SlideShare ist ein Scribd-Unternehmen logo
1 von 19
Profile Giridhar Injam
Giridhar Injam
Tata Consultancy Services
Email: giridhar.toshani@gmail.com, giridhar.thejaswani@gmail.com Phone: +91 7871628949
Experience Summary
• 13+ years of experience in testing in these 10+ years of extensive experience in performance
testing & engineering and 3+ years of functional & automation testing.
• Since Joining TCS, I have worked as a Performance Test consultant Prior to TCS I had
worked as Test Manager and Lead in Performance Testing and Engineering and Functional
automation testing handling around 16-25 resources, RFI, RFP, Plan & estimation and
capacity planning, Has Experience in ERP- SAP, Seibel, Telecom, Retail and Web services.
• Prior to TCS I had gained experience in Financial, Telecom, Consumer Products, Hospitality,
Healthcare and Procurement domain in performance testing and Functional Testing in
Leading MNC’s.
• Worked as on-site Coordinator in UPC, in Amsterdam, Netherlands on 2007
• Worked as performance test consultant in TM, in Malaysia on 2014 and 2015
• Preparing Performance Test Plan, Estimation, Load Modelling, analysing & reviewing the
requirements, test scripts creation, execution, monitoring, identifying bottlenecks and potential
root causes and provide solution analysis report generation and final summary report.
• Preparing Functional Test Plan, Test Strategy, Estimation, Budget Allocation, Resource
Allocation and Management, Conducting various types of Tests, review of test case and
analysis of reported defects based on the category and assigning responsibilities to various
development teams and preparing Final Test Summary Report.
• Conducting Case / System / Process Study for project planning, scoping, estimation and
tracking.
• Implementation of project plans within deadlines. Team mentoring, deployment, monitoring
and development.
• Defining best practices for project support and documentation. Recruitment, training and
counselling of processing associates.
• Involve in Tools evaluation and tools suggestions and i have done the POC for various
performance testing tools to the client, in functional automation and performance testing and
engineering.
• Preparing the RFP/RFI for the new client and existing client for getting the new Projects
Page 1 of 19
Profile Giridhar Injam
Technology
Page 2 of 19
Hardware Software Products Tools Domains
Electronics circuits,
digital systems and
micro processor.
OS –
Windows 98,windows
2000,Windows
XP,Windows 7,Unix
Databases –
Oracle 9i ,SQL Server
Performance Testing
Tools –
Load Runner, OATS,
RPT, J meter, Silk
Performer, HTTP Watch,
Neoload, VSTS and
Soasta.
Monitoring Tools –
Perfmon, Site scope,
Intro scope, Zabbix,
Negios and IBM Tivoli
Functional Testing Tools
– Winrunner, QTP,
selenium and UFT
Defect Tracking Tools –
ALM, Quality Center,
Rational Clear Quest,
Bugzilla, PR-Tracker,
Test director and IPC
Configuration Tools –
Rational Clear Case and
Visual Source Safe
Healthcare &
Financial &
Banking,
Telecom,
Consumer
Products,
Procurement,
Hospitality,
Web based
Applications,
Airline and
Insurance
Domain.
Profile Giridhar Injam
Qualifications
Degree and Date Institute Major and Specialization
Bachelor of Engineering May
2002
Periyar University Electronics and Communication
Engineering
Project Thesis
Project Title BOD, CMS
Company TCS
Customer Lufthansa
Period March 2015 – Till date
Description • Deutsche Lufthansa AG is an air traffic company with global
operations.
• The Lufthansa Group includes more than 400 subsidiaries and
affiliated companies.
• Lufthansa flies to 18 domestic destinations and 193
international destinations in 81 countries across Africa,
Americas, Asia, and Europe (as of April 2014). This includes
destinations served by subsidiaries Lufthansa City Line and
Lufthansa Regional as well as those operated on behalf of
Lufthansa by Private Air.
• Lufthansa is one of the five founding members of the Star
Alliance, the world's largest airline alliance, formed in 1997.
Page 3 of 19
Profile Giridhar Injam
Responsibilities  Understanding the functional and Non Functional
Requirements and validating against the Non Functional
environment.
 As a NFT test consultant and involved in identify the
scope for NFT testing and finalise the business
scenarios for performance testing.
 Prepared the tool evaluation and completed the POC on
Neoload Tool.
 Preparing the Estimation and Plan and test strategy for
NFT and Performance Engineering
 Preparing the various types of metrics and capacity
planning for the testing.
 Preparing the work Load model and scheduling the
business scenarios for performance test execution
 Responsible for communicating with customer, business
team to resolve technical issues
 Actively attend meetings with fellow testers and other
groups to evaluate the progress and Status of the
application.
 Competent in managing, reviewing and monitoring the
SQA test process in a project
 Excellent knowledge of Offshore/Onshore model and
have experience in the product/services project
activities.
Project Title ICP/NOVA/GEMS
Company TCS
Customer Telekom Malaysia (TM)
Period Sep 2014 – March 2015
Description ICP System
ICP supports the end to end operations for TM Broadband
product segment, commercial name ‘Streamyx’.
A copper ADSL based service.
NOVA System
NOVA supports the end to end operations for TM High Speed
Broadband (HSBB) product segment, commercial name ‘UniFi’.
A fiber optic ADSL2, VDSL based service.
GEMS System
GEMS stands for Group Enterprise Resource Management
System. GEMS is a major initiative by the Management of TM
and the GEMS Project Team is responsible for its development.
GEMS will standardize back office operations such as finance,
material management and human resource management for TM
and its subsidiaries using SAP as the Enterprise Resource
Planning (ERP) computing infrastructure.
Page 4 of 19
Profile Giridhar Injam
Responsibilities  Handle with 8 member team offshore and onshore
performance test consultant for TM.
 Understanding the functional and Performance
Requirements and validating against the performance
environment.
 Involved in identify the scope for performance testing
and finalise the business scenario’s for performance
testing.
 Preparing the Estimation and Plan and test strategy for
performance testing and Engineering
 Preparing the various types of metrics and capacity
planning for the testing.
 Involved and reviewed in generating scripts using
Loadrunner tool and reviewing all our scripts standards,
test data support
 Preparing the work Load model and scheduling the
business scenarios for performance test execution
 Developed two assets for the client team
 Responsible for communicating with customer, business
team to resolve technical issues
 Actively attend meetings with fellow testers and other
groups to evaluate the progress and Status of the
application.
 Identifying the Performance bottle neck and giving the
root cause to the project team.
 Competent in managing, reviewing and monitoring the
SQA test process in a project
 Excellent knowledge of Offshore/Onshore model and
have experience in the product/services project
activities.
Project Title hp shopping portal
Company TCS
Customer HP
Period Aug 2014 – Sep 2014
Description Re-design of HP online shopping website into a single,
state of the art ecommerce application for B2B and B2C
solutions. The new system is anticipated to improve the
quality of the customer experience, generating
important benefits to HP and its customers. and its
customers
Page 5 of 19
Profile Giridhar Injam
Responsibilities  Handle with 7 member team automation and
performance testing for hp shopping portal.
 Understanding the functional and Performance
Requirements and validating against the performance
environment.
 Involved in validate the performance and automation test
Scripts and test suits
 Developed new automation frame work for selenium tool
for improving the performance of test execution effort.
 Preparing the various types of metrics and capacity
planning for the testing.
 Preparing the work Load model and scheduling the
business scenarios for performance test execution
 Responsible for communicating with customer, business
team to resolve technical issues
 Actively attend meetings with fellow testers and other
groups to evaluate the progress and Status of the
application.
 Identifying the Performance bottle neck and giving the
root cause to the project team.
 Competent in managing, reviewing and monitoring the
SQA test process in a project
 Excellent knowledge of Offshore/Onshore model and
have experience in the product/services project
activities.
Project Title Pre-sales
Company TCS
Software used Performance and Automations testing proposals
Period Feb 2013 – July 2014
Responsibilities  Understanding the Business requirements of the
application or Product for new proposals
 Involved in identify the architecture of the product and
identify the end to end functional flow.
 Preparing the RFP, RFI and estimation performance
testing and Engineering
 Preparing the various types of metrics and capacity
planning for the testing.
 Preparing the work Load model and scheduling for
business scenarios
 Responsible for communicating with customer, business
team to resolve technical issues
 Actively attend meetings with fellow of team members
and other groups to evaluate the progress and Status of
the pre sales.
 Assessment for the all Telecom performance testing and
engineering projects in Chennai location.
Project ebay/GSI
Company Accenture
Page 6 of 19
Profile Giridhar Injam
Customer Ebay PayPal
Period Aug 2013 – Jan 2014
Description GSI Commerce, Inc. was formerly known as Global Sports Inc.
GSI one of eBay’s three main business units, alongside eBay
Marketplaces and online payments provider PayPal.
GSI Commerce, Inc. provides e-commerce and interactive
marketing solutions for brands and retailers. It offers e-
commerce technology solutions, which include Web store, a
platform to manage the entire online purchasing process; and
multichannel solutions; order management solutions, such as
payment processing services; and infrastructure and
operational services. The company's e-commerce operations
comprise fulfilment solutions, such as facilities and
infrastructure, personalization and customization, and
integration services; and customer care services, including
scalability, quality monitoring, integrated CRM system, e-
commerce and multichannel support, and brand training
services. It also offers marketing services, such as digital
agency, enterprise email marketing, mobile advertising, affiliate
marketing, ad re-targeting, and in-depth analytic services. The
company serves brand and retail clients, such as apparel,
accessories and footwear, toys and baby products, sporting
goods and apparel, consumer electronics, entertainment media,
health and beauty, home goods, appliances and hardware,
speciality foods, jewellery, and gifts and general merchandise
solutions. It helps to innovate, effectively represent your brand,
integrate new channels and penetrate new markets--all with
great speed and efficiency.
The eBay Enterprise commerce technologies portfolio drives
online business growth by providing an industry leading
consumer experience, ultimately strengthening brand loyalty by
connecting consumers with your brand.
Responsibilities  Handle with 8 member performance engineering team
for ebay/GSI .
 Understanding the functional and Performance
Requirements and validating against the performance
environment.
 Involved in identify the business scenarios for
performance test Scripts.
 Preparing the Estimation and Plan and test strategy for
performance testing and Engineering
 Preparing the various types of metrics and capacity
planning for the testing.
 Involved in generating scripts using Loadrunner tool
and reviewing all our scripts standards, test data
support
 Preparing the Load model and scheduling scenarios for
execution
 Analyzing the results and sending the Report to
Business team.
 Responsible for communicating with customer,
business team to resolve technical issues
 Actively attend meetings with fellow testers and other
groups to evaluate the progress and Status of the
Page 7 of 19
Profile Giridhar Injam
application.
 Identifying the Performance bottle neck and giving the
root cause to the project team.
 Competent in managing, reviewing and monitoring the
SQA test process in a project
 Excellent knowledge of Offshore/Onshore model and
have experience in the product/services
Project Integrated Project Management
Company Accenture
Customer NSN
Period Feb 2013 – Aug 2013
Description IPM (Integrated Project Management) Application is a Nokia
Siemens Networks wide project management application. Key
features include project tracking, site management,
documentation management & Reporting. Currently IPM is
actively used globally.
IPM is an enterprise solution supporting several
projects/vendors globally. The solution will act as a central hub
for all project stakeholders. It will enhance collaboration,
information retrieval and decision-making of stakeholders,
thereby supporting a speedy and cost-effective project
outcome.From the technology front IPM is build on Java
technology and also host’s BO and EMC Documentum. This
application also has a SAP interface.
Additionally IPM is supported through mobile client consisting of
limited features. This client can be installed over a mobile
device (currently in scope is Nokia C5).
Current release delivery practices will be followed in all areas:
IPM, SAP and NAIP will reuse their existing environments and
processes.
The objective of this IPM release is to bring in performance
improvements and business related changes in progress
tracking module. Also part of this release the documentum
applet is being replaced with an alternate solution to eliminate
the client (browser) dependency on this functionality. This also
brings in change in the usability of the functionality.
Responsibilities  Handle with 25 member team for NSN – IPM 7.1
release.
 Understanding the functional and Performance
Requirements and validating against the performance
environment.
 Involved in identify the business scenarios for
performance test Scripts.
 Preparing the Estimation and Plan and test strategy for
the functional, Automation and performance testing.
 Preparing the various types of metrics and capacity
planning for the testing.
 Involved in generating scripts using Loadrunner tool
and reviewing all our scripts standards, test data
support
 Preparing the Load model and scheduling scenarios for
Page 8 of 19
Profile Giridhar Injam
execution
 Analysing the results and sending the Report to
Business team.
 Responsible for communicating with customer,
business team to resolve technical issues
 Actively attend meetings with fellow testers and other
groups to evaluate the progress and Status of the
application.
 Identifying the Performance bottle neck and giving the
root cause to the project team.
 Competent in managing, reviewing and monitoring the
SQA test process in a project
 Excellent knowledge of Offshore/Onshore model and
have experience in the product/services project
activities.
Project Regulatory Content Authoring and Management & Clinical
Portal & Collaboration
Company Accenture
Customer Merck
Period Aug 2012 – Jan 2013
Description Merck & Co., Inc. is a global research-driven pharmaceutical
company established in 1891. Merck discovers, develops,
manufactures and markets vaccines and medicines to address
unmet medical needs. They have provided services on the
different Business Area like Global Health Care, Merck
Research Lab etc.
RCAM (Regulatory Content Authoring and Management) is a
FirstDoc – Documentum based application that facilitates the
cross- departmental collaborative preparation, compilation,
and management of content for Submissions.
There will be millions of new documents and we want to
measure how to adding those impacts system performance and
Users will access both via Citrix and Non Citrix environment.
CPAC (Clinical Portal & Collaboration) is a portal and
collaboration framework or platform upon which portal
applications can be built. It will be used to surface new and
existing CRIS applications and appropriate services. CPAC will
have an external focus in direct of clinical trials and submission
management. It is intended to enhance the relationship with
external partners and improve the level of communication. It
will also enhance document flow by providing a central Access
point to clinical trial documents. It allows users to organize
thoughts and ideas, manage information for meetings,
presentations, projects and proposals
Page 9 of 19
Profile Giridhar Injam
Responsibilities  Handle with 6 member team for various capital projects
and regular maintenance releases for Merck.
 Understanding the Performance Requirements and
validating against the performance environment.
 Involved in identify the business scenarios for
performance test Scripts.
 Preparing the Estimation and Plan and test strategy for
the performance testing.
 Preparing the various types of metrics and capacity
planning for the performance testing.
 Involved in generating scripts using Loadrunner tool
and reviewing all our scripts standards, test data
support
 Preparing the Load model and scheduling scenarios for
execution
 Analysing the results and sending the Report to
Business team.
 Responsible for communicating with customer,
business team to resolve technical issues
 Actively attend meetings with fellow testers and other
groups to evaluate the progress and Performance of
the application.
 Identifying the Performance bottle neck and giving the
root cause to the project team.
Project First data
Company Accenture
Customer First data
Period November 2011 - July 2012
Description First Data Corporation is an American payment processing
company. First Data is a provider of electronic commerce and
payment solutions. The company's portfolio includes merchant
transaction processing services; credit, debit, private-label, gift,
payroll and other prepaid card offerings; fraud protection and
authentication solutions. Electronic check acceptance services
through Tele Check as well as Internet commerce and mobile
payment solutions. The company's STAR Network offers PIN-
secured debit acceptance at ATM and retail the e-Customer
Service application enables customers to access their accounts
via the Internet. Customers can log into a secure Web site to
view account information, update personal data, perform
account maintenance, and request specific services.
Responsibilities  Handle with 8 member team for various capital projects
and regular maintenance releases for First data.
 Understanding the Performance Requirements and
validating against the performance environment.
 Involved in identify the business scenarios for
performance test Scripts.
 Preparing the Estimation and Plan and test strategy for
the performance testing.
 Preparing the various types of metrics and capacity
Page 10 of 19
Profile Giridhar Injam
planning for the performance testing.
 Involved in generating scripts using RPT tool and
reviewing all our scripts standards, test data support
 Preparing the Load model and scheduling scenarios for
execution
 Analysing the results and sending the Report to
Business team.
 Responsible for communicating with customer,
business team to resolve technical issues
 Actively attend meetings with fellow testers and other
groups to evaluate the progress and Performance of
the application.
 Identifying the Performance bottle neck and giving the
root cause to the project team.
Project Star wood Hotels & Resorts
Company Accenture
Customer Star wood Hotels & Resorts
Period November 2009 - October 2011
Description Star wood’s current legacy CRS system "Starlink" which
handles $14 billion in bookings per year is being transitioned to
a web services based SOA CRS system named "Valhalla". This
is a complete ground-up development project using web
services to provide business flexibility in integrating with other
systems such as Property Management Systems, Call Center
Application (Saratoga), and consumer web site, other CRS
systems, etc. The idea is to increase scalability while slashing
maintenance costs by relying on Web Services standards. The
entire Performance Team was given the responsibility of
complete Performance testing tasks to identify bottlenecks early
in the development cycles of the Web services and later when
these are being integrated with other GUI enterprise
applications.
Channels: Saratoga, Branded web and Meetings are the
various modes of booking available for the customers to book
the Star wood hotels
CRM: Customer relationship management is maintained using
the CRM applications like Guest Communication, CEM/CSF,
SVO and SGR
CRS: CRS (Central Reservation System) is the heart of the
Star wood project and it has 8 Valhalla engines maintains the
booking, inventory, POE and Rex etc
Sales: Sales is independent part of the Valhalla engines and
take care of the Franchise, owned and managed hotels using
the independent applications like ABCD and Star wood one etc
Page 11 of 19
Profile Giridhar Injam
Responsibilities  Handle with 16 member team for various capital
projects and regular maintenance releases for Star
wood Hotels & Resorts.
 Understanding the Performance Requirements and
validating against the performance environment.
 Involved in identify the business scenarios for
performance test Scripts.
 Preparing the Estimation and Plan and test strategy for
the performance testing.
 Preparing the various types of metrics and capacity
planning for the performance testing.
 Trained 4 members team in OATS tools
 Involved in generating scripts using Loadrunner, HTTP
Watch and OATS tools and reviewing all our scripts
standards, test data support
 Preparing the Load model and scheduling scenarios for
execution
 Analysing the results and sending the Report to
Business team.
 Responsible for communicating with customer,
business team to resolve technical issues
 Actively attend meetings with fellow testers and other
groups to evaluate the progress and Performance of
the application.
 Identifying the Performance bottle neck and giving the
root cause to the project team.
Project Global Wealth Investment Management
Company Accenture
Customer Bank of America
Period February 2009 - October 2009
Description Bank of America GWIM (Global Wealth Investment
Management) - The Wealth Management Online Channel is a
customer facing website whose goal is to provide clients of the
WIM lines of business with unique and differentiated services
and experiences.
CMO (Client Management Online) -CMO is a Siebel application,
mainly intended to provide a single CRM framework for the
Bank Associates to better manage and report on their client
portfolio & the application involves modules on
Entities/Activities/Opportunities/Relationships/Referrals/List
Management.
GCC Referrals Reporting -A new web-based user interface
GCC Referrals Reporting is built and used by the GCC users
(Bank Associates) as a centralized repository to retrieve canned
reports, manage referral work flow and to perform analysis of
base reporting data using a business intelligence tool called
Micro Strategy. The GCC Portal contains a work flow Home
Page, a Reporting Home page and Toolbar links and functions
that will launch reports and perform GCC operational
Page 12 of 19
Profile Giridhar Injam
functions. The reporting home page will display templates and
dashboard summary data that will populate upon access to the
application.
Responsibilities  Understanding the Performance Requirements and
validating against the performance environment.
 Involved in identify the business scenarios for
performance test Scripts.
 Preparing performance test scripts and using
Performance Center I have schedule the scenarios for
execution and analysing the results and sending the
detailed Report to Business team.
 Identifying the Performance bottle neck and giving the
root cause to the project team.
 Handle with4 member team for black box testing,
system testing, System Integration Testing
 Preparing the Estimation and Plan and test strategy for
the Functional Automation testing.
 Trained 4 members team and handle the QTP
Automation functional testing team for BCP Project and
for Bug Tracking using QC
 Responsible for communicating with customer,
business team to resolve technical issues
 Actively attend meetings with fellow testers and other
groups to evaluate the progress and Performance of
the application
Project Procter & Gamble (P&G)
Company Accenture
Customer Procter & Gamble (P&G)
Period November 2007 - January 2009
Description P&G’s work is driven by a Purpose of providing branded
products and services of superior quality and value to improve
the lives of the world’s consumers now and for generations to
come. P&G’s growth strategy, inspired by our Purpose, is to
touch and improve more consumers’ lives in more parts of the
world, more completely.
iBP( Integrated Business Planner) - Global application that has
been customized to meet Customer Teams’ as well as MS&P
Market Strategy and Planning - Internal North America Market
& Development Organization ( NA MDO) responsible for
Strategic Development business needs for trade fund
management, payment and promotion planning. The tool
enables integration with the Company’s other Systems and has
been identified by IDS Information & Decision Solutions - Key
business development organization responsible for internet and
computer systems and solutions as the best technology (Siebel)
for future enhancements
Optima- Global application system solution to enable the
funding, planning, tracking and control of MDA trade funds as
well as a basic module for payout calculation. The tool enables
integration with the Company’s other Systems and has been
identified by IDS Information & Decision Solutions - Key
Page 13 of 19
Profile Giridhar Injam
business development organization responsible for internet and
computer systems and solutions as the best technology (Siebel)
for future enhancements
Responsibilities  Understanding the Performance Requirements and
validating against the performance environment.
 Involved in identify the business scenarios for
performance test Scripts.
 Preparing performance test scripts and using
Performance Center I have schedule the scenarios for
execution and analysing the results and sending the
detailed Report to Business team.
 Handle with3 member team for black box testing,
system testing, System Integration Testing
 Preparing the Functional Automation testing proposal to
the project team.
 Responsible for communicating with customer,
business team to resolve technical issues
 Actively attend meetings with fellow testers and other
groups to evaluate the progress and Performance of
the application
Project AT-Web Channel migration to PE platform
Company Tech Mahindra
Customer UPC
Period February 2007 - October 2007
Description In order to align the web architecture of Austria the existing
functionality of UPC AT Web Channel will be implemented
using the standard Pan European software.
The Pan European Single Sign On component, transferring the
functionality of the AT Web Channel to the PE PHP code base
and implementing a new PE Bank details component also.
AT, CH, CZ, HU, SK, IE, NL, PL and RO different countries’
Web Channel migration to standard PE platform
Responsibilities  Worked as on-site coordinator for UPC,in Amsterdam,
Netherlands
 Handle with 5 member team for black box testing,
system testing, System Integration Testing
 Preparing & Reviewing the system test cases and
Integration Test Cases.
 Test Case execution for overall functionality
 Bug Reporting using IPC.
 Preparing the Functional Automation and Performance
testing proposal to the project team.
 Understanding the Performance Requirements and
validating against the performance environment.
 Involved in identify the business scenarios for
performance test Scripts.
 Preparing performance test scripts and using
Loadrunner I have schedule the scenarios for
execution and analysing the results and sending the
Page 14 of 19
Profile Giridhar Injam
detailed Report to Business team.
 Preparing the Functional Automation testing proposal to
the project team.
 Responsible for communicating with customer,
business team to resolve technical issues
 Actively attend meetings with fellow testers and other
groups to evaluate the progress and Status Reports
and Performance of the application
Project Enterprise Strategic Procurement (ESP)
Company Hewlett and Packard
Customer hp
Period September 2006 - January 2007
Description ESP is global sourcing portal for HP’s Indirect, Services and
Direct Procurement professionals. It was customized to meet
HP specific needs from Ariba Spend Management suite. It
provides the functionality in areas of e-Sourcing, ACM and
Analysis.
Responsibilities  Preparing the System & Performance Test Plan
 Reviewing the system test cases
 Test Case execution for overall functionality
 Bug Reporting using PR-Tracker.
 Involved in identify the business scenarios for
performance test Scripts.
 Preparing performance test scripts and using
Loadrunner I have schedule the scenarios for
execution and analysing the results and sending the
detailed Report to Business team.
 Responsible for communicating with customer,
business team to resolve technical issues
 Actively attend meetings with fellow testers and other
groups to evaluate the progress and Status Reports
and Performance of the application
Project Digital Media Solution SE
Company Hewlett and Packard
Customer hp
Period March 2006 - August 2006
Description HP Digital Media Solution, standards-based technology that
automates the work flow for broadcasters and network
operators, as well as a new workstation line-up with
enhancements in performance and mobility for video editors
and animators.
It enables broadcasters and network operators to automate
every aspect of the digital work flow, from creation of new
Page 15 of 19
Profile Giridhar Injam
content, through editing, processing and storage, to archiving
and retrieval. It is build on top of a DMS Core architecture to
reduce the complexity and cost of building a complete Media
Life-Cycle Management system. The DMS Core facilitates
development of critical media solutions that capture, produce,
manage, re-purpose, store and archive digital media assets in a
multi-platform and multi-vendor environment.
Responsibilities  Preparing the System & Performance Test Plan
 Reviewing the system test cases and execution for
overall functionality Reporting using Bugzilla
 Involved in identify the business scenarios for
performance test Scripts.
 Preparing performance test scripts and using
Loadrunner I have schedule the scenarios for execution
and analyzing the results and sending the detailed
Report to Business team.
 Responsible for communicating with customer,
business team to resolve technical issues
 Actively attend meetings with fellow testers and other
groups to evaluate the progress and Status Reports
and Performance of the application
Project Account Reconciliation Tracking Tool (ARTT)
Company Hewlett and Packard
Customer hp
Period March 2006 - August 2006
Description ARTT is an Administration tracking tool for Reconciliation of
Accounts used by HP World Wide. Account Reconciliation
process is through various users of Hierarchy by different
follow-up modules which involves:
1. Definition and Review of Organization hierarchy.
2. Defining various Roles for the users and Allocation of
Reconciliation Assignment.
3. Definition of Account granularity and defining the limits
like: When a particular Account needs to be
Reconciled, tool/Template to be used and further
actions of escalations if needed.
4. Reconciliation process starts by tracking the Accounts
at Primary, Secondary and Legacy levels.
5. Ends by Reconciling an Account by using Tools called
templates [Generic, Fixed Assets, Pre-Payment
Deferrals and Bank].
6. Quality of Work done [Reconciliation] is measured by
maintaining the Quality score card on each Account
Reconciliation which was done by various users.
7. Status Reports of are available at Account level,
Regional Level and various Hierarchal levels.
Page 16 of 19
Profile Giridhar Injam
Responsibilities  Preparing the System & Performance Test Plan
 Reviewing the system test cases and execution for
overall functionality Reporting using HP-ezilla
 Involved in identify the business scenarios for
performance test Scripts.
 Preparing performance test scripts and using
Loadrunner I have schedule the scenarios for execution
and analysing the results and sending the detailed
Report to Business team.
 Responsible for communicating with customer,
business team to resolve technical issues
 Actively attend meetings with fellow testers and other
groups to evaluate the progress and Status Reports
and Performance of the application
Project Privacy View
Company Genisys
Period March 2004 - April 2005
Description This is a personalized document system. The main aim of the
product is to privatize the user’s Internet browsing session, and
provide the document management for the downloaded files
during that session, which is not even visible to the other users
having access to the machine.
Privacy View versions (1.0, 1.1 and 1.2) in this 1.2 version we
done the customer prioritized testing.
The main focus of this testing is robustness and performance.
Responsibilities  Analysed User requirements and functionality study
 Test Case Generation and execution and posting
defects for system and regression testing
 Bug Reporting using Test director
 Performed Module Functionality and GUI
 Performed Load testing using Astra load
 Actively attend meetings with fellow testers and other
groups to evaluate the progress and Performance the
application.
Project Maintaining Word Pad in Web Site
Company Genisys
Customer Kendall Technologies USA.
Period June 2003 – February 2004
Description This is a replication of Microsoft Word, designed for Kendall
Technologies USA. This is a Word Processor for online editing
the text documents and web pages. Actually this is for Kendall
Tech., providing free space for their clients. In that space they
can store their files. If they have any text based documents and
if they want to edit it, can use this word processor for online
editing and need not go for download the entire document for
modifications. In this word processor we are providing all
Page 17 of 19
Profile Giridhar Injam
necessary text editing tools.
Responsibilities  Analysed User requirements and functionality study
 Preparing and documenting the test conditions and test
cases
 Responsible for the execution of test cases, and
posting defects for system and regression testing
 Bug Reporting using Test director
 Performed Module Functionality and GUI
 Performed Load testing using Loadrunner
 Actively attend meetings with fellow testers and other
groups to evaluate the progress and Performance the
application.
Project Application Automation process
Company Genisys
Period October 2002 - May 2003
Description This application is a automating the process. This application
automates the process of transferring of files from and to the
production server, QC server, raw server and Backup server.
This process ensures that the directory is locked in the
production server, so that the developer will not access to write
to the server unless the QC is over visa versa for Raw Server
and Backup server. It synchronizes the Raw materials,
Production and Quality control.
Responsibilities  Analysed User requirements and functionality study
 Preparing and documenting the test conditions and test
cases
 Responsible for the execution of test cases, and
posting defects for system and regression testing
 Bug Reporting using Test director
 Updating the Test Logs with the results of the Testing
process
 Actively attend meetings with fellow testers and other
groups to evaluate the progress and Performance the
application.
Key Competencies & Skills
My Competency Profile and my soft skills includes the following
Skill Proficiency
Performance testing Expert
Performance engineering Expert
Page 18 of 19
Profile Giridhar Injam
Load Runner, OATS, RPT,
J meter, Silk Performer,
HTTP Watch, Neoload,
VSTS and Soasta.
Expert
Winrunner, QTP, selenium
and UFT
Intermediate
ALM, Quality Center,
Rational Clear Quest,
Bugzilla, PR-Tracker, Test
director and IPC
Expert
Perfmon, Site scope, Intro
scope, Zabix, Nagios and
IBM Tivoli
Expert
Rational Clear Case and
Visual Source Safe
Intermediate
Personal Details
Date of Birth 18/01/1981
Nationality Indian
Passport Details
Name as on
passport
Relations
hip
Passport
Number
Date of Issue Expiry Date Place of Issue
Giridhar Injam Self F7581991 20/04/2006 19/04/2016 Hyderabad
Page 19 of 19

Weitere ähnliche Inhalte

Was ist angesagt?

Bibhas automation testing
Bibhas automation testingBibhas automation testing
Bibhas automation testingBibhas Senapati
 
Sarbajit Resume - Delivery Manager QA - Test Automation Consluting
Sarbajit Resume - Delivery Manager QA - Test Automation ConslutingSarbajit Resume - Delivery Manager QA - Test Automation Consluting
Sarbajit Resume - Delivery Manager QA - Test Automation Conslutingsarbajit Chakrabarty
 
Mohamed thalha senior mes consultant Resume
Mohamed thalha  senior mes consultant ResumeMohamed thalha  senior mes consultant Resume
Mohamed thalha senior mes consultant ResumeMohamed Thalha
 
NavneetKaur_Resume
NavneetKaur_ResumeNavneetKaur_Resume
NavneetKaur_ResumeNavneet Kaur
 
Applicant_Hema_Harchandani
Applicant_Hema_HarchandaniApplicant_Hema_Harchandani
Applicant_Hema_HarchandaniHema Harchandani
 
Rohit Oza_CV_2015
Rohit Oza_CV_2015Rohit Oza_CV_2015
Rohit Oza_CV_2015Rohit Oza
 
Vijay Achar_11+ Yrs of Exp in Testing+TM
Vijay Achar_11+ Yrs of Exp in Testing+TMVijay Achar_11+ Yrs of Exp in Testing+TM
Vijay Achar_11+ Yrs of Exp in Testing+TMAchari Vijaya
 
TeenaMandal_Automation Testing
TeenaMandal_Automation TestingTeenaMandal_Automation Testing
TeenaMandal_Automation TestingTeena Mandal
 
AnilSubhas_11.7 Yrs_Electrical-systems-Engineer.pdf
AnilSubhas_11.7 Yrs_Electrical-systems-Engineer.pdfAnilSubhas_11.7 Yrs_Electrical-systems-Engineer.pdf
AnilSubhas_11.7 Yrs_Electrical-systems-Engineer.pdfANIL SUBHAS
 
Resume - Gagan Gupta
Resume - Gagan GuptaResume - Gagan Gupta
Resume - Gagan GuptaGagan Gupta
 

Was ist angesagt? (20)

Adi CV Tech Manager
Adi CV Tech ManagerAdi CV Tech Manager
Adi CV Tech Manager
 
Bibhas automation testing
Bibhas automation testingBibhas automation testing
Bibhas automation testing
 
Sarbajit Resume - Delivery Manager QA - Test Automation Consluting
Sarbajit Resume - Delivery Manager QA - Test Automation ConslutingSarbajit Resume - Delivery Manager QA - Test Automation Consluting
Sarbajit Resume - Delivery Manager QA - Test Automation Consluting
 
Mohamed thalha senior mes consultant Resume
Mohamed thalha  senior mes consultant ResumeMohamed thalha  senior mes consultant Resume
Mohamed thalha senior mes consultant Resume
 
NavneetKaur_Resume
NavneetKaur_ResumeNavneetKaur_Resume
NavneetKaur_Resume
 
Resume_Haradhan
Resume_HaradhanResume_Haradhan
Resume_Haradhan
 
Applicant_Hema_Harchandani
Applicant_Hema_HarchandaniApplicant_Hema_Harchandani
Applicant_Hema_Harchandani
 
Gaurav_Resume
Gaurav_ResumeGaurav_Resume
Gaurav_Resume
 
MES-SAP-Hemant
MES-SAP-HemantMES-SAP-Hemant
MES-SAP-Hemant
 
Amitabh Tyagi
Amitabh TyagiAmitabh Tyagi
Amitabh Tyagi
 
Nairita Chatterjee Resume
Nairita Chatterjee ResumeNairita Chatterjee Resume
Nairita Chatterjee Resume
 
Rohit Oza_CV_2015
Rohit Oza_CV_2015Rohit Oza_CV_2015
Rohit Oza_CV_2015
 
Resume_Monika2016
Resume_Monika2016Resume_Monika2016
Resume_Monika2016
 
Resume - Rajdeep singh MES
Resume - Rajdeep singh MESResume - Rajdeep singh MES
Resume - Rajdeep singh MES
 
Vijay Achar_11+ Yrs of Exp in Testing+TM
Vijay Achar_11+ Yrs of Exp in Testing+TMVijay Achar_11+ Yrs of Exp in Testing+TM
Vijay Achar_11+ Yrs of Exp in Testing+TM
 
TeenaMandal_Automation Testing
TeenaMandal_Automation TestingTeenaMandal_Automation Testing
TeenaMandal_Automation Testing
 
Shoaib Kamal Resume
Shoaib Kamal ResumeShoaib Kamal Resume
Shoaib Kamal Resume
 
AnilSubhas_11.7 Yrs_Electrical-systems-Engineer.pdf
AnilSubhas_11.7 Yrs_Electrical-systems-Engineer.pdfAnilSubhas_11.7 Yrs_Electrical-systems-Engineer.pdf
AnilSubhas_11.7 Yrs_Electrical-systems-Engineer.pdf
 
Resume - Gagan Gupta
Resume - Gagan GuptaResume - Gagan Gupta
Resume - Gagan Gupta
 
Resume (MES) Online
Resume (MES) OnlineResume (MES) Online
Resume (MES) Online
 

Andere mochten auch

Andere mochten auch (9)

Presentation3 johari
Presentation3 johariPresentation3 johari
Presentation3 johari
 
Evaluation media
Evaluation mediaEvaluation media
Evaluation media
 
Derecho internacional privado
Derecho internacional privadoDerecho internacional privado
Derecho internacional privado
 
Minuta 9
Minuta 9Minuta 9
Minuta 9
 
Prorpiedad intelectual
Prorpiedad intelectualProrpiedad intelectual
Prorpiedad intelectual
 
Letter_of_completion
Letter_of_completionLetter_of_completion
Letter_of_completion
 
Minuta 18puente grupal 1
Minuta 18puente grupal 1Minuta 18puente grupal 1
Minuta 18puente grupal 1
 
Projeto Grafico Editorial - 2 Sem 2015
Projeto Grafico Editorial - 2 Sem 2015Projeto Grafico Editorial - 2 Sem 2015
Projeto Grafico Editorial - 2 Sem 2015
 
Strategia Korporacyjna Grupy SARE S.A.
Strategia Korporacyjna Grupy SARE S.A. Strategia Korporacyjna Grupy SARE S.A.
Strategia Korporacyjna Grupy SARE S.A.
 

Ähnlich wie Giridhar Injam Profile

Ähnlich wie Giridhar Injam Profile (20)

QA Lead profile
QA Lead profileQA Lead profile
QA Lead profile
 
Neha_Verma_Resumeupdated
Neha_Verma_ResumeupdatedNeha_Verma_Resumeupdated
Neha_Verma_Resumeupdated
 
Umesh Resume
Umesh ResumeUmesh Resume
Umesh Resume
 
Satyajit More_Testing_Engineer
Satyajit More_Testing_EngineerSatyajit More_Testing_Engineer
Satyajit More_Testing_Engineer
 
JAVED SAYYED RESUME
JAVED SAYYED RESUMEJAVED SAYYED RESUME
JAVED SAYYED RESUME
 
Resume_Sathishkumar Kothandan_BA and QA_H1B Visa
Resume_Sathishkumar Kothandan_BA and QA_H1B VisaResume_Sathishkumar Kothandan_BA and QA_H1B Visa
Resume_Sathishkumar Kothandan_BA and QA_H1B Visa
 
Sreedhar_Bandaru_M
Sreedhar_Bandaru_MSreedhar_Bandaru_M
Sreedhar_Bandaru_M
 
KotaSriHarsha
KotaSriHarsha KotaSriHarsha
KotaSriHarsha
 
Vishvas resume business_analyst_7_year_exp
Vishvas resume business_analyst_7_year_expVishvas resume business_analyst_7_year_exp
Vishvas resume business_analyst_7_year_exp
 
Vishvas resume business_analyst_7_year_exp
Vishvas resume business_analyst_7_year_expVishvas resume business_analyst_7_year_exp
Vishvas resume business_analyst_7_year_exp
 
Resume
ResumeResume
Resume
 
CV_PraveenKonda_CCIVR
CV_PraveenKonda_CCIVRCV_PraveenKonda_CCIVR
CV_PraveenKonda_CCIVR
 
Suresh Veluguri_BA
Suresh Veluguri_BASuresh Veluguri_BA
Suresh Veluguri_BA
 
Durga Khattry_PM
Durga Khattry_PMDurga Khattry_PM
Durga Khattry_PM
 
Resume_QA Analyst_Projects__VurukutiNarasingaRao
Resume_QA Analyst_Projects__VurukutiNarasingaRaoResume_QA Analyst_Projects__VurukutiNarasingaRao
Resume_QA Analyst_Projects__VurukutiNarasingaRao
 
JAVED SAYYED RESUME (2)
JAVED SAYYED RESUME (2)JAVED SAYYED RESUME (2)
JAVED SAYYED RESUME (2)
 
CV_Thirumalai_1.0
CV_Thirumalai_1.0CV_Thirumalai_1.0
CV_Thirumalai_1.0
 
Soumyabrata Moulick-Business Analyst
Soumyabrata Moulick-Business AnalystSoumyabrata Moulick-Business Analyst
Soumyabrata Moulick-Business Analyst
 
VidyaManjunath_CV
VidyaManjunath_CVVidyaManjunath_CV
VidyaManjunath_CV
 
Anil Kumar
Anil KumarAnil Kumar
Anil Kumar
 

Giridhar Injam Profile

  • 1. Profile Giridhar Injam Giridhar Injam Tata Consultancy Services Email: giridhar.toshani@gmail.com, giridhar.thejaswani@gmail.com Phone: +91 7871628949 Experience Summary • 13+ years of experience in testing in these 10+ years of extensive experience in performance testing & engineering and 3+ years of functional & automation testing. • Since Joining TCS, I have worked as a Performance Test consultant Prior to TCS I had worked as Test Manager and Lead in Performance Testing and Engineering and Functional automation testing handling around 16-25 resources, RFI, RFP, Plan & estimation and capacity planning, Has Experience in ERP- SAP, Seibel, Telecom, Retail and Web services. • Prior to TCS I had gained experience in Financial, Telecom, Consumer Products, Hospitality, Healthcare and Procurement domain in performance testing and Functional Testing in Leading MNC’s. • Worked as on-site Coordinator in UPC, in Amsterdam, Netherlands on 2007 • Worked as performance test consultant in TM, in Malaysia on 2014 and 2015 • Preparing Performance Test Plan, Estimation, Load Modelling, analysing & reviewing the requirements, test scripts creation, execution, monitoring, identifying bottlenecks and potential root causes and provide solution analysis report generation and final summary report. • Preparing Functional Test Plan, Test Strategy, Estimation, Budget Allocation, Resource Allocation and Management, Conducting various types of Tests, review of test case and analysis of reported defects based on the category and assigning responsibilities to various development teams and preparing Final Test Summary Report. • Conducting Case / System / Process Study for project planning, scoping, estimation and tracking. • Implementation of project plans within deadlines. Team mentoring, deployment, monitoring and development. • Defining best practices for project support and documentation. Recruitment, training and counselling of processing associates. • Involve in Tools evaluation and tools suggestions and i have done the POC for various performance testing tools to the client, in functional automation and performance testing and engineering. • Preparing the RFP/RFI for the new client and existing client for getting the new Projects Page 1 of 19
  • 2. Profile Giridhar Injam Technology Page 2 of 19 Hardware Software Products Tools Domains Electronics circuits, digital systems and micro processor. OS – Windows 98,windows 2000,Windows XP,Windows 7,Unix Databases – Oracle 9i ,SQL Server Performance Testing Tools – Load Runner, OATS, RPT, J meter, Silk Performer, HTTP Watch, Neoload, VSTS and Soasta. Monitoring Tools – Perfmon, Site scope, Intro scope, Zabbix, Negios and IBM Tivoli Functional Testing Tools – Winrunner, QTP, selenium and UFT Defect Tracking Tools – ALM, Quality Center, Rational Clear Quest, Bugzilla, PR-Tracker, Test director and IPC Configuration Tools – Rational Clear Case and Visual Source Safe Healthcare & Financial & Banking, Telecom, Consumer Products, Procurement, Hospitality, Web based Applications, Airline and Insurance Domain.
  • 3. Profile Giridhar Injam Qualifications Degree and Date Institute Major and Specialization Bachelor of Engineering May 2002 Periyar University Electronics and Communication Engineering Project Thesis Project Title BOD, CMS Company TCS Customer Lufthansa Period March 2015 – Till date Description • Deutsche Lufthansa AG is an air traffic company with global operations. • The Lufthansa Group includes more than 400 subsidiaries and affiliated companies. • Lufthansa flies to 18 domestic destinations and 193 international destinations in 81 countries across Africa, Americas, Asia, and Europe (as of April 2014). This includes destinations served by subsidiaries Lufthansa City Line and Lufthansa Regional as well as those operated on behalf of Lufthansa by Private Air. • Lufthansa is one of the five founding members of the Star Alliance, the world's largest airline alliance, formed in 1997. Page 3 of 19
  • 4. Profile Giridhar Injam Responsibilities  Understanding the functional and Non Functional Requirements and validating against the Non Functional environment.  As a NFT test consultant and involved in identify the scope for NFT testing and finalise the business scenarios for performance testing.  Prepared the tool evaluation and completed the POC on Neoload Tool.  Preparing the Estimation and Plan and test strategy for NFT and Performance Engineering  Preparing the various types of metrics and capacity planning for the testing.  Preparing the work Load model and scheduling the business scenarios for performance test execution  Responsible for communicating with customer, business team to resolve technical issues  Actively attend meetings with fellow testers and other groups to evaluate the progress and Status of the application.  Competent in managing, reviewing and monitoring the SQA test process in a project  Excellent knowledge of Offshore/Onshore model and have experience in the product/services project activities. Project Title ICP/NOVA/GEMS Company TCS Customer Telekom Malaysia (TM) Period Sep 2014 – March 2015 Description ICP System ICP supports the end to end operations for TM Broadband product segment, commercial name ‘Streamyx’. A copper ADSL based service. NOVA System NOVA supports the end to end operations for TM High Speed Broadband (HSBB) product segment, commercial name ‘UniFi’. A fiber optic ADSL2, VDSL based service. GEMS System GEMS stands for Group Enterprise Resource Management System. GEMS is a major initiative by the Management of TM and the GEMS Project Team is responsible for its development. GEMS will standardize back office operations such as finance, material management and human resource management for TM and its subsidiaries using SAP as the Enterprise Resource Planning (ERP) computing infrastructure. Page 4 of 19
  • 5. Profile Giridhar Injam Responsibilities  Handle with 8 member team offshore and onshore performance test consultant for TM.  Understanding the functional and Performance Requirements and validating against the performance environment.  Involved in identify the scope for performance testing and finalise the business scenario’s for performance testing.  Preparing the Estimation and Plan and test strategy for performance testing and Engineering  Preparing the various types of metrics and capacity planning for the testing.  Involved and reviewed in generating scripts using Loadrunner tool and reviewing all our scripts standards, test data support  Preparing the work Load model and scheduling the business scenarios for performance test execution  Developed two assets for the client team  Responsible for communicating with customer, business team to resolve technical issues  Actively attend meetings with fellow testers and other groups to evaluate the progress and Status of the application.  Identifying the Performance bottle neck and giving the root cause to the project team.  Competent in managing, reviewing and monitoring the SQA test process in a project  Excellent knowledge of Offshore/Onshore model and have experience in the product/services project activities. Project Title hp shopping portal Company TCS Customer HP Period Aug 2014 – Sep 2014 Description Re-design of HP online shopping website into a single, state of the art ecommerce application for B2B and B2C solutions. The new system is anticipated to improve the quality of the customer experience, generating important benefits to HP and its customers. and its customers Page 5 of 19
  • 6. Profile Giridhar Injam Responsibilities  Handle with 7 member team automation and performance testing for hp shopping portal.  Understanding the functional and Performance Requirements and validating against the performance environment.  Involved in validate the performance and automation test Scripts and test suits  Developed new automation frame work for selenium tool for improving the performance of test execution effort.  Preparing the various types of metrics and capacity planning for the testing.  Preparing the work Load model and scheduling the business scenarios for performance test execution  Responsible for communicating with customer, business team to resolve technical issues  Actively attend meetings with fellow testers and other groups to evaluate the progress and Status of the application.  Identifying the Performance bottle neck and giving the root cause to the project team.  Competent in managing, reviewing and monitoring the SQA test process in a project  Excellent knowledge of Offshore/Onshore model and have experience in the product/services project activities. Project Title Pre-sales Company TCS Software used Performance and Automations testing proposals Period Feb 2013 – July 2014 Responsibilities  Understanding the Business requirements of the application or Product for new proposals  Involved in identify the architecture of the product and identify the end to end functional flow.  Preparing the RFP, RFI and estimation performance testing and Engineering  Preparing the various types of metrics and capacity planning for the testing.  Preparing the work Load model and scheduling for business scenarios  Responsible for communicating with customer, business team to resolve technical issues  Actively attend meetings with fellow of team members and other groups to evaluate the progress and Status of the pre sales.  Assessment for the all Telecom performance testing and engineering projects in Chennai location. Project ebay/GSI Company Accenture Page 6 of 19
  • 7. Profile Giridhar Injam Customer Ebay PayPal Period Aug 2013 – Jan 2014 Description GSI Commerce, Inc. was formerly known as Global Sports Inc. GSI one of eBay’s three main business units, alongside eBay Marketplaces and online payments provider PayPal. GSI Commerce, Inc. provides e-commerce and interactive marketing solutions for brands and retailers. It offers e- commerce technology solutions, which include Web store, a platform to manage the entire online purchasing process; and multichannel solutions; order management solutions, such as payment processing services; and infrastructure and operational services. The company's e-commerce operations comprise fulfilment solutions, such as facilities and infrastructure, personalization and customization, and integration services; and customer care services, including scalability, quality monitoring, integrated CRM system, e- commerce and multichannel support, and brand training services. It also offers marketing services, such as digital agency, enterprise email marketing, mobile advertising, affiliate marketing, ad re-targeting, and in-depth analytic services. The company serves brand and retail clients, such as apparel, accessories and footwear, toys and baby products, sporting goods and apparel, consumer electronics, entertainment media, health and beauty, home goods, appliances and hardware, speciality foods, jewellery, and gifts and general merchandise solutions. It helps to innovate, effectively represent your brand, integrate new channels and penetrate new markets--all with great speed and efficiency. The eBay Enterprise commerce technologies portfolio drives online business growth by providing an industry leading consumer experience, ultimately strengthening brand loyalty by connecting consumers with your brand. Responsibilities  Handle with 8 member performance engineering team for ebay/GSI .  Understanding the functional and Performance Requirements and validating against the performance environment.  Involved in identify the business scenarios for performance test Scripts.  Preparing the Estimation and Plan and test strategy for performance testing and Engineering  Preparing the various types of metrics and capacity planning for the testing.  Involved in generating scripts using Loadrunner tool and reviewing all our scripts standards, test data support  Preparing the Load model and scheduling scenarios for execution  Analyzing the results and sending the Report to Business team.  Responsible for communicating with customer, business team to resolve technical issues  Actively attend meetings with fellow testers and other groups to evaluate the progress and Status of the Page 7 of 19
  • 8. Profile Giridhar Injam application.  Identifying the Performance bottle neck and giving the root cause to the project team.  Competent in managing, reviewing and monitoring the SQA test process in a project  Excellent knowledge of Offshore/Onshore model and have experience in the product/services Project Integrated Project Management Company Accenture Customer NSN Period Feb 2013 – Aug 2013 Description IPM (Integrated Project Management) Application is a Nokia Siemens Networks wide project management application. Key features include project tracking, site management, documentation management & Reporting. Currently IPM is actively used globally. IPM is an enterprise solution supporting several projects/vendors globally. The solution will act as a central hub for all project stakeholders. It will enhance collaboration, information retrieval and decision-making of stakeholders, thereby supporting a speedy and cost-effective project outcome.From the technology front IPM is build on Java technology and also host’s BO and EMC Documentum. This application also has a SAP interface. Additionally IPM is supported through mobile client consisting of limited features. This client can be installed over a mobile device (currently in scope is Nokia C5). Current release delivery practices will be followed in all areas: IPM, SAP and NAIP will reuse their existing environments and processes. The objective of this IPM release is to bring in performance improvements and business related changes in progress tracking module. Also part of this release the documentum applet is being replaced with an alternate solution to eliminate the client (browser) dependency on this functionality. This also brings in change in the usability of the functionality. Responsibilities  Handle with 25 member team for NSN – IPM 7.1 release.  Understanding the functional and Performance Requirements and validating against the performance environment.  Involved in identify the business scenarios for performance test Scripts.  Preparing the Estimation and Plan and test strategy for the functional, Automation and performance testing.  Preparing the various types of metrics and capacity planning for the testing.  Involved in generating scripts using Loadrunner tool and reviewing all our scripts standards, test data support  Preparing the Load model and scheduling scenarios for Page 8 of 19
  • 9. Profile Giridhar Injam execution  Analysing the results and sending the Report to Business team.  Responsible for communicating with customer, business team to resolve technical issues  Actively attend meetings with fellow testers and other groups to evaluate the progress and Status of the application.  Identifying the Performance bottle neck and giving the root cause to the project team.  Competent in managing, reviewing and monitoring the SQA test process in a project  Excellent knowledge of Offshore/Onshore model and have experience in the product/services project activities. Project Regulatory Content Authoring and Management & Clinical Portal & Collaboration Company Accenture Customer Merck Period Aug 2012 – Jan 2013 Description Merck & Co., Inc. is a global research-driven pharmaceutical company established in 1891. Merck discovers, develops, manufactures and markets vaccines and medicines to address unmet medical needs. They have provided services on the different Business Area like Global Health Care, Merck Research Lab etc. RCAM (Regulatory Content Authoring and Management) is a FirstDoc – Documentum based application that facilitates the cross- departmental collaborative preparation, compilation, and management of content for Submissions. There will be millions of new documents and we want to measure how to adding those impacts system performance and Users will access both via Citrix and Non Citrix environment. CPAC (Clinical Portal & Collaboration) is a portal and collaboration framework or platform upon which portal applications can be built. It will be used to surface new and existing CRIS applications and appropriate services. CPAC will have an external focus in direct of clinical trials and submission management. It is intended to enhance the relationship with external partners and improve the level of communication. It will also enhance document flow by providing a central Access point to clinical trial documents. It allows users to organize thoughts and ideas, manage information for meetings, presentations, projects and proposals Page 9 of 19
  • 10. Profile Giridhar Injam Responsibilities  Handle with 6 member team for various capital projects and regular maintenance releases for Merck.  Understanding the Performance Requirements and validating against the performance environment.  Involved in identify the business scenarios for performance test Scripts.  Preparing the Estimation and Plan and test strategy for the performance testing.  Preparing the various types of metrics and capacity planning for the performance testing.  Involved in generating scripts using Loadrunner tool and reviewing all our scripts standards, test data support  Preparing the Load model and scheduling scenarios for execution  Analysing the results and sending the Report to Business team.  Responsible for communicating with customer, business team to resolve technical issues  Actively attend meetings with fellow testers and other groups to evaluate the progress and Performance of the application.  Identifying the Performance bottle neck and giving the root cause to the project team. Project First data Company Accenture Customer First data Period November 2011 - July 2012 Description First Data Corporation is an American payment processing company. First Data is a provider of electronic commerce and payment solutions. The company's portfolio includes merchant transaction processing services; credit, debit, private-label, gift, payroll and other prepaid card offerings; fraud protection and authentication solutions. Electronic check acceptance services through Tele Check as well as Internet commerce and mobile payment solutions. The company's STAR Network offers PIN- secured debit acceptance at ATM and retail the e-Customer Service application enables customers to access their accounts via the Internet. Customers can log into a secure Web site to view account information, update personal data, perform account maintenance, and request specific services. Responsibilities  Handle with 8 member team for various capital projects and regular maintenance releases for First data.  Understanding the Performance Requirements and validating against the performance environment.  Involved in identify the business scenarios for performance test Scripts.  Preparing the Estimation and Plan and test strategy for the performance testing.  Preparing the various types of metrics and capacity Page 10 of 19
  • 11. Profile Giridhar Injam planning for the performance testing.  Involved in generating scripts using RPT tool and reviewing all our scripts standards, test data support  Preparing the Load model and scheduling scenarios for execution  Analysing the results and sending the Report to Business team.  Responsible for communicating with customer, business team to resolve technical issues  Actively attend meetings with fellow testers and other groups to evaluate the progress and Performance of the application.  Identifying the Performance bottle neck and giving the root cause to the project team. Project Star wood Hotels & Resorts Company Accenture Customer Star wood Hotels & Resorts Period November 2009 - October 2011 Description Star wood’s current legacy CRS system "Starlink" which handles $14 billion in bookings per year is being transitioned to a web services based SOA CRS system named "Valhalla". This is a complete ground-up development project using web services to provide business flexibility in integrating with other systems such as Property Management Systems, Call Center Application (Saratoga), and consumer web site, other CRS systems, etc. The idea is to increase scalability while slashing maintenance costs by relying on Web Services standards. The entire Performance Team was given the responsibility of complete Performance testing tasks to identify bottlenecks early in the development cycles of the Web services and later when these are being integrated with other GUI enterprise applications. Channels: Saratoga, Branded web and Meetings are the various modes of booking available for the customers to book the Star wood hotels CRM: Customer relationship management is maintained using the CRM applications like Guest Communication, CEM/CSF, SVO and SGR CRS: CRS (Central Reservation System) is the heart of the Star wood project and it has 8 Valhalla engines maintains the booking, inventory, POE and Rex etc Sales: Sales is independent part of the Valhalla engines and take care of the Franchise, owned and managed hotels using the independent applications like ABCD and Star wood one etc Page 11 of 19
  • 12. Profile Giridhar Injam Responsibilities  Handle with 16 member team for various capital projects and regular maintenance releases for Star wood Hotels & Resorts.  Understanding the Performance Requirements and validating against the performance environment.  Involved in identify the business scenarios for performance test Scripts.  Preparing the Estimation and Plan and test strategy for the performance testing.  Preparing the various types of metrics and capacity planning for the performance testing.  Trained 4 members team in OATS tools  Involved in generating scripts using Loadrunner, HTTP Watch and OATS tools and reviewing all our scripts standards, test data support  Preparing the Load model and scheduling scenarios for execution  Analysing the results and sending the Report to Business team.  Responsible for communicating with customer, business team to resolve technical issues  Actively attend meetings with fellow testers and other groups to evaluate the progress and Performance of the application.  Identifying the Performance bottle neck and giving the root cause to the project team. Project Global Wealth Investment Management Company Accenture Customer Bank of America Period February 2009 - October 2009 Description Bank of America GWIM (Global Wealth Investment Management) - The Wealth Management Online Channel is a customer facing website whose goal is to provide clients of the WIM lines of business with unique and differentiated services and experiences. CMO (Client Management Online) -CMO is a Siebel application, mainly intended to provide a single CRM framework for the Bank Associates to better manage and report on their client portfolio & the application involves modules on Entities/Activities/Opportunities/Relationships/Referrals/List Management. GCC Referrals Reporting -A new web-based user interface GCC Referrals Reporting is built and used by the GCC users (Bank Associates) as a centralized repository to retrieve canned reports, manage referral work flow and to perform analysis of base reporting data using a business intelligence tool called Micro Strategy. The GCC Portal contains a work flow Home Page, a Reporting Home page and Toolbar links and functions that will launch reports and perform GCC operational Page 12 of 19
  • 13. Profile Giridhar Injam functions. The reporting home page will display templates and dashboard summary data that will populate upon access to the application. Responsibilities  Understanding the Performance Requirements and validating against the performance environment.  Involved in identify the business scenarios for performance test Scripts.  Preparing performance test scripts and using Performance Center I have schedule the scenarios for execution and analysing the results and sending the detailed Report to Business team.  Identifying the Performance bottle neck and giving the root cause to the project team.  Handle with4 member team for black box testing, system testing, System Integration Testing  Preparing the Estimation and Plan and test strategy for the Functional Automation testing.  Trained 4 members team and handle the QTP Automation functional testing team for BCP Project and for Bug Tracking using QC  Responsible for communicating with customer, business team to resolve technical issues  Actively attend meetings with fellow testers and other groups to evaluate the progress and Performance of the application Project Procter & Gamble (P&G) Company Accenture Customer Procter & Gamble (P&G) Period November 2007 - January 2009 Description P&G’s work is driven by a Purpose of providing branded products and services of superior quality and value to improve the lives of the world’s consumers now and for generations to come. P&G’s growth strategy, inspired by our Purpose, is to touch and improve more consumers’ lives in more parts of the world, more completely. iBP( Integrated Business Planner) - Global application that has been customized to meet Customer Teams’ as well as MS&P Market Strategy and Planning - Internal North America Market & Development Organization ( NA MDO) responsible for Strategic Development business needs for trade fund management, payment and promotion planning. The tool enables integration with the Company’s other Systems and has been identified by IDS Information & Decision Solutions - Key business development organization responsible for internet and computer systems and solutions as the best technology (Siebel) for future enhancements Optima- Global application system solution to enable the funding, planning, tracking and control of MDA trade funds as well as a basic module for payout calculation. The tool enables integration with the Company’s other Systems and has been identified by IDS Information & Decision Solutions - Key Page 13 of 19
  • 14. Profile Giridhar Injam business development organization responsible for internet and computer systems and solutions as the best technology (Siebel) for future enhancements Responsibilities  Understanding the Performance Requirements and validating against the performance environment.  Involved in identify the business scenarios for performance test Scripts.  Preparing performance test scripts and using Performance Center I have schedule the scenarios for execution and analysing the results and sending the detailed Report to Business team.  Handle with3 member team for black box testing, system testing, System Integration Testing  Preparing the Functional Automation testing proposal to the project team.  Responsible for communicating with customer, business team to resolve technical issues  Actively attend meetings with fellow testers and other groups to evaluate the progress and Performance of the application Project AT-Web Channel migration to PE platform Company Tech Mahindra Customer UPC Period February 2007 - October 2007 Description In order to align the web architecture of Austria the existing functionality of UPC AT Web Channel will be implemented using the standard Pan European software. The Pan European Single Sign On component, transferring the functionality of the AT Web Channel to the PE PHP code base and implementing a new PE Bank details component also. AT, CH, CZ, HU, SK, IE, NL, PL and RO different countries’ Web Channel migration to standard PE platform Responsibilities  Worked as on-site coordinator for UPC,in Amsterdam, Netherlands  Handle with 5 member team for black box testing, system testing, System Integration Testing  Preparing & Reviewing the system test cases and Integration Test Cases.  Test Case execution for overall functionality  Bug Reporting using IPC.  Preparing the Functional Automation and Performance testing proposal to the project team.  Understanding the Performance Requirements and validating against the performance environment.  Involved in identify the business scenarios for performance test Scripts.  Preparing performance test scripts and using Loadrunner I have schedule the scenarios for execution and analysing the results and sending the Page 14 of 19
  • 15. Profile Giridhar Injam detailed Report to Business team.  Preparing the Functional Automation testing proposal to the project team.  Responsible for communicating with customer, business team to resolve technical issues  Actively attend meetings with fellow testers and other groups to evaluate the progress and Status Reports and Performance of the application Project Enterprise Strategic Procurement (ESP) Company Hewlett and Packard Customer hp Period September 2006 - January 2007 Description ESP is global sourcing portal for HP’s Indirect, Services and Direct Procurement professionals. It was customized to meet HP specific needs from Ariba Spend Management suite. It provides the functionality in areas of e-Sourcing, ACM and Analysis. Responsibilities  Preparing the System & Performance Test Plan  Reviewing the system test cases  Test Case execution for overall functionality  Bug Reporting using PR-Tracker.  Involved in identify the business scenarios for performance test Scripts.  Preparing performance test scripts and using Loadrunner I have schedule the scenarios for execution and analysing the results and sending the detailed Report to Business team.  Responsible for communicating with customer, business team to resolve technical issues  Actively attend meetings with fellow testers and other groups to evaluate the progress and Status Reports and Performance of the application Project Digital Media Solution SE Company Hewlett and Packard Customer hp Period March 2006 - August 2006 Description HP Digital Media Solution, standards-based technology that automates the work flow for broadcasters and network operators, as well as a new workstation line-up with enhancements in performance and mobility for video editors and animators. It enables broadcasters and network operators to automate every aspect of the digital work flow, from creation of new Page 15 of 19
  • 16. Profile Giridhar Injam content, through editing, processing and storage, to archiving and retrieval. It is build on top of a DMS Core architecture to reduce the complexity and cost of building a complete Media Life-Cycle Management system. The DMS Core facilitates development of critical media solutions that capture, produce, manage, re-purpose, store and archive digital media assets in a multi-platform and multi-vendor environment. Responsibilities  Preparing the System & Performance Test Plan  Reviewing the system test cases and execution for overall functionality Reporting using Bugzilla  Involved in identify the business scenarios for performance test Scripts.  Preparing performance test scripts and using Loadrunner I have schedule the scenarios for execution and analyzing the results and sending the detailed Report to Business team.  Responsible for communicating with customer, business team to resolve technical issues  Actively attend meetings with fellow testers and other groups to evaluate the progress and Status Reports and Performance of the application Project Account Reconciliation Tracking Tool (ARTT) Company Hewlett and Packard Customer hp Period March 2006 - August 2006 Description ARTT is an Administration tracking tool for Reconciliation of Accounts used by HP World Wide. Account Reconciliation process is through various users of Hierarchy by different follow-up modules which involves: 1. Definition and Review of Organization hierarchy. 2. Defining various Roles for the users and Allocation of Reconciliation Assignment. 3. Definition of Account granularity and defining the limits like: When a particular Account needs to be Reconciled, tool/Template to be used and further actions of escalations if needed. 4. Reconciliation process starts by tracking the Accounts at Primary, Secondary and Legacy levels. 5. Ends by Reconciling an Account by using Tools called templates [Generic, Fixed Assets, Pre-Payment Deferrals and Bank]. 6. Quality of Work done [Reconciliation] is measured by maintaining the Quality score card on each Account Reconciliation which was done by various users. 7. Status Reports of are available at Account level, Regional Level and various Hierarchal levels. Page 16 of 19
  • 17. Profile Giridhar Injam Responsibilities  Preparing the System & Performance Test Plan  Reviewing the system test cases and execution for overall functionality Reporting using HP-ezilla  Involved in identify the business scenarios for performance test Scripts.  Preparing performance test scripts and using Loadrunner I have schedule the scenarios for execution and analysing the results and sending the detailed Report to Business team.  Responsible for communicating with customer, business team to resolve technical issues  Actively attend meetings with fellow testers and other groups to evaluate the progress and Status Reports and Performance of the application Project Privacy View Company Genisys Period March 2004 - April 2005 Description This is a personalized document system. The main aim of the product is to privatize the user’s Internet browsing session, and provide the document management for the downloaded files during that session, which is not even visible to the other users having access to the machine. Privacy View versions (1.0, 1.1 and 1.2) in this 1.2 version we done the customer prioritized testing. The main focus of this testing is robustness and performance. Responsibilities  Analysed User requirements and functionality study  Test Case Generation and execution and posting defects for system and regression testing  Bug Reporting using Test director  Performed Module Functionality and GUI  Performed Load testing using Astra load  Actively attend meetings with fellow testers and other groups to evaluate the progress and Performance the application. Project Maintaining Word Pad in Web Site Company Genisys Customer Kendall Technologies USA. Period June 2003 – February 2004 Description This is a replication of Microsoft Word, designed for Kendall Technologies USA. This is a Word Processor for online editing the text documents and web pages. Actually this is for Kendall Tech., providing free space for their clients. In that space they can store their files. If they have any text based documents and if they want to edit it, can use this word processor for online editing and need not go for download the entire document for modifications. In this word processor we are providing all Page 17 of 19
  • 18. Profile Giridhar Injam necessary text editing tools. Responsibilities  Analysed User requirements and functionality study  Preparing and documenting the test conditions and test cases  Responsible for the execution of test cases, and posting defects for system and regression testing  Bug Reporting using Test director  Performed Module Functionality and GUI  Performed Load testing using Loadrunner  Actively attend meetings with fellow testers and other groups to evaluate the progress and Performance the application. Project Application Automation process Company Genisys Period October 2002 - May 2003 Description This application is a automating the process. This application automates the process of transferring of files from and to the production server, QC server, raw server and Backup server. This process ensures that the directory is locked in the production server, so that the developer will not access to write to the server unless the QC is over visa versa for Raw Server and Backup server. It synchronizes the Raw materials, Production and Quality control. Responsibilities  Analysed User requirements and functionality study  Preparing and documenting the test conditions and test cases  Responsible for the execution of test cases, and posting defects for system and regression testing  Bug Reporting using Test director  Updating the Test Logs with the results of the Testing process  Actively attend meetings with fellow testers and other groups to evaluate the progress and Performance the application. Key Competencies & Skills My Competency Profile and my soft skills includes the following Skill Proficiency Performance testing Expert Performance engineering Expert Page 18 of 19
  • 19. Profile Giridhar Injam Load Runner, OATS, RPT, J meter, Silk Performer, HTTP Watch, Neoload, VSTS and Soasta. Expert Winrunner, QTP, selenium and UFT Intermediate ALM, Quality Center, Rational Clear Quest, Bugzilla, PR-Tracker, Test director and IPC Expert Perfmon, Site scope, Intro scope, Zabix, Nagios and IBM Tivoli Expert Rational Clear Case and Visual Source Safe Intermediate Personal Details Date of Birth 18/01/1981 Nationality Indian Passport Details Name as on passport Relations hip Passport Number Date of Issue Expiry Date Place of Issue Giridhar Injam Self F7581991 20/04/2006 19/04/2016 Hyderabad Page 19 of 19