Weld-impr-example_sect_1_5 1
LIFE TIME EXTENSION AND
INTEGRITY OF OFFSHORE STRUCTURES
5_WELD IMPROVEMENT METHODS
Why and How to grind
by use of a burr grinder?
• Crack growth due to fatigue loads – example
• Why do grinding improve the fatigue life?
• Corrosion and Crack growth
• Procedure for grinding
• Where to perform grinding by a burr grinder?
• Filings and protection
Weld Improvement Example in Offshore Oil & Gas
1
Weld-impr-example_sect_1_5 2
Class improvement *1.3,
Fatigue life *2.2
Ref- IIW, Commission XIII
Post Weld Treatment
Burr grinding TIG Dressing
Re-melting the material at the weld toe.
• Improved profile
• Remove weld toe flaws
• Plate thickness > 6mm
Class improvement *1.3,
Fatigue life *2.2
Weld-impr-example_sect_1_5 3
Hammer Peening
Compressive residual stress at the weld
toe.
• Improved profile
• Compress weld toe flaws
• Plate thickness > 4mm
Class improvement *1.3,
Fatigue life *2.2
Needle Peening
Compressive residual stress at the weld
toe.
• Improved profile
• Compress weld toe flaws
• Plate thickness > 4mm
Class improvement *1.3,
Fatigue life *2.2
Effect of grinding
• Remove smaller weld defects i.e. Longer crack initiation period
• Smother transitions i.e. reduce stress concentration that reduce the
crack growth rate.
• A deep groove will increase the stress concentration i.e. increased
crack growth rate
• Grinding increase the fatigue life with a factor of 2 to 6
• A ground grove of 1.5 – 2mm give capacity as a weld without
grinding.
Corrosion and fatigue crack growth
• Corrosion results in a shorter crack initiation period
• Corrosion results in an increased crack growth rate
• Corrosion reduce the fatigue life estimate with a factor of 2
-2,0
-1,0
0,0
1,0
2,0
3,0
4,0
5,0
20 220 420 620 820
AcceptableGrooveDepth
Initial Fatigue Life Estimate
Acceptable Groove Depth as function of initial
fatigue life estimate and condition at groove
No Shape
Haz
No gr.
Corrosion, No Shape
Haz
No gr.
Air, No Shape
Haz
No gr.
Air, Shape
Haz
Grind
Air, Shape
Haz
No gr.
Shape
Haz
No gr.
Area
code
Pos.
nr.
Clock
Pos.
No
Shape
Haz
No gr.
Shape
Haz
No gr.
Shape
Haz
Grind
PK3 3 0100 1,4 2,9 4,0
PK3 3 0200 0,7 1,9 2,8
PK3 3 0300 0,8 2,0 2,9
PK3 3 0400 0,5 1,6 2,4
PK3 3 0500 1,4 2,9 4,0
PK3 3 0600 3,0 6,8 8,0
PK3 3 0700 2,1 3,8 5,1
PK3 3 0800 1,2 2,6 3,6
PK3 3 0900 1,2 2,6 3,6
PK3 3 1000 1,5 3,0 4,2
PK3 3 1100 2,1 3,8 5,1
PK3 3 1200 3,0 5,8 7,5
Acceptable groove depth
Weld-impr-example_sect_1_5 4
Figure 1 A butt weld given damage due to corrosion. Weld material is grey, corrosion damage is red
and groove shape is yellow.
Case:
External corrosion resulted in a flaw
at the brace in a butt weld. The flaw
is ground by a burr grinder to an
elliptic shaped groove in the direction
of the stress. Wall thickness of the
brace is 32mm and has a diameter of
2.5m. Max groove depth will as far as
possible be located outside the weld
and HAZ area.
Weld-impr-example_sect_1_5 5
Ok, However
only grinding of
weld toe was
required. (Also
weld toe between
the string of
welding.)
Not as wanted as
grind disk and flap
disk has been
used. Needle
peening was
required.
Figur 7.5 Slipt spor etter fjerning av Samgong-anodeNormal quality, removal of anode.
FEM- model of weld detail of Ring stiffener
55 mm
20 mm
Grinding for weld improvement, has effect on
the Stress Intensity Magnification Factor, Mk
The Mk function estimated base on detailed analysis
da/dN = C⋅(Y·Mk · ∆σ·√πa )m
0,6
0,8
1,0
1,2
1,4
1,6
1,8
2,0
2,2
2,4
2,6
2,8
3,0
3,2
0,0 0,1 0,2 0,3 0,4 0,5
a/t
Mk
Membrane stress, rho = 1 mm
Membrane stress, rho = 10 mm
Bending stress, rho = 1 mm
Bending stress, rho = 10 mm
The Magnification Mk factor also for toe grinded welds Validation of the probabilistic fracture
mechanic model
• Deterministic validation. The FM model applied v.s. a
reference FM model.
• Probabilistic FM model v.s. probabilistic SN-model
• Sensitivity sign check
• Standard checks in structural reliability i.e.
- absolute sensitivity value check
- importance factor check
- simulation v.s. FORM/SORM
Weld-impr-example_sect_1_5 6
The Challenge of Quality - Workmanship
• Case Veslefrikk B
– Detailed engineering and analyses
– Detailed follow up activity at site
– The Integrity engineers at site
• Case Drilling Unit
– Detailed engineering and analyses
– Normal follow up activity at site
– No Integrity Engineer, Site and Inspection Engineers
Case Drilling Unit – North Sea,
Detailed FEM , FLS-analyses in 1999 and 2002:
• Reconstructed in year 2000
•Detailed As-Is and probabilistic fatigue assessment in 2004
•RS2009 included extended inspection scope, twice of normal
scope
•IS2011 NDT scope closely to 150% of normal renewal scope
Drilling Units – after RS2004
• The experience shows that the critical fatigue failure are mainly due to gross
errors in design, fabrication or inspection scheduling.
– The FLS analysis may be insufficient w.r.t. extent or quality
– gross error during design or fabrication
– knowledge not developed based on in-service observations i.e. validate the
prediction model (SRA-model)
– Re-analysis based on incomplete as-is description or re-assessment
process have not included knowledge from fabrication and maintenance
• Successful implementation of SRA for fatigue assessment fulfil the NORSOK
requirements:
To predict and to determine with a reasonable level of confidence the
existence, extent and consequences of deterioration, damages and defects of
the structural components
• We recommend to include an inspection program for verification of the
predictions of the SRA model in addition to the inspections scheduled by the
SRA model
Every inspection of a defined inspection point is given one row in
the spreadsheet. The spreadsheet is based on “positive” reporting.
i.e. both “finding” and “no-finding” are recorded.
Number of items (rows in spreadsheet): 1124 + 282
Number of findings: 204 + 83 (43 hot spot)
Number of cracks: 100 + 83 (43 hot spot)
Number of cracks not finally repaired: 47 (24 hot spot)
All 0-30%
prob fat
30-70%
prob fat
70-100%
prob fat
# of cracks: 83(43) 42(17) 31(18) 10(8)
# not finally
repaired:
47(24) 24(12) 20(10) 3(2)
Table 4.1 Number of cracks detected up to now in year 2009. The
numbers in brackets are number of different hot spot given detection
of crack.
Drilling Units – offshore RS2009
Year detected Potentially
fabrication
defect
Potentially propagating
cracks
Most likely
propagating cracks
Per cent belief of
crack to be
propagating
< 30%
Between
30-70% >70%
1980 4 6 3
1981 1 1
1982 2 1
1990 2 1
1994 1
1998 2 15 10
2003 2 1
2004 22 19 7
2009 42(17) 31(18) 10(8)
Total 72(47) 76(63) 35(33)
Classification of cracks. The number in brackets represents number of hot spot given
detection of crack and not the actual number of cracks.
Drilling Units – offshore RS2009
# of Hot Spots
within group
Range of Fatigue life in
years
Cumulative list
# of Hot Spots
0 1-5 0
2 5-10 2
13 10-15 15
21 15-20 36
36 20-30 72
25 30-40 97
38 40-60 135
62 60-100 197
91 100-300 288
121 300-∞ 409
Summary of the calculated fatigue life estimates.
* - high SCF included due to lack of information for hot spots that
potentially have low fatigue lives.
Drilling Units – offshore RS2009
Weld-impr-example_sect_1_5 7
Inspection scheduling – Principle
The theory predicts approximately 3-15 per cent of the scheduled
inspection to detect small fatigue cracks. The probability for detection of a
through thickness crack is less than 0.5 per cent. The answer is given by
the future inspections. Significant deviation between prediction and
observation motivate for a re-assessment.
•For RS2009, internally a total 200 NDT inspections done
•Findings are 10 or 42 fatigue cracks detected
•Percent detection of crack; 10/200 = 5%, 42/200 =
21%
•Inspection result indicate the fatigue crack potential to
be higher than assumed in the inspection scheduling.
•Inspection result indicate very poor welding quality, re-
welding and improvement will be proposed.
Present fatigue crack growth potential
According reporting in April 2009 the following cracks were identified as the most critical:
Item Description Fatigue life in
years
Used SCF
1 SC1-10-06, end of stiffener, ground out by burr
grinding to a depth of 15mm, wt=24mm
0,18, (52) 4,3 (*1,1)
2 SK3-5-0600 – weld repair given initial large root
failure, latest repair in June 2009 reports root
failure of 3-4mm.
0,21 (32,5) 3,7 (*1,1)
3 SK3-5-1200 – weld repair given initial large root
failure, latest repair in June 2009 reports root
failure of 3-4mm.
0,34 (52,2) 3,7 (*1,1)
4 SK3-5-0300- end of stiffener, ground out by burr
grinding to a depth of 9mm, wt=23mm
0,39 (39,9) 3,35 (*1,1)
Table 1 The critical item and fatigue life estimates for present condition. Fatigue life and
SCF in brackets represent the values without any crack or groove present.
Remaining fatigue capacity of brace after leakage
Use of BS7910 for flaw assessment
Procedure applied:
- Use of quality class
- Model of through thickness crack in a plate
- A half pipe model given the crack at the edge
The analyses done is not a detailed assessment including estimation of crack size given
final cracking. However, the analyses give an indication of time from leakage to loss of
brace. Based on the result in table 1 and 2 we select the SCF = 2.5 and SCF = 3.5 as
upper and lower boundary for a reasonable time estimate. The fatigue life estimate is
than between 0,26 and 1,07 year.
NB!! We have limited the assessment to one crack even if section SK3-5 has critical hot
spot at three clock positions.
Conclusions – 10.09.2009
• Ref. conclusion after RS2004
• Additions:
– The internal inspection for RS2004 was not managed by skilled
personnel – most likely the poor welding quality would have been
focused in 2004 if the inspection team of 2009 had been used
– Modification of cracked area and other high stress area , will require very
god weld and detailed design quality. Ongoing activity and proposal to be
delivered DNV the following weeks.
.
Case Drilling Unit, North Sea, Status March 2013
• Extended and frequent NDT inspection
• No findings compromise the safety against larges disaster
• Number of findings larger than acceptable level of 3-15 % finding and 0.5%
fatigue failure (TTC - Through Thickness Crack)
• 21% and 5% during offshore survey RS2009
• 10% and 1% totally for RS2009, (1633 NDT inspections )
• 2% and 1% for IS2011. ( 107 NDT inspections )
• Des.2012: Ca. 40 NDT for SC4 og PC4 => 50% og 22% byAS2012
• Mars2013: 153 NDT, 7 (14) find => 5% (9%) og 0% by AS2013
Weld-impr-example_sect_1_5 8
Compensating measures:
•Install stress gouges
•New structural analyses delivered from 2 independent vendors
•Inspection of critical area after storm periods
•Start of design for re-construction
Case Drilling Unit, North Sea, Status March 2013 Preliminary results from the stress gouge measurement after 1
winter season
• Measurements indicate 20% longer fatigue life estimate than the analyses
from vendor 1
• The fatigue load effect in the braces are high but within acceptable limits
• The fatigue load effect is locally within the column base tank too high.
Reconstruction is required.
Centre line
Clock
position
Mean
RatioS
95% Confidence,
Upper limit
RatioAWSG
95% Confidence,
Lower limit
RatioAWAA
0600 0,97 <0,95, 2,03> <0,72, 0,8>
0300 1,16 <1,04, 2,64> <0,71, 1,11>
0900 0,56 <0,65, 1,05> <0,43, 0,5>
1200 0,44 <0,34, 1,04> <0,24, 0,44>
SCF=1,53, Traditional design
R=2000mm,
SCF=1,08
SCF=1,2, behind the TIP,
Factor for fatigue life = 2,3
Weld improvement factor = 4
Total factor = 9.2
End of external doubling plate, (#72)
Fatigue crack observed after 5 year
Weld-impr-example_sect_1_5 9
Alternative Follow-Up Regime for Structure:
• Level 0 : Standard “DNV” Follow-Up Scheme - IIP
• Level 1 : Based on detailed in-service FLS analyses
• Level 2 : RBI analyses including inspection history
• Level 3 : Extended by As-Is description and improved
follow-up regime for inspection, repair, modifications and
weld improvement
Validation Studies – The Benefit of Refinements
• Studies for Philips Petroleum, bp, TFE, PSA-N and HSE-UK in the period 1995-1999,
• 3 published reports by HSE-UK and more than 10 papers
• Detailed assessment of more than 500 fatigue cracks
Main Conclusion
• Traditional follow-up regime – level 0 and level 1
– 20-40% of the detected cracks are in accordance with the initial fatigue analyses
– Crack growth does mainly occur at details given poor fabrication quality
– All units given comparable amount of inspections
• AIMS based approach – level 3 and partially level 2
– The calculations are based on As-Is description
– 70-80% of the fatigue crack growth are according the calculated crack growth
potential
– The scope of inspection varies from 30 to 200% of a traditional follow up scope
Competance at Site
Unit 1 – Level 3
• Extensive and detailed follow up regime at site by competent
personnel
• Upon 10 years operation
– 73 fatigue cracks of 1 at weld improved area i.e. hot spot given ultra high
fatigue loads
Unit 2 – Level 2
• Traditional site team for inspection, repair and modification
• Upon 5-years operation
– 180 fatigue cracks at 143 different locations
– All cracks at hot spot given high fatigue loads
– Main reason: Poor workmanship for weld improvement and local modification
Page 52
Integrity Management
vs.
Inspection Management
Inspection
Integrity Engineering and Inspection
working together on-site, on-shore and off-shore.
Integrity Eng.
Condition
Assessment –
The process of
What to be done
Perform
inspection –
The process of
How to do

Weitere ähnliche Inhalte

Was ist angesagt?

Rop services i
Rop services iRop services i
Rop services ilylegreen
 
Design and Analysis of Compressor Impeller using AL25ZN Material
Design and Analysis of Compressor Impeller using AL25ZN MaterialDesign and Analysis of Compressor Impeller using AL25ZN Material
Design and Analysis of Compressor Impeller using AL25ZN MaterialIRJET Journal
 
Failure Analysis, benefits, logistics and limitations
Failure Analysis, benefits, logistics and limitationsFailure Analysis, benefits, logistics and limitations
Failure Analysis, benefits, logistics and limitationsAccendo Reliability
 
Engineering & Piping design
Engineering & Piping designEngineering & Piping design
Engineering & Piping designMusa Sabri
 
SPEE3D Case Study: Royal Australian Navy
SPEE3D Case Study: Royal Australian NavySPEE3D Case Study: Royal Australian Navy
SPEE3D Case Study: Royal Australian NavyPaul Hollowaty
 
Moldex3D for Effective Design Validation, Optimization of Plastic Parts and M...
Moldex3D for Effective Design Validation, Optimization of Plastic Parts and M...Moldex3D for Effective Design Validation, Optimization of Plastic Parts and M...
Moldex3D for Effective Design Validation, Optimization of Plastic Parts and M...Altair
 
Tire Testing Applications & Solutions
Tire Testing Applications & SolutionsTire Testing Applications & Solutions
Tire Testing Applications & SolutionsInstron
 
Evaluating Static Analysis of the Damper Grommets for Compressor
Evaluating Static Analysis of the Damper Grommets for CompressorEvaluating Static Analysis of the Damper Grommets for Compressor
Evaluating Static Analysis of the Damper Grommets for CompressorIRJET Journal
 
Min ambient temp considerations
Min ambient temp considerationsMin ambient temp considerations
Min ambient temp considerationsRajendra Chakole
 
IRJET- Case Study of RCC Structure with the Help of Non Destructive Testing
IRJET-  	  Case Study of RCC Structure with the Help of Non Destructive TestingIRJET-  	  Case Study of RCC Structure with the Help of Non Destructive Testing
IRJET- Case Study of RCC Structure with the Help of Non Destructive TestingIRJET Journal
 
Continuous Casting : Get More from your caster
Continuous Casting :  Get More from your casterContinuous Casting :  Get More from your caster
Continuous Casting : Get More from your casterRakesh Niranjan
 
Painting procedure rev 0 (d 1157)
Painting procedure rev 0 (d 1157)Painting procedure rev 0 (d 1157)
Painting procedure rev 0 (d 1157)ghani386
 
Inspection manual for piping
Inspection manual for pipingInspection manual for piping
Inspection manual for pipingKhiem Vo Duy
 
Piping inspector questions 1
Piping inspector questions  1 Piping inspector questions  1
Piping inspector questions 1 MOHAMMAD ATIF ALI
 

Was ist angesagt? (18)

Rop services i
Rop services iRop services i
Rop services i
 
Design and Analysis of Compressor Impeller using AL25ZN Material
Design and Analysis of Compressor Impeller using AL25ZN MaterialDesign and Analysis of Compressor Impeller using AL25ZN Material
Design and Analysis of Compressor Impeller using AL25ZN Material
 
Sspc pa 2-2012
Sspc pa 2-2012Sspc pa 2-2012
Sspc pa 2-2012
 
Failure Analysis, benefits, logistics and limitations
Failure Analysis, benefits, logistics and limitationsFailure Analysis, benefits, logistics and limitations
Failure Analysis, benefits, logistics and limitations
 
Engineering & Piping design
Engineering & Piping designEngineering & Piping design
Engineering & Piping design
 
SPEE3D Case Study: Royal Australian Navy
SPEE3D Case Study: Royal Australian NavySPEE3D Case Study: Royal Australian Navy
SPEE3D Case Study: Royal Australian Navy
 
Moldex3D for Effective Design Validation, Optimization of Plastic Parts and M...
Moldex3D for Effective Design Validation, Optimization of Plastic Parts and M...Moldex3D for Effective Design Validation, Optimization of Plastic Parts and M...
Moldex3D for Effective Design Validation, Optimization of Plastic Parts and M...
 
Asme sec viii div 1 icb
Asme sec viii div 1 icbAsme sec viii div 1 icb
Asme sec viii div 1 icb
 
Tire Testing Applications & Solutions
Tire Testing Applications & SolutionsTire Testing Applications & Solutions
Tire Testing Applications & Solutions
 
Evaluating Static Analysis of the Damper Grommets for Compressor
Evaluating Static Analysis of the Damper Grommets for CompressorEvaluating Static Analysis of the Damper Grommets for Compressor
Evaluating Static Analysis of the Damper Grommets for Compressor
 
Min ambient temp considerations
Min ambient temp considerationsMin ambient temp considerations
Min ambient temp considerations
 
IRJET- Case Study of RCC Structure with the Help of Non Destructive Testing
IRJET-  	  Case Study of RCC Structure with the Help of Non Destructive TestingIRJET-  	  Case Study of RCC Structure with the Help of Non Destructive Testing
IRJET- Case Study of RCC Structure with the Help of Non Destructive Testing
 
Continuous Casting : Get More from your caster
Continuous Casting :  Get More from your casterContinuous Casting :  Get More from your caster
Continuous Casting : Get More from your caster
 
Painting procedure rev 0 (d 1157)
Painting procedure rev 0 (d 1157)Painting procedure rev 0 (d 1157)
Painting procedure rev 0 (d 1157)
 
Well test procedures manual
Well test procedures manualWell test procedures manual
Well test procedures manual
 
Api 570 01_api_570
Api 570 01_api_570Api 570 01_api_570
Api 570 01_api_570
 
Inspection manual for piping
Inspection manual for pipingInspection manual for piping
Inspection manual for piping
 
Piping inspector questions 1
Piping inspector questions  1 Piping inspector questions  1
Piping inspector questions 1
 

Andere mochten auch

Technical Challenges In Offshore Software Development
Technical Challenges In Offshore Software Development Technical Challenges In Offshore Software Development
Technical Challenges In Offshore Software Development Jonathan Bardin
 
Offshore development model in 10 steps sap yard
Offshore development model in 10 steps   sap yardOffshore development model in 10 steps   sap yard
Offshore development model in 10 steps sap yardSAPYard
 
Offshore Software Development company India
Offshore Software Development company IndiaOffshore Software Development company India
Offshore Software Development company Indiarahulkwebvirtue
 
Coating Solution Forum Presentation V6
Coating Solution Forum Presentation V6Coating Solution Forum Presentation V6
Coating Solution Forum Presentation V6FortGroup
 
Complete Guide to Remote Work and Remote Project Delivery
Complete Guide to Remote Work and Remote Project DeliveryComplete Guide to Remote Work and Remote Project Delivery
Complete Guide to Remote Work and Remote Project DeliveryTom Blondies
 
Aircraft Painting What You Should Know
Aircraft Painting   What You Should KnowAircraft Painting   What You Should Know
Aircraft Painting What You Should Knowaheffernan
 
Fundamentals of metallic corrosion
Fundamentals of metallic corrosionFundamentals of metallic corrosion
Fundamentals of metallic corrosionSergio Ríos
 
'Growing to a Next Level Test Organisation' by Tim Koomen
'Growing to a Next Level Test Organisation' by Tim Koomen'Growing to a Next Level Test Organisation' by Tim Koomen
'Growing to a Next Level Test Organisation' by Tim KoomenTEST Huddle
 
Oil & Gas technical training courses
Oil & Gas technical training coursesOil & Gas technical training courses
Oil & Gas technical training coursesDasline Sinta
 
1 Corrosion Control In Oil And Gas Industry
1  Corrosion Control In Oil And Gas Industry1  Corrosion Control In Oil And Gas Industry
1 Corrosion Control In Oil And Gas Industryemesap
 
On Site & Off Site It Business Models
On Site & Off Site It Business ModelsOn Site & Off Site It Business Models
On Site & Off Site It Business Modelsvcite9
 
Managing IT Projects - Onsite Offshore Coordination
Managing IT Projects - Onsite Offshore CoordinationManaging IT Projects - Onsite Offshore Coordination
Managing IT Projects - Onsite Offshore CoordinationMahesh Dedhia
 
Offshore Agile Challenges
Offshore Agile ChallengesOffshore Agile Challenges
Offshore Agile ChallengesNaresh Jain
 
Types of corrosions
Types of corrosionsTypes of corrosions
Types of corrosionsAmar Ilindra
 
Cross Cultural Management
Cross Cultural ManagementCross Cultural Management
Cross Cultural Managementguest34faa6
 
Agr Field Operations Pipeline Inspection
Agr Field Operations Pipeline InspectionAgr Field Operations Pipeline Inspection
Agr Field Operations Pipeline Inspectionjsthetford
 

Andere mochten auch (20)

Technical Challenges In Offshore Software Development
Technical Challenges In Offshore Software Development Technical Challenges In Offshore Software Development
Technical Challenges In Offshore Software Development
 
Offshore development model in 10 steps sap yard
Offshore development model in 10 steps   sap yardOffshore development model in 10 steps   sap yard
Offshore development model in 10 steps sap yard
 
Offshore Software Development company India
Offshore Software Development company IndiaOffshore Software Development company India
Offshore Software Development company India
 
Coating Solution Forum Presentation V6
Coating Solution Forum Presentation V6Coating Solution Forum Presentation V6
Coating Solution Forum Presentation V6
 
Complete Guide to Remote Work and Remote Project Delivery
Complete Guide to Remote Work and Remote Project DeliveryComplete Guide to Remote Work and Remote Project Delivery
Complete Guide to Remote Work and Remote Project Delivery
 
PAINTING SURFACES de Beaufort
PAINTING SURFACES de BeaufortPAINTING SURFACES de Beaufort
PAINTING SURFACES de Beaufort
 
Aircraft Painting What You Should Know
Aircraft Painting   What You Should KnowAircraft Painting   What You Should Know
Aircraft Painting What You Should Know
 
Marine Corrosion Protection
Marine Corrosion ProtectionMarine Corrosion Protection
Marine Corrosion Protection
 
Fundamentals of metallic corrosion
Fundamentals of metallic corrosionFundamentals of metallic corrosion
Fundamentals of metallic corrosion
 
'Growing to a Next Level Test Organisation' by Tim Koomen
'Growing to a Next Level Test Organisation' by Tim Koomen'Growing to a Next Level Test Organisation' by Tim Koomen
'Growing to a Next Level Test Organisation' by Tim Koomen
 
Oil & Gas technical training courses
Oil & Gas technical training coursesOil & Gas technical training courses
Oil & Gas technical training courses
 
1 Corrosion Control In Oil And Gas Industry
1  Corrosion Control In Oil And Gas Industry1  Corrosion Control In Oil And Gas Industry
1 Corrosion Control In Oil And Gas Industry
 
On Site & Off Site It Business Models
On Site & Off Site It Business ModelsOn Site & Off Site It Business Models
On Site & Off Site It Business Models
 
Managing IT Projects - Onsite Offshore Coordination
Managing IT Projects - Onsite Offshore CoordinationManaging IT Projects - Onsite Offshore Coordination
Managing IT Projects - Onsite Offshore Coordination
 
Offshore Agile Challenges
Offshore Agile ChallengesOffshore Agile Challenges
Offshore Agile Challenges
 
Types of corrosions
Types of corrosionsTypes of corrosions
Types of corrosions
 
Cross Cultural Management
Cross Cultural ManagementCross Cultural Management
Cross Cultural Management
 
Introducing DevOps
Introducing DevOpsIntroducing DevOps
Introducing DevOps
 
Agr Field Operations Pipeline Inspection
Agr Field Operations Pipeline InspectionAgr Field Operations Pipeline Inspection
Agr Field Operations Pipeline Inspection
 
Corrosion.ppt
Corrosion.pptCorrosion.ppt
Corrosion.ppt
 

Ähnlich wie Weld Improvement Example in Offshore Oil & Gas

IRJET - Mathematical Analysis of Angular Distortion on GTA Welded Hot Rolled ...
IRJET - Mathematical Analysis of Angular Distortion on GTA Welded Hot Rolled ...IRJET - Mathematical Analysis of Angular Distortion on GTA Welded Hot Rolled ...
IRJET - Mathematical Analysis of Angular Distortion on GTA Welded Hot Rolled ...IRJET Journal
 
Asmesectionix
Asmesectionix Asmesectionix
Asmesectionix Nuri Cesur
 
ASME Section VIII Div 1. design training
ASME Section VIII Div 1.  design trainingASME Section VIII Div 1.  design training
ASME Section VIII Div 1. design trainingSam Jose
 
THE EFFECT OF OPENINGS IN THE SLAB STIFFENED WITH SHALLOW BEAMS
THE EFFECT OF OPENINGS IN THE SLAB STIFFENED WITH SHALLOW BEAMSTHE EFFECT OF OPENINGS IN THE SLAB STIFFENED WITH SHALLOW BEAMS
THE EFFECT OF OPENINGS IN THE SLAB STIFFENED WITH SHALLOW BEAMSIRJET Journal
 
IRJET- Optimal Riser Design for Sand Casting of Drop Ball using Constraint Op...
IRJET- Optimal Riser Design for Sand Casting of Drop Ball using Constraint Op...IRJET- Optimal Riser Design for Sand Casting of Drop Ball using Constraint Op...
IRJET- Optimal Riser Design for Sand Casting of Drop Ball using Constraint Op...IRJET Journal
 
Experimental Investigation of Reinforced Concrete Beam with Opening for Combi...
Experimental Investigation of Reinforced Concrete Beam with Opening for Combi...Experimental Investigation of Reinforced Concrete Beam with Opening for Combi...
Experimental Investigation of Reinforced Concrete Beam with Opening for Combi...IRJET Journal
 
Spot welding lobe curve simulation
Spot welding lobe curve simulationSpot welding lobe curve simulation
Spot welding lobe curve simulationRashidi Asari
 
Evaluating Pipeline Operational Integrity - Sand Production
Evaluating Pipeline Operational Integrity - Sand ProductionEvaluating Pipeline Operational Integrity - Sand Production
Evaluating Pipeline Operational Integrity - Sand ProductionVijay Sarathy
 
IRJET- Geotechnical Investigation of Different Soil Samples using Regression ...
IRJET- Geotechnical Investigation of Different Soil Samples using Regression ...IRJET- Geotechnical Investigation of Different Soil Samples using Regression ...
IRJET- Geotechnical Investigation of Different Soil Samples using Regression ...IRJET Journal
 
IRJET- Parametric Optimisation of Submerged ARC Welding Process by using Resp...
IRJET- Parametric Optimisation of Submerged ARC Welding Process by using Resp...IRJET- Parametric Optimisation of Submerged ARC Welding Process by using Resp...
IRJET- Parametric Optimisation of Submerged ARC Welding Process by using Resp...IRJET Journal
 
Cswip welding-inspection-notes-and-questions-1
Cswip welding-inspection-notes-and-questions-1Cswip welding-inspection-notes-and-questions-1
Cswip welding-inspection-notes-and-questions-1dhiaa ebadi
 
Cswip welding inspection notes and questions
Cswip welding inspection notes and questionsCswip welding inspection notes and questions
Cswip welding inspection notes and questionsKarthik Banari
 
Twi cswip welding inspection notes and questions
Twi cswip welding inspection notes and questionsTwi cswip welding inspection notes and questions
Twi cswip welding inspection notes and questionsThang Do Minh
 
Gabriel India Limited_ProjectPresentation
Gabriel India Limited_ProjectPresentationGabriel India Limited_ProjectPresentation
Gabriel India Limited_ProjectPresentationAmeya Margaj
 
SSPC-2: Surface Prep Guide through webinar.pdf
SSPC-2: Surface Prep Guide through webinar.pdfSSPC-2: Surface Prep Guide through webinar.pdf
SSPC-2: Surface Prep Guide through webinar.pdfdkaranths
 
Twi welding training_6
Twi welding training_6Twi welding training_6
Twi welding training_6Alif Elhasani
 
IRJET- Prediction of Angular Distortion in GTA Welded Stainless Steel 304 Pla...
IRJET- Prediction of Angular Distortion in GTA Welded Stainless Steel 304 Pla...IRJET- Prediction of Angular Distortion in GTA Welded Stainless Steel 304 Pla...
IRJET- Prediction of Angular Distortion in GTA Welded Stainless Steel 304 Pla...IRJET Journal
 
Study of effect of process parameter setting on porosity levels of aluminium ...
Study of effect of process parameter setting on porosity levels of aluminium ...Study of effect of process parameter setting on porosity levels of aluminium ...
Study of effect of process parameter setting on porosity levels of aluminium ...IOSR Journals
 

Ähnlich wie Weld Improvement Example in Offshore Oil & Gas (20)

IRJET - Mathematical Analysis of Angular Distortion on GTA Welded Hot Rolled ...
IRJET - Mathematical Analysis of Angular Distortion on GTA Welded Hot Rolled ...IRJET - Mathematical Analysis of Angular Distortion on GTA Welded Hot Rolled ...
IRJET - Mathematical Analysis of Angular Distortion on GTA Welded Hot Rolled ...
 
Asmesectionix
Asmesectionix Asmesectionix
Asmesectionix
 
ASME Section VIII Div 1. design training
ASME Section VIII Div 1.  design trainingASME Section VIII Div 1.  design training
ASME Section VIII Div 1. design training
 
THE EFFECT OF OPENINGS IN THE SLAB STIFFENED WITH SHALLOW BEAMS
THE EFFECT OF OPENINGS IN THE SLAB STIFFENED WITH SHALLOW BEAMSTHE EFFECT OF OPENINGS IN THE SLAB STIFFENED WITH SHALLOW BEAMS
THE EFFECT OF OPENINGS IN THE SLAB STIFFENED WITH SHALLOW BEAMS
 
IRJET- Optimal Riser Design for Sand Casting of Drop Ball using Constraint Op...
IRJET- Optimal Riser Design for Sand Casting of Drop Ball using Constraint Op...IRJET- Optimal Riser Design for Sand Casting of Drop Ball using Constraint Op...
IRJET- Optimal Riser Design for Sand Casting of Drop Ball using Constraint Op...
 
Experimental Investigation of Reinforced Concrete Beam with Opening for Combi...
Experimental Investigation of Reinforced Concrete Beam with Opening for Combi...Experimental Investigation of Reinforced Concrete Beam with Opening for Combi...
Experimental Investigation of Reinforced Concrete Beam with Opening for Combi...
 
Spot welding lobe curve simulation
Spot welding lobe curve simulationSpot welding lobe curve simulation
Spot welding lobe curve simulation
 
Evaluating Pipeline Operational Integrity - Sand Production
Evaluating Pipeline Operational Integrity - Sand ProductionEvaluating Pipeline Operational Integrity - Sand Production
Evaluating Pipeline Operational Integrity - Sand Production
 
IRJET- Geotechnical Investigation of Different Soil Samples using Regression ...
IRJET- Geotechnical Investigation of Different Soil Samples using Regression ...IRJET- Geotechnical Investigation of Different Soil Samples using Regression ...
IRJET- Geotechnical Investigation of Different Soil Samples using Regression ...
 
Mill &amp; Kiln Gear Asset Management
Mill &amp; Kiln Gear Asset ManagementMill &amp; Kiln Gear Asset Management
Mill &amp; Kiln Gear Asset Management
 
IRJET- Parametric Optimisation of Submerged ARC Welding Process by using Resp...
IRJET- Parametric Optimisation of Submerged ARC Welding Process by using Resp...IRJET- Parametric Optimisation of Submerged ARC Welding Process by using Resp...
IRJET- Parametric Optimisation of Submerged ARC Welding Process by using Resp...
 
Cswip welding-inspection-notes-and-questions-1
Cswip welding-inspection-notes-and-questions-1Cswip welding-inspection-notes-and-questions-1
Cswip welding-inspection-notes-and-questions-1
 
Cswip welding inspection notes and questions
Cswip welding inspection notes and questionsCswip welding inspection notes and questions
Cswip welding inspection notes and questions
 
Twi cswip welding inspection notes and questions
Twi cswip welding inspection notes and questionsTwi cswip welding inspection notes and questions
Twi cswip welding inspection notes and questions
 
Gabriel India Limited_ProjectPresentation
Gabriel India Limited_ProjectPresentationGabriel India Limited_ProjectPresentation
Gabriel India Limited_ProjectPresentation
 
SSPC-2: Surface Prep Guide through webinar.pdf
SSPC-2: Surface Prep Guide through webinar.pdfSSPC-2: Surface Prep Guide through webinar.pdf
SSPC-2: Surface Prep Guide through webinar.pdf
 
PMS FY 22-23.pptx
PMS FY 22-23.pptxPMS FY 22-23.pptx
PMS FY 22-23.pptx
 
Twi welding training_6
Twi welding training_6Twi welding training_6
Twi welding training_6
 
IRJET- Prediction of Angular Distortion in GTA Welded Stainless Steel 304 Pla...
IRJET- Prediction of Angular Distortion in GTA Welded Stainless Steel 304 Pla...IRJET- Prediction of Angular Distortion in GTA Welded Stainless Steel 304 Pla...
IRJET- Prediction of Angular Distortion in GTA Welded Stainless Steel 304 Pla...
 
Study of effect of process parameter setting on porosity levels of aluminium ...
Study of effect of process parameter setting on porosity levels of aluminium ...Study of effect of process parameter setting on porosity levels of aluminium ...
Study of effect of process parameter setting on porosity levels of aluminium ...
 

Kürzlich hochgeladen

DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationBhangaleSonal
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...soginsider
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf203318pmpc
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086anil_gaur
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 

Kürzlich hochgeladen (20)

DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 

Weld Improvement Example in Offshore Oil & Gas

  • 1. Weld-impr-example_sect_1_5 1 LIFE TIME EXTENSION AND INTEGRITY OF OFFSHORE STRUCTURES 5_WELD IMPROVEMENT METHODS Why and How to grind by use of a burr grinder? • Crack growth due to fatigue loads – example • Why do grinding improve the fatigue life? • Corrosion and Crack growth • Procedure for grinding • Where to perform grinding by a burr grinder? • Filings and protection Weld Improvement Example in Offshore Oil & Gas
  • 2. 1 Weld-impr-example_sect_1_5 2 Class improvement *1.3, Fatigue life *2.2 Ref- IIW, Commission XIII Post Weld Treatment Burr grinding TIG Dressing Re-melting the material at the weld toe. • Improved profile • Remove weld toe flaws • Plate thickness > 6mm Class improvement *1.3, Fatigue life *2.2
  • 3. Weld-impr-example_sect_1_5 3 Hammer Peening Compressive residual stress at the weld toe. • Improved profile • Compress weld toe flaws • Plate thickness > 4mm Class improvement *1.3, Fatigue life *2.2 Needle Peening Compressive residual stress at the weld toe. • Improved profile • Compress weld toe flaws • Plate thickness > 4mm Class improvement *1.3, Fatigue life *2.2 Effect of grinding • Remove smaller weld defects i.e. Longer crack initiation period • Smother transitions i.e. reduce stress concentration that reduce the crack growth rate. • A deep groove will increase the stress concentration i.e. increased crack growth rate • Grinding increase the fatigue life with a factor of 2 to 6 • A ground grove of 1.5 – 2mm give capacity as a weld without grinding. Corrosion and fatigue crack growth • Corrosion results in a shorter crack initiation period • Corrosion results in an increased crack growth rate • Corrosion reduce the fatigue life estimate with a factor of 2 -2,0 -1,0 0,0 1,0 2,0 3,0 4,0 5,0 20 220 420 620 820 AcceptableGrooveDepth Initial Fatigue Life Estimate Acceptable Groove Depth as function of initial fatigue life estimate and condition at groove No Shape Haz No gr. Corrosion, No Shape Haz No gr. Air, No Shape Haz No gr. Air, Shape Haz Grind Air, Shape Haz No gr. Shape Haz No gr. Area code Pos. nr. Clock Pos. No Shape Haz No gr. Shape Haz No gr. Shape Haz Grind PK3 3 0100 1,4 2,9 4,0 PK3 3 0200 0,7 1,9 2,8 PK3 3 0300 0,8 2,0 2,9 PK3 3 0400 0,5 1,6 2,4 PK3 3 0500 1,4 2,9 4,0 PK3 3 0600 3,0 6,8 8,0 PK3 3 0700 2,1 3,8 5,1 PK3 3 0800 1,2 2,6 3,6 PK3 3 0900 1,2 2,6 3,6 PK3 3 1000 1,5 3,0 4,2 PK3 3 1100 2,1 3,8 5,1 PK3 3 1200 3,0 5,8 7,5 Acceptable groove depth
  • 4. Weld-impr-example_sect_1_5 4 Figure 1 A butt weld given damage due to corrosion. Weld material is grey, corrosion damage is red and groove shape is yellow. Case: External corrosion resulted in a flaw at the brace in a butt weld. The flaw is ground by a burr grinder to an elliptic shaped groove in the direction of the stress. Wall thickness of the brace is 32mm and has a diameter of 2.5m. Max groove depth will as far as possible be located outside the weld and HAZ area.
  • 5. Weld-impr-example_sect_1_5 5 Ok, However only grinding of weld toe was required. (Also weld toe between the string of welding.) Not as wanted as grind disk and flap disk has been used. Needle peening was required. Figur 7.5 Slipt spor etter fjerning av Samgong-anodeNormal quality, removal of anode. FEM- model of weld detail of Ring stiffener 55 mm 20 mm Grinding for weld improvement, has effect on the Stress Intensity Magnification Factor, Mk The Mk function estimated base on detailed analysis da/dN = C⋅(Y·Mk · ∆σ·√πa )m 0,6 0,8 1,0 1,2 1,4 1,6 1,8 2,0 2,2 2,4 2,6 2,8 3,0 3,2 0,0 0,1 0,2 0,3 0,4 0,5 a/t Mk Membrane stress, rho = 1 mm Membrane stress, rho = 10 mm Bending stress, rho = 1 mm Bending stress, rho = 10 mm The Magnification Mk factor also for toe grinded welds Validation of the probabilistic fracture mechanic model • Deterministic validation. The FM model applied v.s. a reference FM model. • Probabilistic FM model v.s. probabilistic SN-model • Sensitivity sign check • Standard checks in structural reliability i.e. - absolute sensitivity value check - importance factor check - simulation v.s. FORM/SORM
  • 6. Weld-impr-example_sect_1_5 6 The Challenge of Quality - Workmanship • Case Veslefrikk B – Detailed engineering and analyses – Detailed follow up activity at site – The Integrity engineers at site • Case Drilling Unit – Detailed engineering and analyses – Normal follow up activity at site – No Integrity Engineer, Site and Inspection Engineers Case Drilling Unit – North Sea, Detailed FEM , FLS-analyses in 1999 and 2002: • Reconstructed in year 2000 •Detailed As-Is and probabilistic fatigue assessment in 2004 •RS2009 included extended inspection scope, twice of normal scope •IS2011 NDT scope closely to 150% of normal renewal scope Drilling Units – after RS2004 • The experience shows that the critical fatigue failure are mainly due to gross errors in design, fabrication or inspection scheduling. – The FLS analysis may be insufficient w.r.t. extent or quality – gross error during design or fabrication – knowledge not developed based on in-service observations i.e. validate the prediction model (SRA-model) – Re-analysis based on incomplete as-is description or re-assessment process have not included knowledge from fabrication and maintenance • Successful implementation of SRA for fatigue assessment fulfil the NORSOK requirements: To predict and to determine with a reasonable level of confidence the existence, extent and consequences of deterioration, damages and defects of the structural components • We recommend to include an inspection program for verification of the predictions of the SRA model in addition to the inspections scheduled by the SRA model Every inspection of a defined inspection point is given one row in the spreadsheet. The spreadsheet is based on “positive” reporting. i.e. both “finding” and “no-finding” are recorded. Number of items (rows in spreadsheet): 1124 + 282 Number of findings: 204 + 83 (43 hot spot) Number of cracks: 100 + 83 (43 hot spot) Number of cracks not finally repaired: 47 (24 hot spot) All 0-30% prob fat 30-70% prob fat 70-100% prob fat # of cracks: 83(43) 42(17) 31(18) 10(8) # not finally repaired: 47(24) 24(12) 20(10) 3(2) Table 4.1 Number of cracks detected up to now in year 2009. The numbers in brackets are number of different hot spot given detection of crack. Drilling Units – offshore RS2009 Year detected Potentially fabrication defect Potentially propagating cracks Most likely propagating cracks Per cent belief of crack to be propagating < 30% Between 30-70% >70% 1980 4 6 3 1981 1 1 1982 2 1 1990 2 1 1994 1 1998 2 15 10 2003 2 1 2004 22 19 7 2009 42(17) 31(18) 10(8) Total 72(47) 76(63) 35(33) Classification of cracks. The number in brackets represents number of hot spot given detection of crack and not the actual number of cracks. Drilling Units – offshore RS2009 # of Hot Spots within group Range of Fatigue life in years Cumulative list # of Hot Spots 0 1-5 0 2 5-10 2 13 10-15 15 21 15-20 36 36 20-30 72 25 30-40 97 38 40-60 135 62 60-100 197 91 100-300 288 121 300-∞ 409 Summary of the calculated fatigue life estimates. * - high SCF included due to lack of information for hot spots that potentially have low fatigue lives. Drilling Units – offshore RS2009
  • 7. Weld-impr-example_sect_1_5 7 Inspection scheduling – Principle The theory predicts approximately 3-15 per cent of the scheduled inspection to detect small fatigue cracks. The probability for detection of a through thickness crack is less than 0.5 per cent. The answer is given by the future inspections. Significant deviation between prediction and observation motivate for a re-assessment. •For RS2009, internally a total 200 NDT inspections done •Findings are 10 or 42 fatigue cracks detected •Percent detection of crack; 10/200 = 5%, 42/200 = 21% •Inspection result indicate the fatigue crack potential to be higher than assumed in the inspection scheduling. •Inspection result indicate very poor welding quality, re- welding and improvement will be proposed. Present fatigue crack growth potential According reporting in April 2009 the following cracks were identified as the most critical: Item Description Fatigue life in years Used SCF 1 SC1-10-06, end of stiffener, ground out by burr grinding to a depth of 15mm, wt=24mm 0,18, (52) 4,3 (*1,1) 2 SK3-5-0600 – weld repair given initial large root failure, latest repair in June 2009 reports root failure of 3-4mm. 0,21 (32,5) 3,7 (*1,1) 3 SK3-5-1200 – weld repair given initial large root failure, latest repair in June 2009 reports root failure of 3-4mm. 0,34 (52,2) 3,7 (*1,1) 4 SK3-5-0300- end of stiffener, ground out by burr grinding to a depth of 9mm, wt=23mm 0,39 (39,9) 3,35 (*1,1) Table 1 The critical item and fatigue life estimates for present condition. Fatigue life and SCF in brackets represent the values without any crack or groove present. Remaining fatigue capacity of brace after leakage Use of BS7910 for flaw assessment Procedure applied: - Use of quality class - Model of through thickness crack in a plate - A half pipe model given the crack at the edge The analyses done is not a detailed assessment including estimation of crack size given final cracking. However, the analyses give an indication of time from leakage to loss of brace. Based on the result in table 1 and 2 we select the SCF = 2.5 and SCF = 3.5 as upper and lower boundary for a reasonable time estimate. The fatigue life estimate is than between 0,26 and 1,07 year. NB!! We have limited the assessment to one crack even if section SK3-5 has critical hot spot at three clock positions. Conclusions – 10.09.2009 • Ref. conclusion after RS2004 • Additions: – The internal inspection for RS2004 was not managed by skilled personnel – most likely the poor welding quality would have been focused in 2004 if the inspection team of 2009 had been used – Modification of cracked area and other high stress area , will require very god weld and detailed design quality. Ongoing activity and proposal to be delivered DNV the following weeks. . Case Drilling Unit, North Sea, Status March 2013 • Extended and frequent NDT inspection • No findings compromise the safety against larges disaster • Number of findings larger than acceptable level of 3-15 % finding and 0.5% fatigue failure (TTC - Through Thickness Crack) • 21% and 5% during offshore survey RS2009 • 10% and 1% totally for RS2009, (1633 NDT inspections ) • 2% and 1% for IS2011. ( 107 NDT inspections ) • Des.2012: Ca. 40 NDT for SC4 og PC4 => 50% og 22% byAS2012 • Mars2013: 153 NDT, 7 (14) find => 5% (9%) og 0% by AS2013
  • 8. Weld-impr-example_sect_1_5 8 Compensating measures: •Install stress gouges •New structural analyses delivered from 2 independent vendors •Inspection of critical area after storm periods •Start of design for re-construction Case Drilling Unit, North Sea, Status March 2013 Preliminary results from the stress gouge measurement after 1 winter season • Measurements indicate 20% longer fatigue life estimate than the analyses from vendor 1 • The fatigue load effect in the braces are high but within acceptable limits • The fatigue load effect is locally within the column base tank too high. Reconstruction is required. Centre line Clock position Mean RatioS 95% Confidence, Upper limit RatioAWSG 95% Confidence, Lower limit RatioAWAA 0600 0,97 <0,95, 2,03> <0,72, 0,8> 0300 1,16 <1,04, 2,64> <0,71, 1,11> 0900 0,56 <0,65, 1,05> <0,43, 0,5> 1200 0,44 <0,34, 1,04> <0,24, 0,44> SCF=1,53, Traditional design R=2000mm, SCF=1,08 SCF=1,2, behind the TIP, Factor for fatigue life = 2,3 Weld improvement factor = 4 Total factor = 9.2 End of external doubling plate, (#72) Fatigue crack observed after 5 year
  • 9. Weld-impr-example_sect_1_5 9 Alternative Follow-Up Regime for Structure: • Level 0 : Standard “DNV” Follow-Up Scheme - IIP • Level 1 : Based on detailed in-service FLS analyses • Level 2 : RBI analyses including inspection history • Level 3 : Extended by As-Is description and improved follow-up regime for inspection, repair, modifications and weld improvement Validation Studies – The Benefit of Refinements • Studies for Philips Petroleum, bp, TFE, PSA-N and HSE-UK in the period 1995-1999, • 3 published reports by HSE-UK and more than 10 papers • Detailed assessment of more than 500 fatigue cracks Main Conclusion • Traditional follow-up regime – level 0 and level 1 – 20-40% of the detected cracks are in accordance with the initial fatigue analyses – Crack growth does mainly occur at details given poor fabrication quality – All units given comparable amount of inspections • AIMS based approach – level 3 and partially level 2 – The calculations are based on As-Is description – 70-80% of the fatigue crack growth are according the calculated crack growth potential – The scope of inspection varies from 30 to 200% of a traditional follow up scope Competance at Site Unit 1 – Level 3 • Extensive and detailed follow up regime at site by competent personnel • Upon 10 years operation – 73 fatigue cracks of 1 at weld improved area i.e. hot spot given ultra high fatigue loads Unit 2 – Level 2 • Traditional site team for inspection, repair and modification • Upon 5-years operation – 180 fatigue cracks at 143 different locations – All cracks at hot spot given high fatigue loads – Main reason: Poor workmanship for weld improvement and local modification Page 52 Integrity Management vs. Inspection Management Inspection Integrity Engineering and Inspection working together on-site, on-shore and off-shore. Integrity Eng. Condition Assessment – The process of What to be done Perform inspection – The process of How to do