parts 2013
Paolo Gallibci, Electrolux presentation at Spare Parts 2013Paolo Gallibci, Electrolux presentation at Spare Parts 2013
Paolo Gallibci, Electrolux presentation at Spare Parts 2013Copperberg
 

Ähnlich wie 160615 Quickscan JLG (Stijn Verputten) (20)

180926 UT-FS - Identifying Business Cases for 3D Printing in Service Logistics
180926 UT-FS - Identifying Business Cases for 3D Printing in Service Logistics180926 UT-FS - Identifying Business Cases for 3D Printing in Service Logistics
180926 UT-FS - Identifying Business Cases for 3D Printing in Service Logistics
 
YSX TECH Presentation
YSX TECH PresentationYSX TECH Presentation
YSX TECH Presentation
 
Giacomo Squintani, PTC presenation at Spare Parts 2013
Giacomo Squintani, PTC presenation at Spare Parts 2013Giacomo Squintani, PTC presenation at Spare Parts 2013
Giacomo Squintani, PTC presenation at Spare Parts 2013
 
Company Presentation 2015
Company Presentation 2015Company Presentation 2015
Company Presentation 2015
 
Tasman 3DPrinters presentation - Avalon Airshow 2015
Tasman 3DPrinters presentation - Avalon Airshow 2015Tasman 3DPrinters presentation - Avalon Airshow 2015
Tasman 3DPrinters presentation - Avalon Airshow 2015
 
Gearing up for Volume Manufacturing
Gearing up for Volume ManufacturingGearing up for Volume Manufacturing
Gearing up for Volume Manufacturing
 
Term Project presentation Robotic Gripper design project - Copy.pptx
Term Project presentation Robotic Gripper design project - Copy.pptxTerm Project presentation Robotic Gripper design project - Copy.pptx
Term Project presentation Robotic Gripper design project - Copy.pptx
 
How to Increase ROI with Returnables
How to Increase ROI with ReturnablesHow to Increase ROI with Returnables
How to Increase ROI with Returnables
 
Generating significant savings through China sourcing
Generating significant savings through China sourcingGenerating significant savings through China sourcing
Generating significant savings through China sourcing
 
Vendor Selection for Manufacturing Companies
Vendor Selection for Manufacturing Companies Vendor Selection for Manufacturing Companies
Vendor Selection for Manufacturing Companies
 
COMIT Community Day Spring 2019 - Cement & Beyond
COMIT Community Day Spring 2019 - Cement & BeyondCOMIT Community Day Spring 2019 - Cement & Beyond
COMIT Community Day Spring 2019 - Cement & Beyond
 
Ashok Iron Work Jai Hind Plant Internship Report, Belagavi
Ashok Iron Work Jai Hind Plant Internship Report, BelagaviAshok Iron Work Jai Hind Plant Internship Report, Belagavi
Ashok Iron Work Jai Hind Plant Internship Report, Belagavi
 
Sheet Metal Part Costing
Sheet Metal Part CostingSheet Metal Part Costing
Sheet Metal Part Costing
 
Maximizing Profit of Steel Production by Integrated Optimisation Technology
Maximizing Profit of Steel Production by Integrated Optimisation TechnologyMaximizing Profit of Steel Production by Integrated Optimisation Technology
Maximizing Profit of Steel Production by Integrated Optimisation Technology
 
LESSON-7_Businesses-and-the-Costs-of-Production.pptx
LESSON-7_Businesses-and-the-Costs-of-Production.pptxLESSON-7_Businesses-and-the-Costs-of-Production.pptx
LESSON-7_Businesses-and-the-Costs-of-Production.pptx
 
Corporate presentation 2014
Corporate presentation 2014Corporate presentation 2014
Corporate presentation 2014
 
REFRIGERATOR INDUSTRY
REFRIGERATOR INDUSTRYREFRIGERATOR INDUSTRY
REFRIGERATOR INDUSTRY
 
Supply chain design and operation
Supply chain design and operationSupply chain design and operation
Supply chain design and operation
 
Presentation
PresentationPresentation
Presentation
 
Paolo Gallibci, Electrolux presentation at Spare Parts 2013
Paolo Gallibci, Electrolux presentation at Spare Parts 2013Paolo Gallibci, Electrolux presentation at Spare Parts 2013
Paolo Gallibci, Electrolux presentation at Spare Parts 2013
 

Mehr von SINTAS

180926 Visagio - Supercharging Supply Chains with 3D Printing
180926 Visagio - Supercharging Supply Chains with 3D Printing180926 Visagio - Supercharging Supply Chains with 3D Printing
180926 Visagio - Supercharging Supply Chains with 3D PrintingSINTAS
 
180926 UT-NLR - Towards Technical Limitations and Opportunities of Metal-AM
180926 UT-NLR - Towards Technical Limitations and Opportunities of Metal-AM180926 UT-NLR - Towards Technical Limitations and Opportunities of Metal-AM
180926 UT-NLR - Towards Technical Limitations and Opportunities of Metal-AMSINTAS
 
180926 TUE-RNLA - Printing Spare Parts in Remote Locations
180926 TUE-RNLA - Printing Spare Parts in Remote Locations180926 TUE-RNLA - Printing Spare Parts in Remote Locations
180926 TUE-RNLA - Printing Spare Parts in Remote LocationsSINTAS
 
180926 UT - Introduction and discussion
180926 UT - Introduction and discussion180926 UT - Introduction and discussion
180926 UT - Introduction and discussionSINTAS
 
171130 Dimanex MSc project (Pieter Ruijssenaars-Elise Kok)
171130 Dimanex MSc project (Pieter Ruijssenaars-Elise Kok)171130 Dimanex MSc project (Pieter Ruijssenaars-Elise Kok)
171130 Dimanex MSc project (Pieter Ruijssenaars-Elise Kok)SINTAS
 
171130 Fokker MSc Project (Robin Rijnbeek-Olaf de Kruijff)
171130 Fokker MSc Project (Robin Rijnbeek-Olaf de Kruijff)171130 Fokker MSc Project (Robin Rijnbeek-Olaf de Kruijff)
171130 Fokker MSc Project (Robin Rijnbeek-Olaf de Kruijff)SINTAS
 
171130 MSc Project (Fabian Plura)
171130 MSc Project (Fabian Plura)171130 MSc Project (Fabian Plura)
171130 MSc Project (Fabian Plura)SINTAS
 
171130 Progress Update WP3 (Nils Knofius)
171130 Progress Update WP3 (Nils Knofius)171130 Progress Update WP3 (Nils Knofius)
171130 Progress Update WP3 (Nils Knofius)SINTAS
 
171130 Progress Update WP2 (Bram Westerweel)
171130 Progress Update WP2 (Bram Westerweel)171130 Progress Update WP2 (Bram Westerweel)
171130 Progress Update WP2 (Bram Westerweel)SINTAS
 
171130 Progress Update WP1 (Laura Cordova Gonzalez)
171130 Progress Update WP1 (Laura Cordova Gonzalez)171130 Progress Update WP1 (Laura Cordova Gonzalez)
171130 Progress Update WP1 (Laura Cordova Gonzalez)SINTAS
 
171130 Project Progress Update (Matthieu van der Heijden)
171130 Project Progress Update (Matthieu van der Heijden)171130 Project Progress Update (Matthieu van der Heijden)
171130 Project Progress Update (Matthieu van der Heijden)SINTAS
 
170614 BSc Projects Royal Netherlands Army (Tiedo Tinga)
170614 BSc Projects Royal Netherlands Army (Tiedo Tinga)170614 BSc Projects Royal Netherlands Army (Tiedo Tinga)
170614 BSc Projects Royal Netherlands Army (Tiedo Tinga)SINTAS
 
170614 MSc Project Thales (Michel Reimert)
170614 MSc Project Thales (Michel Reimert)170614 MSc Project Thales (Michel Reimert)
170614 MSc Project Thales (Michel Reimert)SINTAS
 
170614 Progress Update WP2 (Bram Westerweel)
170614 Progress Update WP2 (Bram Westerweel)170614 Progress Update WP2 (Bram Westerweel)
170614 Progress Update WP2 (Bram Westerweel)SINTAS
 
170614 Progress Update WP1 (Laura Cordova Gonzalez)
170614 Progress Update WP1 (Laura Cordova Gonzalez)170614 Progress Update WP1 (Laura Cordova Gonzalez)
170614 Progress Update WP1 (Laura Cordova Gonzalez)SINTAS
 
170614 Progress Update WP3 (Nils Knofius)
170614 Progress Update WP3 (Nils Knofius)170614 Progress Update WP3 (Nils Knofius)
170614 Progress Update WP3 (Nils Knofius)SINTAS
 
170614 Project Progress Update (Matthieu van der Heijden)
170614 Project Progress Update (Matthieu van der Heijden)170614 Project Progress Update (Matthieu van der Heijden)
170614 Project Progress Update (Matthieu van der Heijden)SINTAS
 
Quickscan Royal Netherlands Army (Gino Balisteri)
Quickscan Royal Netherlands Army (Gino Balisteri)Quickscan Royal Netherlands Army (Gino Balisteri)
Quickscan Royal Netherlands Army (Gino Balisteri)SINTAS
 
Quickscan Fokker Services (Casper Sterkman)
Quickscan Fokker Services (Casper Sterkman)Quickscan Fokker Services (Casper Sterkman)
Quickscan Fokker Services (Casper Sterkman)SINTAS
 
161130 Progress Update WP2 (Bram Westerweel)
161130 Progress Update WP2 (Bram Westerweel)161130 Progress Update WP2 (Bram Westerweel)
161130 Progress Update WP2 (Bram Westerweel)SINTAS
 

Mehr von SINTAS (20)

180926 Visagio - Supercharging Supply Chains with 3D Printing
180926 Visagio - Supercharging Supply Chains with 3D Printing180926 Visagio - Supercharging Supply Chains with 3D Printing
180926 Visagio - Supercharging Supply Chains with 3D Printing
 
180926 UT-NLR - Towards Technical Limitations and Opportunities of Metal-AM
180926 UT-NLR - Towards Technical Limitations and Opportunities of Metal-AM180926 UT-NLR - Towards Technical Limitations and Opportunities of Metal-AM
180926 UT-NLR - Towards Technical Limitations and Opportunities of Metal-AM
 
180926 TUE-RNLA - Printing Spare Parts in Remote Locations
180926 TUE-RNLA - Printing Spare Parts in Remote Locations180926 TUE-RNLA - Printing Spare Parts in Remote Locations
180926 TUE-RNLA - Printing Spare Parts in Remote Locations
 
180926 UT - Introduction and discussion
180926 UT - Introduction and discussion180926 UT - Introduction and discussion
180926 UT - Introduction and discussion
 
171130 Dimanex MSc project (Pieter Ruijssenaars-Elise Kok)
171130 Dimanex MSc project (Pieter Ruijssenaars-Elise Kok)171130 Dimanex MSc project (Pieter Ruijssenaars-Elise Kok)
171130 Dimanex MSc project (Pieter Ruijssenaars-Elise Kok)
 
171130 Fokker MSc Project (Robin Rijnbeek-Olaf de Kruijff)
171130 Fokker MSc Project (Robin Rijnbeek-Olaf de Kruijff)171130 Fokker MSc Project (Robin Rijnbeek-Olaf de Kruijff)
171130 Fokker MSc Project (Robin Rijnbeek-Olaf de Kruijff)
 
171130 MSc Project (Fabian Plura)
171130 MSc Project (Fabian Plura)171130 MSc Project (Fabian Plura)
171130 MSc Project (Fabian Plura)
 
171130 Progress Update WP3 (Nils Knofius)
171130 Progress Update WP3 (Nils Knofius)171130 Progress Update WP3 (Nils Knofius)
171130 Progress Update WP3 (Nils Knofius)
 
171130 Progress Update WP2 (Bram Westerweel)
171130 Progress Update WP2 (Bram Westerweel)171130 Progress Update WP2 (Bram Westerweel)
171130 Progress Update WP2 (Bram Westerweel)
 
171130 Progress Update WP1 (Laura Cordova Gonzalez)
171130 Progress Update WP1 (Laura Cordova Gonzalez)171130 Progress Update WP1 (Laura Cordova Gonzalez)
171130 Progress Update WP1 (Laura Cordova Gonzalez)
 
171130 Project Progress Update (Matthieu van der Heijden)
171130 Project Progress Update (Matthieu van der Heijden)171130 Project Progress Update (Matthieu van der Heijden)
171130 Project Progress Update (Matthieu van der Heijden)
 
170614 BSc Projects Royal Netherlands Army (Tiedo Tinga)
170614 BSc Projects Royal Netherlands Army (Tiedo Tinga)170614 BSc Projects Royal Netherlands Army (Tiedo Tinga)
170614 BSc Projects Royal Netherlands Army (Tiedo Tinga)
 
170614 MSc Project Thales (Michel Reimert)
170614 MSc Project Thales (Michel Reimert)170614 MSc Project Thales (Michel Reimert)
170614 MSc Project Thales (Michel Reimert)
 
170614 Progress Update WP2 (Bram Westerweel)
170614 Progress Update WP2 (Bram Westerweel)170614 Progress Update WP2 (Bram Westerweel)
170614 Progress Update WP2 (Bram Westerweel)
 
170614 Progress Update WP1 (Laura Cordova Gonzalez)
170614 Progress Update WP1 (Laura Cordova Gonzalez)170614 Progress Update WP1 (Laura Cordova Gonzalez)
170614 Progress Update WP1 (Laura Cordova Gonzalez)
 
170614 Progress Update WP3 (Nils Knofius)
170614 Progress Update WP3 (Nils Knofius)170614 Progress Update WP3 (Nils Knofius)
170614 Progress Update WP3 (Nils Knofius)
 
170614 Project Progress Update (Matthieu van der Heijden)
170614 Project Progress Update (Matthieu van der Heijden)170614 Project Progress Update (Matthieu van der Heijden)
170614 Project Progress Update (Matthieu van der Heijden)
 
Quickscan Royal Netherlands Army (Gino Balisteri)
Quickscan Royal Netherlands Army (Gino Balisteri)Quickscan Royal Netherlands Army (Gino Balisteri)
Quickscan Royal Netherlands Army (Gino Balisteri)
 
Quickscan Fokker Services (Casper Sterkman)
Quickscan Fokker Services (Casper Sterkman)Quickscan Fokker Services (Casper Sterkman)
Quickscan Fokker Services (Casper Sterkman)
 
161130 Progress Update WP2 (Bram Westerweel)
161130 Progress Update WP2 (Bram Westerweel)161130 Progress Update WP2 (Bram Westerweel)
161130 Progress Update WP2 (Bram Westerweel)
 

Kürzlich hochgeladen

Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusZilliz
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWERMadyBayot
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxRustici Software
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...apidays
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MIND CTI
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAndrey Devyatkin
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfOrbitshub
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyKhushali Kathiriya
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Orbitshub
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Jeffrey Haguewood
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...DianaGray10
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FMESafe Software
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingEdi Saputra
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdfSandro Moreira
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDropbox
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native ApplicationsWSO2
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024The Digital Insurer
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Victor Rentea
 

Kürzlich hochgeladen (20)

Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
DBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor PresentationDBX First Quarter 2024 Investor Presentation
DBX First Quarter 2024 Investor Presentation
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 

160615 Quickscan JLG (Stijn Verputten)

  • 1. Logistical impact of Additive Manufacturing on after-sales service supply chains A Quick scan at JLG Ground Support Stijn Verputten, TU/e
  • 2. Table of contents 1. JLG Industries 2. Ranking method 3. Promising parts
  • 3. JLG Industries • JLG is a $3 Billion global Company • Part of $9 Billion Oshkosh Corporation • Distributer of access equipment • Work platforms • Tele-handlers • JLG Ground Support • Aftermarket • Operating all around the world • Project done in Maasmechelen, Belgium
  • 4. Benefits of Additive Manufacturing Benefits1 for JLG Ground Support • Simpler supply chain • Shorter lead times  Lower inventories • Small production batches Company goal: Reduce inventory while maintaining a fill rate of 98% Company goal in combination with AM benefits • In our project we investigate how we can use AM to meet this goal • We need to know which parts are eligible and what criteria they must meet [1] Holmström, J., Partanen, J., Tuomi, J., & Walter, M. (2010). Rapid manufacturing in the spare parts supply chain: alternative approaches to capacity deployment. Journal of Manufacturing Technology Management,21(6), 687-697.
  • 5. Ranking method • We follow Knofius’ framework as conducted at Fokker and Royal Netherlands Army • Ranking method made in 3 phases Data Filtering Spare Part attributes assortment Data Scoring Overall Score Phase 1 Phase 2 Phase 3 Result
  • 6. Data Filtering • Start with 74 882 parts • Go/No-Go attributes • Data unavailability • 803 promising parts ID Field Restriction Remaining parts 1 All parts JLG Ground Support 74,882 parts 2 Superseded/obsolete =’(Blanks)’ 71,805 parts 3 Buy level =’buy level’ 17,064 parts 4 Sales 2007/2016 Yes/No =’Yes’ 5,284 parts 5 Std price > 20€ 2,600 parts 6 Commodity code Min {irrelevant keywords} 883 parts 7 Printable Material type Min {irrelevant keywords} 868 parts 8 Total Size printable =1 853 parts 9 Printable Weight < 22 pounds 803 parts
  • 7. Spare part attributes • Determine spare part attributes • Demand • Lead time • Cost • Batch size/sales • Inventory Turnover Rate(ITR)
  • 8. Spare part attribute weight 19% 22% 19% 18% 22% Demand Leadtime Batchsize ITR Cost • Analytical Hierarchy Process • 5 Decision makers • Pair-wise comparison
  • 9. Data scoring • All candidate parts receive a score from ‘0’ to ‘1’ for every spare part attribute • Normalize scores based on extreme values • Linear scoring: • Lead time • Batch size/sale • ITR • Logarithmic scoring: • cost • Other scoring: • Demand
  • 10. Final results Very promising parts: • Parts with score >0.6 • 122 parts 0 50 100 150 200 250 0-0.1 0.1-0.2 0.2-0.3 0.3-0.4 0.4-0.5 0.5-0.6 0.6-0.7 0.7-0.8 1 34 88 177 220 161 89 33 Numberofparts total scores Total scores
  • 11. Promising parts • Manual check for the 50 best parts • 4 parts are selected in collaboration with the company. • Based on: - Suitability to manufacture with AM - Favorable for AM - Kind of part
  • 12. Stop, Lift cylinder Specification: • Material: Metal • Size: • Weight: 0,700 kg • Lead time: 25 days • Cost: € 30,63 • Demand: 2 a year • Batch size/sales:12.50 • ITR: 0.08 0,190 0,0490,190 0,174 0,02 6 Total score: 0.629301 Score demand score leadtime score batchsize score ITR score Cost
  • 13. Mount, Rear window latch Specification: • Material: A36 Steel • Size: 52 mm • Weight: 0,067 kg • Lead time: 77 days • Cost: € 34,04 • Demand: 1 a year • Batch size/sales:1 • ITR: 0,14
  • 14. Pin, Kingpin (1001130160) Specification: • Material: Metal (4150101). • Size: 150 mm • Weight: 0,400 kg • Lead time: 59 days • Cost: € 95,36 • Demand: 2 a year • Batch size/sales:0,5 • ITR: 0,15
  • 15. Valve, Heater water Specification: • Material: Metal • Size: 106,0 mm • Weight: 0,450 kg • Lead time: 81 days • Cost: € 106,41 • Demand: 0 a year • Batch size/sales:1 • ITR: 0
  • 16. Future steps • Next steps with these parts are, with Westerweel’s model: • Determine minimum Quality of the AM parts • Determine maximum cost of the AM parts • To determine definit Go/No-go for the selected parts
  • 19. Pin, Axle Pivot Specification: • Material: Metal (4150101) • Size: 222,5 mm • Lead time: 79 days • Cost: € 21,72 • Demand: 2 a year • Batch size/sales:5 • ITR: 1
  • 20. Valve, Fly boom Specification: • Material: • Size: 153,7 mm • Lead time: 59 days • Cost: € 150,60 • Demand: 0 a year • Batch size/sales:5 • ITR: 0
  • 21. Valve, Counterbalance Specification: • Material: Metal (4150421) • Size: 134,8 mm • Lead time: 111 days • Cost: € 73,34 • Demand: 1 a year • Batch size/sales:1 • ITR: 0,5