DC MACHINE-Motoring and generation, Armature circuit equation
Â
2015 03 31 cv giovanni koolman.docx lattes update jan 2016
1. GIOVANNI S. KOOLMAN
Sabana Basora #180 Aruba Dutch Caribbean
Phone: Aruba 297.585.6866 (H); 297 569.3496 Aruba (Mobile)
Date of Birth: June 20, 1965
Nationality: Dutch
Languages: English,Dutch, Spanish and Papiamento
Email): giovanni.koolman@gmail.com,giovannikoolman@hotmail.com
SUMMARY
A SENIOR ELECTRICAL ENGINEER with 20 years of successful career whileconsistently leading responsiveteams in
Maintenance, Electrical Reliability,E&I ProjectManagement, QA/QC activities - Steam and Gas turbines,
Pumps, Mechanical,piping and Water plants acrosstheoil & gas industry |Managed multi-disciplinegroups in
successful completion of major EPC projects
CORE COMPETENCIES
Pumpsâ repair and servicing | QA/QC Controller and E&I Electrical standards | Steam and Gas Turbinegenerator
operation / turnaround - GE 7FA Gas Turbines | Installation / testing/ preventive maintenanceof substation -
transformer, HV switch gear and Protection Relays | Utilities Operations / preventive maintenance
implementations - boilers,Water plant/ reverse osmosis | Projectmanagement/Project engineering /
Maintenance / Turnaround of major equipment | Refinery commissioning / turnaround / maintenance - Crude
Distillation / Vacuum / Coker / Hydro treating units | Conversant with HAZOP, MOC and PSSR
PROFESSIONAL EXPERIENCE
British Petroleum Angola | Luanda, Angola | June 2014 to Present
ï§ Operator ofspread-moored Greater PlutonioFPSO, located at a water depthof 1300 meters with all production, gas
and water injection wells being subsea
SENIOR ELECTRICAL ENGINEER / PLANNER
ï· Acts as the onshoreSingle PointAccountability of activities fromplanningthrough execution for assigned
Equipment Classes involving13,722 Electrical tagnumbers
ï· Initiates countless Technical Queries/ Management of Change for the electrical discipline
ï· Reviews Electrical Safety Critical Equipment/ Major Accident Critical EquipmentWork Plans to ensure that
Job Plans arefully loaded with Tasks,Labor, Durations,Materials,and PreventiveMaintenance Procedures
ï· Provided Electrical Team Leader with 642 long range (8 Quarters) activities till 2016 to support awareness
of the Critical Activity Planning(CAP) work orders and associated budget considerations.
Citgo (Tacoa power plantCaracas Venezuela) 2013 to March 28,2014
MAINTENANCECOORDINATOR
ï· Developed a preventive maintenance programfor two GE 7FA (175 MW) power barges and major
overhauling of both units;provided trainingto the plantpersonnel and consultants.Installation of the new
hydrogen system for the generator cooling systems and renewable of the water injection system for the
power barges ( Josefa Rufina and Margarita).
CRU (Curacao Refinery) Curacao 2011 to May 12,2013
PROJECTMANAGER
ï· Led the successful major overhaul of four Mitsubishi 22.5 MW steam turbine, one 1959 stork steam
turbine, one stork 135-Ton boiler and three Mitsubishi 210-Ton boilers
ï· Completed the CRU Projectdeliverables whilesupervising CRUpersonnel and managing contractors
ï· Provided project progress reports on major turnaround of the Curacao utility plant,includingmechanical,
painting,process equipment,insulation and instrumentation
2. Resume -Giovanni S. KOOLMAN
Page 2 of 3
ï· Ensured coordination between the PlanningTeam and the PurchasingDepartment for all procurement
activities
ï· As directreport to the Major Projects Director,managed electrical engineeringactivities atthe Utility Plant
ï· Assisted operations and maintenancedepartment in investigations duringmajor electrical system
disturbances
ï· Reviewed engineering design of all major equipment such as transformers,switchgear,MCC, l argemotors
and feeders
ï· Participated in HAZOP and PSSR (Pre-Start-up Safety Review) meetings.
WEB Aruba Veolia Solutions & Technologies 2010 to Sept. 2011
PROJECT COORDINATOR
ï· Co-led the instrumentation and electrical quality assuranceand quality control team
ï· Using Veolia water technology web Aruba SWRO#2 Sea Water Reverse Osmosis water plant, installed
and commissioned all Utilities equipment - product lines,chemical piping,and chemical equipment
ï· Carried out inspection and witness testing of electrical equipment and installation.
ï· Provided technical and engineering support; prepared and developed instrumentation and electrical
packagefor construction work.
VALERO ARUBA REFINERY N.V., Aruba 2004 to 2009
A Fortune 500 company and largest refinery in North America producing 3.1 million barrels per day, with refining networks
from Canada, US Gulf Coast and West Coast and the Caribbean
MAINTENANCE SUPERINTENDENT â UTILITIES DIVISION 2005 to 2009
ï· Promoted in October 2005 as Superintendentwith 5 MaintenanceSupervisors and 38 skilled craft
technicians as subordinates
ï· Coordinated all EquipmentTurnarounds,Major Overhaul of Steam & Gas Turbines, re-commissioning of new
substations
ï· Scheduled and implemented preventive and predictivemaintenanceactivitiesof 6-Steam Turbines,2 Gas
Turbines,4 Major Compressors,9 Steam GeneratingBoilers,2 Desalination Units,Distribution System(440
V, 2.3 kV & 13.8 KV.) and a total of 250-Electrical Motors
ï· By implementing a Reliability and PredictiveMaintenanceProgram,reduced the breakdowns from 4 per
day to 0.
ï· Replaced the Refinery Main Sync-bus from 1000 to 2000-MVA with-out major shutdown
ï· Completed the upgradeof theSteam TurbineManual Governorto an Automatic Governor Controller
(Woodward)
ï· Reduced from1,800 to 600 all Electromechanical ProtectionRelaysby using GEMultilink Solid StateProtection
Relays
ï· Cut Reactor consumption costby US$ 80,000 per year by introducing ClipUnitto bypass13.8KVPower
Reactors
MAINTENANCE SUPERVISOR - SPECIAL ASSIGNMENTUTILITIES DIVISION 2005
In 2005 was on special assignment to the Utilities maintenance department to integrate Multi-crafting
skills into the Utilities Maintenance group; introduced and implemented the SAP MM & M System while
developing the Standard Operating Procedures for the Maintenanceactivitiesin theUtilities area
MAINTENANCE SUPERVISOR - SPECIAL ASSIGNMENT SAP IMPLEMENTATION TEAM 2004 to 2005
Assigned to CorporateSAP Implementation Teamto work on the implementationof Preventive Maintenance
Planningand Schedulingfor I& E department. Duringthis period, in an actingcapacity of E&I Maintenance
Superintendent, executed the design and implementation of the compressor panel upgrade
EL PASO ENERGY CORP.- ARUBA REFINERY N.V., Aruba. 2001 to 2004
MAINTENANCE SUPERVISOR
3. Resume -Giovanni S. KOOLMAN
Page 3 of 3
ï· Replaced 42 main feeder (13.8KV) cables refinery-wideto eliminateall feeder un-planned shutdowns
ï· Trained and developed techniciansfor High VoltageTesting and Splicingtechniques
ï· Initiated PreventiveMaintenanceand TestingProgramon all majorTransformersfrom500- kVAto 10-MVA
ï· Conducted thePCB contaminated Transformer Oil ReplacementProgram
ï· Upgraded to modern UPS solid statesystem all critical Instrumentation distribution systems
COASTAL ARUBA REFINERY N.V., Aruba 1990 to 2001
MAINTENANCE SUPERVISOR
ï· Progressed to MaintenanceSupervisorwithin 4 yearsfromentry date;assistedinrestructuring andmanagement
of employees
ï· Actively participated in thedesign,executionand implementation of the compressor panel upgrade
refinery-wide
ï· Key person in theElectrical planningand execution of Turnarounds(T/A)
ï· As the refinery main troubleshooter,commissioned theSubstationDesalination Plantand Frame-5 Gas
Turbine
VECOM TECHNICAL SERVICES B.V., Netherlands 1985 to 1990
SERVICE TECHNICIAN
ï· Worked in the Research and Development of different chemical equipment for theshipping industries
ï· Acted as company representativein the testing of ships in Rotterdam harbor, Germany, England, France and
Singaporefor Vecom products
EDUCATION
Associate Electrical Engineering | Ashwood University, USA | 2009
Assoc.Degree in Electrical Engineering Technology | Cesar Tersano MTS, Aruba | 1985
Diploma in Electrical Science| John F. Kennedy Schoolâ (LTS),Aruba | 1979
Management / Professional Training
Management in Strategic Leadership, Preventing Workplace Violence, Business Ethics, Performance
Management, Communication | Total Quality Management | Safety, Maintenance Planning, Root
Cause Analysis | Project Management | Woodward Governors, Protective Relays, Static Exciters | SAP
PROFESSIONAL AFFILIATIONS
Institute of Electrical & Electronic Engineers (IEEE)
The International Electrical TestingAssociation (NETA)
National Electrical Code(NEC)
National FireProtection Association (NFPA)
GE Enervista
STANDARDS (ELECTRICAL STANDARDSANDPRACTICES)
âą NEC (National Electrical Code)
âą NEN1010 (Electrical Installation)
âą NEN 3840 (High Voltage Installation)
âą V.A.E.P (Valero Aruba Engineering Practices)
âą DEP (Design and Engineering Practices Shell)
âą IEEE (Instituteof Electrical and Electronics Engineering)
âą NETA (International Electrical TestingAssociation)
âą API